CN102852506B - 一种高压气动爆破卸压增透方法 - Google Patents

一种高压气动爆破卸压增透方法 Download PDF

Info

Publication number
CN102852506B
CN102852506B CN201210393559.6A CN201210393559A CN102852506B CN 102852506 B CN102852506 B CN 102852506B CN 201210393559 A CN201210393559 A CN 201210393559A CN 102852506 B CN102852506 B CN 102852506B
Authority
CN
China
Prior art keywords
blasting
pressure
steel pipe
coal body
drill hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210393559.6A
Other languages
English (en)
Other versions
CN102852506A (zh
Inventor
林柏泉
杨威
郑春山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201210393559.6A priority Critical patent/CN102852506B/zh
Publication of CN102852506A publication Critical patent/CN102852506A/zh
Priority to AU2013330947A priority patent/AU2013330947B2/en
Priority to PCT/CN2013/074447 priority patent/WO2014059777A1/zh
Priority to RU2014138190/03A priority patent/RU2588095C2/ru
Application granted granted Critical
Publication of CN102852506B publication Critical patent/CN102852506B/zh
Priority to ZA2014/07507A priority patent/ZA201407507B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C37/00Other methods or devices for dislodging with or without loading
    • E21C37/06Other methods or devices for dislodging with or without loading by making use of hydraulic or pneumatic pressure in a borehole
    • E21C37/14Other methods or devices for dislodging with or without loading by making use of hydraulic or pneumatic pressure in a borehole by compressed air; by gas blast; by gasifying liquids

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Rigid Pipes And Flexible Pipes (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Pipe Accessories (AREA)
  • Measuring Fluid Pressure (AREA)

Abstract

一种高压气动爆破卸压增透方法,包括在煤层中施工爆破钻孔,在爆破钻孔中间隔进行高压水射流割缝作业,使爆破钻孔周围煤体内形成引导缝槽;在爆破钻孔中送入顶部封堵的爆破钢管,爆破钢管的前部开有若干气孔,对爆破钻孔的孔口向内进行8-10m的密封段,形成水泥塞;在爆破钢管外露端经管路与高压气站相连接,打开设在管路上的阀门注入高压气,使高压气体经由爆破钢管从若干气孔中喷出,在原有煤体裂隙和割缝所形成的缝槽、裂隙的基础上,高压气体的瞬间冲击爆破作用会使原有缝槽、裂隙不断扩大,并产生很多新的裂隙,最终使煤体内形成以爆破钻孔为中心相互连通的大裂隙网,达到煤体卸压增透的目的。且其操作简单、易于实现、效果显著。

Description

一种高压气动爆破卸压增透方法
技术领域
本发明涉及一种高压气动爆破卸压增透方法,尤其适用于煤矿井下区域瓦斯治理的煤体卸压增透。
背景技术
我国煤矿的瓦斯地质条件较为复杂,其中高瓦斯煤层占50%-70%,而低透气性煤层又占其中的70%左右。因此,应把瓦斯的防治工作作为煤矿安全工作的重中之重,但对于低透气性煤层来说,为达到较佳的瓦斯治理效果,应把有效实现煤体的卸压增透作为首要工作。目前,煤体卸压增透方法有很多,如开采保护层、定向水力压裂、深孔松动爆破、水力冲孔等。开采保护层已被证明是一种行之有效的方法,但其对煤层赋存条件要求比较苛刻,不是所有的煤层均可应用此法;定向水力压裂方法效果亦很显著,前苏联经验表明:可使瓦斯抽采率达到60%左右,但是在压裂裂缝周围会产生应力集中区,形成潜在的安全隐患,另外,该方法对钻孔密封的要求较高,在井下进行定向水力压裂的工作时,频繁出现注入煤体内部的高压水从孔口上部流出的现象;而水力冲孔对地应力大、瓦斯压力大、煤质松软易粉化流变的有自喷能力的软分层,效果良好,但其所需水量大、工艺复杂,不易推广利用。
发明内容
技术问题:本发明的目的是针对已有技术中的不足,提供一种操作简单、易于实现、效果显著的煤体卸压增透方法。
技术方案:本发明的高压气动爆破卸压增透方法,包括在煤层中施工爆破钻孔,在所述的爆破钻孔中间隔进行高压水射流割缝作业,使爆破钻孔周围煤体内形成引导缝槽;在爆破钻孔中送入顶部封堵的爆破钢管,爆破钢管的前部开有若干气孔,对爆破钻孔的孔口向内进行8-10m的密封段,形成水泥塞;在爆破钢管外露端经管路与高压气站相连接,打开设在管路上的阀门注入高压气,使高压气体经由爆破钢管从若干气孔中喷出,实现高压气动爆破煤体。
所述注入的高压气压力为25Mpa。
有益效果:由于气体是一种可压缩流体,尤其对高速流动的气体更是如此,且气体的压缩系数一般都很大,空气在一个大气压下的等温压缩系数 ,而水在同样情况下为,可见空气比水的压缩系数大五个数量级,故在高压气体瞬间得以释放时,会产生巨大的能量。因此本发明利用高压气体对煤体进行高压气动爆破,并辅以水力割缝措施,是实现煤体卸压增透的一种有效方法。本发明采用在爆破钻孔成孔之后,先进行水力割缝作业,形成高压气体引导缝槽和裂隙,使得高压气动爆破后,裂隙的产生和贯通效果更好;对爆破钻孔开口段进行密封之后,突然间打开阀门,高压气体经由爆破钢管从气孔迅速喷出作用于周围煤体,高压气体的瞬间冲入、膨胀使得原有缝槽、裂隙不断扩大及产生新的裂隙,随后进入裂隙网内的高压气体,在裂隙内形成小的局部气动爆破,使煤体裂隙不断扩大、贯通,从而裂隙越变越大,产生的新裂隙越来越多,如此循环下去,最终在煤体内形成以爆破钻孔为中心相互连通的大裂隙网,达到煤体卸压增透的目的,从而提高瓦斯抽采率,解决高瓦斯低透气性煤层渗透率低、瓦斯抽采效果差的技术难题。且其操作简单、易于实现、效果显著。 
附图说明
附图是本发明所述高压气动爆破方法的纵向剖视图。
图中 1.高压气站;2. 阀门;3.爆破钢管;4.水泥塞;5.爆破钻孔;6.气孔;7.煤层;8.引导缝槽。
具体实施方式
下面结合附图中的实施例对本发明作进一步的描述:
本发明的高压气动爆破卸压增透方法,首先按常规在煤层7中施工爆破钻孔5,爆破钻孔5的深度为25-30m;爆破钻孔5成孔之后,在爆破钻孔5中由里向外间隔进行高压水射流割缝作业,使爆破钻孔5内部周围的煤体内形成等间距的引导缝槽8;割缝一方面能使煤体产生更多的裂隙,增强煤体的卸压增透效果,另一方面,这些缝槽和裂隙能够起到引导、控制作用,使得高压气体集中冲击于几个方向,裂隙的产生和贯通效果更好,爆破效果更好;在爆破钻孔5中送入顶部封堵的爆破钢管3,爆破钢管3的前部封闭端外壁上开有若干气孔6,采用满足耐高强度气动冲击要求的密封材料及工艺对爆破钻孔5的孔口段进行密封,形成8-10m的水泥塞4;也可采用“强弱强”的密封方法对爆破钻孔5的孔口段进行密封,“强弱强”密封的孔口密封段的两端为强度较高的封孔材料,中间段为塑性较高的封孔材料,两端的高强度封孔材料可以有效阻挡高压气体冲击波,同时中间段的高塑性封孔材料能够有效吸收冲击波,可以实现有效的密封,保证良好的爆破效果。将爆破钢管3的开口端通过阀门2与高压气站1连接,阀门2是一个快速启动开关,以实现高压气体的瞬间释放,同时可设为远程控制开关,通过传感器进行操控,以达到安全要求。打开设在管路上的阀门2注入高压气,注入的高压气体压力为25Mpa,高压气体经由爆破钢管3从若干气孔6中喷出,作用于周围煤体形成新的缝隙,在原有裂隙和割缝缝槽、裂隙存在的基础上,切割能力很强的高压气体不断作用于煤体,同时,高压气体瞬间冲入煤体,会不断扩大原有裂隙,这样裂隙的数目和尺寸均大大增加,而后更多的高压气体进入不断增多、增大的煤体裂隙中,由于高压气体的压缩系数很大,故裂隙中的高压气体蕴含着巨大的膨胀能,随着气体体积的不断膨胀,会在裂隙中形成一个个局部气动爆破,使煤体裂隙变得更多,尺寸变得更大,并不断地交汇贯通,这样会有更多的高压气体进入煤体裂隙之中,如此不断地积累叠加、循环反复,最终在煤体内形成以爆破钻孔为中心相互贯通的大裂隙网,从而达到煤体卸压增透的目的,实现高压气动爆破煤体。

Claims (1)

1.一种高压气动爆破卸压增透方法,包括在煤层(7)中施工爆破钻孔(5),其特征在于:在所述的爆破钻孔(5)中间隔进行高压水射流割缝作业,使爆破钻孔(5)周围煤体内形成引导缝槽(8);在爆破钻孔(5)中送入顶部封堵的爆破钢管(3),爆破钢管(3)的前部开有若干气孔(6),对爆破钻孔(5)的孔口向内进行8-10m的密封段,形成水泥塞(4);在爆破钢管(3)外露端经管路与高压气站(1)相连接,打开设在管路上的阀门(2)注入高压气,使高压气体经由爆破钢管(3)从若干气孔(6)中喷出,实现高压气动爆破煤体,所述注入的高压气压力为25MPa。
CN201210393559.6A 2012-10-17 2012-10-17 一种高压气动爆破卸压增透方法 Active CN102852506B (zh)

Priority Applications (5)

Application Number Priority Date Filing Date Title
CN201210393559.6A CN102852506B (zh) 2012-10-17 2012-10-17 一种高压气动爆破卸压增透方法
AU2013330947A AU2013330947B2 (en) 2012-10-17 2013-04-19 High-pressure pneumatic blasting pressure relieving and transmission increasing method
PCT/CN2013/074447 WO2014059777A1 (zh) 2012-10-17 2013-04-19 一种高压气动爆破卸压增透方法
RU2014138190/03A RU2588095C2 (ru) 2012-10-17 2013-04-19 Сброс давления пневматического взрыва высокого давления и способ усиления передачи
ZA2014/07507A ZA201407507B (en) 2012-10-17 2014-10-16 High-pressure pneumatic blasting pressure relieving and transmission increasing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210393559.6A CN102852506B (zh) 2012-10-17 2012-10-17 一种高压气动爆破卸压增透方法

Publications (2)

Publication Number Publication Date
CN102852506A CN102852506A (zh) 2013-01-02
CN102852506B true CN102852506B (zh) 2014-05-14

Family

ID=47399438

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210393559.6A Active CN102852506B (zh) 2012-10-17 2012-10-17 一种高压气动爆破卸压增透方法

Country Status (4)

Country Link
CN (1) CN102852506B (zh)
AU (1) AU2013330947B2 (zh)
WO (1) WO2014059777A1 (zh)
ZA (1) ZA201407507B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104696006A (zh) * 2015-02-03 2015-06-10 太原理工大学 地面钻井穿透残留煤柱抽采多层老空区残余煤层气的方法

Families Citing this family (39)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102852506B (zh) * 2012-10-17 2014-05-14 中国矿业大学 一种高压气动爆破卸压增透方法
CN103046949B (zh) * 2013-01-15 2014-11-19 中国矿业大学 一种偏置气液两相射流割缝增透装置及方法
CN103195466B (zh) * 2013-03-30 2015-08-19 重庆大学 一种定向水压爆破提高煤层透气性的方法
CN103362538B (zh) * 2013-07-15 2015-04-22 中国矿业大学 煤层割缝致裂压抽交变抽采瓦斯方法
CN103334790B (zh) * 2013-07-23 2015-10-28 辽宁工程技术大学 基于高压气体爆破的煤层顶板超前预裂方法
CN103510979B (zh) * 2013-10-30 2015-07-08 河南理工大学 干冰爆炸增透装置及其抽放瓦斯的方法
CN103821516B (zh) * 2014-03-10 2016-09-21 平顶山天安煤业股份有限公司 二次卸压防治冲击地压的方法
CN103939075B (zh) * 2014-04-21 2016-11-16 杨世梁 一种提高煤矿瓦斯抽采效果的压裂方法及装置
CN103899349B (zh) * 2014-04-23 2015-12-09 重庆市能源投资集团科技有限责任公司 一种煤层瓦斯预抽采方法及抽采孔径向钻进导向装置
CN103912304A (zh) * 2014-04-23 2014-07-09 重庆市能源投资集团科技有限责任公司 一种松软煤层本层瓦斯抽采方法
CN104314606B (zh) * 2014-08-15 2016-01-13 中国矿业大学 一种钻孔内水力割缝与瓦斯爆炸致裂煤体联合强化抽采方法
CN104632270B (zh) * 2015-01-06 2016-11-16 中国矿业大学 一种振荡脉冲式高能气体压裂与注热交变抽采瓦斯方法
CN104612746B (zh) * 2015-01-12 2016-08-24 中国矿业大学 一种钻孔内割-爆耦合式煤体增透方法
CN104763335A (zh) * 2015-02-05 2015-07-08 山东华坤地质工程有限公司 高压水射流钻孔旋切方法
CN104989356A (zh) * 2015-06-10 2015-10-21 太原理工大学 一种煤矿井下煤层钻孔高压气体压裂增透方法及系统
CN105275443B (zh) * 2015-11-06 2018-10-19 中国矿业大学 一种煤矿井下高功率电爆震辅助水力压裂增透方法
CN105332684B (zh) * 2015-11-13 2017-09-12 重庆大学 一种高压水爆与co2压裂相结合的煤层气驱替抽采工艺
CN105954124A (zh) * 2016-04-20 2016-09-21 张家港市华尊宝特种材料科技有限公司 一种在高低温中进行钢管高压爆破的设备以及检测方法
CN105927268B (zh) * 2016-04-21 2017-12-15 中国矿业大学 一种诱导抽采后期钻孔孔内瓦斯燃爆煤层增透的抽采方法
CN105909302B (zh) * 2016-04-21 2017-12-12 中国矿业大学 一种诱导钻孔抽采后期瓦斯燃爆煤层增透的系统及工艺
CN105781549B (zh) * 2016-04-25 2019-03-12 重庆科技学院 一种外部气压与内部水囊联合爆破岩石的装置及方法
CN105735993B (zh) * 2016-04-26 2017-12-19 辽宁工程技术大学 一种基于二氧化碳爆破的防治坚硬顶板型冲击地压的方法
CN105804753B (zh) * 2016-04-26 2018-01-30 辽宁工程技术大学 一种基于二氧化碳爆破的弱化坚硬煤层放顶煤的方法
CN106442265A (zh) * 2016-10-14 2017-02-22 安徽理工大学 一种弱瓦斯爆炸诱导下煤岩增透试验系统
CN106761901B (zh) * 2016-12-02 2020-04-03 中国矿业大学(北京) 矿用煤岩体冲击防止煤岩动力灾害技术及装备
CN106930724B (zh) * 2017-04-17 2019-03-15 山东科技大学 一种富含水钻孔密封及瓦斯抽采一体化方法
CN107989586B (zh) * 2017-10-18 2018-12-25 西安交通大学 基于可控冲击波复合浪涌式增压注水的煤层气井改造方法
CN108708722B (zh) * 2018-03-27 2020-01-14 山东科技大学 一种用于低透气性煤层的高效防治冲击地压的方法
CN108594295B (zh) * 2018-05-31 2019-12-17 天地科技股份有限公司 一种煤层爆破卸压效果评价方法
CN109252846B (zh) * 2018-11-13 2019-09-20 煤科集团沈阳研究院有限公司 高压空气脉冲水波周期性锤击煤体增透系统及方法
CN109372572A (zh) * 2018-12-20 2019-02-22 华北科技学院 一种低渗透性煤层瓦斯高效抽采方法
CN109989752B (zh) * 2019-05-13 2023-12-19 西安科技大学 一种内注式静态破碎煤层围岩卸压装置
CN110529090A (zh) * 2019-09-25 2019-12-03 高九华 一种以爆破气体冲击波激震压裂煤岩增透装置及方法
CN111441227B (zh) * 2020-03-30 2024-06-07 中山大学 诱导缝切割装置及既有冻土路基公路防治冻胀融沉的方法
CN112459762A (zh) * 2020-10-13 2021-03-09 北京科技大学 一种原位溶浸瞬间高压气脉冲造缝系统及其使用方法
CN113565431A (zh) * 2021-08-27 2021-10-29 中国铁建重工集团股份有限公司 一种气动潜孔锤用空压机压力控制方法
CN113668498A (zh) * 2021-08-27 2021-11-19 中铁十九局集团广州工程有限公司 一种杂土硬壳层排水板堆载预压沉降施工方法
CN114033375A (zh) * 2021-11-26 2022-02-11 重庆大学 一种水力切槽与高压劈裂耦合的坚硬顶板造缝方法
CN116411964B (zh) * 2023-05-26 2024-01-02 中国矿业大学 一种适用于硬岩的水力压裂截割协同装置及使用方法

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101614133A (zh) * 2009-07-14 2009-12-30 中国矿业大学 高压射流钻割一体化卸压防突方法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101813002B (zh) * 2010-04-26 2011-11-16 张海成 一种基于瓦斯抽采的煤层预裂方法
CN102852506B (zh) * 2012-10-17 2014-05-14 中国矿业大学 一种高压气动爆破卸压增透方法

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101614133A (zh) * 2009-07-14 2009-12-30 中国矿业大学 高压射流钻割一体化卸压防突方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
高压空气冲击煤体增透技术实验研究;高坤 等;《矿业安全与环保》;20111231;第38卷(第6期);9-11,14 *
高坤 等.高压空气冲击煤体增透技术实验研究.《矿业安全与环保》.2011,第38卷(第6期),9-11,14.

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104696006A (zh) * 2015-02-03 2015-06-10 太原理工大学 地面钻井穿透残留煤柱抽采多层老空区残余煤层气的方法
CN104696006B (zh) * 2015-02-03 2016-07-27 太原理工大学 地面钻井穿透残留煤柱抽采多层老空区残余煤层气的方法

Also Published As

Publication number Publication date
CN102852506A (zh) 2013-01-02
ZA201407507B (en) 2015-11-25
RU2014138190A (ru) 2016-04-10
AU2013330947B2 (en) 2016-04-07
WO2014059777A1 (zh) 2014-04-24
AU2013330947A1 (en) 2015-02-05

Similar Documents

Publication Publication Date Title
CN102852506B (zh) 一种高压气动爆破卸压增透方法
CN102678117B (zh) 基于聚能爆破的定向水力致裂方法
US20170370156A1 (en) Method of performing combined drilling, flushing, and cutting operations on coal seam having high gas content and prone to bursts to relieve pressure and increase permeability
CN103742115B (zh) 一种煤矿井下压裂密封装置及方法
CN109252846B (zh) 高压空气脉冲水波周期性锤击煤体增透系统及方法
CN104131832A (zh) 一种高瓦斯煤层冲割压抽一体化的卸压增透瓦斯抽采方法
CN104213921B (zh) 基于水力割缝的冻结式石门揭煤方法
CN105332684A (zh) 一种高压水爆与co2压裂相结合的煤层气驱替抽采工艺
CN104265354A (zh) 一种低透气性煤层水力相变致裂强化瓦斯抽采方法
CN104696003A (zh) 一种钻割一体化与振荡注热协同强化煤层瓦斯抽采方法
CN104563990A (zh) 一种钻冲割一体化与注热协同强化煤层瓦斯抽采方法
CN102619552A (zh) 导向槽定向水力压穿增透及消突方法
CN104481574A (zh) 一种利用高能声电复合技术提高煤层透气性的方法
CA2943638C (en) Production enhancement system using robot drill for drilling multi-branched fishbone and radial microholes in shale gas reservoir, and method thereof
CN105370256A (zh) 一种分段预裂提高低透气性煤层高压注水湿润半径的方法
CN105909225A (zh) 综放工作面架间定向水压致裂顶煤弱化方法
CN103510979A (zh) 干冰爆炸增透装置及其抽放瓦斯的方法
CN105804786A (zh) 一种松软煤层底板穿层钻孔压冲增透方法
CN101975023B (zh) 一种顺层钻进松软煤层深长瓦斯抽采孔的方法及装置
CN109458214A (zh) 一种低透气性煤层静态爆破增透瓦斯抽采方法
CN109209325A (zh) 一种利用径向技术进行立井揭煤的方法
CN103615014B (zh) 一种软土基坑的降水装置及其使用方法
CN104912588A (zh) 一种用于井下煤层巷道快速掘进的胀裂增透方法
CN105003294A (zh) 一种基于水热耦合压裂煤体石门揭煤方法
CN110617103B (zh) 煤矿井下瓦斯抽放钻孔增透改造方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant