CN103953285B - 顺层水力冲孔方法 - Google Patents

顺层水力冲孔方法 Download PDF

Info

Publication number
CN103953285B
CN103953285B CN201410142003.9A CN201410142003A CN103953285B CN 103953285 B CN103953285 B CN 103953285B CN 201410142003 A CN201410142003 A CN 201410142003A CN 103953285 B CN103953285 B CN 103953285B
Authority
CN
China
Prior art keywords
coal seam
coal
bedding
diameter
drill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410142003.9A
Other languages
English (en)
Other versions
CN103953285A (zh
Inventor
李辉
李普
王志军
李超
岳志奇
王新伟
肖云涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan University of Technology
Original Assignee
Henan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan University of Technology filed Critical Henan University of Technology
Priority to CN201410142003.9A priority Critical patent/CN103953285B/zh
Publication of CN103953285A publication Critical patent/CN103953285A/zh
Application granted granted Critical
Publication of CN103953285B publication Critical patent/CN103953285B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

本发明公开了一种顺层水力冲孔方法,在预开采煤壁的一侧利用变径钻沿顺层向深层钻孔,产生厚度为h1直径为d1的外部小钻孔和厚度为h2直径为d2的内部大钻孔,其中d1<d2;退出变径钻后,向钻孔深处插入注水管,对其进行封孔并充入高压水。本发明解决了顺层开采一直以来存在容易发生瓦斯突出事故,而很难采取顺层采煤的问题,利用变径钻形成厚度为h1的煤墙作为保护墙可防止煤墙内部的煤层因受力不平衡而发生突出事故,保护工人安全。也可以提高水压力强度,使煤层内部压力增大,有充足的裂隙,达到更换的增透性。本发明与穿层水力冲孔相比,方法简单,效率高,工作量小,成本低。

Description

顺层水力冲孔 方法
技术领域
本发明涉及煤矿开采技术领域,尤其涉及一种煤层顺层水力冲孔破壁的安全作业方法。
背景技术
地下煤层处于长期高压状态,瓦斯被封闭和压缩于煤层的不同区域,形成稳定结构。但在开采过程中,由于新开采区域破坏了煤层平衡性,被封闭的瓦斯会突然释放,引起突出事故。目前,对煤层开采过程中通常需要在煤层钻孔,利用水力压裂增透,井下压裂显著增加了煤层的透气性。水力压裂的目的是使煤体内形成微裂隙和贯通裂隙,使煤层气快速运移出来,为下一步开采提供条件。
然而,由于煤体的松散性特点,不易直接进行水力压裂。顺层钻孔太小,内部空间小,不能达到较好的压力增透效果,顺层钻孔太大会使钻孔冲垮(我国关于突出煤层钻孔的外孔直径要求不超过120mm),甚至煤壁垮塌。另外,在高压水冲压过程中,破坏了煤层内部的受力平衡,如果某一区域煤层蕴含大量瓦斯,则有可能在高压冲孔的同时出现突出事故。
现有技术通常采用穿层的方法进行水力冲孔作业,即在煤层(大约2m厚的煤层)的上侧或下侧岩石层中钻孔,倾斜进入煤层中,然后充入高压水进行压裂增透。岩层硬度大,具有保护作业,封孔后可以提高水压,充分压裂煤层,提高增透性。然而,借助于岩层的穿层冲孔方法,需要在每个开层面都设置竖井,需要深入竖井中对岩层钻孔,工作量大,成本高,难度大,效率低。而且竖井数量增多会破坏地质构造,容易发生透水等问题。
发明内容
本发明的目的是为了解决顺层开采一直以来存在容易发生瓦斯突出事故,因而基本不敢采取顺层采煤的问题,提供一种通过顺层水力冲孔的方法,可以适合所有煤层构造,适用性强,降低开采难度,提高水力冲孔效率。
为实现上述目的,本发明采用如下技术方案:一种顺层水力冲孔方法,在预开采煤壁的一侧,利用变径钻沿煤层顺层方向,向深层钻孔,产生厚度为h1且直径为d1的外部小钻孔,同时又产生厚度为h2且直径为d2的内部大钻孔,其中d1<d2,从而在顺层煤层的预开采区域形成一层厚度为h1的煤墙;退出变径钻后,向钻孔深处插入注水管并对注水管进行封孔,注水管的出水口位于煤墙内侧的大钻孔中;向煤层深处充入高压水使大钻孔内的煤层形成微裂隙和贯通裂隙。
也可以在钻孔后先插入瓦斯抽放管对瓦斯进行抽放,然后再进行高压注水作业。在首次开采区域设置有与煤层连通的竖井,在竖井与顺层煤层交接位置,沿顺层向煤层内进行钻孔。
本发明的有益效果是:本发明利用变径钻形成煤墙作为保护墙,对保护墙内的煤层进行水力冲孔,煤墙可以提供支持强度,防止煤墙内部的煤层因受力不平衡而发生突出事故,保护工人安全。煤墙的作用可以提高水压力强度,使煤层内部压力增大,有充足的裂隙,达到更换的增透性。本发明与穿层水力冲孔相比,方法简单,效率高,工作量小,成本低。
本发明提高了煤层顺层水力冲孔的可行性和适用性,克服了一直以来顺层水力冲孔的难题和煤矿开采过程不适合顺层水力冲孔的偏见。通过在多种煤质条件下试用,效果非常显著,可以改变长期以来以穿层水力冲孔为主的局面,从而降低开采难度和开采成本,提高开采效率,确保工人安全。非常利于推广实施。
具体实施方式:
实施例1:一种顺层水力冲孔方法,(1)在预开采煤壁的一侧,利用变径钻沿顺层(煤层所在区域)向深层钻孔,产生厚度为20m,直径为70mm的外部小钻孔,同时产生厚度为60m,直径为150mm的内部大钻孔,从而形成一层厚度为20m的煤墙;(2)退出变径钻后,向钻孔深处插入注水管并对其进行封孔,出水口位于煤墙内侧的煤层中;(3)向煤层深处充入高压水使煤层内形成微裂隙和贯通裂隙。
实施例2:另一种顺层水力冲孔方法,在实施例1基础上,在第(1)步和低(2)步之间,插入瓦斯抽放管对煤层中的瓦斯进行抽放。
实施例3:在实施例1首次开采区域设置有与煤层连通的竖井,从竖井内开始首次顺层钻孔。

Claims (3)

1.一种顺层水力冲孔方法,其特征是:在预开采煤壁的一侧,利用变径钻沿煤层顺层方向,向深层钻孔,产生厚度为h1且直径为d1的外部小钻孔,同时又产生厚度为h2且直径为d2的内部大钻孔,其中d1<d2,从而在煤层的预开采区域形成一层厚度为h1的煤墙;退出变径钻后,向钻孔深处插入注水管并对注水管进行封孔,注水管的出水口位于煤墙内侧的大钻孔中;向煤层深处充入高压水使大钻孔内的煤层形成微裂隙和贯通裂隙。
2.根据权利要求1所述的顺层水力冲孔方法,其特征是:在钻孔后先插入瓦斯抽放管对瓦斯进行抽放,然后再进行高压注水作业。
3.根据权利要求1所述的顺层水力冲孔方法,其特征是:在首次开采区域设置有与煤层连通的竖井,在竖井与煤层交接位置,沿顺层向煤层内进行钻孔。
CN201410142003.9A 2014-04-10 2014-04-10 顺层水力冲孔方法 Expired - Fee Related CN103953285B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410142003.9A CN103953285B (zh) 2014-04-10 2014-04-10 顺层水力冲孔方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410142003.9A CN103953285B (zh) 2014-04-10 2014-04-10 顺层水力冲孔方法

Publications (2)

Publication Number Publication Date
CN103953285A CN103953285A (zh) 2014-07-30
CN103953285B true CN103953285B (zh) 2016-08-17

Family

ID=51330617

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410142003.9A Expired - Fee Related CN103953285B (zh) 2014-04-10 2014-04-10 顺层水力冲孔方法

Country Status (1)

Country Link
CN (1) CN103953285B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105736039A (zh) * 2016-01-29 2016-07-06 河南铁福来装备制造股份有限公司 一种掘进工作面顺层孔高压水力造穴瓦斯抽采方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101280687A (zh) * 2008-05-27 2008-10-08 河南理工大学 突出煤层沿顶钻孔施工技术及抽采盲区消除方法
CN101963066A (zh) * 2010-03-03 2011-02-02 北京鑫源九鼎科技有限公司 煤层顺层水力压裂抽放瓦斯的方法
CN102116168A (zh) * 2011-01-26 2011-07-06 河南理工大学 低渗透、松软煤层抽采瓦斯系统及方法
CN102619552A (zh) * 2012-02-24 2012-08-01 煤炭科学研究总院沈阳研究院 导向槽定向水力压穿增透及消突方法
CN102635388A (zh) * 2012-02-24 2012-08-15 煤炭科学研究总院沈阳研究院 煤层预裂爆破与水力压裂联作增透方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2436576B (en) * 2006-03-28 2008-06-18 Schlumberger Holdings Method of facturing a coalbed gas reservoir

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101280687A (zh) * 2008-05-27 2008-10-08 河南理工大学 突出煤层沿顶钻孔施工技术及抽采盲区消除方法
CN101963066A (zh) * 2010-03-03 2011-02-02 北京鑫源九鼎科技有限公司 煤层顺层水力压裂抽放瓦斯的方法
CN102116168A (zh) * 2011-01-26 2011-07-06 河南理工大学 低渗透、松软煤层抽采瓦斯系统及方法
CN102619552A (zh) * 2012-02-24 2012-08-01 煤炭科学研究总院沈阳研究院 导向槽定向水力压穿增透及消突方法
CN102635388A (zh) * 2012-02-24 2012-08-15 煤炭科学研究总院沈阳研究院 煤层预裂爆破与水力压裂联作增透方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
高压水射流扩孔技术的研究;梁运培等;《煤炭科学技术》;20011031;第29卷(第10期);第28-31页 *

Also Published As

Publication number Publication date
CN103953285A (zh) 2014-07-30

Similar Documents

Publication Publication Date Title
CN103362538B (zh) 煤层割缝致裂压抽交变抽采瓦斯方法
CN102155254B (zh) 一种低透气性煤层脉冲压裂增透抽采瓦斯方法
CN103510957B (zh) 一种组合式石门揭煤方法
CN101644156B (zh) 煤岩体水力爆破致裂弱化方法
CN101575983B (zh) 煤矿井下定向压裂增透消突方法及压裂增透消突装置
CN102383828B (zh) 深孔水力致裂驱赶瓦斯浅孔抽采的增透与消突方法
CN102852506B (zh) 一种高压气动爆破卸压增透方法
CN103195467B (zh) 一种水力压裂与注浆固化相结合的石门揭煤方法
CN105507940B (zh) 一种割封压一体化强化瓦斯抽采装置及方法
CN105041344B (zh) 一种微裂隙围岩预切槽高压气体扩缝注浆堵水方法
CN101666241B (zh) 一种区域瓦斯治理钻爆压抽一体化防突方法
CN106907175A (zh) 底板顺层长钻孔分段压裂高效抽放煤巷条带瓦斯及区域消突方法
CN105239983B (zh) 一种预裂与高压注水相结合的低透气性煤层弱化增透方法
CN106869966B (zh) 一种离层水补给源的封堵方法
CN102817603B (zh) 一种连通地面与地下开采煤层气的方法
CN102628352B (zh) 一种多段式定点水力压裂方法
CN103912302B (zh) 一种穿层钻孔水力破裂瓦斯抽采方法
CN104763462A (zh) 岩巷穿层钻孔高压水力造穴瓦斯抽采方法
CN104389559B (zh) 一种防治厚煤层开采过程中瓦斯超限的方法及装置
CN207048739U (zh) 一种低瓦斯矿井瓦斯地面抽采技术钻井井身结构
CN104329113B (zh) 一种地面钻孔松动爆破煤层底板卸压抽采瓦斯的方法
CN106285680B (zh) 冲击性软煤层巷道后路冲击地压防治方法
CN105909225A (zh) 综放工作面架间定向水压致裂顶煤弱化方法
CN103147734A (zh) 煤矿井下顺煤层多段水力压裂方法
CN104763368A (zh) 大直径潜孔锤用孔口密封装置及其反循环施工工艺

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160817

Termination date: 20210410