CN102644477A - 保护层风巷高位钻场穿层钻孔抽采被保护层瓦斯的方法 - Google Patents

保护层风巷高位钻场穿层钻孔抽采被保护层瓦斯的方法 Download PDF

Info

Publication number
CN102644477A
CN102644477A CN2012101427217A CN201210142721A CN102644477A CN 102644477 A CN102644477 A CN 102644477A CN 2012101427217 A CN2012101427217 A CN 2012101427217A CN 201210142721 A CN201210142721 A CN 201210142721A CN 102644477 A CN102644477 A CN 102644477A
Authority
CN
China
Prior art keywords
layer
drilling
topping
extraction
protected seam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101427217A
Other languages
English (en)
Inventor
王亮
程远平
卢守青
李伟
蔡春成
安丰华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN2012101427217A priority Critical patent/CN102644477A/zh
Publication of CN102644477A publication Critical patent/CN102644477A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

本发明公开的一种保护层风巷高位钻场穿层钻孔抽采被保护层瓦斯的方法,通过在被保护层风巷布置高位钻场,然后在高位钻场内向被保护层用普通钻机和定向钻机分别打直线和弯曲穿层钻孔;待钻孔施工完毕后,封孔并接入瓦斯抽采管路进行瓦斯抽采。该方法用于保护层开采技术中的瓦斯抽采,可在保护层开采前预抽被保护层瓦斯,在保护层开采后实现被保护层卸压瓦斯的抽采。该方法降低了施工成本、缩短了开采周期,消除了安全隐患,方便安全管理。

Description

保护层风巷高位钻场穿层钻孔抽采被保护层瓦斯的方法
技术领域
本发明涉及瓦斯抽采技术,尤其是适用于一种保护层风巷高位钻场穿层钻孔抽采被保护层瓦斯的方法。
背景技术
《防治煤与瓦斯突出规定》规定突出煤层必须采取区域性防突措施,保护层开采技术为一种主要的区域性防突措施,其中涉及保护层与被保护层两个煤层。为消除邻近煤层(被保护层)的突出危险而先开采的煤层称为保护层;由于保护层开采的采动作用并同时抽采卸压瓦斯,可使邻近的突出危险煤层转变为无突出危险煤层,该突出危险煤层称为被保护层。
保护层开采之后,被保护层获得了卸压增透效果,为使被保护层消除突出危险性,必须对被保护层的卸压瓦斯进行抽采。目前,底板岩巷网格式上向穿层钻孔抽采方法是对被保护层卸压瓦斯进行抽采的常见措施之一。该方法需要在被保护层的底板内走向施工底板岩石巷道(底板岩巷),在底板岩巷内每隔一定距离施工高位钻场,在每个高位钻场内向被保护层施工网格式穿层钻孔,并对穿层钻孔进行永久封孔,通过封孔管将钻孔连入底板岩巷内铺设的总抽采管路中进行瓦斯抽采。但是该方法施工巷道工程量大、投资成本高、施工周期长,这不仅增加了成本而且影响了开采周期;瓦斯沿裂隙进入巷道可能导致底板岩巷内瓦斯浓度超限,造成底板巷日常管理困难,存在安全隐患。
发明内容
技术问题:本发明的目的是克服已有技术中存在的问题,提供一种方法简单、施工成本低、周期短、安全高效、管理简单的保护层风巷高位钻场穿层钻孔抽采被保护层瓦斯的方法。
技术方案:本发明保护层风巷高位钻场穿层钻孔抽采被保护层瓦斯的方法,包括如下步骤:
a.在与保护层机巷相对应的保护层风巷煤层走向每隔90m向外侧布置一个高位钻场;
b.在每个高位钻场内用普通钻机和定向钻机分别沿走向布置三排穿层钻孔,三排穿层钻孔呈直线或者弯曲穿过被保护层,布置穿层钻孔时应避免穿过采空区冒落带;
c. 每个高位钻场内的穿层钻孔施工结束后按常规对其进行水泥砂浆封孔,封孔管长度根据围岩性质确定,封孔完毕后在封孔管外露端连接抽放管路;
d.在保护层开采前,先对被保护层进行瓦斯预先抽采;
e. 在保护层开采后,随着开采工作面的推进,被保护层因采动产生卸压增透,在抽采负压作用下卸压瓦斯经穿层钻孔被抽出。
所述的沿走向布置三排穿层钻孔的走向间距为30m,倾向间距为30m;所述的沿走向布置三排穿层钻孔的第一排的走向超前高位钻场的距离为40~50m;所述沿走向布置三排穿层钻孔中的每排穿层钻孔的最外侧的两个钻孔位置分别距离被保护层机巷和被保护层风巷外侧15~20m。
有益效果:本发明的保护层风巷高位钻场穿层钻孔抽采被保护层瓦斯的方法,不需要施工专门的底板岩巷,克服了传统的底板岩巷网格式上向穿层钻孔抽采方法施工巷道工程量大、投资成本高、施工周期长,这不仅增加了成本而且影响了开采周期;瓦斯沿裂隙进入巷道可能导致底板岩巷内瓦斯浓度超限,造成底板巷日常管理困难,存在安全隐患。该方法降低了施工成本、缩短了开采周期,方便安全管理。
附图说明
图1是本发明的保护层风巷高位钻场穿层钻孔抽采被保护层瓦斯的方法示意图。
图2是本发明的一组穿层钻孔横截面抽采方法示意图。
图中:1—保护层;2—被保护层;3—保护层风巷;4—保护层机巷;5—被保护层风巷;6—被保护层机巷;7—空区冒落带;8—高位钻场;9—穿层钻孔。
具体实施方式
如图1所示,本发明的保护层风巷高位钻场穿层钻孔抽采被保护层瓦斯的方法,首先在与保护层机巷4相应的保护层风巷3沿煤层走向每隔90m向内侧布置一个高位钻场8,待高位钻场8施工完毕后,在高位钻场8内用普通钻机和定向钻机分别沿走向布置三排直线或弯曲穿过被保护层多个穿层钻孔9,如图2所示,布置穿层钻9时应避免穿过采空区冒落带7,每个高位钻场8内沿走向布置的三排穿层钻孔9走向间距为30m,穿层钻孔9的第一排的走向超前高位钻场8为40~50m;每排穿层钻孔9的倾向间距为30m,每排穿层钻孔9的最外侧的两个钻孔位置分别距离被保护层机巷6和被保护层风巷5外侧15~20m;穿层钻孔9施工结束后对其进行水泥砂浆封孔,封孔管长度根据围岩性质确定,围岩情况好可短些,围岩情况差或长些。封孔完毕后在封孔管外露端连接抽放管路。在保护层1开采前,先对被保护层2进行瓦斯预先抽采;在保护层1开采后,随着开采工作面的推进,被保护层1因采动产生卸压增透,在抽采负压作用下卸压瓦斯经穿层钻孔9被抽出;进行抽采的负压为15~20 KPa。

Claims (4)

1.一种保护层风巷高位钻场穿层钻孔抽采被保护层瓦斯的方法,其特征在于包括如下步骤:
a.在与保护层机巷(4)相对应的保护层风巷(3)煤层走向每隔90m向外侧布置一个高位钻场(8);
b.在每个高位钻场(8)内用普通钻机和定向钻机分别沿走向布置三排穿层钻孔(9),三排穿层钻孔(9)呈直线或者弯曲穿过被保护层(2),布置穿层钻孔(9)时应避免穿过采空区冒落带(7);
c. 每个高位钻场(8)内的穿层钻孔(9)施工结束后按常规对其进行水泥砂浆封孔,封孔管长度根据围岩性质确定,封孔完毕后在封孔管外露端连接抽放管路;
d.在保护层(1)开采前,先对被保护层(2)进行瓦斯预先抽采;
e. 在保护层(1)开采后,随着开采工作面的推进,被保护层(2)因采动产生卸压增透,在抽采负压作用下卸压瓦斯经穿层钻孔(9)被抽出。
2.根据权利要求1所述的保护层风巷高位钻场穿层钻孔抽采被保护层瓦斯的方法,其特征在于:所述的沿走向布置三排穿层钻孔(9)的走向间距为30m,倾向间距为30m。
3.根据权利要求1所述的保护层风巷高位钻场穿层钻孔抽采被保护层瓦斯的方法,其特征在于:所述的沿走向布置三排穿层钻孔(9)的第一排的走向超前高位钻场(8)的距离为40~50m。
4.根据权利要求1、2或3所述的保护层风巷高位钻场穿层钻孔抽采被保护层瓦斯的方法,其特征在于:所述沿走向布置三排穿层钻孔(9)中的每排穿层钻孔(9)的最外侧的两个钻孔位置分别距离被保护层机巷(6)和被保护层风巷(5)外侧15~20m。
CN2012101427217A 2012-05-10 2012-05-10 保护层风巷高位钻场穿层钻孔抽采被保护层瓦斯的方法 Pending CN102644477A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101427217A CN102644477A (zh) 2012-05-10 2012-05-10 保护层风巷高位钻场穿层钻孔抽采被保护层瓦斯的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101427217A CN102644477A (zh) 2012-05-10 2012-05-10 保护层风巷高位钻场穿层钻孔抽采被保护层瓦斯的方法

Publications (1)

Publication Number Publication Date
CN102644477A true CN102644477A (zh) 2012-08-22

Family

ID=46657532

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101427217A Pending CN102644477A (zh) 2012-05-10 2012-05-10 保护层风巷高位钻场穿层钻孔抽采被保护层瓦斯的方法

Country Status (1)

Country Link
CN (1) CN102644477A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104047629A (zh) * 2014-06-25 2014-09-17 中国矿业大学 薄煤层综采沿空留巷定向钻进抽采临近下煤层瓦斯的方法
CN106368729A (zh) * 2016-11-04 2017-02-01 大同煤矿集团有限责任公司 超前采动卸压区域预抽瓦斯防治方法
CN109899037A (zh) * 2019-03-14 2019-06-18 湖南科技大学 一种大倾角煤层开采过程中及开采后的瓦斯抽采方法
CN113294199A (zh) * 2021-04-07 2021-08-24 淮南矿业(集团)有限责任公司 开采下保护层瓦斯治理巷道布置方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2008142601A (ru) * 2008-10-27 2010-05-10 Институт угля и углехимии Сибирского отделения Российской академии наук (ИУУ СО РАН) (RU) Способ дегазации отрабатываемого угольного пласта
RU2398971C1 (ru) * 2009-03-02 2010-09-10 Анатолий Владимирович Ремезов Способ предварительной дегазации угольных пластов
CN102155254A (zh) * 2011-02-28 2011-08-17 中国矿业大学 一种低透气性煤层脉冲压裂增透抽采瓦斯方法
CN102226413A (zh) * 2011-05-24 2011-10-26 中国矿业大学 瓦斯排放巷穿层钻孔区域瓦斯抽采方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2008142601A (ru) * 2008-10-27 2010-05-10 Институт угля и углехимии Сибирского отделения Российской академии наук (ИУУ СО РАН) (RU) Способ дегазации отрабатываемого угольного пласта
RU2398971C1 (ru) * 2009-03-02 2010-09-10 Анатолий Владимирович Ремезов Способ предварительной дегазации угольных пластов
CN102155254A (zh) * 2011-02-28 2011-08-17 中国矿业大学 一种低透气性煤层脉冲压裂增透抽采瓦斯方法
CN102226413A (zh) * 2011-05-24 2011-10-26 中国矿业大学 瓦斯排放巷穿层钻孔区域瓦斯抽采方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
聂政: "淮北煤田区域性防治煤与瓦斯突出对策", 《煤炭科学技术》 *
魏胜田: "高位钻场穿层钻孔预抽上覆被保护层瓦斯技术", 《煤炭科学技术》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104047629A (zh) * 2014-06-25 2014-09-17 中国矿业大学 薄煤层综采沿空留巷定向钻进抽采临近下煤层瓦斯的方法
CN104047629B (zh) * 2014-06-25 2016-05-18 中国矿业大学 薄煤层综采沿空留巷定向钻进抽采临近下煤层瓦斯的方法
CN106368729A (zh) * 2016-11-04 2017-02-01 大同煤矿集团有限责任公司 超前采动卸压区域预抽瓦斯防治方法
CN109899037A (zh) * 2019-03-14 2019-06-18 湖南科技大学 一种大倾角煤层开采过程中及开采后的瓦斯抽采方法
CN113294199A (zh) * 2021-04-07 2021-08-24 淮南矿业(集团)有限责任公司 开采下保护层瓦斯治理巷道布置方法
CN113294199B (zh) * 2021-04-07 2022-08-02 淮南矿业(集团)有限责任公司 开采下保护层瓦斯治理巷道布置方法

Similar Documents

Publication Publication Date Title
CN102644476B (zh) 保护层机巷高位钻场穿层钻孔抽采被保护层瓦斯的方法
CN102080526B (zh) 地面煤层顶板顺层水平压裂井抽采瓦斯方法
CN106285477B (zh) 煤矿井下采动瓦斯抽采顶板上仰穿层定向孔施工方法
CN101832149B (zh) 一种井下注热抽采煤层瓦斯的方法
CN102635392B (zh) 超前留巷施工抽采工程的无煤柱煤与瓦斯共采方法
CN103615250B (zh) 分条间柱全空场开采嗣后充填协同采矿法
CN105971663B (zh) 一种煤层高压水力割缝压裂的钻孔布置结构及增透方法
CN102661167B (zh) 被保护层底板上向梳状钻孔瓦斯抽采方法
CN103306714B (zh) 近距离煤层群底抽巷钻孔一孔三用的瓦斯治理方法
CN102877884B (zh) 一种基于千米定向钻探技术的矿井奥灰顶部改造及施工方法
CN103670496A (zh) 单一低透气性突出煤层沿空留巷与预抽区段煤层瓦斯方法
CN102094669B (zh) 三位立体分源卸压瓦斯治理方法
CN102900460A (zh) 松软高突煤层穿层割缝卸压增透及快速掘进方法
CN109209474B (zh) 一种双分支井抽取下煤层及上部多采空区瓦斯与积水的方法
CN102352769A (zh) 高突矿井煤与瓦斯共采一体化开采方法
CN103758559A (zh) 沿空留巷y型通风高位回风巷钻孔抽采瓦斯方法
CN105134286B (zh) L型井采空区瓦斯抽采方法
CN103939135B (zh) 一种综采工作面撤架通道快速施工方法
CN103899348A (zh) 一种采煤工作面瓦斯快速抽采方法
CN102116169A (zh) 被保护层卸压瓦斯底板岩巷抽采方法
CN103758560A (zh) 一种多重递进保护层分组区域瓦斯治理方法
CN105484790A (zh) 一种穿层钻孔间隔注水促进瓦斯抽采与工作面降尘的方法
CN103362539A (zh) 留巷钻场钻孔抽采卸压瓦斯的方法
CN102587960A (zh) 一种高瓦斯煤层回采工作面巷道的布置方法
CN103061771A (zh) 复采矿井综采面切眼掘进及其支护方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120822