CN105040706B - A kind of Retaining Structure with Double-row Piles and its construction method that can make full use of basement space - Google Patents

A kind of Retaining Structure with Double-row Piles and its construction method that can make full use of basement space Download PDF

Info

Publication number
CN105040706B
CN105040706B CN201510253634.2A CN201510253634A CN105040706B CN 105040706 B CN105040706 B CN 105040706B CN 201510253634 A CN201510253634 A CN 201510253634A CN 105040706 B CN105040706 B CN 105040706B
Authority
CN
China
Prior art keywords
campshed
basement
stake
construction
double
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510253634.2A
Other languages
Chinese (zh)
Other versions
CN105040706A (en
Inventor
曹净
刘玮辰
赵党书
刘甜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunming University of Science and Technology
Original Assignee
Kunming University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunming University of Science and Technology filed Critical Kunming University of Science and Technology
Priority to CN201510253634.2A priority Critical patent/CN105040706B/en
Publication of CN105040706A publication Critical patent/CN105040706A/en
Application granted granted Critical
Publication of CN105040706B publication Critical patent/CN105040706B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The present invention relates to a kind of Retaining Structure with Double-row Piles and its construction method that can make full use of basement space, belong to construction and field of house buildings.Campshed stake top is provided with Guan Liang I before the present invention, the stake top of campshed is provided with Guan Liang II afterwards, preceding campshed and rear campshed stake top are connected by coupling beam I, it is provided with water-stop curtain stake after campshed stake in the soil body afterwards, after the leveling of place one of coupling beam II, coupling beam II and negative one layer basement bottom board one-piece casting are poured by all engineering piles of designing and constructing, preceding campshed stake top after a resection, the charge stratifying compacted fill between preceding campshed and minus two layers of outer wall of basement, plain concrete is filled between preceding campshed and minus two layers of basement bottom board.The present invention by double-row pile and Single row pillars etc. rigidity substitution principle, the rigidity such as double-row pile are replaced into single pilework, can not only control the horizontal displacement of supporting structure system, while pattern foundation pit supporting structure expense can also be greatly reduced;There is preferable economy in the base pit engineering with multi-storey basement.

Description

A kind of Retaining Structure with Double-row Piles and its construction method that can make full use of basement space
Technical field
The present invention relates to a kind of Retaining Structure with Double-row Piles and its construction method that can make full use of basement space, belong to and build Build construction and field of house buildings.
Background technology
With the quickening of urbanization process paces, the building height more and more higher of inner city, the ground of building Lower room is towards deeper, great development, and geological conditions is worse and worse, and base pit engineering surrounding enviroment become increasingly complex.Central city The available land resource of base pit engineering in area is fewer and fewer, but how sharp to greatest extent in existing land resource With being the common target most asked of developers.At present, China frequently with supporting scheme have:Slope excavation, soil-nail wall support, stake Anchor supporting, cement-soil gravity type retaining wall, campshed add the support patterns such as inner supporting structure, double-row pile.Slope is excavated, soil nail wall branch Shield, pile-anchor retaining are excessive in the support space required for inner city, can not often use.For the base containing multi-storey basement Engineering is cheated, the requirement of foundation pit deformation can not be met using cantilevered Single row pillars supporting construction;Cantilevered Retaining Structure with Double-row Piles is firm Degree is big but adaptation depth is limited;Common campshed adds high inner support supporting construction cost, long construction period and basement space to utilize Rate is inadequate.Therefore, there is certain limitation using traditional supporting construction.
The content of the invention
In order to preferably solve the above problems, while basement space is set to be fully utilized, the present invention provides A kind of Retaining Structure with Double-row Piles and its construction method that can make full use of basement space.
The technical scheme is that:A kind of Retaining Structure with Double-row Piles that can make full use of basement space, by preceding campshed 1st, rear campshed 2, Guan Liang I 3, Guan Liang II 4, coupling beam I 5, water-stop curtain stake 6, basement 7, engineering pile 8, plain concrete 9, layering are rammed 10, negative one layer basement bottom board 12, minus two layers of basement bottom board 13, the coupling beam II 14 of banketing in fact form;The wherein preceding stake top of campshed 1 is set There is Guan Liang I 3, the stake top of rear campshed 2 is provided with Guan Liang II 4, preceding campshed 1 and the stake top of rear campshed 2 and connected by coupling beam I 5, rear campshed 2 Water-stop curtain stake 6 is provided with after stake in the soil body, by all engineering piles 8 of designing and constructing, preceding campshed after a resection 1 after the leveling of place One of coupling beam II 14, coupling beam II 14 and the one-piece casting of negative one layer basement bottom board 12 are built in top casting, in preceding campshed 1 and minus two layers of underground Charge stratifying compacted fill 10 between the exterior wall of room, plain concrete 9 is filled between preceding campshed 1 and minus two layers of basement bottom board 13.
The pile body horizontal layout of the preceding campshed 1 and rear campshed 2 is rectangular or " fourth " font array arrangement and is spaced Arrangement.
A kind of construction method for the Retaining Structure with Double-row Piles that can make full use of basement space, the construction procedure are as follows:
Step1, the requirement according to Geological condition and deep pit monitor Stability Numerical Analysis, determine that the stake of campshed is long, stake Footpath and stake spacing, it is determined that spacing, sectional dimension and the arrangement form of support;To campshed and the cross-sectional strength and arrangement of reinforcement of support system It is designed;Determine the sectional dimension and quantity of reinforcement of Guan Liang;Determine excavation process;
Step2, according to the pile body stiffness of Single row pillars by etc. the replacement of rigidity substitution principle into Retaining Structure with Double-row Piles, double-row pile In after the position of campshed determine that and the array pitch of campshed is 3 before and after ensureing according to the position of the scope of excavation of foundation pit and property line ~5 times of campshed diameter (the total materials of pile shaft material are greatly reduced);
Step3, according to construction requirement, after levelling of the land, all engineering piles 8 of having been constructed on setting absolute altitude;
Step4, construction water-stop curtain stake 6, pile-type are required to determine by design and sealing;
Campshed 2 after Step5, construction, pile-type are determined by design;
Campshed 1 before Step6, construction, pile-type are determined by design;
Step7, construction Guan Liang I 3, Guan Liang II 4, coupling beam I 5, coupling beam II 14, make whole support system form an entirety, Each several part cooperative bearing deforms;
Step8, excavated by operating mode layer and section and design each layer support system, Foundation Pit bottom is arrived until excavating;
Step9, pour basement bottom board, and up construct and basement structure and remove each road support system, until pouring Before negative one layer basement bottom board 12;
Step10, segmentation remove first of inner support, preceding campshed 1, Guan Liang I 3 and coupling beam I 5, and before and after removing between campshed stake The soil body;By negative one layer basement bottom board 12 be segmented pour to apart from rear campshed 2 be 1m opening position and pour outer wall of basement extremely Ground, wherein basement structure can use preceding campshed to be also used as vertical force transfer system using Cantilever Beams 15 as force transfer system; By said process section construction until whole basement construction is completed.
When basement structure uses preceding campshed as force transfer system, the basement of extension and original basement connecting portion palpus (differential settlement is avoided to cause the basement structure of epitaxial part to destroy, preceding campshed not only will provided with one of subsiding crack 11 Meet as supporting construction when anti-bending bearing capacity requirement, and to meet Compressive Bearing Capacity during as force transfer system and vertically The requirement of sedimentation and deformation).The length of the preceding campshed 1 may be designed as being more than or equal to the rear length of campshed 2.
When basement structure is used as vertical force transfer system using Cantilever Beams 15, the sectional dimension and spacing of Cantilever Beams 15 answer root Calculate and determine according to the load of extension basement structure.
If it is determined that using a diameter of d single supporting pile structure, single pilework is pressed and waits Rigidity Theory to replace into double Pilework, it is assumed that the diameter of the front and rear campshed of Retaining Structure with Double-row Piles is equal, and a diameter of D of support pile after replacement, takes supporting The array pitch of stake is 4D, by grade Rigidity Theory then:EIIt is single=EIIt is double(wherein, support pile is reinforced concrete pile, Single row pillars with it is double The elastic modulus E of stake is equal), obtain π d4/ 64=2 ∫ y2DA (wherein y=2D, A=π D2/ 4), solveIt is then double Stake supporting construction front and rear campshed area of section and be:Take double The stake of stake is long long equal with the stake of Single row pillars supporting construction, then under equal rigidity condition, double-row pile concrete amount is only single The 1/4 of campshed, its economy are considerable.
The beneficial effects of the invention are as follows:
1st, for deep big foundation pit engineering, particularly containing base pit engineering more than two layers of basement, at present Single row pillars combination Inner support support form becomes main flow, but the rigidity of Single row pillars is smaller, with the increase of foundation depth, to control supporting knot The horizontal displacement of structure, then the diameter of support pile will certainly be increased, reduce the horizontally and vertically spacing supported, increase supporting construction Sectional dimension etc., significantly add engineering material, cause unnecessary waste.From this angle, by double Stake with Single row pillars etc. rigidity substitution principle, by the rigidity such as double-row pile replacement into single pilework, can not only control supporting knot The horizontal displacement of structure system, while pattern foundation pit supporting structure expense can also be greatly reduced.
2nd, Retaining Structure with Double-row Piles improves the stress performance of supporting construction, reduced compared with Single row pillars supporting construction Pile shaft material dosage, effectively control support pile pile body displacement;Compared with traditional double-row pile, increase negative one layer basement can Utilization space, limited land resource is fully utilized, improve economic benefit, in the base with multi-storey basement There is preferable economy in the engineering of hole.
3rd, vertical force transfer system that as needed can be using preceding campshed as proposed building basement, campshed before adding Purposes.
Brief description of the drawings
Fig. 1 is profile when basement structure of the present invention uses preceding campshed as force transfer system;
Fig. 2 is profile when basement structure of the present invention uses Cantilever Beams as force transfer system;
Each label in figure:Campshed before 1-;Campshed after 2-;3- Guan Liangs I;4- Guan Liangs II;5- coupling beams I;6- water-stop curtain stakes;7- Basement;8- engineering piles;9- plain concretes;10- compactions in layers are banketed;11- subsiding cracks;12- negative one layer basement bottom boards;13- Minus two layers of basement bottom board;14- coupling beams II;15- Cantilever Beams.
Embodiment
Embodiment 1:As shown in figure 1, a kind of Retaining Structure with Double-row Piles that can make full use of basement space, by preceding campshed 1, Campshed 2, Guan Liang I 3, Guan Liang II 4, coupling beam I 5, water-stop curtain stake 6, basement 7, engineering pile 8, plain concrete 9, compaction in layers afterwards 10, negative one layer basement bottom board 12, minus two layers of basement bottom board 13, the coupling beam II 14 of banketing form;The wherein preceding stake top of campshed 1 is provided with Guan Liang I 3, the stake top of rear campshed 2 are provided with Guan Liang II 4, preceding campshed 1 and the stake top of rear campshed 2 and connected by coupling beam I 5, rear campshed 2 Water-stop curtain stake 6 is provided with the soil body afterwards, by all engineering piles 8 of designing and constructing, the stake top of preceding campshed 1 after a resection after the leveling of place One of coupling beam II 14, coupling beam II 14 and the one-piece casting of negative one layer basement bottom board 12 are poured, in preceding campshed 1 and minus two layers of basement Charge stratifying compacted fill 10 between exterior wall, plain concrete 9 is filled between preceding campshed 1 and minus two layers of basement bottom board 13.
The pile body horizontal layout rectangular array arrangement of the preceding campshed 1 and rear campshed 2 and it is spaced arrangement.
A kind of construction method for the Retaining Structure with Double-row Piles that can make full use of basement space, the construction procedure are as follows:
Step1, the requirement according to Geological condition and deep pit monitor Stability Numerical Analysis, determine that the stake of campshed is long, stake Footpath and stake spacing, it is determined that spacing, sectional dimension and the arrangement form of support;To campshed and the cross-sectional strength and arrangement of reinforcement of support system It is designed;Determine the sectional dimension and quantity of reinforcement of Guan Liang;Determine excavation process;
Step2, according to the pile body stiffness of Single row pillars by etc. the replacement of rigidity substitution principle into Retaining Structure with Double-row Piles, double-row pile In after the position of campshed determine that and the array pitch of campshed is 3 before and after ensureing according to the position of the scope of excavation of foundation pit and property line Campshed diameter again;
Step3, according to construction requirement, after levelling of the land, all engineering piles 8 of having been constructed on setting absolute altitude;
Step4, construction water-stop curtain stake 6, pile-type are required to determine by design and sealing;
Campshed 2 after Step5, construction, pile-type are determined by design;
Campshed 1 before Step6, construction, pile-type are determined by design;
Step7, construction Guan Liang I 3, Guan Liang II 4, coupling beam I 5, coupling beam II 14, make whole support system form an entirety, Each several part cooperative bearing deforms;
Step8, excavated by operating mode layer and section and design each layer support system, Foundation Pit bottom is arrived until excavating;
Step9, pour basement bottom board, and up construct and basement structure and remove each road support system, until pouring Before negative one layer basement bottom board 12;
Step10, segmentation remove first of inner support, preceding campshed 1, Guan Liang I 3 and coupling beam I 5, and before and after removing between campshed stake The soil body;By negative one layer basement bottom board 12 be segmented pour to apart from rear campshed 2 be 1m opening position and pour outer wall of basement extremely Ground, wherein basement structure are using preceding campshed as force transfer system;By said process section construction until whole basement is applied Work is completed.
When basement structure uses preceding campshed as force transfer system, the basement of extension and original basement connecting portion palpus Provided with one of subsiding crack 11.
The length of the preceding campshed 1 may be designed as being equal to the rear length of campshed 2.
Embodiment 2:As shown in figure 1, substantially the same manner as Example 1, its difference:
A kind of construction method for the Retaining Structure with Double-row Piles that can make full use of basement space, the length of the preceding campshed 1 It may be designed as being more than the rear length of campshed 2.
Embodiment 3:As shown in figure 1, substantially the same manner as Example 1, its difference:
A kind of Retaining Structure with Double-row Piles that can make full use of basement space, the pile body of the preceding campshed 1 and rear campshed 2 are put down Face arrangement is in " fourth " font array arrangement and is spaced arrangement.
Embodiment 4:As shown in figure 1, substantially the same manner as Example 1, its difference:
A kind of Retaining Structure with Double-row Piles that can make full use of basement space, the pile body of the preceding campshed 1 and rear campshed 2 are put down Face arrangement is in " fourth " font array arrangement and is spaced arrangement.
A kind of construction method for the Retaining Structure with Double-row Piles that can make full use of basement space, the length of the preceding campshed 1 It may be designed as being more than the rear length of campshed 2.
Embodiment 5:As shown in figure 1, substantially the same manner as Example 1, its difference:
A kind of construction method for the Retaining Structure with Double-row Piles that can make full use of basement space, the array pitch of the front and rear campshed For 5 times of campshed diameter.
Embodiment 6:As shown in figure 1, substantially the same manner as Example 1, its difference:
A kind of construction method for the Retaining Structure with Double-row Piles that can make full use of basement space, the array pitch of the front and rear campshed For 5 times of campshed diameter.The length of the preceding campshed 1 may be designed as being more than the rear length of campshed 2.
Embodiment 7:As shown in figure 1, substantially the same manner as Example 1, its difference:
A kind of Retaining Structure with Double-row Piles that can make full use of basement space, the pile body of the preceding campshed 1 and rear campshed 2 are put down Face arrangement is in " fourth " font array arrangement and is spaced arrangement.
A kind of construction method for the Retaining Structure with Double-row Piles that can make full use of basement space, the array pitch of the front and rear campshed For 5 times of campshed diameter.The length of the preceding campshed 1 may be designed as being more than the rear length of campshed 2.
Embodiment 8:As shown in figure 1, substantially the same manner as Example 1, its difference:
A kind of Retaining Structure with Double-row Piles that can make full use of basement space, the pile body of the preceding campshed 1 and rear campshed 2 are put down Face arrangement is in " fourth " font array arrangement and is spaced arrangement.
A kind of construction method for the Retaining Structure with Double-row Piles that can make full use of basement space, the array pitch of the front and rear campshed For 5 times of campshed diameter.
Embodiment 9:As shown in Fig. 2 a kind of Retaining Structure with Double-row Piles that can make full use of basement space, by preceding campshed 1, Campshed 2, Guan Liang I 3, Guan Liang II 4, coupling beam I 5, water-stop curtain stake 6, basement 7, engineering pile 8, plain concrete 9, compaction in layers afterwards 10, negative one layer basement bottom board 12, minus two layers of basement bottom board 13, the coupling beam II 14 of banketing form;The wherein preceding stake top of campshed 1 is provided with Guan Liang I 3, the stake top of rear campshed 2 are provided with Guan Liang II 4, preceding campshed 1 and the stake top of rear campshed 2 and connected by coupling beam I 5, rear campshed 2 Water-stop curtain stake 6 is provided with the soil body afterwards, by all engineering piles 8 of designing and constructing, the stake top of preceding campshed 1 after a resection after the leveling of place One of coupling beam II 14, coupling beam II 14 and the one-piece casting of negative one layer basement bottom board 12 are poured, in preceding campshed 1 and minus two layers of basement Charge stratifying compacted fill 10 between exterior wall, plain concrete 9 is filled between preceding campshed 1 and minus two layers of basement bottom board 13.
The pile body horizontal layout rectangular array arrangement of the preceding campshed 1 and rear campshed 2 and it is spaced arrangement.
A kind of construction method for the Retaining Structure with Double-row Piles that can make full use of basement space, the construction procedure are as follows:
Step1, the requirement according to Geological condition and deep pit monitor Stability Numerical Analysis, determine that the stake of campshed is long, stake Footpath and stake spacing, it is determined that spacing, sectional dimension and the arrangement form of support;To campshed and the cross-sectional strength and arrangement of reinforcement of support system It is designed;Determine the sectional dimension and quantity of reinforcement of Guan Liang;Determine excavation process;
Step2, according to the pile body stiffness of Single row pillars by etc. the replacement of rigidity substitution principle into Retaining Structure with Double-row Piles, double-row pile In after the position of campshed determine that and the array pitch of campshed is 3 before and after ensureing according to the position of the scope of excavation of foundation pit and property line Campshed diameter again;
Step3, according to construction requirement, after levelling of the land, all engineering piles 8 of having been constructed on setting absolute altitude;
Step4, construction water-stop curtain stake 6, pile-type are required to determine by design and sealing;
Campshed 2 after Step5, construction, pile-type are determined by design;
Campshed 1 before Step6, construction, pile-type are determined by design;
Step7, construction Guan Liang I 3, Guan Liang II 4, coupling beam I 5, coupling beam II 14, make whole support system form an entirety, Each several part cooperative bearing deforms;
Step8, excavated by operating mode layer and section and design each layer support system, Foundation Pit bottom is arrived until excavating;
Step9, pour basement bottom board, and up construct and basement structure and remove each road support system, until pouring Before negative one layer basement bottom board 12;
Step10, segmentation remove first of inner support, preceding campshed 1, Guan Liang I 3 and coupling beam I 5, and before and after removing between campshed stake The soil body;By negative one layer basement bottom board 12 be segmented pour to apart from rear campshed 2 be 1m opening position and pour outer wall of basement extremely Ground, wherein basement structure are used as vertical force transfer system using Cantilever Beams 15;By said process section construction until entirely Lower room construction is completed.
When basement structure is used as vertical force transfer system using Cantilever Beams 15, the sectional dimension and spacing of Cantilever Beams 15 answer root Calculate and determine according to the load of extension basement structure.
According to the size of encorbelment width and the dead load load of extension basement, pressed in negative one layer basement bottom board 12 Certain distance sets certain Cantilever Beams 15 to transmit the load of epitaxial part basement.
Embodiment 10:As shown in Fig. 2 substantially the same manner as Example 9, its difference:
A kind of Retaining Structure with Double-row Piles that can make full use of basement space, the pile body of the preceding campshed 1 and rear campshed 2 are put down Face arrangement is in " fourth " font array arrangement and is spaced arrangement.
Embodiment 11:As shown in Fig. 2 substantially the same manner as Example 9, its difference:
A kind of construction method for the Retaining Structure with Double-row Piles that can make full use of basement space, the array pitch of the front and rear campshed For 5 times of campshed diameter;
Embodiment 12:As shown in Fig. 2 substantially the same manner as Example 9, its difference:
A kind of Retaining Structure with Double-row Piles that can make full use of basement space, the pile body of the preceding campshed 1 and rear campshed 2 are put down Face arrangement is in " fourth " font array arrangement and is spaced arrangement.
A kind of construction method for the Retaining Structure with Double-row Piles that can make full use of basement space, the array pitch of the front and rear campshed For 5 times of campshed diameter.
Embodiment 13:As shown in Figure 1-2, a kind of Retaining Structure with Double-row Piles that can make full use of basement space, by front row Stake 1, rear campshed 2, Guan Liang I 3, Guan Liang II 4, coupling beam I 5, water-stop curtain stake 6, basement 7, engineering pile 8, plain concrete 9, layering Compacted fill 10, negative one layer basement bottom board 12, minus two layers of basement bottom board 13, coupling beam II 14 form;The wherein preceding stake top of campshed 1 Provided with Guan Liang I 3, the stake top of rear campshed 2 is provided with Guan Liang II 4, preceding campshed 1 and the stake top of rear campshed 2 and connected by coupling beam I 5, rear campshed Water-stop curtain stake 6 is provided with after 2 in the soil body, by all engineering piles 8 of designing and constructing, preceding campshed 1 after a resection after the leveling of place Stake top pours one of coupling beam II 14, coupling beam II 14 and the one-piece casting of negative one layer basement bottom board 12, in preceding campshed 1 and minus two layers of ground Charge stratifying compacted fill 10 between the exterior wall of lower room, plain concrete 9 is filled between preceding campshed 1 and minus two layers of basement bottom board 13.
A kind of construction method for the Retaining Structure with Double-row Piles that can make full use of basement space, the construction procedure are as follows:
Step1, the requirement according to Geological condition and deep pit monitor Stability Numerical Analysis, determine that the stake of campshed is long, stake Footpath and stake spacing, it is determined that spacing, sectional dimension and the arrangement form of support;To campshed and the cross-sectional strength and arrangement of reinforcement of support system It is designed;Determine the sectional dimension and quantity of reinforcement of Guan Liang;Determine excavation process;
Step2, according to the pile body stiffness of Single row pillars by etc. the replacement of rigidity substitution principle into Retaining Structure with Double-row Piles, double-row pile In after the position of campshed determine that and the array pitch of campshed is 3 before and after ensureing according to the position of the scope of excavation of foundation pit and property line ~5 times of campshed diameter;
Step3, according to construction requirement, after levelling of the land, all engineering piles 8 of having been constructed on setting absolute altitude;
Step4, construction water-stop curtain stake 6, pile-type are required to determine by design and sealing;
Campshed 2 after Step5, construction, pile-type are determined by design;
Campshed 1 before Step6, construction, pile-type are determined by design;
Step7, construction Guan Liang I 3, Guan Liang II 4, coupling beam I 5, coupling beam II 14, make whole support system form an entirety, Each several part cooperative bearing deforms;
Step8, excavated by operating mode layer and section and design each layer support system, Foundation Pit bottom is arrived until excavating;
Step9, pour basement bottom board, and up construct and basement structure and remove each road support system, until pouring Before negative one layer basement bottom board 12;
Step10, segmentation remove first of inner support, preceding campshed 1, Guan Liang I 3 and coupling beam I 5, and before and after removing between campshed stake The soil body;By negative one layer basement bottom board 12 be segmented pour to apart from rear campshed 2 be 1m opening position and pour outer wall of basement extremely Ground, wherein basement structure are using preceding campshed as force transfer system;By said process section construction until whole basement is applied Work is completed.
When basement structure uses preceding campshed as force transfer system, the basement of extension and original basement connecting portion palpus Provided with one of subsiding crack 11.The length of the preceding campshed 1 may be designed as being more than or equal to the rear length of campshed 2.
Embodiment 14:As shown in Figure 1-2, a kind of Retaining Structure with Double-row Piles that can make full use of basement space, by front row Stake 1, rear campshed 2, Guan Liang I 3, Guan Liang II 4, coupling beam I 5, water-stop curtain stake 6, basement 7, engineering pile 8, plain concrete 9, layering Compacted fill 10, negative one layer basement bottom board 12, minus two layers of basement bottom board 13, coupling beam II 14 form;The wherein preceding stake top of campshed 1 Provided with Guan Liang I 3, the stake top of rear campshed 2 is provided with Guan Liang II 4, preceding campshed 1 and the stake top of rear campshed 2 and connected by coupling beam I 5, rear campshed Water-stop curtain stake 6 is provided with after 2 in the soil body, by all engineering piles 8 of designing and constructing, preceding campshed 1 after a resection after the leveling of place Stake top pours one of coupling beam II 14, coupling beam II 14 and the one-piece casting of negative one layer basement bottom board 12, in preceding campshed 1 and minus two layers of ground Charge stratifying compacted fill 10 between the exterior wall of lower room, plain concrete 9 is filled between preceding campshed 1 and minus two layers of basement bottom board 13.
A kind of construction method for the Retaining Structure with Double-row Piles that can make full use of basement space, the construction procedure are as follows:
Step1, the requirement according to Geological condition and deep pit monitor Stability Numerical Analysis, determine that the stake of campshed is long, stake Footpath and stake spacing, it is determined that spacing, sectional dimension and the arrangement form of support;To campshed and the cross-sectional strength and arrangement of reinforcement of support system It is designed;Determine the sectional dimension and quantity of reinforcement of Guan Liang;Determine excavation process;
Step2, according to the pile body stiffness of Single row pillars by etc. the replacement of rigidity substitution principle into Retaining Structure with Double-row Piles, double-row pile In after the position of campshed determine that and the array pitch of campshed is 3 before and after ensureing according to the position of the scope of excavation of foundation pit and property line ~5 times of campshed diameter;
Step3, according to construction requirement, after levelling of the land, all engineering piles 8 of having been constructed on setting absolute altitude;
Step4, construction water-stop curtain stake 6, pile-type are required to determine by design and sealing;
Campshed 2 after Step5, construction, pile-type are determined by design;
Campshed 1 before Step6, construction, pile-type are determined by design;
Step7, construction Guan Liang I 3, Guan Liang II 4, coupling beam I 5, coupling beam II 14, make whole support system form an entirety, Each several part cooperative bearing deforms;
Step8, excavated by operating mode layer and section and design each layer support system, Foundation Pit bottom is arrived until excavating;
Step9, pour basement bottom board, and up construct and basement structure and remove each road support system, until pouring Before negative one layer basement bottom board 12;
Step10, segmentation remove first of inner support, preceding campshed 1, Guan Liang I 3 and coupling beam I 5, and before and after removing between campshed stake The soil body;By negative one layer basement bottom board 12 be segmented pour to apart from rear campshed 2 be 1m opening position and pour outer wall of basement extremely Ground, wherein basement structure are used as vertical force transfer system using Cantilever Beams 15;By said process section construction until entirely Lower room construction is completed.
When basement structure is used as vertical force transfer system using Cantilever Beams 15, the sectional dimension and spacing of Cantilever Beams 15 answer root Calculate and determine according to the load of extension basement structure.
Above in conjunction with accompanying drawing to the present invention embodiment be explained in detail, but the present invention be not limited to it is above-mentioned Embodiment, can also be before present inventive concept not be departed from those of ordinary skill in the art's possessed knowledge Put that various changes can be made.

Claims (5)

  1. A kind of 1. Retaining Structure with Double-row Piles that can make full use of basement space, it is characterised in that:By preceding campshed(1), rear campshed (2), Guan Liang I(3), Guan Liang II(4), coupling beam I(5), water-stop curtain stake(6), basement(7), engineering pile(8), plain concrete (9), compaction in layers bankets(10), negative one layer basement bottom board(12), minus two layers of basement bottom board(13), coupling beam II(14)Group Into;Wherein preceding campshed(1)Stake top is provided with Guan Liang I(3), rear campshed(2)Stake top be provided with Guan Liang II(4), preceding campshed(1)And heel row Stake(2)Stake top passes through coupling beam I(5)Connection, rear campshed(2)After stake water-stop curtain stake is provided with the soil body(6), by setting after the leveling of place All engineering piles of meter construction(8), preceding campshed after a resection(1)Stake top pours one of coupling beam II(14), coupling beam II(14)With bearing One layer of basement bottom board(12)One-piece casting, in preceding campshed(1)The charge stratifying compacted fill between minus two layers of outer wall of basement (10), in preceding campshed(1)With minus two layers of basement bottom board(13)Between fill plain concrete(9);
    The preceding campshed(1)With rear campshed(2)Pile body horizontal layout is rectangular or " fourth " font array arrangement and is spaced Arrangement.
  2. 2. the construction method of the Retaining Structure with Double-row Piles according to claim 1 that can make full use of basement space, it is special Sign is:The construction procedure is as follows:
    Step1, the requirement according to Geological condition and deep pit monitor Stability Numerical Analysis, determine the stake of campshed is long, stake footpath and Stake spacing, it is determined that spacing, sectional dimension and the arrangement form of support;The cross-sectional strength and arrangement of reinforcement of campshed and support system are carried out Design;Determine the sectional dimension and quantity of reinforcement of Guan Liang;Determine excavation process;
    Step2, according to the pile body stiffness of Single row pillars by etc. the replacement of rigidity substitution principle into Retaining Structure with Double-row Piles, in double-row pile after The position of campshed determines according to the scope of excavation of foundation pit and the position of property line, and the array pitch of campshed is 3 ~ 5 times before and after guarantee Campshed diameter;
    Step3, according to construction requirement, after levelling of the land, all engineering piles of having been constructed on setting absolute altitude(8);
    Step4, construction water-stop curtain stake(6), pile-type is by design and sealing requirement determination;
    Campshed after Step5, construction(2), pile-type is by design determination;
    Campshed before Step6, construction(1), pile-type is by design determination;
    Step7, construction Guan Liang I(3), Guan Liang II(4), coupling beam I(5), whole support system is formed an entirety, each several part association Same stress deformation;
    Step8, excavated by operating mode layer and section and design each layer support system, Foundation Pit bottom is arrived until excavating;
    Step9, pour basement bottom board, and up construct and basement structure and remove each road support system, until pouring negative one Layer basement bottom board(12)Before;
    First of inner support, preceding campshed are removed in Step10, segmentation(1), Guan Liang I(3)And coupling beam I(5), and campshed stake before and after removing Between the soil body, construct coupling beam II(14);By negative one layer basement bottom board(12)Segmentation is poured to apart from rear campshed(2)For 1m position Place simultaneously pours outer wall of basement to ground, and wherein basement structure can use preceding campshed as force transfer system also using in coupling beam Ⅱ(14)Upper construction Cantilever Beams(15)As vertical force transfer system;By said process section construction until whole basement construction is complete Into.
  3. 3. the construction method of the Retaining Structure with Double-row Piles according to claim 2 that can make full use of basement space, it is special Sign is:When basement structure uses preceding campshed as force transfer system, the basement of extension and original basement connecting portion palpus Provided with one of subsiding crack(11).
  4. 4. the construction method of the Retaining Structure with Double-row Piles according to claim 2 that can make full use of basement space, it is special Sign is:The preceding campshed(1)Length may be designed as being more than or equal to rear campshed(2)Length.
  5. 5. the construction method of the Retaining Structure with Double-row Piles according to claim 2 that can make full use of basement space, it is special Sign is:Basement structure uses Cantilever Beams(15)During as vertical force transfer system, Cantilever Beams(15)Sectional dimension and spacing It should be calculated and determined according to the load of extension basement structure.
CN201510253634.2A 2015-05-19 2015-05-19 A kind of Retaining Structure with Double-row Piles and its construction method that can make full use of basement space Expired - Fee Related CN105040706B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510253634.2A CN105040706B (en) 2015-05-19 2015-05-19 A kind of Retaining Structure with Double-row Piles and its construction method that can make full use of basement space

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510253634.2A CN105040706B (en) 2015-05-19 2015-05-19 A kind of Retaining Structure with Double-row Piles and its construction method that can make full use of basement space

Publications (2)

Publication Number Publication Date
CN105040706A CN105040706A (en) 2015-11-11
CN105040706B true CN105040706B (en) 2017-11-10

Family

ID=54447653

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510253634.2A Expired - Fee Related CN105040706B (en) 2015-05-19 2015-05-19 A kind of Retaining Structure with Double-row Piles and its construction method that can make full use of basement space

Country Status (1)

Country Link
CN (1) CN105040706B (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735325B (en) * 2016-04-20 2018-01-23 山东大学 A kind of intensive permanent support assembled basement structure system and construction method
CN105804093B (en) * 2016-05-05 2017-10-03 宁波建工工程集团有限公司 Prefabricated double-row pile foundation pit supporting construction integrated with water-stop curtain and its construction method
CN106120804B (en) * 2016-06-26 2018-12-11 中建三局集团有限公司 A kind of super-giant foundation pit double-row pile second level support system and its construction method
CN106400812A (en) * 2016-10-27 2017-02-15 中铁第四勘察设计院集团有限公司 Foundation pit partition support structure and support method based on foundation pit partition support structure
CN108385693B (en) * 2018-02-27 2023-10-03 中科院广州化灌工程有限公司 Equal-generation anchor bolt supporting method and system for staged basement supporting
CN108824483A (en) * 2018-07-23 2018-11-16 中国建筑第八工程局有限公司 The external wall structure and its construction method of multi-storey basement
CN109914394A (en) * 2019-03-30 2019-06-21 西安科技大学 A kind of zigzag Row Piles Supporting Structure
CN110309557B (en) * 2019-06-13 2021-04-27 中建一局集团第二建筑有限公司 Construction method for hoisting at side of deep foundation pit of double-row support pile system
CN110777806B (en) * 2019-11-12 2020-11-27 广东省工程勘察院 Multi-connecting-rod plane frame permanent supporting structure and construction process thereof
CN112962667B (en) * 2021-02-08 2022-08-30 中国建筑第八工程局有限公司 Outer wall structure of sinking yard and construction method thereof
CN113136854A (en) * 2021-04-21 2021-07-20 安徽省交通规划设计研究总院股份有限公司 Separated lock chamber system with double-row pile support and buttress side wall combined
CN113605397B (en) * 2021-07-14 2022-12-02 广州市设计院集团有限公司 Trapezoidal staggered foundation pit supporting mechanism and foundation pit supporting method
CN113605398B (en) * 2021-07-14 2023-04-07 广州市设计院集团有限公司 Foundation pit supporting mechanism

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204982906U (en) * 2015-05-19 2016-01-20 昆明理工大学 Double row pile supporting construction in ability make full use of basement space

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0663237B2 (en) * 1989-04-18 1994-08-22 清水建設株式会社 Construction method of basement
CN102587416B (en) * 2012-04-01 2014-04-16 广东中城建设集团有限公司 Construction method of basement attached lane structure
CN103074898B (en) * 2013-01-18 2015-09-23 江苏鸿基科技有限公司 Multi-row pile foundation pit support structure and construction method thereof
CN103306301A (en) * 2013-07-04 2013-09-18 天津市天友建筑设计股份有限公司 Pile foundation structure and construction method thereof based on fender post and basement baseplate
CN203768912U (en) * 2014-03-13 2014-08-13 南京工业大学 Double-row prestressing high-strength concrete rectangular pile foundation pit supporting structure

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204982906U (en) * 2015-05-19 2016-01-20 昆明理工大学 Double row pile supporting construction in ability make full use of basement space

Also Published As

Publication number Publication date
CN105040706A (en) 2015-11-11

Similar Documents

Publication Publication Date Title
CN105040706B (en) A kind of Retaining Structure with Double-row Piles and its construction method that can make full use of basement space
CN206655248U (en) A kind of assembly concrete empty van soil-baffling structure
CN105756091B (en) A kind of Metro station excavation construction method of control adjacent building composition deformation
CN105804119A (en) Underground corridor structure with dual-purpose pile foundations and construction method of underground corridor structure
CN102691302B (en) Concrete structure for supporting deep foundation pit
CN107142856A (en) Bridge pier and the bridge of lifting reconstruction that abutment remodeling method, abutment, abutment are transformed
CN202559377U (en) Mutually-embedded ecological building block
CN104674863A (en) Method for reinforcing existing municipal pipe gallery within deep foundation pit excavation range
CN110158630A (en) A kind of deep covering layer area large-span arch bridge annular ground continuous wall base
CN104863177A (en) Composite retaining wall structure and construction method thereof
CN107237343A (en) A kind of many wall type nodular diaphragm walls as bridge foundation for soft soil foundation
CN106884431A (en) One kind building pit foundation construction safety supporting construction
CN204435407U (en) A kind of batter post group anchor formula rock foundation
CN206844132U (en) Superelevation light supporting structure
CN207582492U (en) A kind of step landscape retaining wall
CN102312443A (en) Bearing platform structure with variable cross section and variable rigidity for special-shaped compound cross-section pile and construction method thereof
CN203834512U (en) Combined type gravity retaining wall
CN204982906U (en) Double row pile supporting construction in ability make full use of basement space
CN205669211U (en) A kind of prefabricated Gravity Retaining Wall
CN205024719U (en) Pile foundation and integrated reverse construction vertical braces system of underground continuous wall
CN218346137U (en) Foundation with strong bearing capacity
CN207062955U (en) The foundation pit supporting construction that a kind of thick long stake is combined with thin stub
CN201801880U (en) Variable cross-section variable-stiffness bearing platform structure of special-shaped combined cross-section pile
CN205502070U (en) A dual -purpose underground gallery structure
CN210151776U (en) Structure of balance weight type retaining wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171110