CN202039860U - 平行对拉式综放面结构 - Google Patents

平行对拉式综放面结构 Download PDF

Info

Publication number
CN202039860U
CN202039860U CN2011201339448U CN201120133944U CN202039860U CN 202039860 U CN202039860 U CN 202039860U CN 2011201339448 U CN2011201339448 U CN 2011201339448U CN 201120133944 U CN201120133944 U CN 201120133944U CN 202039860 U CN202039860 U CN 202039860U
Authority
CN
China
Prior art keywords
mechanized
full
work
face
roadway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011201339448U
Other languages
English (en)
Inventor
蒋风雷
张启
席刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Jincheng Anthracite Mining Group Co Ltd
Original Assignee
Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Jincheng Anthracite Mining Group Co Ltd filed Critical Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority to CN2011201339448U priority Critical patent/CN202039860U/zh
Application granted granted Critical
Publication of CN202039860U publication Critical patent/CN202039860U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本实用新型涉及煤矿井下工作面设计领域,具体为一种平行对拉式综放面结构,解决现有工作面巷道布置多、皮带运输机需求量多以及预留煤柱多等问题,包括平行设置的第一综采工作面、第二综采工作面,两个综采工作面之间设有一个进风及皮带运输巷,每个综采工作面外侧均设有一个回风及辅助运输巷。两个回采面之间为无煤柱设计,提高回采率,高产高效;两个工作面共用一条中间运输巷,一条巷道发挥两条巷道的功能,减少了巷道的施工工程量,节省人力、物力、财力;两个工作面之间共用一条皮带运输,减少了设备的采购、安装、维护、检修费用,同时可以提高设备的开机率及利用率;最大长臂可达400-500米工作面长度。

Description

平行对拉式综放面结构
技术领域
本实用新型涉及煤矿井下工作面设计领域,具体为一种平行对拉式综放面结构。
背景技术
目前,煤矿井下工作面巷道多,巷道施工准备时间长,准备费用、人工费用、材料费用高,回采效率低,主要制约因素就是每个工作面必须至少有两条巷道,才能满足进回风和安全生产需要。在高瓦斯矿井或高瓦斯区域,甚至有些矿井的每个工作面需要布置5条或7条巷道,才能满足瓦斯治理需要。目前的煤矿综采工作面,每个面至少需要一套皮带运输机来进行煤炭运输,增加了运输成本,而且煤矿井下每两个回采工作面之间,在回采后,都留有一个或多个煤柱,造成煤炭资源浪费。
发明内容
本实用新型为了解决现有工作面巷道布置多、皮带运输机需求量多以及预留煤柱多等问题,提供一种平行对拉式综放面结构。
本实用新型是采用如下技术方案实现的:平行对拉式综放面结构,包括平行设置的第一综采工作面、第二综采工作面,两个综采工作面之间设有一个进风及皮带运输巷,每个综采工作面外侧均设有一个回风及辅助运输巷。
采用本实用新型的结构设计,两个工作面采用“一进(进风巷,兼作皮带运输巷)两回(回风巷,兼作辅助运输巷)”布置,具体为两个综采工作面平行布置,中间共用一条进风巷(即共用一条皮带运输巷),两个综采面的转载机和破碎机平行布置,共同搭接在一条运输皮带上;两个综采工作面平行布置,回采时同时进行;两个综采工作面平行布置,回采后两个面之间为无煤柱留设。
与现有技术相比,本实用新型所述平行对拉式无煤柱高产高效综放面设计的特点及优势:
1、两个回采面之间为无煤柱设计,提高回采率,高产高效;
2、两个工作面共用一条中间运输巷,一条巷道发挥两条巷道的功能,减少了巷道的施工工程量,节省人力、物力、财力;
3、两个工作面之间共用一条皮带运输,减少了设备的采购、安装、维护、检修费用,同时可以提高设备的开机率及利用率;
4、最大长臂可达400-500米工作面长度。
附图说明
图1为本实用新型的结构示意图;
图中: 1-第一综采工作面;2-第二综采工作面;3-进风及皮带运输巷;4-回风及辅助运输巷;5-工作面溜子;6-转载机;7-皮带运输机。
具体实施方式
平行对拉式综放面结构,如图1所示,包括平行设置的第一综采工作面1、第二综采工作面2,两个综采工作面之间设有一个进风及皮带运输巷3,每个综采工作面外侧均设有一个回风及辅助运输巷4。
开采时,第一综采工作面和第二综采工作面同时开采,两个综采工作面中间为无煤柱设计,两个工作面开采时同时共用一条进风巷(皮带巷),共用一条运输皮带机,每个工作面的转载机同时搭接在这一条皮带机上。通风方式为“T型”即“一进两回”。

Claims (1)

1.一种平行对拉式综放面结构,其特征是包括平行设置的第一综采工作面(1)、第二综采工作面(2),两个综采工作面之间设有一个进风及皮带运输巷(3),每个综采工作面外侧均设有一个回风及辅助运输巷(4)。
CN2011201339448U 2011-04-29 2011-04-29 平行对拉式综放面结构 Expired - Lifetime CN202039860U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201339448U CN202039860U (zh) 2011-04-29 2011-04-29 平行对拉式综放面结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201339448U CN202039860U (zh) 2011-04-29 2011-04-29 平行对拉式综放面结构

Publications (1)

Publication Number Publication Date
CN202039860U true CN202039860U (zh) 2011-11-16

Family

ID=44967309

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201339448U Expired - Lifetime CN202039860U (zh) 2011-04-29 2011-04-29 平行对拉式综放面结构

Country Status (1)

Country Link
CN (1) CN202039860U (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103696782A (zh) * 2013-12-17 2014-04-02 中煤西安设计工程有限责任公司 一种矿山超大断面组合巷道布置方法
CN105525921A (zh) * 2016-02-18 2016-04-27 刘玉勇 共轭式采准方法
CN107882562A (zh) * 2016-09-29 2018-04-06 河南理工大学 对拉工作面布置煤柱回收的实现方法
CN108979658A (zh) * 2018-07-20 2018-12-11 淮阴工学院 一种适用于智能化无人工作面的t型巷道布局

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103696782A (zh) * 2013-12-17 2014-04-02 中煤西安设计工程有限责任公司 一种矿山超大断面组合巷道布置方法
CN103696782B (zh) * 2013-12-17 2015-07-22 中煤西安设计工程有限责任公司 一种矿山超大断面组合巷道布置方法
CN105525921A (zh) * 2016-02-18 2016-04-27 刘玉勇 共轭式采准方法
CN107882562A (zh) * 2016-09-29 2018-04-06 河南理工大学 对拉工作面布置煤柱回收的实现方法
CN107882562B (zh) * 2016-09-29 2020-06-05 河南理工大学 对拉工作面布置煤柱回收的实现方法
CN108979658A (zh) * 2018-07-20 2018-12-11 淮阴工学院 一种适用于智能化无人工作面的t型巷道布局

Similar Documents

Publication Publication Date Title
CN102493838B (zh) 一种急倾斜煤层综采连续充填采煤方法
CN102155260B (zh) 一种急倾斜煤层采空区充填方法
CN103821515B (zh) 一种对拉工作面充填采煤工艺
CN101187308A (zh) 薄煤层高效综采工艺
CN101526001A (zh) 薄煤层综采对拉工作面采煤工艺
CN106321103A (zh) 一种固体充填协同人工矿柱回收房式煤柱方法
CN104653182B (zh) 一种含厚夹矸煤层煤矸分采的采煤方法
CN202039860U (zh) 平行对拉式综放面结构
CN102182460A (zh) 高瓦斯多巷无煤柱开采法
CN105298496A (zh) 设置预留工作面煤柱的全采全充采煤方法
CN104088662A (zh) 一种固体充填采煤沿空留巷支护墙体的施工方法
CN103485786A (zh) 一种急倾斜煤层走向长壁机械化开采方法
CN109882239A (zh) 一种露天端帮压煤放射式充填开采方法
CN204299617U (zh) 一种防刮裂型沿空留巷充填气囊
CN105240012A (zh) 一种实现煤柱同采的f型区段采煤方法
CN103147757A (zh) 一种间歇式采煤方法
CN106285682A (zh) 房柱采矿法
CN103850690A (zh) 一种用于无煤柱开采的混凝土砌块配合锚索切顶沿空留巷方法
CN202544921U (zh) 岩巷快速掘进排矸装置
CN103291344A (zh) 一种高瓦斯工作面跨区段双u型通风系统及其使用方法
CN204041072U (zh) 原煤管状顺槽运输系统装备
CN104444209B (zh) 皮带机过轨道运输装置
CN103939132B (zh) 一种连续自动化的矿床地下开采运输方法
CN107882562B (zh) 对拉工作面布置煤柱回收的实现方法
CN205150919U (zh) 一种可移式装载转运装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20111116

CX01 Expiry of patent term