CN105040662B - 钻井平台桩腿与桩靴的合拢方法 - Google Patents
钻井平台桩腿与桩靴的合拢方法 Download PDFInfo
- Publication number
- CN105040662B CN105040662B CN201510368881.7A CN201510368881A CN105040662B CN 105040662 B CN105040662 B CN 105040662B CN 201510368881 A CN201510368881 A CN 201510368881A CN 105040662 B CN105040662 B CN 105040662B
- Authority
- CN
- China
- Prior art keywords
- bracket
- segmentation
- spud leg
- shoe
- leg
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
- Supports For Pipes And Cables (AREA)
Abstract
本发明公开了一种钻井平台桩腿与桩靴的合拢方法,包括如下步骤:S1:在肘板靠近桩腿的一侧划分一切割区域;S2:对切割区域进行切割得到一用于与桩腿连接的肘板第一分段,肘板切割后的剩余部分为肘板第二分段,肘板第一分段与肘板第二分段能够拼合成完整的肘板;S3:将肘板第一分段焊接于桩腿的底部;S4:将各桩腿的底部通过若干水平支撑管固定在一起;S5:将各桩腿的底部通过若干斜支撑管固定在一起,得到一桩腿整件;S6:吊装桩腿整件,使桩腿整件上的各肘板第一分段均能够与桩靴上的一肘板第二分段相互匹配;S7:将肘板第一分段与肘板第二分段焊接固定。本发明具有节省工时的优点。
Description
技术领域
本发明涉及一种钻井平台桩腿与桩靴的合拢方法。
背景技术
钻井平台建造过程中,桩腿与桩靴通常通过肘板进行连接,而后将桩腿之间通过水平支撑管、斜支撑管固定在一起。由于采用的是依次焊接各个部件的方式,因此合拢周期较长。
发明内容
本发明要解决的技术问题是:现有钻井平台的桩腿与桩靴的合拢是采用将桩腿、水平支撑管、斜支撑管等部件依次固定到桩靴上的方法,该种合拢方法周期较长,且一旦将桩腿焊接到桩靴后具有不方便对桩腿的焊接情况进行检查的缺陷,提供一种钻井平台桩腿与桩靴的合拢方法。
本发明是通过下述技术方案来解决上述技术问题:
一种钻井平台桩腿与桩靴的合拢方法,其特点在于,其包括如下步骤:
S1:在肘板靠近桩腿的一侧划分一切割区域;
S2:对所述切割区域进行切割得到一用于与所述桩腿连接的肘板第一分段,所述肘板切割后的剩余部分为肘板第二分段,所述肘板第一分段与所述肘板第二分段能够拼合成完整的肘板;
S3:将所述肘板第一分段焊接于所述桩腿的底部;
S4:将各所述桩腿的底部通过若干水平支撑管固定在一起;
S5:将各所述桩腿的底部通过若干斜支撑管固定在一起,得到一桩腿整件;
S6:吊装所述桩腿整件,使所述桩腿整件上的各所述肘板第一分段均能够与所述桩靴上的一所述肘板第二分段相互匹配;
S7:将所述肘板第一分段与所述肘板第二分段焊接固定。通过将肘板切割成肘板第一分段以及肘板第二分段,使得吊装时桩腿与桩靴之间、桩腿与水平支撑杆、斜支撑杆之间的依次连接,实际上简化为肘板第一分段与肘板第二分段之间的连接,省时省力。
较佳地,在步骤S1之前进行如下步骤:
S0:将所述肘板固定于所述桩靴。
较佳地,在步骤S5之后进行如下步骤:
S5.1:对所述水平支撑管、所述斜支撑管的焊缝进行检查。由于采用了预先将水平支撑管、斜支撑管与桩腿焊接的方式,使得对于焊缝的检查比较方便,避免了以前将桩腿焊接到桩靴后检查所存在的空间小等不便。
较佳地,在步骤S5.1之后进行如下步骤:
S5.2:对于所述桩腿整件的焊接处进行打磨。
较佳地,所述肘板的数量为3个,各所述肘板之间的夹角为120°。
较佳地,所述桩腿、所述桩靴、所述肘板均为不锈钢材质。
本发明的积极进步效果在于:通过将连接桩腿与桩靴的肘板分割成肘板第一分段、肘板第二分段,使得可以在将桩腿焊接到桩靴之前,预先对桩腿、水平支撑管、斜支撑管等进行处理,制作成桩腿整件,并将桩腿整件与桩靴固定,提高了工作效率。
附图说明
图1为本发明一实施例的钻井平台桩腿与桩靴的合拢方法的流程示意图。
图2为本发明一实施例的切割为肘板第一分段、肘板第二分段的肘板的结构示意图。
附图标记说明:
肘板 10
肘板第一分段 11
肘板第二分段 12
具体实施方式
下面通过实施例的方式进一步说明本发明,但并不因此将本发明限制在所述的实施例范围之中。
实施例
请结合图1-2予以理解,一种钻井平台桩腿与桩靴的合拢方法,其包括如下步骤:
S0:将肘板10固定于桩靴;
S1:在肘板10靠近桩腿的一侧划分一切割区域。切割区域选择肘板10靠近桩腿的一侧;
S2:对切割区域进行切割得到一用于与桩腿连接的肘板第一分段11,肘板10切割后的剩余部分为肘板第二分段12,肘板第一分段11与肘板第二分段12能够拼合成完整的肘板10;
S3:将肘板第一分段11焊接于桩腿的底部;
S4:将各桩腿的底部通过若干水平支撑管固定在一起;
S5:将各桩腿的底部通过若干斜支撑管固定在一起,得到一桩腿整件。为了使各个桩腿能够作为一个整体与桩靴进行焊接,除了要制作肘板第一分段11、肘板第二分段12外,还要事先将各个桩腿通过水平支撑管、斜支撑管固定在一起,以加强桩腿整件的牢固性;
S5.1:对水平支撑管、斜支撑管的焊缝进行检查。在将桩腿整件安装到桩靴前进行焊缝的检查,便于及时进行补焊或者更换支撑管,以免将桩腿整件安装到桩靴后再进行焊缝检查所带来的不便;
S5.2:对于桩腿整件的焊接处进行打磨;
S6:吊装桩腿整件,使桩腿整件上的各肘板第一分段均能够与桩靴上的一肘板第二分段相互匹配;
S7:将肘板第一分段与肘板第二分段焊接固定。
肘板的数量为3个,各肘板之间的夹角为120°。桩腿、桩靴、肘板均为不锈钢材质。
虽然以上描述了本发明的具体实施方式,但是本领域的技术人员应当理解,这些仅是举例说明,本发明的保护范围是由所附权利要求书限定的。本领域的技术人员在不背离本发明的原理和实质的前提下,可以对这些实施方式做出多种变更或修改,但这些变更和修改均落入本发明的保护范围。
Claims (6)
1.一种钻井平台桩腿与桩靴的合拢方法,其特征在于,其包括如下步骤:
S1:在肘板靠近桩腿的一侧划分一切割区域;
S2:对所述切割区域进行切割得到一用于与所述桩腿连接的肘板第一分段,所述肘板切割后的剩余部分为肘板第二分段,所述肘板第一分段与所述肘板第二分段能够拼合成完整的肘板;
S3:将所述肘板第一分段焊接于所述桩腿的底部;
S4:将各所述桩腿的底部通过若干水平支撑管固定在一起;
S5:将各所述桩腿的底部通过若干斜支撑管固定在一起,得到一桩腿整件;
S6:吊装所述桩腿整件,使所述桩腿整件上的各所述肘板第一分段均能够与所述桩靴上的一所述肘板第二分段相互匹配;
S7:将所述肘板第一分段与所述肘板第二分段焊接固定。
2.如权利要求1所述的钻井平台桩腿与桩靴的合拢方法,其特征在于,在步骤S1之前进行如下步骤:
S0:将所述肘板固定于所述桩靴。
3.如权利要求1所述的钻井平台桩腿与桩靴的合拢方法,其特征在于,在步骤S5之后进行如下步骤:
S5.1:对所述水平支撑管和所述斜支撑管的焊缝进行检查。
4.如权利要求3所述的钻井平台桩腿与桩靴的合拢方法,其特征在于,在步骤S5.1之后进行如下步骤:
S5.2:对所述桩腿整件的焊接处进行打磨。
5.如权利要求1所述的钻井平台桩腿与桩靴的合拢方法,其特征在于,所述肘板的数量为3个,各所述肘板之间的夹角为120°。
6.如权利要求1所述的钻井平台桩腿与桩靴的合拢方法,其特征在于,所述桩腿、所述桩靴、所述肘板均为不锈钢材质。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510368881.7A CN105040662B (zh) | 2015-06-29 | 2015-06-29 | 钻井平台桩腿与桩靴的合拢方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510368881.7A CN105040662B (zh) | 2015-06-29 | 2015-06-29 | 钻井平台桩腿与桩靴的合拢方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105040662A CN105040662A (zh) | 2015-11-11 |
CN105040662B true CN105040662B (zh) | 2017-03-08 |
Family
ID=54447610
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510368881.7A Active CN105040662B (zh) | 2015-06-29 | 2015-06-29 | 钻井平台桩腿与桩靴的合拢方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105040662B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106223302B (zh) * | 2016-07-22 | 2018-11-09 | 上海外高桥造船有限公司 | 自升式钻井平台的建造方法 |
CN106638525A (zh) * | 2016-10-20 | 2017-05-10 | 南通振华重型装备制造有限公司 | 一种ju2000e型自升式钻井平台桩腿和桩靴安装技术 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3826099A (en) * | 1972-09-25 | 1974-07-30 | Eng Technology Analysts Inc | Self-elevating offshore platform with folding legs |
CN102587363A (zh) * | 2012-03-14 | 2012-07-18 | 中国海洋石油总公司 | 自升式钻井平台桁架式桩腿的合拢方法 |
CN102704455B (zh) * | 2012-07-05 | 2014-11-26 | 南通中远船务工程有限公司 | 一种风车安装船桩腿和桩靴的连接方法 |
CN102704453B (zh) * | 2012-07-05 | 2014-09-17 | 南通中远船务工程有限公司 | 风车安装船桩腿和桩靴的连接方法 |
CN103966990A (zh) * | 2013-01-27 | 2014-08-06 | 江齐锋 | 单齿条桩腿总段合拢方法和工装 |
CN203213134U (zh) * | 2013-03-06 | 2013-09-25 | 三一集团有限公司 | 一种桩腿及海上作业平台 |
CN204266224U (zh) * | 2014-10-27 | 2015-04-15 | 武汉船用机械有限责任公司 | 一种自升式平台桩腿装置 |
-
2015
- 2015-06-29 CN CN201510368881.7A patent/CN105040662B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN105040662A (zh) | 2015-11-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103643800B (zh) | 屈曲约束支撑构件的提升安装体系及其施工方法 | |
CN203654299U (zh) | 一种钢支撑活络端 | |
CN104929097B (zh) | 一种300尺自升式钻井平台桩腿与桩靴分段搭载方法 | |
CN105040662B (zh) | 钻井平台桩腿与桩靴的合拢方法 | |
CN105692468A (zh) | 大型网壳式拱顶整体提升吊装机构及其使用方法 | |
CN103264968A (zh) | 超高层核心筒内外挂塔吊支撑梁结构及其施工方法 | |
CN104801836A (zh) | 海上风力发电导管架基础法兰安装方法 | |
CN109457929A (zh) | 一种可周转式电梯井支模用操作平台及其施工方法 | |
CN104308449A (zh) | 大口径混凝土管道内衬薄壁不锈钢的修复工艺 | |
CN103470036B (zh) | 一种外挑结构的施工方法 | |
CN105274976B (zh) | 水中钢平台预制安装施工方法 | |
CN205914561U (zh) | 一种风电机组支架焊接变形矫正工装 | |
CN205000333U (zh) | 海上风机基础 | |
CN104476055B (zh) | 一种米字型撑管的桩腿制作方法 | |
CN116221497A (zh) | 一种大高差不锈钢排油烟风管倒装安装方法 | |
CN108747069A (zh) | 一种塔体设备的安装方法 | |
CN104625447A (zh) | 一种扇形导管安装工艺 | |
CN108049425A (zh) | 一种综合管廊临时封堵墙结构及施工方法 | |
CN103437385A (zh) | 一种输电铁塔纠偏方法 | |
CN204139162U (zh) | 混凝土管桩接桩结构 | |
CN204357622U (zh) | 一种混流式水轮机蜗壳 | |
CN104563306B (zh) | 一种交错伸缩缝幕墙抗风抗水平位移钢柱节点及其加工方法 | |
CN207064956U (zh) | 一种电厂大口径循环水管道水压试验专用封头 | |
CN106032670A (zh) | 一种提高地下室支护桩水平抗力的支护结构及施工方法 | |
CN106592995B (zh) | 张悬梁钢结构受力体系的安装方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |