CN105009725B CN201410168209.9A CN201410168209A CN105009725B CN 105009725 B CN105009725 B CN 105009725B CN 201410168209 A CN201410168209 A CN 201410168209A CN 105009725 B CN105009725 B CN 105009725B
Authority
CN
China
Prior art keywords
soil
earthing
earth
thickness
full
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410168209.9A
Other languages
Chinese (zh)
Other versions
CN105009725A (en
Inventor
魏朝富
信桂新
吕家恪
李萍
杨朝现
邵景安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest University
Original Assignee
Southwest University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest University filed Critical Southwest University
Priority to CN201410168209.9A priority Critical patent/CN105009725B/en
Publication of CN105009725A publication Critical patent/CN105009725A/en
Application granted granted Critical
Publication of CN105009725B publication Critical patent/CN105009725B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Peeled off the invention provides a kind of topsoil and reuse method.Wherein method includes:The soil information in borrow areas is gathered, according to the soil information of collection, the soil property and the thickness that fetches earth in borrow areas is determined;Carry out classification and fetch earth with the thickness that fetches earth according to the soil property for determining;Muck haulage and earthing.Further, the embodiment of the present invention, before earthing, the restricted information of soil in collection earthing area, what the restricted information of soil according to collection determined earthing area needs earthing matter and thickness of earth covering;And in earthing:It is that the soil for needing earthing matter for determining carries out earthing that soil property is chosen from the soil of step acquisition of fetching earth, and the thickness of earthing is the thickness of earth covering for determining.The embodiment of the present invention, can improve the soil sampling mass of topsoil, it is ensured that the reuse ratio of topsoil resource.

Description

Topsoil is peeled off and reuse method
Technical field
Peeled off and reuse method the present invention relates to soil reutilization technology field, more particularly to a kind of topsoil.
Background technology
The topsoil thickness in arable land is general between 20 to 30cm, its nutrient content is abundant, crop root is intensive and It is the elite in soil in crumbled structure, is also to ensure that crops obtain the fundamental prerequisite of stable high yield.Topsoil Once being lost in, the speed of regeneration will slowly, with certain non-renewable, therefore when ploughing occupied, for example:It is non- Agriculture construction is taken up an area, and peels off the table soil in occupied arable land for newly-ploughed arable land, ground inferior or the improvement of other arable soils, makes preciousness Topsoil is able to preserve and realize to recycle, to improving farmland quality, improving the ecological environment with highly important value.
But, existing topsoil peel off normally only include with recycling mode fetch earth, muck haulage and the step of earthing three, and And extremely easily cause the destruction and waste of soil resource typically using the coarse mode that fetches earth in the link that fetches earth.
The content of the invention
In view of this, the present invention provides a kind of topsoil and peels off and reuse method, can improve topsoil Soil sampling mass, it is ensured that the reuse ratio of topsoil resource.
A kind of topsoil that the present invention is provided is peeled off and reuse method, including:Fetch earth, muck haulage and earthing, it is described Method also includes:Before described fetching earth, the soil information in borrow areas is gathered, according to the soil information of collection, determine borrow areas Soil property and fetch earth thickness;It is described fetch earth including:Carry out classification and fetch earth with the thickness that fetches earth according to the soil property for determining.
Further, the soil information includes:Grogs content, pH value, the content of organic matter and soil thickness.
Further, the soil property includes:Fertile table is native, barren table is native and contaminated surface soil.
Further, the soil information according to collection, determines the soil property in borrow areas, including:
It is less than when the chad of the content of organic matter >=1.5%, soil thickness >=40cm, > 1mm is less than the 5% of full soil weight, particle diameter When the granule content of 10-60% or particle diameter more than 0.01mm that the granule content of 0.01mm accounts for full soil weight accounts for the 40-90% of full soil weight, It is the fertile table soil that can be fetched earth;
It is less than when the chad of content of organic matter < 1%, soil thickness < 30cm, > 1mm is more than the 10% of full soil weight, particle diameter The granule content of more than 60% or particle diameter more than 0.01mm that the granule content of 0.01mm accounts for full soil weight accounts for more than the 90% of full soil weight, It is the barren table soil that can not be fetched earth;
It is the contaminated surface soil that can not be fetched earth as pH value < 5.5 or pH value > 8.5.
Further, methods described also includes:Before the earthing, the restricted information of soil in collection earthing area, according to What the restricted information of soil of collection determined earthing area needs earthing matter and thickness of earth covering;
The earthing includes:From the soil for fetching earth step acquisition, it is that the determination needs earthing matter to choose soil property Soil carry out earthing, and earthing thickness be the determination thickness of earth covering.
Further, the soil restrictive factor includes:Soil types, grogs content, pH value, the content of organic matter and soil layer Thickness.
Further, the restricted information of soil according to collection determines that the earthing matter that needs in earthing area includes:
When soil types is paddy field, as soil thickness >=40cm, the chad of > 1mm is more than the 10% of full soil weight, particle diameter and is less than The granule content of more than 60% or particle diameter more than 0.01mm that the granule content of 0.01mm accounts for full soil weight accounts for more than the 90% of full soil weight, Content of organic matter < 1%, need to cover fertile table soil;
When soil types is paddy field, as soil thickness < 30cm, fertile table soil need to be covered;
When soil types is nonirrigated farmland, as soil thickness >=40cm, the chad of > 1mm is more than the 10% of full soil weight, particle diameter and is less than The granule content of more than 60% or particle diameter more than 0.01mm that the granule content of 0.01mm accounts for full soil weight accounts for more than the 90% of full soil weight, Fertile table soil need to be covered;
When soil types is nonirrigated farmland, when soil thickness < 30cm, or naked rock make the region on ground, fertile table soil need to be covered.
Further, when fetching earth, hillside fields is fetched earth from top to bottom, and level land is inversely fallen back and fetched earth.
Further, in earthing, using two kinds of Casing ways of uniform earthing and band earthing.
Beneficial effects of the present invention:
The embodiment of the present invention, it is true according to the analysis institute by the soil information to borrow areas before fetching earth when fetching earth The soil property in fixed borrow areas and the thickness that fetches earth carry out classification and fetch earth, to avoid leakage taking effective soil or crossing taking unwanted soil Earth, such that it is able to the effective soil sampling mass for improving topsoil, it is ensured that the reuse ratio of topsoil resource.
The embodiment of the present invention, in earthing, according to what is determined to the analysis of the restricted information of soil in earthing area before earthing Needing earthing matter and thickness of earth covering carries out earthing, and good improvement is obtained with the soil for ensureing earthing area, truly realizes ploughing Make the recycling of layer soil.
Brief description of the drawings
The invention will be further described with reference to the accompanying drawings and examples:
Fig. 1 is the schematic flow sheet of the first embodiment of the topsoil stripping that the present invention is provided and reuse method.
Fig. 2 is the schematic flow sheet of the first embodiment of the topsoil stripping that the present invention is provided and reuse method.
Fig. 3 is that the topsoil stripping that the present invention is provided is anticipated with the flow of the concrete application embodiment of reuse method Figure.
Table soil resource and its distribution schematic diagram that Fig. 4 occupies cultivated land for construction project in the embodiment of the present invention.
Fig. 5 is earthing Project Areas schematic diagram in present example.
Fig. 6 is muck haulage route and interim mound point schematic diagram in present example.
Fig. 7 is the schematic diagram that fetched earth in present example.
Fig. 8 is Casing ways schematic diagram in present example.
Specific embodiment
As shown in figure 1, being the flow of the topsoil stripping with the first embodiment of reuse method of present invention offer Schematic diagram, it includes:
Step S11, the soil information in collection borrow areas, according to the soil information of collection, determine the soil property in borrow areas and take Soil thickness.
Step S12, the soil property and the thickness that fetches earth that determine according to step S11 carry out classification and fetch earth.
Step S13, muck haulage.
Step S14, earthing.
The embodiment of the present invention, it is true according to the analysis institute by the soil information to borrow areas before fetching earth when fetching earth The soil property in fixed borrow areas and the thickness that fetches earth carry out classification and fetch earth, to avoid leakage taking effective soil or crossing taking unwanted soil Earth, such that it is able to the effective soil sampling mass for improving topsoil, it is ensured that the reuse ratio of topsoil resource.
The step of Fig. 1 in S11, soil information includes:Grogs content, pH value, the content of organic matter and soil thickness.Soil property Including:Fertile table is native, barren table is native and contaminated surface soil.
In step s 11, when the chad of the content of organic matter >=1.5%, soil thickness >=40cm, > 1mm is less than full soil weight 5%th, granule content of the particle diameter less than 0.01mm accounts for the heavy granule content of 10-60% or particle diameter more than 0.01mm of full soil and accounts for full soil weight 40-90% when, be can fetch earth fertile table soil;When the chad of content of organic matter < 1%, soil thickness < 30cm, > 1mm is more than Full soil weight 10%, granule content of the particle diameter less than 0.01mm account for the particle of more than 60% or particle diameter more than 0.01mm of full soil weight and contain Amount accounts for more than the 90% of full soil weight, is the barren table soil that can not be fetched earth;As pH value < 5.5 or pH value > 8.5, for that can not fetch earth Contaminated surface soil.This kind of standard, it is adaptable to various soil types, for example:Paddy field or dry land or field etc. are lived through human being's production Dynamic influence and the anthropogenic soil of transformation.
The step of Fig. 1 in S12, according to the soil property for determining and the thickness that fetches earth carries out classification and fetch earth to specifically refer to, for not The soil property of same type, is separately fetched earth according to its corresponding thickness that fetches earth for determining, it is to avoid different types of soil property occurs mixed The appearance of the phenomenons such as conjunction.The mode for wherein fetching earth can comprehensively utilize excavator, bull-dozer and the artificial mode that fetches earth such as fetch earth. Before specifically fetching earth, the attachment and larger gravel peeled off on place can be first removed, in order to fetch earth;Simultaneously in completion of fetching earth Afterwards, stripping area place and construction disturbance face are tamped in time, in order to avoid raise native airborne dust.
In Fig. 1 during step S13, as far as possible using existing road, the optimal route of easy and haul distance is selected.Can if not existing Existing road, can newly repair sidewalk, simple and practical by the way of newly sidewalk is repaiied, and arable land is accounted for less, and avert danger location.For Remote muck haulage, it is also an option that the interim mound point in earthing area is closed on convenient transportation, and in interim mound point using dress soil Woven bag assembles simple retaining wall, prevents erosion.
As shown in Fig. 2 being the flow of the topsoil stripping with the second embodiment of reuse method of present invention offer Schematic diagram, it includes:
Step S21, the soil information in collection borrow areas, according to the soil information of collection, determine the soil property in borrow areas and take Soil thickness.
Step S22, the restricted information of soil in collection earthing area, the restricted information of soil according to collection determine earthing area Need earthing matter and thickness of earth covering.
Step S23, the soil property and the thickness that fetches earth that determine according to step S121 carry out classification and fetch earth.
Step S24, muck haulage.
It is that the soil for needing earthing matter for determining carries out earthing that soil property is chosen in step S25, the soil obtained from the step that fetches earth, And the thickness of earthing is the thickness of earth covering of the determination.
The present embodiment, before earthing, according to the restricted information of soil to earthing area analysis determine need earthing matter and Thickness of earth covering carries out earthing, and good improvement is obtained with the soil for ensureing earthing area, truly realizes topsoil Recycle.
In Fig. 2 in step S22, soil restrictive factor includes:Soil types, gravel concentration, pH value, the content of organic matter and Table soil thickness.Wherein soil types can be the farming that paddy field or dry land or field etc. influence and transform through human production activity Soil.The earthing matter that needs for determining earthing area according to the restricted information of soil includes:Soil types be paddy field when, when soil thickness >= The chad of 40cm, > 1mm is more than the 10% of full soil weight, granule content of the particle diameter less than 0.01mm and accounts for more than 60% or grain of complete native weight Granule content of the footpath more than 0.01mm accounts for more than 90%, content of organic matter < 1% of full soil weight, need to cover fertile table soil;Soil class When type is paddy field, as soil thickness < 30cm, fertile table soil need to be covered;When soil types is nonirrigated farmland, as soil thickness >=40cm, The chad of > 1mm more than full soil weight 10%, granule content of the particle diameter less than 0.01mm account for full soil weight more than 60% or particle diameter it is big More than the 90% of full soil weight is accounted in the granule content of 0.01mm, fertile table soil need to be covered;When soil types is nonirrigated farmland, when soil layer is thick Degree < 30cm, or naked rock makes the region on ground, need to cover fertile table soil.
The embodiment of the present invention is illustrated with reference to instantiation.
As shown in figure 3, being the flow of the topsoil stripping with the 3rd embodiment of reuse method of present invention offer Schematic diagram, it includes:
In step A, by the reconnaissance trip to project construction area tile B, stripping table soil is divided into fertile table is native, barren table Soil and contaminated surface soil, using fertile table soil as the Tu Yuan that fetches earth, as shown in Figure 4.Wherein, fertile table soil fetches earth thickness 30cm.
In step B, by the investigation to earthing area tile F, according to soil restrictive factor difference, earthing is divided into The fertile Biao Tu earthing areas of 30cm and the fertile Biao Tu earthing areas of 20cm, as shown in Figure 5.
In step C, when fetching earth, hillside fields is excavated and is carried out from top to bottom toward lower from eminence, and level land is inversely fallen from end is excavated Excavation is moved back, as shown in Figure 6.
In step D, an existing road is communicated between tile B and tile F, can make muck haulage route;But to fetching earth and earthing The road in plot needs newly to repair interim sidewalk connection, as shown in Figure 7.
Further, since haul distance is more long, two interim mound points are built by road in tile B.
In addition, earth moving tool is completed using dump truck and lever rubber tire handcart.
In step E, two kinds of Casing ways of uniform earthing and band earthing are taken, as shown in Figure 8.Uniform earthing is by earthing Thickness requirement, by mound point soil manually is carried into earthing plot, uniform earthing smooth reaches tillage requirements in surface; Band earthing is that farming ridge earthing is increased and improved by ridge culture requirement.
Finally illustrate, the above embodiments are merely illustrative of the technical solutions of the present invention and it is unrestricted, although with reference to compared with Good embodiment has been described in detail to the present invention, it will be understood by those within the art that, can be to skill of the invention Art scheme is modified or equivalent, and without deviating from the objective and scope of technical solution of the present invention, it all should cover at this In the middle of the right of invention.

Claims (3)

1. a kind of topsoil is peeled off and reuse method, including:Fetch earth, muck haulage and earthing, it is characterised in that:Methods described Also include:Before described fetching earth, the soil information in borrow areas is gathered, according to the soil information of collection, determine the soil in borrow areas Matter and the thickness that fetches earth;It is described fetch earth including:Carry out classification and fetch earth with the thickness that fetches earth according to the soil property for determining.
The soil information includes:Grogs content, pH value, the content of organic matter and soil thickness;
The soil property includes:Fertile table is native, barren table is native and contaminated surface soil;
The soil information according to collection, determines the soil property in borrow areas, including:
It is less than when the chad of the content of organic matter >=1.5%, soil thickness >=40cm, > 1mm is less than the 5% of full soil weight, particle diameter The granule content of 0.01mm accounts for the 40-90% that the heavy granule content of 10-60% or particle diameter more than 0.01mm of full soil accounts for full soil weight When, it is the fertile table soil that can be fetched earth;
It is less than when the chad of content of organic matter < 1%, soil thickness < 30cm, > 1mm is more than the 10% of full soil weight, particle diameter The granule content of 0.01mm account for full soil weight the granule content of more than 60% or particle diameter more than 0.01mm account for the 90% of full soil weight with On, it is the barren table soil that can not be fetched earth;
It is the contaminated surface soil that can not be fetched earth as pH value < 5.5 or pH value > 8.5;
Methods described also includes:Before the earthing, the restricted information of soil in collection earthing area, the soil limit according to collection What property information processed determined earthing area needs earthing matter and thickness of earth covering;
The earthing includes:The soil for needing earthing matter that soil property is the determination is chosen from the soil of the step acquisition of fetching earth Carry out earthing, and earthing thickness be the determination thickness of earth covering;
The soil restrictive factor includes:Soil types, grogs content, pH value, the content of organic matter and soil thickness;
The restricted information of soil according to collection determines that the earthing matter that needs in earthing area includes:
When soil types is paddy field, as soil thickness >=40cm, the chad of > 1mm is more than the 10% of full soil weight, particle diameter and is less than The granule content of 0.01mm account for full soil weight the granule content of more than 60% or particle diameter more than 0.01mm account for the 90% of full soil weight with On, content of organic matter < 1% need to cover fertile table soil;
When soil types is paddy field, as soil thickness < 30cm, fertile table soil need to be covered;
When soil types is nonirrigated farmland, as soil thickness >=40cm, the chad of > 1mm is more than the 10% of full soil weight, particle diameter and is less than The granule content of 0.01mm account for full soil weight the granule content of more than 60% or particle diameter more than 0.01mm account for the 90% of full soil weight with On, fertile table soil need to be covered;
When soil types is nonirrigated farmland, when soil thickness < 30cm, or naked rock make the region on ground, fertile table soil need to be covered.
2. topsoil as claimed in claim 1 is peeled off and reuse method, it is characterised in that:When fetching earth, hillside fields is certainly Fetched earth under above, level land is inversely fallen back and fetched earth.
3. topsoil as claimed in claim 1 is peeled off and reuse method, it is characterised in that:In earthing, using equal Two kinds of Casing ways of even earthing and band earthing.
CN201410168209.9A 2014-04-24 2014-04-24 Topsoil is peeled off and reuse method Active CN105009725B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410168209.9A CN105009725B (en) 2014-04-24 2014-04-24 Topsoil is peeled off and reuse method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410168209.9A CN105009725B (en) 2014-04-24 2014-04-24 Topsoil is peeled off and reuse method

Publications (2)

Publication Number Publication Date
CN105009725A CN105009725A (en) 2015-11-04
CN105009725B true CN105009725B (en) 2017-06-23

Family

ID=54400397

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410168209.9A Active CN105009725B (en) 2014-04-24 2014-04-24 Topsoil is peeled off and reuse method

Country Status (1)

Country Link
CN (1) CN105009725B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106134557A (en) * 2016-06-15 2016-11-23 上海市农业机械研究所 What the supination of a kind of layer-stepping elder generation was ploughed ploughs deeply operational method
CN110140467B (en) * 2019-06-21 2021-08-24 中国地质大学(北京) Reconstruction method of southern paddy field damaged soil
CN113439498B (en) * 2021-06-17 2023-03-17 广西壮族自治区自然资源生态修复中心 Method for stripping plough layer in karst rocky mountain area
CN115004895A (en) * 2022-05-13 2022-09-06 广东华远国土工程有限公司 Method for stripping, storing and recycling plough layer

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102301847A (en) * 2011-06-22 2012-01-04 中国矿业大学(北京) Construction method for land arrangement of rolling ground by topsoil stripping and backfilling
RU2476051C1 (en) * 2012-01-10 2013-02-27 Алексей Николаевич Рыжук Method of crop growing
CN103081602A (en) * 2012-12-28 2013-05-08 中国矿业大学(北京) Method of soil reclamation project topsoil stripping
CN103283335B (en) * 2013-05-22 2015-05-06 中国矿业大学(北京) Filling reclamation method for reclaiming coal mining subsidence lands by Yellow River sediment
CN103614997B (en) * 2013-12-19 2014-12-24 张大安 Earth borrowing method in process of highway construction

Also Published As

Publication number Publication date
CN105009725A (en) 2015-11-04

Similar Documents

Publication Publication Date Title
Homburg et al. Anthropogenic effects on soil quality of ancient agricultural systems of the American Southwest
Sterk et al. Wind‐blown nutrient transport and soil productivity changes in southwest Niger
Krümmelbein et al. Development of soil physical parameters in agricultural reclamation after brown coal mining within the first four years
CN104686003A (en) Reconstruction method of reclaimed soil profile in coal mining subsidence area
CN105009725B (en) Topsoil is peeled off and reuse method
Bedard-Haughn et al. The effects of erosional and management history on soil organic carbon stores in ephemeral wetlands of hummocky agricultural landscapes
CN101743839B (en) Quick ecological restoration method for destroyed homesteads after earthquakes
Mitchell et al. Sustainability of reclaimed desertified land in Ningxia, China
CN107787634A (en) A kind of Honghe fault wetland salt-soda soil Suaeda heteroptera ecological restoring method
Grassano et al. Evaluation of rapeseed cultivation suitability in Apulia with GIS-multicriteria analysis
Abate et al. Detecting and quantifying land use/land cover dynamics in Nadda Asendabo Watershed, South Western Ethiopia
CN106561206A (en) Ecological landscape construction method of stopping and controlling non-point source pollution of multi-metal tailings
CN105900555A (en) Land engineering design method
Wei et al. Response of surface soil hydrology to the micro-pattern of bio-crust in a dry-land Loess environment, China
He et al. Arbuscular mycorrhizal fungus–induced decrease in phosphorus loss due to leaching in red soils under simulated heavy rainfall
Truckell et al. Soil and transport factors in potential distribution systems for biofertilisers derived from palm oil mill residues in Malaysia
Hobson et al. The effect of tillage depth and traffic management on soil properties and root development during two growth stages of winter wheat (Triticum aestivum L.)
Gastauer et al. Revegetation on tropical steep slopes after mining and infrastructure projects: challenges and solutions
Kaje et al. Long-term impact of organic and conventional farming on soil physical properties under rice (Oryza sativa)-wheat (Triticum aestivum) cropping system in north-western Indo-Gangetic plains
CN106489591A (en) A kind of substitution tables soil material for open coal mine
O'Geen et al. Soil-landscape model helps predict potassium supply in vineyards
CN115486311A (en) Plant community configuration method for ecological restoration of alpine lozenite and application
Pierret et al. Reshaping upland farming policies to support nature and livelihoods: lessons from soil erosion in Southeast Asia with emphasis on Lao PDR.[Report of the Management of Soil Erosion Consortium (MSEC) Project]
CN106018754B (en) A kind of construction method for the fine compaction model for reconstructing soil
Basuki et al. Spatial distribution of land susceptibility to degradation and recomendation for its improvement: a case study in the upper Solo Sub-Watershed

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant