CN105088960B - A kind of tower crane method to set up being applied on bridge - Google Patents
A kind of tower crane method to set up being applied on bridge Download PDFInfo
- Publication number
- CN105088960B CN105088960B CN201510568918.0A CN201510568918A CN105088960B CN 105088960 B CN105088960 B CN 105088960B CN 201510568918 A CN201510568918 A CN 201510568918A CN 105088960 B CN105088960 B CN 105088960B
- Authority
- CN
- China
- Prior art keywords
- tower crane
- post strut
- king
- binder
- lower king
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses a kind of tower crane method to set up being applied on bridge, it is characterised in that the tower crane method to set up comprises the steps:After the concrete placings of lower king-post strut are finished, it is provided for the built-in fitting of tower crane is installed on the top surface of the lower king-post strut;Reinforcing bar and template are installed on the top surface of the lower king-post strut and the concrete placings of upper king-post strut are completed;To eject for connecting the basic component of the tower crane on the built-in fitting of the lower king-post strut top surface, complete the installation of the tower crane afterwards on the basic component.It is an advantage of the invention that construction method is easy, it is easy to operate, construction cost can be effectively reduced.
Description
Technical field
The invention belongs to technical field of bridge engineering, and in particular to a kind of tower crane setting side being applied on bridge
Method.
Background technology
It is for the setting of tower crane, extremely common in Bridges in Our Country is built.In large bridge construction it is especially
Vertical transport is solved the problems, such as, often arranges tower crane to solve the problem.But, the basis of its tower crane typically can all be arranged on
On cushion cap foundation, so relatively more directly perceived, stress is also clearer and more definite.
But, tower crane is set on cushion cap foundation, problems with is typically can be potentially encountered:
1)When the area of cushion cap is unsatisfactory for arranging tower crane, at this moment the side root meeting " falling through " of tower crane, can be used outstanding
Choose interim bracket on suspended deck structure side to solve;Or the interim pile foundation of injection is processing;
2)When lower king-post strut is higher, it is the column stabilizing measures for solving tower crane, sometimes between lower king-post strut and tower crane pier shaft
Temporary rod system is set.Built-in fitting to be set between concrete column, detrimental effect is brought to the presentation quality of concrete column;
3)When bridge floor design is more wide, original structure design can be typically " vase " style column superstructure design,
To meet the stable needs of cross-section of bridge;So, the setting to tower crane brings certain difficulty.
Therefore, it is not very high structure to superstructure, while needing tower crane to solve the problems, such as vertical transport, is protecting
Under the precondition of safety, high-quality, it is quick, economically realize job site Perpendicular Problems, becoming construction technical staff needs solution
Problem certainly.
The content of the invention
The purpose of the present invention be according to above-mentioned the deficiencies in the prior art in place of, there is provided a kind of tower crane base being applied on bridge
Plinth method to set up, the tower crane method to set up reduce tower crane tower by by the basis instrument of tower crane in the top surface of lower king-post strut
The sections of body, reduces operating expenses.
The object of the invention is realized being completed by technical scheme below:
A kind of tower crane method to set up being applied on bridge, it is characterised in that the tower crane method to set up includes
Following steps:After the concrete placings of lower king-post strut are finished, it is provided for the built-in fitting of tower crane is installed on the top surface of the lower king-post strut;
Reinforcing bar and template are installed on the top surface of the lower king-post strut and the concrete placings of upper king-post strut are completed;By positioned at the lower king-post strut top surface
Eject on built-in fitting for connecting the basic component of the tower crane, complete the peace of the tower crane afterwards on the basic component
Dress.
The lower king-post strut is made up of vertically arranged column and level to the side binder and middle binder that arrange, the tower crane
Supporting is installed on the side binder and the middle binder.
The basic component constitutes interim positioning by welding iron plate.
It is an advantage of the invention that(1)Solve on the basis of tower crane is arranged at cushion cap concrete or encorbelment on cushion cap foundation
Performance difficulty problem during " bracket " structure, it is economical and practical;(2)Tower crane is solved because cushion cap area is not enough arranged, and is made
The operation at sea of tower crane is set with interim injection pile foundation, construction cost is advantageously reduced by reducing operation at sea;(3)
As tower crane is arranged on the top of concrete column, reduce the sections of tower crane tower body, i.e., the tower body in the range of the stem height,
As the position for arranging is improved, the tower body structure of this section is reduced, the lease expenses of equipment is reduced.
Description of the drawings
Fig. 1 is 1/2 lower king-post strut top floor map in the present invention;
Fig. 2 is the positive elevational schematic view of 1/2 lower king-post strut in the present invention.
Specific embodiment
The feature and other correlated characteristics of the present invention is described in further detail by embodiment below in conjunction with accompanying drawing, with
It is easy to the understanding of technical staff of the same trade:
Such as Fig. 1-2, in figure, labelling 1-6 is respectively:Column 1, side binder 2, middle binder 3, built-in fitting 4, tower crane 5, lateral and
Diagonal brace 6.
Embodiment:As shown in Figure 1, 2, the present embodiment is specifically related to a kind of tower crane setting side being applied on bridge
Method, the bridge are the short tower girder stayed-cable bridge of six tower single cable planes, and full-bridge has 6 king-towers, and each king-tower substructure tower body is highly
21-25M, two-by-two symmetrically, king-post top is made up of 2 road binders.
The tower crane method to set up by by the basis instrument of tower crane in lower king-post strut top surface to simplify construction method, and
Construction cost is reduced, following steps are specifically included:
(1)The concrete placings of lower king-post strut are completed, lower king-post strut is made up of column 1, side binder 2 and middle binder 3, twice side binder
2 are symmetricly set in 3 both sides of middle binder, and three's horizontal cross is connected between twice vertical upright column 1;Install in lower king-post strut top surface
Pour the reinforcing bar and template needed for upper king-post strut;It is respectively provided with built-in fitting 4 afterwards on side binder 2 with middle binder 3, built-in fitting 4 has
Body is the iron plate that welding is embedded on 3 side of side binder 2 and middle binder in advance;
It should be noted that these built-in fittings 4 some be to be welded or prefabricated in factory or concentrated processing place,
During in-site installation, not weld with all kinds of reinforcing bars in column 1, side binder 2 and middle binder 3, to avoid affecting lower king-post strut main body
The intensity of structure;
(2)The concrete placings construction of upper king-post strut is completed, the intensity and elastic modelling quantity of upper king-post strut must reach wanting for concrete structure design
Ask;
(3)Eject on default built-in fitting 4 before for connecting the basic component of tower crane, i.e. lateral and diagonal brace 6, and profit
Temporary weld positioning is carried out with iron plate;
(4)The erecting and welding of tower crane 5 is completed according to the design drawing of tower crane 5;
(5)According to the administrative provisions of special equipment, carry out situ loading, and submit a report asking for relevant department carrying out an acceptance inspection.
The present embodiment has the characteristics of safe and reliable, construction is convenient, economical and practical, specifically includes following beneficial effect:
(1)Solve on the basis of tower crane is arranged at cushion cap concrete or encorbelment on cushion cap foundation " bracket " structure when reality
Difficult problem is applied, it is economical and practical;
(2)Tower crane is solved because cushion cap area is not enough arranged, and tower crane is set using interim injection pile foundation
Operation at sea, by reduce operation at sea advantageously reduce construction cost;
(3)As tower crane is arranged on the top of concrete column, the sections of tower crane tower body is reduced, i.e., in stem height model
Tower body in enclosing, as the position for arranging is improved, reduces the tower body structure of this section, reduces the lease expenses of equipment.
Claims (2)
1. a kind of tower crane method to set up being applied on bridge, it is characterised in that the tower crane method to set up include as
Lower step:After the concrete placings of lower king-post strut are finished, it is provided for the built-in fitting of tower crane is installed on the top surface of the lower king-post strut;
Reinforcing bar and template are installed on the top surface of the lower king-post strut and the concrete placings of upper king-post strut are completed;By positioned at the pre- of the lower king-post strut top surface
Eject on embedded part for connecting the basic component of the tower crane, complete the installation of the tower crane afterwards on the basic component;
The lower king-post strut is made up of vertically arranged column and level to the side binder and middle binder that arrange, and the tower crane supporting is installed
On the side binder and the middle binder;The installation of embedded parts in the middle binder and the side of the side binder,
The both sides of the basic component are connected to the built-in fitting of the middle binder side and the built-in fitting of the side binder side.
2. a kind of tower crane method to set up according to claim 1, it is characterised in that the basic component is by welding
Iron plate is positioned temporarily with constituting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510568918.0A CN105088960B (en) | 2015-09-09 | 2015-09-09 | A kind of tower crane method to set up being applied on bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510568918.0A CN105088960B (en) | 2015-09-09 | 2015-09-09 | A kind of tower crane method to set up being applied on bridge |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105088960A CN105088960A (en) | 2015-11-25 |
CN105088960B true CN105088960B (en) | 2017-03-29 |
Family
ID=54570220
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510568918.0A Active CN105088960B (en) | 2015-09-09 | 2015-09-09 | A kind of tower crane method to set up being applied on bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105088960B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114941284A (en) * | 2022-03-04 | 2022-08-26 | 中建八局天津建设工程有限公司 | Permanent-temporary combined tower crane foundation and construction method thereof |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201581409U (en) * | 2009-12-25 | 2010-09-15 | 浙江中成建工集团有限公司 | Combined tower crane foundation of cross beam supported by steel latticework columns in deep foundation pit |
CN202787297U (en) * | 2012-05-22 | 2013-03-13 | 实事集团建设工程有限公司 | Tower crane base |
CN203256761U (en) * | 2013-05-17 | 2013-10-30 | 中建八局第三建设有限公司 | Tower crane foundation arranged on top plate of basement |
CN203334643U (en) * | 2013-06-06 | 2013-12-11 | 浙江城建建设集团有限公司 | Tower crane standard knot and structural steel combination high-altitude large-span operation frame device |
-
2015
- 2015-09-09 CN CN201510568918.0A patent/CN105088960B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN105088960A (en) | 2015-11-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107090975B (en) | Formwork erecting construction method for ultrahigh large-span concrete cast-in-place beam bailey truss | |
CN101956457B (en) | Method for constructing rectangular steel pipe concrete column | |
CN105350454B (en) | Steel arch rib outer wrapped concrete construction method for steel trussed arch bridge | |
CN205443958U (en) | Composite truss support of big cantilever bent cap | |
CN105839536A (en) | Construction method of cable-stayed bridge pylon | |
CN103243649B (en) | The system and method for a kind of cable saddle Fast Installation, location | |
CN105586833B (en) | Stiff skeleton steel reinforcement cage global formation large-scale cast-in-place tall pier and thin wall construction method | |
CN104674665B (en) | Large-spatial structures vestibule bridge installation method | |
CN105908902A (en) | Positioning frame for prefabricated pier column reinforcing bar cages and construction method of pier column reinforcing bar cages | |
CN203440753U (en) | Multifunctional steel bar locating framework | |
CN203487664U (en) | Prefabricated concrete filled wall suspension type flexible connection | |
CN105317052A (en) | Tower crane foundation bolt fixing method | |
CN102777044B (en) | Hoisting method of steel-structured spraying layer of urea prilling tower | |
CN101838986B (en) | Disassembling tool type lattice column and construction method thereof | |
CN104563525B (en) | A kind of box steel arch beam Integral horizontal type group is to method | |
CN202577338U (en) | Tower crane pedestal and steel cushion cap connecting device | |
CN106032704A (en) | Construction method for using concrete columns to support structures on both sides of post-pouring strip | |
CN104775363B (en) | The spelling method of upper king-post strut reinforcing bar sections | |
CN105088960B (en) | A kind of tower crane method to set up being applied on bridge | |
CN105442453A (en) | Construction method for suspension bridge tower crossbeam combination support | |
CN202809494U (en) | Bracket for pouring 0# block to rigid continuous girder bridge | |
CN102296600A (en) | Method for positioning middle pile of spread built subway station | |
CN107587770A (en) | Disjunctor storehouse synchronization slding form operation method | |
CN103615058B (en) | A kind of constraint steel plate construction of super high-rise steel plate concrete shear wall and construction method thereof | |
CN203429556U (en) | System for quickly installing and positioning cable saddle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |