CN105088960B - A kind of tower crane method to set up being applied on bridge - Google Patents

A kind of tower crane method to set up being applied on bridge Download PDF

Info

Publication number
CN105088960B
CN105088960B CN201510568918.0A CN201510568918A CN105088960B CN 105088960 B CN105088960 B CN 105088960B CN 201510568918 A CN201510568918 A CN 201510568918A CN 105088960 B CN105088960 B CN 105088960B
Authority
CN
China
Prior art keywords
tower crane
post strut
king
binder
lower king
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510568918.0A
Other languages
Chinese (zh)
Other versions
CN105088960A (en
Inventor
陈立生
黄永春
王兵
邓建新
张辉荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Urban Construction Municipal Engineering Group Co Ltd
Original Assignee
Shanghai Urban Construction Municipal Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Urban Construction Municipal Engineering Group Co Ltd filed Critical Shanghai Urban Construction Municipal Engineering Group Co Ltd
Priority to CN201510568918.0A priority Critical patent/CN105088960B/en
Publication of CN105088960A publication Critical patent/CN105088960A/en
Application granted granted Critical
Publication of CN105088960B publication Critical patent/CN105088960B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of tower crane method to set up being applied on bridge, it is characterised in that the tower crane method to set up comprises the steps:After the concrete placings of lower king-post strut are finished, it is provided for the built-in fitting of tower crane is installed on the top surface of the lower king-post strut;Reinforcing bar and template are installed on the top surface of the lower king-post strut and the concrete placings of upper king-post strut are completed;To eject for connecting the basic component of the tower crane on the built-in fitting of the lower king-post strut top surface, complete the installation of the tower crane afterwards on the basic component.It is an advantage of the invention that construction method is easy, it is easy to operate, construction cost can be effectively reduced.

Description

A kind of tower crane method to set up being applied on bridge
Technical field
The invention belongs to technical field of bridge engineering, and in particular to a kind of tower crane setting side being applied on bridge Method.
Background technology
It is for the setting of tower crane, extremely common in Bridges in Our Country is built.In large bridge construction it is especially Vertical transport is solved the problems, such as, often arranges tower crane to solve the problem.But, the basis of its tower crane typically can all be arranged on On cushion cap foundation, so relatively more directly perceived, stress is also clearer and more definite.
But, tower crane is set on cushion cap foundation, problems with is typically can be potentially encountered:
1)When the area of cushion cap is unsatisfactory for arranging tower crane, at this moment the side root meeting " falling through " of tower crane, can be used outstanding Choose interim bracket on suspended deck structure side to solve;Or the interim pile foundation of injection is processing;
2)When lower king-post strut is higher, it is the column stabilizing measures for solving tower crane, sometimes between lower king-post strut and tower crane pier shaft Temporary rod system is set.Built-in fitting to be set between concrete column, detrimental effect is brought to the presentation quality of concrete column;
3)When bridge floor design is more wide, original structure design can be typically " vase " style column superstructure design, To meet the stable needs of cross-section of bridge;So, the setting to tower crane brings certain difficulty.
Therefore, it is not very high structure to superstructure, while needing tower crane to solve the problems, such as vertical transport, is protecting Under the precondition of safety, high-quality, it is quick, economically realize job site Perpendicular Problems, becoming construction technical staff needs solution Problem certainly.
The content of the invention
The purpose of the present invention be according to above-mentioned the deficiencies in the prior art in place of, there is provided a kind of tower crane base being applied on bridge Plinth method to set up, the tower crane method to set up reduce tower crane tower by by the basis instrument of tower crane in the top surface of lower king-post strut The sections of body, reduces operating expenses.
The object of the invention is realized being completed by technical scheme below:
A kind of tower crane method to set up being applied on bridge, it is characterised in that the tower crane method to set up includes Following steps:After the concrete placings of lower king-post strut are finished, it is provided for the built-in fitting of tower crane is installed on the top surface of the lower king-post strut; Reinforcing bar and template are installed on the top surface of the lower king-post strut and the concrete placings of upper king-post strut are completed;By positioned at the lower king-post strut top surface Eject on built-in fitting for connecting the basic component of the tower crane, complete the peace of the tower crane afterwards on the basic component Dress.
The lower king-post strut is made up of vertically arranged column and level to the side binder and middle binder that arrange, the tower crane Supporting is installed on the side binder and the middle binder.
The basic component constitutes interim positioning by welding iron plate.
It is an advantage of the invention that(1)Solve on the basis of tower crane is arranged at cushion cap concrete or encorbelment on cushion cap foundation Performance difficulty problem during " bracket " structure, it is economical and practical;(2)Tower crane is solved because cushion cap area is not enough arranged, and is made The operation at sea of tower crane is set with interim injection pile foundation, construction cost is advantageously reduced by reducing operation at sea;(3) As tower crane is arranged on the top of concrete column, reduce the sections of tower crane tower body, i.e., the tower body in the range of the stem height, As the position for arranging is improved, the tower body structure of this section is reduced, the lease expenses of equipment is reduced.
Description of the drawings
Fig. 1 is 1/2 lower king-post strut top floor map in the present invention;
Fig. 2 is the positive elevational schematic view of 1/2 lower king-post strut in the present invention.
Specific embodiment
The feature and other correlated characteristics of the present invention is described in further detail by embodiment below in conjunction with accompanying drawing, with It is easy to the understanding of technical staff of the same trade:
Such as Fig. 1-2, in figure, labelling 1-6 is respectively:Column 1, side binder 2, middle binder 3, built-in fitting 4, tower crane 5, lateral and Diagonal brace 6.
Embodiment:As shown in Figure 1, 2, the present embodiment is specifically related to a kind of tower crane setting side being applied on bridge Method, the bridge are the short tower girder stayed-cable bridge of six tower single cable planes, and full-bridge has 6 king-towers, and each king-tower substructure tower body is highly 21-25M, two-by-two symmetrically, king-post top is made up of 2 road binders.
The tower crane method to set up by by the basis instrument of tower crane in lower king-post strut top surface to simplify construction method, and Construction cost is reduced, following steps are specifically included:
(1)The concrete placings of lower king-post strut are completed, lower king-post strut is made up of column 1, side binder 2 and middle binder 3, twice side binder 2 are symmetricly set in 3 both sides of middle binder, and three's horizontal cross is connected between twice vertical upright column 1;Install in lower king-post strut top surface Pour the reinforcing bar and template needed for upper king-post strut;It is respectively provided with built-in fitting 4 afterwards on side binder 2 with middle binder 3, built-in fitting 4 has Body is the iron plate that welding is embedded on 3 side of side binder 2 and middle binder in advance;
It should be noted that these built-in fittings 4 some be to be welded or prefabricated in factory or concentrated processing place, During in-site installation, not weld with all kinds of reinforcing bars in column 1, side binder 2 and middle binder 3, to avoid affecting lower king-post strut main body The intensity of structure;
(2)The concrete placings construction of upper king-post strut is completed, the intensity and elastic modelling quantity of upper king-post strut must reach wanting for concrete structure design Ask;
(3)Eject on default built-in fitting 4 before for connecting the basic component of tower crane, i.e. lateral and diagonal brace 6, and profit Temporary weld positioning is carried out with iron plate;
(4)The erecting and welding of tower crane 5 is completed according to the design drawing of tower crane 5;
(5)According to the administrative provisions of special equipment, carry out situ loading, and submit a report asking for relevant department carrying out an acceptance inspection.
The present embodiment has the characteristics of safe and reliable, construction is convenient, economical and practical, specifically includes following beneficial effect:
(1)Solve on the basis of tower crane is arranged at cushion cap concrete or encorbelment on cushion cap foundation " bracket " structure when reality Difficult problem is applied, it is economical and practical;
(2)Tower crane is solved because cushion cap area is not enough arranged, and tower crane is set using interim injection pile foundation Operation at sea, by reduce operation at sea advantageously reduce construction cost;
(3)As tower crane is arranged on the top of concrete column, the sections of tower crane tower body is reduced, i.e., in stem height model Tower body in enclosing, as the position for arranging is improved, reduces the tower body structure of this section, reduces the lease expenses of equipment.

Claims (2)

1. a kind of tower crane method to set up being applied on bridge, it is characterised in that the tower crane method to set up include as Lower step:After the concrete placings of lower king-post strut are finished, it is provided for the built-in fitting of tower crane is installed on the top surface of the lower king-post strut; Reinforcing bar and template are installed on the top surface of the lower king-post strut and the concrete placings of upper king-post strut are completed;By positioned at the pre- of the lower king-post strut top surface Eject on embedded part for connecting the basic component of the tower crane, complete the installation of the tower crane afterwards on the basic component; The lower king-post strut is made up of vertically arranged column and level to the side binder and middle binder that arrange, and the tower crane supporting is installed On the side binder and the middle binder;The installation of embedded parts in the middle binder and the side of the side binder, The both sides of the basic component are connected to the built-in fitting of the middle binder side and the built-in fitting of the side binder side.
2. a kind of tower crane method to set up according to claim 1, it is characterised in that the basic component is by welding Iron plate is positioned temporarily with constituting.
CN201510568918.0A 2015-09-09 2015-09-09 A kind of tower crane method to set up being applied on bridge Active CN105088960B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510568918.0A CN105088960B (en) 2015-09-09 2015-09-09 A kind of tower crane method to set up being applied on bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510568918.0A CN105088960B (en) 2015-09-09 2015-09-09 A kind of tower crane method to set up being applied on bridge

Publications (2)

Publication Number Publication Date
CN105088960A CN105088960A (en) 2015-11-25
CN105088960B true CN105088960B (en) 2017-03-29

Family

ID=54570220

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510568918.0A Active CN105088960B (en) 2015-09-09 2015-09-09 A kind of tower crane method to set up being applied on bridge

Country Status (1)

Country Link
CN (1) CN105088960B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114941284A (en) * 2022-03-04 2022-08-26 中建八局天津建设工程有限公司 Permanent-temporary combined tower crane foundation and construction method thereof

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201581409U (en) * 2009-12-25 2010-09-15 浙江中成建工集团有限公司 Combined tower crane foundation of cross beam supported by steel latticework columns in deep foundation pit
CN202787297U (en) * 2012-05-22 2013-03-13 实事集团建设工程有限公司 Tower crane base
CN203256761U (en) * 2013-05-17 2013-10-30 中建八局第三建设有限公司 Tower crane foundation arranged on top plate of basement
CN203334643U (en) * 2013-06-06 2013-12-11 浙江城建建设集团有限公司 Tower crane standard knot and structural steel combination high-altitude large-span operation frame device

Also Published As

Publication number Publication date
CN105088960A (en) 2015-11-25

Similar Documents

Publication Publication Date Title
CN107090975B (en) Formwork erecting construction method for ultrahigh large-span concrete cast-in-place beam bailey truss
CN101956457B (en) Method for constructing rectangular steel pipe concrete column
CN105350454B (en) Steel arch rib outer wrapped concrete construction method for steel trussed arch bridge
CN205443958U (en) Composite truss support of big cantilever bent cap
CN105839536A (en) Construction method of cable-stayed bridge pylon
CN103243649B (en) The system and method for a kind of cable saddle Fast Installation, location
CN105586833B (en) Stiff skeleton steel reinforcement cage global formation large-scale cast-in-place tall pier and thin wall construction method
CN104674665B (en) Large-spatial structures vestibule bridge installation method
CN105908902A (en) Positioning frame for prefabricated pier column reinforcing bar cages and construction method of pier column reinforcing bar cages
CN203440753U (en) Multifunctional steel bar locating framework
CN203487664U (en) Prefabricated concrete filled wall suspension type flexible connection
CN105317052A (en) Tower crane foundation bolt fixing method
CN102777044B (en) Hoisting method of steel-structured spraying layer of urea prilling tower
CN101838986B (en) Disassembling tool type lattice column and construction method thereof
CN104563525B (en) A kind of box steel arch beam Integral horizontal type group is to method
CN202577338U (en) Tower crane pedestal and steel cushion cap connecting device
CN106032704A (en) Construction method for using concrete columns to support structures on both sides of post-pouring strip
CN104775363B (en) The spelling method of upper king-post strut reinforcing bar sections
CN105088960B (en) A kind of tower crane method to set up being applied on bridge
CN105442453A (en) Construction method for suspension bridge tower crossbeam combination support
CN202809494U (en) Bracket for pouring 0# block to rigid continuous girder bridge
CN102296600A (en) Method for positioning middle pile of spread built subway station
CN107587770A (en) Disjunctor storehouse synchronization slding form operation method
CN103615058B (en) A kind of constraint steel plate construction of super high-rise steel plate concrete shear wall and construction method thereof
CN203429556U (en) System for quickly installing and positioning cable saddle

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant