CN101718209B - 综采工作面过陷落柱的处理方法 - Google Patents

综采工作面过陷落柱的处理方法 Download PDF

Info

Publication number
CN101718209B
CN101718209B CN2009102278523A CN200910227852A CN101718209B CN 101718209 B CN101718209 B CN 101718209B CN 2009102278523 A CN2009102278523 A CN 2009102278523A CN 200910227852 A CN200910227852 A CN 200910227852A CN 101718209 B CN101718209 B CN 101718209B
Authority
CN
China
Prior art keywords
gangue
exhaustion
measure
lanes
working face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2009102278523A
Other languages
English (en)
Other versions
CN101718209A (zh
Inventor
闫振东
高昕
程建祯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Jincheng Anthracite Mining Group Co Ltd
Original Assignee
Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Jincheng Anthracite Mining Group Co Ltd filed Critical Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority to CN2009102278523A priority Critical patent/CN101718209B/zh
Publication of CN101718209A publication Critical patent/CN101718209A/zh
Application granted granted Critical
Publication of CN101718209B publication Critical patent/CN101718209B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明涉及一种煤矿采煤新工艺,具体为一种综采工作面过陷落柱的处理方法。解决现有技术中存在的陷落柱在采煤过程中难以有效治理的问题。具体为,当工作面布置完毕后,通过在两巷精探出陷落柱的具体位置,根据陷落柱的长度范围施工二条或多条出矸措施巷,然后根据陷落柱的宽度范围设计布置一条或多条纵向布置的出矸联络横川,出矸措施巷通过出矸联络横川相互连通并与工作面回风巷贯通形成通风系统,通过施工出矸措施巷和出矸联络横川把陷落柱大部分的矸石掏出,并有效地支护好出矸措施巷和出矸联络横川,工作面采到此处后直接切割经过处理后的陷落柱。

Description

综采工作面过陷落柱的处理方法
技术领域
本发明涉及一种煤矿采煤新工艺,具体为一种综采工作面过陷落柱的处理方法。
背景技术
煤矿井下煤层敷存条件复杂,地质构造复杂多变,在回采过程中经常遇到断层、陷落柱等地质构造。所谓陷落柱是由于地层的运动,煤层中由于坍塌而嵌入了不规则的岩石体。目前,煤矿综采工作面遭遇陷落柱通常采用平推硬过或整体或局部(尾部)设备搬家的办法,采用平推硬过的办法对工作面设备损害严重,同时由于陷落柱区顶板不好给安全生产带来隐患、也制约生产进度,此办法仅适应于陷落柱相对较小的区域。采用工作面设备搬家的办法搬家周期长、储量损失大,严重影响矿井产量,给煤矿安全生产和经济效益带来损失。
发明内容
本发明为了解决现有技术中存在的陷落柱在采煤过程中难以有效治理的问题而提供了一种综采工作面过陷落柱的处理方法。
本发明是由以下技术方案实现的,一种综采工作面过陷落柱的处理方法,具体为,当工作面布置完毕后,通过在两巷精探出陷落柱的具体位置,根据陷落柱的长度范围施工二条或多条出矸措施巷,然后根据陷落柱的宽度范围设计布置一条或多条纵向布置的出矸联络横川,出矸措施巷通过出矸联络横川相互连通并与工作面回风巷贯通形成通风系统,通过施工出矸措施巷和出矸联络横川把陷落柱大部分的矸石掏出,并有效地支护好出矸措施巷和出矸联络横川,工作面采到此处后直接切割经过处理后的陷落柱。
与现有的方法相比,本发明所述的方法具有以下优点:
1、可在工作面生产的同时施工出矸巷掏空陷落柱,实现工作面连续生产,工作面采到此处也可以相对较快的速度通过,保证了工作面产量,最大程度减少经济效益损失。
2、由于将陷落柱的主体部分破碎掏空,所以可以最大程度地避免了工作面设备过陷落柱对设备造成的严重损害。
3、提高了陷落柱区顶板控制水平,消除了生产作业安全带来隐患。
附图说明
图1为综采工作面对陷落柱施工的结构布置示意图
图中:1-工作面进风巷、2-工作面回风巷、3-工作面、4-出矸措施巷、5-出矸联络横川、6-陷落柱
具体实施方式
一种综采工作面过陷落柱的处理方法,具体为,当采煤工作面布置完毕后,通过在工作面进风巷1和工作面回风巷2两巷精探出陷落柱6的具体位置,根据陷落柱6的长度范围施工二条或多条出矸措施巷4,然后根据陷落柱6的宽度范围设计布置一条或多条纵向布置的出矸联络横川5,出矸措施巷4通过出矸联络横川5相互连通并与工作面回风巷2贯通形成通风系统,通过施工出矸措施巷4和出矸联络横川5可以把陷落柱大部分的矸石掏出,并有效地支护好出矸措施巷4和出矸联络横川5,形成如图1所示的结构分布状态,工作面采到此处后直接切割经过处理后的陷落柱。可有效避免综采设备直接处理陷落柱。

Claims (1)

1.一种综采工作面过陷落柱的处理方法,其特征在于:具体为,当采煤工作面布置完毕后,通过在工作面进风巷(1)和工作面回风巷(2)两巷精探出陷落柱(6)的具体位置,根据陷落柱(6)的长度范围施工二条以上出矸措施巷(4),然后根据陷落柱(6)的宽度范围设计布置一条或多条纵向布置的出矸联络横川(5),出矸措施巷(4)通过出矸联络横川(5)相互连通并与工作面回风巷(2)贯通形成通风系统,通过施工出矸措施巷(4)和出矸联络横川(5)可以把陷落柱大部分的矸石掏出,并有效地支护好出矸措施巷(4)和出矸联络横川(5),工作面采到此处后直接切割经过处理后的陷落柱。
CN2009102278523A 2009-12-16 2009-12-16 综采工作面过陷落柱的处理方法 Active CN101718209B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009102278523A CN101718209B (zh) 2009-12-16 2009-12-16 综采工作面过陷落柱的处理方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009102278523A CN101718209B (zh) 2009-12-16 2009-12-16 综采工作面过陷落柱的处理方法

Publications (2)

Publication Number Publication Date
CN101718209A CN101718209A (zh) 2010-06-02
CN101718209B true CN101718209B (zh) 2011-10-26

Family

ID=42432838

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009102278523A Active CN101718209B (zh) 2009-12-16 2009-12-16 综采工作面过陷落柱的处理方法

Country Status (1)

Country Link
CN (1) CN101718209B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102758629A (zh) * 2012-07-17 2012-10-31 太原理工大学 一种钻孔弱化岩石使综采工作面直接过陷落柱的方法

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720497B (zh) * 2012-06-18 2014-08-27 太原理工大学 一种化学软化岩石使综采工作面通过陷落柱的方法
CN103628897B (zh) * 2013-12-06 2016-02-24 中国矿业大学 一种通过巷道高冒区方法
CN105160188B (zh) * 2015-09-16 2018-11-16 中国矿业大学(北京) 一种确定临近陷落柱破碎巷道支护长度的方法
CN111828036B (zh) * 2020-08-04 2022-04-08 开平市中立德路桥设备有限公司 一种隧道支护结构
CN111828014B (zh) * 2020-08-04 2022-10-28 云南建投矿业工程有限公司 一种隧道施工方法
CN112112559A (zh) * 2020-08-26 2020-12-22 山西晋城无烟煤矿业集团有限责任公司 一种井下采面陷落柱巷帮同一注浆孔分段注浆方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2231640C1 (ru) * 2002-10-23 2004-06-27 Институт угля и углехимии СО РАН Способ разработки пологого угольного пласта
RU2232272C1 (ru) * 2002-12-15 2004-07-10 Открытое акционерное общество по добыче угля "Воркутауголь" Способ разработки пластов полезных ископаемых
CN1963148A (zh) * 2006-11-17 2007-05-16 中国矿业大学 利用结构关键层作为隔水层的保水采煤方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2231640C1 (ru) * 2002-10-23 2004-06-27 Институт угля и углехимии СО РАН Способ разработки пологого угольного пласта
RU2232272C1 (ru) * 2002-12-15 2004-07-10 Открытое акционерное общество по добыче угля "Воркутауголь" Способ разработки пластов полезных ископаемых
CN1963148A (zh) * 2006-11-17 2007-05-16 中国矿业大学 利用结构关键层作为隔水层的保水采煤方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
朱友莉,颜贤华,向先富.陷落柱成因及其开采时的处理方法.《矿业安全与环保》.1991,(第4期),38-41. *
温大维.综采工作面安全穿过陷落柱.《矿山压力与顶板管理》.1984,(第00期),28-31. *
魏树群,杨军辉.采煤工作面遇特大陷落柱后前进式开采技术.《河北煤炭》.2008,(第4期),11-12,62. *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102758629A (zh) * 2012-07-17 2012-10-31 太原理工大学 一种钻孔弱化岩石使综采工作面直接过陷落柱的方法

Also Published As

Publication number Publication date
CN101718209A (zh) 2010-06-02

Similar Documents

Publication Publication Date Title
CN101718209B (zh) 综采工作面过陷落柱的处理方法
CN102644476B (zh) 保护层机巷高位钻场穿层钻孔抽采被保护层瓦斯的方法
CN103306714B (zh) 近距离煤层群底抽巷钻孔一孔三用的瓦斯治理方法
CN104632219B (zh) 厚煤层大采高沿空留巷方法
CN103939135B (zh) 一种综采工作面撤架通道快速施工方法
CN100591893C (zh) 用于消除突出煤层抽采盲区的沿顶钻孔施工方法
CN102587960A (zh) 一种高瓦斯煤层回采工作面巷道的布置方法
CN103016053A (zh) 一种采空区局部充填控制地表沉陷的方法
CN106968671B (zh) 煤矿井下采煤工作面回撤通道充填回撤方法
CN105134286B (zh) L型井采空区瓦斯抽采方法
CN102943690A (zh) 采煤工作面顶板离层水的防治方法
CN105484790A (zh) 一种穿层钻孔间隔注水促进瓦斯抽采与工作面降尘的方法
CN102418525B (zh) 软煤层长壁大采高综合机械化采煤末采方法
CN102022133A (zh) 区域瓦斯井下高压射流掏穴卸压防突方法
CN103758560A (zh) 一种多重递进保护层分组区域瓦斯治理方法
Yuan Theories and techniques of coal bed methane control in China
CN204386632U (zh) 大倾角煤层顶板破碎带人工底板及假顶设施
CN107575228A (zh) 一种减少双巷护巷煤柱尺寸及降低巷道变形量的采煤方法
CN102425453A (zh) 一种小窑破坏区域充填规模化复采方法
CN102155227A (zh) 垂直方向上连续开采方法及在全矿体连续开采中的应用
CN103758521B (zh) 一种深部煤层的开采方法
CN103410557B (zh) 单一、低透气性煤层瓦斯治理方法
CN102691502B (zh) 一种提高综放顶煤回收率的方法
CN102444402A (zh) 一种区域性防治煤与瓦斯突出的方法
CN102644477A (zh) 保护层风巷高位钻场穿层钻孔抽采被保护层瓦斯的方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant