CN100591893C - 用于消除突出煤层抽采盲区的沿顶钻孔施工方法 - Google Patents
用于消除突出煤层抽采盲区的沿顶钻孔施工方法 Download PDFInfo
- Publication number
- CN100591893C CN100591893C CN200810049874A CN200810049874A CN100591893C CN 100591893 C CN100591893 C CN 100591893C CN 200810049874 A CN200810049874 A CN 200810049874A CN 200810049874 A CN200810049874 A CN 200810049874A CN 100591893 C CN100591893 C CN 100591893C
- Authority
- CN
- China
- Prior art keywords
- coal
- hole
- along
- blind zone
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Earth Drilling (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Abstract
本发明公开了一种用于消除突出煤层抽采盲区的沿顶钻孔施工方法,按如下步骤操作进行:第一步,在回采巷道的巷帮内施工挑顶钻场;第二步,在挑顶钻场内放置钻机,调整钻机的高度,使钻机能够在突出煤层施工沿顶煤孔;第三步,在挑顶钻场内施工一组沿顶煤孔,每个沿顶煤孔的开孔角度与其上部煤层顶板的倾角或伪倾角一致。使沿顶煤孔达到或穿越抽采盲区,甚至穿越采煤工作面的区段宽度或条带宽度;在复杂地质条件下或构造带,当沿顶煤孔难以穿越抽采盲区时,可再施工沿顶岩孔到达抽采盲区的上方,然后对沿顶岩孔实施爆破预裂或水力压裂的方法,使沿顶岩孔与抽采盲区通过人为裂隙沟通;当煤层厚度较大时,在施工沿顶煤孔的下方再补充施工强化煤孔。
Description
技术领域
本发明涉及一种用于消除突出煤层抽采盲区的沿顶钻孔施工方法,尤其是适用于松软突出煤层打钻技术及利用沿顶煤孔消除松软突出煤层采煤工作面抽采盲区的方法。
背景技术
突出煤层深孔钻进是个公认的世界性难题。由于突出煤层深孔钻进困难,即煤层钻孔深度受限,使得突出煤层采煤工作面中部存在一个煤层钻孔难以达到的区域,煤层钻孔难以到达的区域称为抽采盲区,抽采盲区不仅影响采煤工作面的开机率,而且对采煤工作面造成安全隐患。国内很多突出矿井在煤层地板岩层内施工岩石巷道,在岩石巷道内施工穿层钻孔向抽采盲区内打钻,即利用穿层钻孔的方法消除抽采盲区。采用穿层钻孔法消除抽采盲区,需要大量的岩石巷道工程和大量的岩石钻孔工程,因而造成采煤工作面的投资费用大大升高。
为解决突出煤层深孔钻进难题,国内外在钻机和钻杆改进方面做了很多研究,如本发明人发明的“突出煤层扒孔降温钻具及其钻进方法”(2006101118307)和国外引进的先进打钻装备,这些关于突出煤层钻进技术在一定程度上取得了一定的效果,但均不能从根本上解决突出煤层深孔钻进困难的世界性难题,也不能有效地消除采煤工作面的抽采盲区。
发明内容
本发明所要解决的技术问题是针对现行突出煤层深孔钻进困难和采煤工作面抽采空白带难以消除或消除代价过高的现状,提供一种用于消除突出煤层抽采盲区的沿顶钻孔施工方法。
为实现上述目的,本发明采用如下技术方案:一种用于消除突出煤层抽采盲区的沿顶钻孔施工方法,按如下步骤操作进行:第一步,在回采巷道的巷帮内施工挑顶钻场;第二步,在挑顶钻场内放置钻机,调整钻机的高度,使钻机能够在突出煤层施工沿顶煤孔;第三步,在挑顶钻场内施工一组沿顶煤孔,每个沿顶煤孔的开孔角度与其上部煤层顶板的倾角或伪倾角一致。
在复杂地质条件下或构造带,当沿顶煤孔难以穿越抽采盲区时,所述第三步施工结束后,继续第四步,升高钻机的高度,在没能达到或穿越抽采盲区的煤孔上方施工沿顶岩孔,使沿顶岩孔达到或穿越抽采盲区的上方,沿顶岩孔距离煤层的距离根据岩层条件和地质构造情况确定,距离范围在0~1.5米;第五步,在沿顶岩孔超过煤孔深度的钻孔段实施爆破预裂或水力压裂,使沿顶岩孔通过人为裂隙与抽采盲区联通。
当煤层厚度较大时,所述第五步施工结束后,继续第六步,降低钻机的高度,使钻机能够施工强化煤孔;第七步,在挑顶钻场内施工一组强化煤孔,每个强化煤孔的开孔角度与上部煤层顶板的倾角或伪倾角一致。
所述的一组沿顶煤孔呈发散状布置,所述的一组强化煤孔与沿顶煤孔呈同样的发散状布置,每个强化煤孔与其对应的沿顶煤孔在一条垂线上,其垂直距离根据煤层条件确定,范围在0.5~2米。
本发明基于发明人提出的钻穴概念,发明采用挑顶钻场施工沿顶煤孔的深孔钻进技术,利用大深度沿顶煤孔消除采煤工作面抽采盲区。为了便于陈述和理解本发明的原理方法,对本发明中出现的名词做以下定义和解释。
在突出煤层钻进的过程中,因孔内各种动力现象引起的直径远大于钻孔理论直径的准充填型洞穴,称为钻穴。钻穴在一定时空内被孔内动力现象带来的松散煤渣完全充填或部分充填而处于准充填状态。钻孔方向上的钻穴是突出煤层深孔钻进的主要障碍,是流体排渣系统阻塞和机械排渣系统阻力过大的原因,钻穴对突出煤层深孔钻进的危害程度与钻穴的体积大小成正变关系,钻穴可能的最大体积与钻孔距离煤层顶板的高度成反变关系。沿煤层与煤层顶板交接面钻进的位于煤层顶部的煤层钻孔称为沿顶煤孔,沿煤层顶板距离煤层一定距离施工的岩石钻孔称为沿顶岩孔。根据本发明人提出的钻穴概念和钻穴对打钻的危害,沿顶煤孔可以最大限度地限制钻穴的体积,从而可以施工深度较大的沿顶煤孔,这为沿顶煤孔直接穿越抽采盲区提供了条件。当煤层厚度较大时,仅靠沿顶煤孔进行瓦斯抽采会带来抽采效率低的弊端,在垂直方向上位于沿顶煤孔正下方一定距离并与对应沿顶煤孔方位、倾角相同的煤层钻孔称为强化煤孔,强化煤孔的作用是强化瓦斯的抽采效果,提高抽采速度。回采巷道一般沿煤层顶板或地板掘进,在回采巷道内无法直接施工沿顶煤孔和沿顶岩孔,为了施工沿顶煤孔和沿顶岩孔而在回采巷道巷帮开挖的将煤层顶板挑落的钻场称为挑顶钻场。
为解决现有技术方法存在的问题,本发明在回采巷道的巷帮施工挑顶钻场,挑顶钻场深入巷帮一定深度,在挑顶钻场内安置钻机,在挑顶钻场内施工呈发散状布置的多个沿顶煤孔,按照煤层顶板的倾斜角度和伪倾斜角度确定不同沿顶煤孔的不同倾角,沿顶煤孔的深度越深越好,使沿顶煤孔达到或穿越抽采盲区,甚至穿越采煤工作面的区段宽度或条带宽度;在复杂地质条件下或构造带,当沿顶煤孔难以穿越抽采盲区时,可在施工沿顶煤孔的基础上通过施工沿顶岩孔到达抽采盲区的上方,然后对沿顶岩孔实施爆破预裂或水力压裂的方法,使沿顶岩孔与抽采盲区通过人为裂隙沟通;当煤层厚度较大时,在施工沿顶煤孔的基础上再补充施工强化煤孔。
附图说明
图1所示为本发明施工状态示意图;
图2所示为图1中A-A截面施工完成后的状态示意图。
具体实施方式
如图1、2所示,本发明按如下步骤操作进行:
第一步,在回采巷道2的巷帮内施工挑顶钻场3。第二步,在挑顶钻场3内放置钻机4,调整钻机4的高度,使钻机4能够在突出煤层5中施工沿顶煤孔6。第三步,在挑顶钻场3内施工一组沿顶煤孔6,本组沿顶煤孔6呈发散状布置,每个沿顶煤孔6的开孔角度与其上部煤层1顶板的倾角或伪倾角一致。第四步,升高钻机的高度,在没能达到或穿越抽采盲区的煤孔上方施工沿顶岩孔8,使沿顶岩孔8达到或穿越抽采盲区的上方,沿顶岩孔8距离煤层的距离根据岩层条件和地质构造情况确定,距离范围在0~1.5米。第五步,在沿顶岩孔8超过煤孔深度的钻孔段实施爆破预裂或水力压裂,使沿顶岩孔8通过人为裂隙9与抽采盲区联通。第六步,降低钻机4的高度,使钻机4能够施工强化煤孔7。第七步,在挑顶钻场3内施工一组强化煤孔7,每个强化煤孔7的开孔角度与上部煤层1顶板的倾角或伪倾角一致,本组强化煤孔7与沿顶煤孔6呈同样的发散状布置,每个强化煤孔7与其对应的沿顶煤孔6在一条垂线上,其垂直距离根据煤层条件确定,范围在0.5~2米。
Claims (4)
1、一种用于消除突出煤层抽采盲区的沿顶钻孔施工方法,其特征在于按如下步骤操作进行:第一步,在回采巷道(2)的巷帮内施工挑顶钻场(3);第二步,在挑顶钻场(3)内放置钻机(4),调整钻机(4)的高度,使钻机(4)能够在突出煤层(5)施工沿顶煤孔(6);第三步,在挑顶钻场(3)内施工一组沿顶煤孔(6),每个沿顶煤孔(6)的开孔角度与其上部煤层(1)顶板的倾角或伪倾角一致;所述沿顶煤孔为沿煤层与煤层顶板交接面钻进的位于煤层顶部的煤层钻孔,所述挑顶钻场是在回采巷道巷帮开挖的将煤层顶板挑落的钻场。
2、如权利要求1所述的用于消除突出煤层抽采盲区的沿顶钻孔施工方法,其特征在于:所述第三步施工结束后,继续第四步,升高钻机的高度,在没能达到或穿越抽采盲区的煤孔上方施工沿顶岩孔(8),使沿顶岩孔(8)达到或穿越抽采盲区的上方,沿顶岩孔(8)距离煤层的距离根据岩层条件和地质构造情况确定,距离范围在0~1.5米;第五步,在沿顶岩孔(8)超过煤孔深度的钻孔段实施爆破预裂或水力压裂,使沿顶岩孔(8)通过人为裂隙(9)与抽采盲区联通;所述沿顶岩孔为沿煤层顶板距离煤层一定距离施工的岩石钻孔。
3、如权利要求2所述的用于消除突出煤层抽采盲区的沿顶钻孔施工方法,其特征在于:所述第五步施工结束后,继续第六步,降低钻机(4)的高度,使钻机(4)能够施工强化煤孔(7);第七步,在挑顶钻场(3)内施工一组强化煤孔(7),每个强化煤孔(7)的开孔角度与上部煤层(1)顶板的倾角或伪倾角一致;所述强化煤孔是在垂直方向上位于沿顶煤孔正下方一定距离并与对应沿顶煤孔方位、倾角相同的煤层钻孔。
4、如权利要求3所述的用于消除突出煤层抽采盲区的沿顶钻孔施工方法,其特征在于:所述的一组沿顶煤孔(6)呈发散状布置,所述的一组强化煤孔(7)与沿顶煤孔(6)呈同样的发散状布置,每个强化煤孔(7)与其对应的沿顶煤孔(6)在一条垂线上,其垂直距离根据煤层条件确定,范围在0.5~2米。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200810049874A CN100591893C (zh) | 2008-05-27 | 2008-05-27 | 用于消除突出煤层抽采盲区的沿顶钻孔施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200810049874A CN100591893C (zh) | 2008-05-27 | 2008-05-27 | 用于消除突出煤层抽采盲区的沿顶钻孔施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101280687A CN101280687A (zh) | 2008-10-08 |
CN100591893C true CN100591893C (zh) | 2010-02-24 |
Family
ID=40013332
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200810049874A Expired - Fee Related CN100591893C (zh) | 2008-05-27 | 2008-05-27 | 用于消除突出煤层抽采盲区的沿顶钻孔施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100591893C (zh) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101575983B (zh) * | 2009-02-27 | 2012-07-04 | 河南省煤层气开发利用有限公司 | 煤矿井下定向压裂增透消突方法及压裂增透消突装置 |
CN101614134B (zh) * | 2009-07-15 | 2011-07-06 | 中国矿业大学 | 钻、爆、抽三位一体卸压防突方法 |
CN103061732B (zh) * | 2012-12-20 | 2015-07-15 | 大同煤矿集团有限责任公司 | 煤层顶板中2-3米厚坚硬中砂岩层的水力致裂方法 |
CN103498680B (zh) * | 2013-10-16 | 2015-10-21 | 大同煤矿集团有限责任公司 | 提高综放工作面初采期间顶煤回收率的方法 |
CN103953285B (zh) * | 2014-04-10 | 2016-08-17 | 河南理工大学 | 顺层水力冲孔方法 |
CN108798758B (zh) * | 2017-04-28 | 2020-02-04 | 煤科集团沈阳研究院有限公司 | 沿顶大直径顺层钻孔抽采采空区及上隅角瓦斯工艺 |
CN109025999B (zh) * | 2018-09-12 | 2020-03-10 | 中国矿业大学 | 一种一场三用的顶煤弱化方法 |
CN110145340B (zh) * | 2019-06-19 | 2020-08-25 | 河南理工大学 | 一种煤层裂隙注浆封堵装置 |
CN112211666B (zh) * | 2020-09-30 | 2022-12-23 | 四川华蓥山龙滩煤电有限责任公司 | 一种采煤工作面盲区判别方法 |
CN112211644B (zh) * | 2020-10-20 | 2022-04-05 | 吕梁学院 | 一种松软含瓦斯煤层煤巷条带保障煤巷掘进的方法 |
CN113803104B (zh) * | 2021-09-29 | 2023-07-28 | 太原理工大学 | 上采区埋管与下向钻孔一体化布置及全周期瓦斯抽采方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101131069A (zh) * | 2006-08-25 | 2008-02-27 | 河南理工大学 | 突出煤层扒孔降温钻具及其钻进方法 |
CN101144389A (zh) * | 2007-04-06 | 2008-03-19 | 中国矿业大学 | 网格式穿层钻孔孔群增透瓦斯抽采方法 |
-
2008
- 2008-05-27 CN CN200810049874A patent/CN100591893C/zh not_active Expired - Fee Related
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101131069A (zh) * | 2006-08-25 | 2008-02-27 | 河南理工大学 | 突出煤层扒孔降温钻具及其钻进方法 |
CN101144389A (zh) * | 2007-04-06 | 2008-03-19 | 中国矿业大学 | 网格式穿层钻孔孔群增透瓦斯抽采方法 |
Non-Patent Citations (6)
Title |
---|
"三软"不稳定突出煤层消突技术研究. 刘际宏.中州煤炭,第5期. 2007 |
"三软"不稳定突出煤层消突技术研究. 刘际宏.中州煤炭,第5期. 2007 * |
突出松软煤层深孔打钻工艺的创新与应用. 代志旭等.煤矿安全. 2007 |
突出松软煤层深孔打钻工艺的创新与应用. 代志旭等.煤矿安全. 2007 * |
高瓦斯综采面顶板覆岩卸压抽放瓦斯试验研究. 卢平等.力学与实践,第25卷第4期. 2003 |
高瓦斯综采面顶板覆岩卸压抽放瓦斯试验研究. 卢平等.力学与实践,第25卷第4期. 2003 * |
Also Published As
Publication number | Publication date |
---|---|
CN101280687A (zh) | 2008-10-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100591893C (zh) | 用于消除突出煤层抽采盲区的沿顶钻孔施工方法 | |
CN104863629B (zh) | 一种利用复合钻孔抽覆岩下离层瓦斯及排水注浆的方法 | |
CN102337919B (zh) | “四期五用”钻孔高效抽采瓦斯工艺方法 | |
CN104763432B (zh) | 一种高应力巷道围岩卸压控制大变形的方法 | |
CN102536239B (zh) | 一种长壁工作面无煤柱开采方法 | |
CN102220868B (zh) | 城市浅埋大断面隧道五部开挖工法 | |
CN103216236A (zh) | 一种采场覆岩离层的注浆减沉方法 | |
CN101280688B (zh) | 突出煤层掘进工作面沿顶钻进大循环区域性消突方法 | |
CN104712358A (zh) | 基于首采全岩卸压工作面沿空留巷的高瓦斯煤层群卸压共采方法 | |
CN109236297B (zh) | 裂充结合上行复采刀柱残采区遗留煤层的采煤方法 | |
CN109209472A (zh) | 一种冲孔、爆破、注水相互耦合的煤层卸压防突方法 | |
CN107120137B (zh) | 一种煤巷掘进沿煤层底板深孔预裂爆破抽采方法 | |
CN112593936B (zh) | 一种深部矿井多灾害区域超前综合防治方法 | |
CN102877857B (zh) | 大采高工作面过特殊地质的深孔预注浆加固顶板方法 | |
CN108343418B (zh) | 从地表定向水压致裂预裂基岩控制采动影响范围的方法 | |
CN113404534B (zh) | 一种l型地面水平井分段压裂防治冲击地压的方法 | |
CN103953386A (zh) | 一种上堵下渗抽采采动区瓦斯的方法 | |
CN110966002B (zh) | 一种基于密集钻孔的切顶卸压方法 | |
AU2021106168A4 (en) | High-gas Coal Seam Group Pressure Relief Mining Method Based on Gob-side Entry Retaining in the First Mining Whole Rock Pressure Relief Working Face | |
CN107152279A (zh) | 旺格维利回采工作面顶板水力压裂弱化方法及装置 | |
US11976557B2 (en) | Coal bump control method for sectional hydraulic fracturing regions of near vertical ultra thick coal seam | |
CN107145684B (zh) | 一种地下岩体工程地压管理与控制方法 | |
CN112814679A (zh) | 一种缓倾斜厚煤层分层俯斜综采直覆坚硬顶板的预裂爆破方法 | |
CN106677781A (zh) | 一种极薄煤层钻采卸压增透方法 | |
CN110965964B (zh) | 一种特厚煤层瓦斯抽采方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100224 Termination date: 20130527 |