CN202787297U - Tower crane base - Google Patents
Tower crane base Download PDFInfo
- Publication number
- CN202787297U CN202787297U CN 201220229963 CN201220229963U CN202787297U CN 202787297 U CN202787297 U CN 202787297U CN 201220229963 CN201220229963 CN 201220229963 CN 201220229963 U CN201220229963 U CN 201220229963U CN 202787297 U CN202787297 U CN 202787297U
- Authority
- CN
- China
- Prior art keywords
- tower crane
- platform
- steel
- lattice column
- steel lattice
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model relates to a tower crane base and belongs to the tower crane technical field. The tower crane base comprises four drilled grouting piles and is characterized in that the top end of each drilled grouting pile is provided with a steel latticed column in a fitting mode. A platform is arranged at the top end of the four steel latticed columns. A tower crane is arranged on the platform. The tower crane base has the advantages of being simple in structure, convenient to install on site, fast in construction speed, light and handy and firm, and greatly reducing cost of construction due to the fact that the platform and the steel latticed columns can be recycled and utilized, not occupying earthwork excavation construction period and greatly reducing construction period and project amount of an earthwork construction stage.
Description
Technical field
The utility model belongs to the tower crane technical field, is specially a kind of tower crane.
Background technology
At present, in existing tower crane construction technology, mostly adopt the tower crane of reinforced concrete structure, its advantage is that construction technology is ripe, and reliability is high, but it is larger to build tower crane concrete Foundation Design amount, tower crane concrete basis needs maintenance a period of time to reach the design strength requirement, often takies other operations duration, and, tower crane concrete basis can not reuse, sometimes in addition construction be difficult to process after finishing.This shows that there is long, the problem such as engineering quantity large, can not reuse of construction period in tower crane concrete basis.
The utility model content
For the above-mentioned problems in the prior art, the purpose of this utility model is to design the technical scheme that a kind of tower crane is provided, on-the-spot easy for installation, speed of application is fast, the construction period is short, light and handy firm, and platform and all reusable edible or recovery of steel lattice column greatly reduce cost.
Described a kind of tower crane comprises four bored piles, it is characterized in that every bored pile top is equipped with steel lattice column, and four steel lattice column tops are equipped with platform, and tower crane is installed on the platform.
Described a kind of tower crane is characterized in that the interlocking of bored pile top arranges steel lattice column, and the degree of depth of steel lattice column inlay bur hole pouring pile is 2.5-3.5 rice.
Described a kind of tower crane is characterized in that being equipped with the shearing support between each adjacent steel lattice column.
Described a kind of tower crane is characterized in that platform cooperates with each steel lattice column top welding, and adopts steel gusset reinforcement of weld.
Described a kind of tower crane is characterized in that described platform is made of steel plate, channel-section steel welding.
Described a kind of tower crane is characterized in that described shearing support is made of horizontal connecting rod and the welding of oblique connecting rod.
Above-mentioned a kind of tower crane, simple in structure, on-the-spot easy for installation, speed of application is fast, and is firmly light and handy; Platform and steel lattice column reusable edible or recovery greatly reduce cost; And adopt this tower crane, do not take the cubic metre of earth and stone and excavate the duration, can greatly reduce duration in restoration in earth-rock construction stage and engineering quantity.
Description of drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is platform schematic diagram of the present utility model;
Among the figure: 1-bored pile, 2-steel lattice column, 3-shearing support, 4-platform, 4a-steel plate, 4b-channel-section steel, 5-steel gusset, 6-tower crane.
The specific embodiment
The utility model is described in further detail below in conjunction with Figure of description.
As shown in the figure, this tower crane comprises four bored piles 1, and every bored pile 1 top is equipped with 2, four steel lattice column 2 tops of steel lattice column and is equipped with platform 4, on the direct mounting platform 4 of tower crane 6 usefulness bolts.The interlocking of bored pile 1 top arranges steel lattice column 2, and the degree of depth of steel lattice column 2 inlay bur hole pouring piles 1 is 2.5-3.5 rice, stable connection.Be equipped with shearing support 3 between each adjacent steel lattice column 2, described shearing support 3 is made of horizontal connecting rod and the welding of oblique connecting rod, and four steel lattice columns 2 are reinforced into whole by shearing support 3.Platform 4 cooperates with each steel lattice column 2 tops welding, and adopts steel gusset 5 reinforcement of welds.Described platform 4 is made of two steel plate 4a and eight channel-section steel 4b welding.Bored pile 1 is that the tower crane of installing is special-purpose, the position of four bored piles 1 and spacing meet the institute desired position of installation tower crane and underlying parameter, and tower crane 6 weight are distributed to the center line of four steel lattice columns 2 of center line and bottom of four installation feet and tower crane Special drill castinplace pile 1 center line on same straight line.This tower crane is owing to adopted full steel structure, and on-the-spot easy for installation, speed of application is fast, and the construction period is short, and is firmly light and handy, and platform and steel lattice column reusable edible or recovery, greatly reduces cost.
Claims (2)
1. tower crane, comprise four bored piles (1), it is characterized in that every bored pile (1) top is equipped with steel lattice column (2), four steel lattice columns (2) top is equipped with platform (4), described platform (4) is made of two blocks of steel plates (4a) and eight channel-section steels (4b) welding, the upper tower crane (6) of installing of platform (4), the interlocking of bored pile (1) top arranges steel lattice column (2), the degree of depth of steel lattice column (2) inlay bur hole pouring pile (1) is 2.5-3.5 rice, be equipped with shearing support (3) between each adjacent steel lattice column (2), platform (4) cooperates with the welding of each steel lattice column (2) top, and adopts steel gusset (5) reinforcement of weld.
2. a kind of tower crane as claimed in claim 1 is characterized in that described shearing support (3) is made of horizontal connecting rod and the welding of oblique connecting rod.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201220229963 CN202787297U (en) | 2012-05-22 | 2012-05-22 | Tower crane base |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201220229963 CN202787297U (en) | 2012-05-22 | 2012-05-22 | Tower crane base |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN202787297U true CN202787297U (en) | 2013-03-13 |
Family
ID=47814579
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 201220229963 Expired - Fee Related CN202787297U (en) | 2012-05-22 | 2012-05-22 | Tower crane base |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN202787297U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103498482A (en) * | 2013-09-30 | 2014-01-08 | 上海建工七建集团有限公司 | Three-pile lattice type combined tower crane foundation structure |
| CN105088960A (en) * | 2015-09-09 | 2015-11-25 | 上海城建市政工程(集团)有限公司 | Tower crane foundation arrangement method applied on great bridge |
-
2012
- 2012-05-22 CN CN 201220229963 patent/CN202787297U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103498482A (en) * | 2013-09-30 | 2014-01-08 | 上海建工七建集团有限公司 | Three-pile lattice type combined tower crane foundation structure |
| CN105088960A (en) * | 2015-09-09 | 2015-11-25 | 上海城建市政工程(集团)有限公司 | Tower crane foundation arrangement method applied on great bridge |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203145038U (en) | lattice column type tower crane foundation | |
| CN102127974B (en) | Design and construction method of additional cellar under existing building | |
| CN100564700C (en) | The job practices of lattice type steel column tower crane pedestal | |
| CN103195085B (en) | Downward story-adding basement and construction method thereof | |
| CN103696429B (en) | A kind of concrete of special-shaped foundation ditch supports the combined support system and the construction method that add fish belly sill | |
| CN108278115A (en) | A kind of three step Rapid Construction of Tunnels method of big arch springing and structure based on pre-timbering with tubular prop | |
| CN201826325U (en) | Foundation structure of tower crane | |
| CN203222809U (en) | Pre-stressed concrete pipe pile foundation for pole and tower of power transmission line | |
| CN102900090A (en) | Non-inclined dry-operation open caisson capable of preventing water burst and land subsidence and construction method thereof | |
| CN205024712U (en) | Combined tower crane foundation | |
| CN103114595A (en) | Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch | |
| CN103321244A (en) | Construction method for additionally arranged basement in existing building on sand foundation | |
| CN107964979A (en) | A kind of transmission line of electricity combining structure assembled cushion cap anchor rod foundation | |
| CN103711056B (en) | Steel tool-type temporary construction road and construction method thereof | |
| CN203547753U (en) | Profile steel concrete shaft wall base | |
| CN103422510A (en) | Steel pipe frame type cofferdam structure and construction method | |
| CN103225304A (en) | Marine foundation supporting structure and construction method thereof | |
| CN201770942U (en) | Support for soft soil foundation cast-in-place concrete continuous beam bridge | |
| CN203716046U (en) | Steel trestle for earthwork transportation of foundation pit | |
| CN205329709U (en) | Mountain region photovoltaic support foundation structure | |
| CN202124862U (en) | Spiral-anchor plate type composite foundation | |
| CN202787297U (en) | Tower crane base | |
| CN103215965A (en) | Laminate type high-rise platform pile tower crane foundation and construction method | |
| CN202280066U (en) | Water-burst-proof ground-subsidence-proof non-inclination dry work sinking well | |
| CN202090352U (en) | Deep foundation pit bracing system with steel pipe piles-self-drilling type pre-stress anchor rods |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130313 Termination date: 20200522 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |