CN105041311A - 铺设三角溜拐弯掘进施工工艺 - Google Patents

铺设三角溜拐弯掘进施工工艺 Download PDF

Info

Publication number
CN105041311A
CN105041311A CN201510286622.XA CN201510286622A CN105041311A CN 105041311 A CN105041311 A CN 105041311A CN 201510286622 A CN201510286622 A CN 201510286622A CN 105041311 A CN105041311 A CN 105041311A
Authority
CN
China
Prior art keywords
scraper
trough conveyer
trough
tunnel
conveyer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510286622.XA
Other languages
English (en)
Inventor
窦帅帅
秦海忠
张庆栋
李素锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Jincheng Anthracite Mining Group Co Ltd
Original Assignee
Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Jincheng Anthracite Mining Group Co Ltd filed Critical Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority to CN201510286622.XA priority Critical patent/CN105041311A/zh
Publication of CN105041311A publication Critical patent/CN105041311A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Structure Of Belt Conveyors (AREA)

Abstract

本发明涉及一种煤矿掘进施工工艺,具体为一种铺设三角溜拐弯掘进施工工艺。解决在煤矿施工中,横川方向到巷道内的掘进机组拐弯的问题,待联络横川内掘进施工结束后,在施工巷道内先沿巷道方向铺设一号溜子,在回风联络横川铺设出煤二号溜子,在巷道一号溜子和横川内的二号溜子之间搭接三号斜溜子,形成“三角”状出煤系统,再将掘进机组调转90°,机头朝向巷道内,转载机安装在一号溜子上,掘进机继续巷道向前掘进,延伸一号溜子跟进,一号溜子前移过程中相应调整三号斜溜子的位置,使其两端始终不脱离一号溜子和二号溜子,当掘进巷道超过联络横川达到设计距离时,拆掉一号溜子、三号斜溜子,将二号溜子机尾延长,同时一号溜子位置更换为输送皮带,至此完成拐弯施工。

Description

铺设三角溜拐弯掘进施工工艺
技术领域
本发明涉及一种煤矿掘进施工工艺,具体为一种铺设三角溜拐弯掘进施工工艺。
背景技术
巷道掘进过程中,双巷掘进全风压巷道“开口”施工时,由于开口巷道超前回风横川距离不足,无法就近在回风横川内安设出煤系统,只能掘进机直接拖挂转载机拐弯施工。
如图1所示意,掘进机拖挂转载机拐弯施工时,开口前三排掘进机挂转载机直接施工撒煤量大,增加人工劳动清理强度;施工第4—14排时,由于掘进机组、转载机、胶带机承载部连续出煤系统弯曲程度加剧变为钝角,转载机机尾经常掉道增加机电事故,掉到后处理掉到中断生产;施工第15—20排时,由于掘进机组、桥式转载机、胶带机承载部连续出煤系统弯曲程度进一步加剧,原本割、装、运出煤一体的出煤系统,就需要卸掉转载机后,退掘进机组出煤,造成割一会煤再退着出一会煤中断生产,退机组出煤效率低;施工第21以后时,挂转载机配合溜子出煤,存在转载机掉道风险。
总结起来存在以下三个问题:
1)退机出煤时,割煤、装煤、运煤工序时间延长,掘进效率降低;
2)转载机频繁从承载部上掉落,发生机电事故,造成安全隐患;
3)工作面煤大量洒落到机组后,几乎全部洒落到机组后,人工清煤量大。
发明内容
本发明为了解决在煤矿施工中,横川方向到巷道内的掘进机组拐弯的问题,提供了一种铺设三角溜拐弯掘进施工工艺。
本发明技术方案是,一种铺设三角溜拐弯掘进施工工艺,待联络横川内掘进施工结束后,在施工巷道内先沿巷道方向铺设一号溜子,长度以能满足安装转载机及机组前后移动为标准,在联络横川铺设出煤二号溜子,在巷道一号溜子和横川内的二号溜子之间搭接三号斜溜子,形成“三角”状出煤系统,
再将掘进机组调转90°,机头朝向巷道内,转载机安装在一号溜子上,掘进机继续巷道向前掘进,延伸一号溜子跟进,一号溜子前移过程中相应调整三号斜溜子的位置,使其两端始终不脱离一号溜子和二号溜子,当掘进巷道超过联络横川达到设计距离时,拆掉一号溜子、三号斜溜子,将二号溜子机尾延长,同时一号溜子位置更换为输送皮带,至此完成拐弯施工。
与现有技术相比,本发明所述的“铺设三角溜”施工工艺,解决了联络横川向巷道方向的拐弯施工问题。将拐弯施工改变为直巷施工,减少了撒煤量降低清煤劳动强度,杜绝了转载机掉道事故的发生,杜绝了退机出煤掘进效率降低的影响,保证了掘进过程中割煤、装煤、运煤连续生产。
附图说明
图1为现有施工技术图
图2为本发明施工技术现场布置图
图3为施工进程之一
图4为施工进程之二
图中:1-巷道、2-掘进机组、3-转载机、4-联络横川、5-溜子、6-皮带、7-一号溜子、8-三号斜溜子、9-二号溜子。
具体实施方式
一种铺设三角溜拐弯掘进施工工艺,待联络横川4内掘进施工结束后,如图2所示意,在施工巷道1内先沿巷道方向铺设一号溜子7,长度以能满足安装转载机及机组2前后移动为标准,在回风联络横川4内铺设出煤二号溜子9,在巷道内一号溜子7和联络横川4内的二号溜子9之间搭接三号斜溜子8,形成“三角”状出煤系统,再将掘进机组2调转90°,使机头朝向巷道前,转载机安装在一号溜子7上,如图3所示意,掘进机继续沿着巷道向前掘进,延伸一号溜子7跟进,一号溜子7前移过程中相应调整三号斜溜子8的位置,使其两端始终不脱离一号溜子7和二号溜子9,如图4所示意,当掘进的巷道超过联络横川4达到设计距离时,拆掉一号溜子7、三号斜溜子8,将二号溜子9机尾延长,同时一号溜子位置更换为输送皮带10,至此完成拐弯施工。

Claims (1)

1.一种铺设三角溜拐弯掘进施工工艺,其特征是:待联络横川(4)内掘进施工结束后,在施工巷道(1)内先沿巷道方向铺设一号溜子(7),长度以能满足安装转载机及掘进机组(2)前后移动为标准,在联络横川(4)内铺设出煤二号溜子(9),在巷道内一号溜子(7)和横川内的二号溜子(9)之间搭接三号斜溜子(8),形成“三角”状出煤系统,再将掘进机组(2)调转90°,使机头朝向巷道前,转载机安装在一号溜子(7)上,掘进机继续沿着巷道向前掘进,延伸一号溜子(7)跟进,一号溜子(7)前移过程中相应调整三号斜溜子(8)的位置,使其两端始终不脱离一号溜子(7)和二号溜子(9),当掘进的巷道超过联络横川(4)达到设计距离时,拆掉一号溜子(7)、三号斜溜子(8),将二号溜子(9)机尾延长,同时一号溜子位置更换为输送皮带(10),至此完成拐弯施工。
CN201510286622.XA 2015-05-30 2015-05-30 铺设三角溜拐弯掘进施工工艺 Pending CN105041311A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510286622.XA CN105041311A (zh) 2015-05-30 2015-05-30 铺设三角溜拐弯掘进施工工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510286622.XA CN105041311A (zh) 2015-05-30 2015-05-30 铺设三角溜拐弯掘进施工工艺

Publications (1)

Publication Number Publication Date
CN105041311A true CN105041311A (zh) 2015-11-11

Family

ID=54448233

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510286622.XA Pending CN105041311A (zh) 2015-05-30 2015-05-30 铺设三角溜拐弯掘进施工工艺

Country Status (1)

Country Link
CN (1) CN105041311A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111379561A (zh) * 2020-04-07 2020-07-07 北京中矿创新联盟能源环境科学研究院 采煤系统及基于该采煤系统的无煤柱自成巷开采方法
CN111764917A (zh) * 2020-06-24 2020-10-13 临沂矿业集团菏泽煤电有限公司 一种综掘机快速开门巷道掘进施工方法
CN113464154A (zh) * 2021-07-20 2021-10-01 兖州煤业股份有限公司 掘进机多功能自动旋转运输装置及拐弯开口施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA1080757A (en) * 1976-10-15 1980-07-01 United States Of America As Represented By The Secretary Of Commerce Nat Ional Technical Information Service Automatic face transfer linear cutting rotary head continuous mining machine
CN101289941A (zh) * 2007-12-14 2008-10-22 三一重型装备有限公司 多矿车式第二运输机
CN202493284U (zh) * 2012-03-01 2012-10-17 山西中新唐山沟煤业有限责任公司 一种井下转载装置
CN102865082A (zh) * 2012-09-21 2013-01-09 山西晋城无烟煤矿业集团有限责任公司 煤矿t型巷道直角拐弯快速施工方法
CN104121022A (zh) * 2014-06-19 2014-10-29 山西晋城无烟煤矿业集团有限责任公司 煤矿巷道开口掘进工艺
CN204113288U (zh) * 2014-09-18 2015-01-21 安徽理工大学 一种新型煤矿井下绿色高效运输设备

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA1080757A (en) * 1976-10-15 1980-07-01 United States Of America As Represented By The Secretary Of Commerce Nat Ional Technical Information Service Automatic face transfer linear cutting rotary head continuous mining machine
CN101289941A (zh) * 2007-12-14 2008-10-22 三一重型装备有限公司 多矿车式第二运输机
CN202493284U (zh) * 2012-03-01 2012-10-17 山西中新唐山沟煤业有限责任公司 一种井下转载装置
CN102865082A (zh) * 2012-09-21 2013-01-09 山西晋城无烟煤矿业集团有限责任公司 煤矿t型巷道直角拐弯快速施工方法
CN104121022A (zh) * 2014-06-19 2014-10-29 山西晋城无烟煤矿业集团有限责任公司 煤矿巷道开口掘进工艺
CN204113288U (zh) * 2014-09-18 2015-01-21 安徽理工大学 一种新型煤矿井下绿色高效运输设备

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111379561A (zh) * 2020-04-07 2020-07-07 北京中矿创新联盟能源环境科学研究院 采煤系统及基于该采煤系统的无煤柱自成巷开采方法
CN111379561B (zh) * 2020-04-07 2021-10-29 北京中矿创新联盟能源环境科学研究院 采煤系统及基于该采煤系统的无煤柱自成巷开采方法
CN111764917A (zh) * 2020-06-24 2020-10-13 临沂矿业集团菏泽煤电有限公司 一种综掘机快速开门巷道掘进施工方法
CN113464154A (zh) * 2021-07-20 2021-10-01 兖州煤业股份有限公司 掘进机多功能自动旋转运输装置及拐弯开口施工方法

Similar Documents

Publication Publication Date Title
CN103742148B (zh) 一种急倾斜煤层柔掩支护下行矸石充填的采煤法
CN102392640B (zh) 近距离薄煤层同采并运方法
CN105298496B (zh) 设置预留工作面煤柱的全采全充采煤方法
CN102865082B (zh) 煤矿t型巷道直角拐弯快速施工方法
CN105041311A (zh) 铺设三角溜拐弯掘进施工工艺
CN106968671B (zh) 煤矿井下采煤工作面回撤通道充填回撤方法
CN104653182B (zh) 一种含厚夹矸煤层煤矸分采的采煤方法
CN102587913A (zh) 一种急倾斜煤层俯伪斜走向长壁综合机械化采煤方法
CN104847360A (zh) 露天矿半连续系统的组合台阶开采方法
CN104033151A (zh) 一种双系煤层复杂条件下千万吨矿井安全开采方法
CN103256051A (zh) 露天煤矿的双翼连续采煤工艺方法
CN105003268A (zh) 急倾斜煤层走向推进伪俯斜综采
CN101718209B (zh) 综采工作面过陷落柱的处理方法
CN107575228A (zh) 一种减少双巷护巷煤柱尺寸及降低巷道变形量的采煤方法
CN109184692A (zh) 一种急倾斜煤层临界伪斜角综合机械化开采方法
CN109268013B (zh) 一种综采工作面不等长大角度旋转开采工艺
CN105134212A (zh) 一种三软厚煤层巷道沿顶掘进综放开采保证回采率的方法
CN105525919A (zh) 一种急倾斜综采面切眼扩刷与设备安装交叉作业方法
CN206562127U (zh) 掘进巷用后退式皮带机自移机尾
CN203239353U (zh) 矿用龙门式转载机
CN102979532B (zh) 一种辅助斜坡道配合胶带斜井运输的开拓方法
CN202039860U (zh) 平行对拉式综放面结构
CN102777184B (zh) 矿山的开采系统和方法
CN104121022A (zh) 煤矿巷道开口掘进工艺
CN102644477A (zh) 保护层风巷高位钻场穿层钻孔抽采被保护层瓦斯的方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20151111