CN105006772B - Modified G5 turriforms overhead-groundwire lifter, connection gold utensil change device and method - Google Patents

Modified G5 turriforms overhead-groundwire lifter, connection gold utensil change device and method Download PDF

Info

Publication number
CN105006772B
CN105006772B CN201510392458.0A CN201510392458A CN105006772B CN 105006772 B CN105006772 B CN 105006772B CN 201510392458 A CN201510392458 A CN 201510392458A CN 105006772 B CN105006772 B CN 105006772B
Authority
CN
China
Prior art keywords
lifting arm
earth wire
aerial earth
support
nut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510392458.0A
Other languages
Chinese (zh)
Other versions
CN105006772A (en
Inventor
刘宝龙
凌铸
李昌甫
陆文叁
潘雷庭
韩竹平
陈鹏康
赵晓龙
陈远飞
余岗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanning Bureau of Extra High Voltage Power Transmission Co
Original Assignee
Nanning Bureau of Extra High Voltage Power Transmission Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanning Bureau of Extra High Voltage Power Transmission Co filed Critical Nanning Bureau of Extra High Voltage Power Transmission Co
Priority to CN201510392458.0A priority Critical patent/CN105006772B/en
Publication of CN105006772A publication Critical patent/CN105006772A/en
Application granted granted Critical
Publication of CN105006772B publication Critical patent/CN105006772B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)
  • Electric Cable Installation (AREA)

Abstract

The invention discloses a kind of modified G5 turriform overhead-groundwire lifters, it includes lifting arm, nut, support and rolling bearing, an insertion groove is opened up in the lower end of the lifting arm, mounting hole is offered on the lifting arm correspondence position of the insertion groove both sides, the support and rolling bearing are placed on lifting arm, the nut is threadedly coupled with lifting arm, and the support is located between rolling bearing and insertion groove, and the rolling bearing is located between support and nut.The invention also discloses a kind of aerial earth wire connection gold utensil more changing device.The vertical movement for being converted into lifting arm that the present invention passes through nut, the sliding friction between nut and support is changed into rolling friction by rolling bearing simultaneously, frictional force is greatly reduced, reduce operating personnel's quantity, save operating personnel's muscle power, the activity duration is reduced, operating efficiency is improved.

Description

Modified G5 turriforms overhead-groundwire lifter, connection gold utensil change device and method
Technical field
The present invention relates to a kind of Maintenance of Electric Transmission Line instrument, and in particular to a kind of modified G5 turriforms aerial earth wire lifting Device, connection gold utensil change device and method.
Background technology
The connection gold utensil total length of ± 500kV HVDC transmission line G5 sections tower connection aerial earth wire is 327mm, shelves Cause connection gold utensil load big away from big (distance is remote), the connection gold utensil of aerial earth wire is changed through investigating All other routes to be used Hand operating hoist and leading screw, loosen connection gold utensil by tightening up Hand operating hoist and leading screw, are then changed.But it can hold at present It is respectively 480mm, 450mm by the Hand operating hoist of the load and the minimum of contraction length of leading screw, much larger than the length of connection gold utensil, Cause this method not to be suitable for G5 sections tower connection aerial earth wire connection gold utensil to change.Job step is as follows:
(1) electrician carries the upper tower of transmission rope to aerial earth wire operating position, after fastening seat belts.
(2), will be built on stilts to aerial earth wire operating point using tower on the steel wire rope of transmission rope transmission high intensity, Hand operating hoist Ground wire is tied up in operating position with steel wire rope.
(3) when steel wire rope to aerial earth wire hanging point is tightened up with Hand operating hoist not stressing completely, service work can be carried out.
(4) required service kit is delivered on tower by ground electrician, because aerial earth wire lifting can not be arrived work by steel wire rope The position needed, needs ground electrician's service hoisting aerial earth wire.
(5) aerial earth wire backing positions space is small, and staff is more, and the Work tool of utilization is also more.
(6) when carrying out aerial earth wire accessory replacing, both sides steel wire rope need to constantly be adjusted.
(7) after inspection is errorless, defect elimination or other maintenance are carried out.Recovery routine is in contrast.
(8) check whether pin is plugged, whether in place socket, after no problem, make by dismountable instrument, tower under personnel, cleaning Industry scene, finishing tool, power cut-off.
The content of the invention
In view of the shortcomings of the prior art, it is an object of the invention to provide a kind of lifting of modified G5 turriforms aerial earth wire Device, which greatly reduces replacing G5 tower aerial earth wire connection gold utensil work on the spot amounts, reduces operating personnel's quantity, save Operating personnel's muscle power, reduces the activity duration, improves operating efficiency.
To achieve these goals, the present invention is adopted the technical scheme that:
A kind of modified G5 turriform overhead-groundwire lifters, it includes lifting arm, nut, support and rolling bearing, in institute The lower end for stating lifting arm opens up and offers peace on an insertion groove, the lifting arm correspondence position of the insertion groove both sides Hole is filled, the support and rolling bearing are placed on lifting arm, and the nut is threadedly coupled with lifting arm, the support is located at rolling Between dynamic bearing and insertion groove, the rolling bearing is located between support and nut.
The modified G5 turriform overhead-groundwire lifters further comprise a sleeve assembly, and the sleeve assembly includes set Barrier part and the rod member for being fixedly connected on sleeve member side, the inside of the sleeve member are provided with one and matched with nut external dimensions Hollow slots.
The sleeve member and rod member are integrally formed.The sleeve assembly further comprises an extension rod, the extension rod button It is connected to one end end of the rod member away from sleeve member.
The present invention also provides a kind of aerial earth wire connection gold utensil more changing device, it include it is parallel with aerial earth wire built on stiltsly Line bracket, the aerial earth wire support is connected by connection gold utensil with aerial earth wire, and the connection gold utensil more changing device includes upper The modified G5 turriform overhead-groundwire lifters stated, the lower end of the lifting arm is consolidated through aerial earth wire support with aerial earth wire Fixed, the support is stuck on aerial earth wire support.
The aerial earth wire is through in insertion groove, is bolted between mounting hole.Spiral shell in insertion groove The periphery of bolt is arranged a rubber sleeve.
A shackle passed through for aerial earth wire is fixedly connected with the mounting hole, rubber can also be arranged on the stud of shackle Gum cover, rubber sleeve also is located in insertion groove.
The present invention also provides a kind of method that aerial earth wire connection gold utensil is changed, and it comprises the following steps:
Electrician carries transmission rope, tower on corner block in step 1, tower, fastens seat belts, and is hung at aerial earth wire operating point Good transmission rope, corner block;
Step 2, ground electrician are using the matching relationship of transmission rope and corner block by two above-mentioned modified G5 turriforms Overhead-groundwire lifter is sent to aerial earth wire operating point in two times;
Two modified G5 turriform overhead-groundwire lifters are positioned on aerial earth wire support by electrician in step 3, tower, institute State aerial earth wire support to be made up of two L-type angle steel, two angle steel Relative distributions and form space therebetween, two improvement The lifting arm of type G5 turriform overhead-groundwire lifters passes through space, while by bracket clamp in angle steel both sides;
Step 4, the bolt in the mounting hole of lifting arm lower end taken out, the insertion groove of lifting arm lower end is stuck in built on stilts ground On line, bolt and screwing bolts are inserted into, two modified G5 turriforms overhead-groundwire lifters are built on stilts positioned at being connected to respectively The both sides of connection gold utensil between ground wire and aerial earth wire support;
After the completion of step 5, connection, the non-stress of lifting arm now, electrician rotates and upgrades the nut of bar by using hand on tower By lifting arm pre-tightening;
After step 6, pre-tightening lifting arm, electrician is gradually lifted built on stilts using pipe wrench or sleeve assembly rotation nut on tower Ground wire, until the load of aerial earth wire is fully transferred on lifting arm;
Step 7, the bearing pin removed in connection gold utensil, are changed to connection gold utensil.
In the step 4, if the length for the width or lifting arm that the diameter of aerial earth wire is more than insertion groove is less than Angle steel upper surface to aerial earth wire apart from when, by the mounting hole of lifting arm lower end bolt take out after, a shackle is connected to On aerial earth wire, and the stud of shackle is installed on mounting hole.
Compared with prior art, the beneficial effects of the present invention are:
1st, the vertical movement of the invention that be converted into lifting arm by nut, it is simple in construction, it is easy to operate, greatly It is big to reduce replacing G5 tower aerial earth wire connection gold utensil work on the spot amounts, while rolling bearing is by the slip between nut and support Friction is changed into rolling friction, and frictional force is greatly reduced, and reduces operating personnel's quantity, saves operating personnel's muscle power, reduces Activity duration, improve operating efficiency.
2nd, two lifting arms are used simultaneously, and back-up protection each other, security is greatly improved.
3rd, using the sleeve assembly supporting with nut, more convenient safety is operated.
4th, rubber sleeve can avoid aerial earth wire from directly being contacted with bolt, reduce the damage of the aerial earth wire caused by friction Wound.
Brief description of the drawings
Fig. 1 is the structural representation of modified G5 turriform overhead-groundwire lifters of the present invention;
Fig. 2 is the structural representation of sleeve assembly;
Fig. 3 is the structural representation of aerial earth wire connection gold utensil more changing device of the present invention.
Description of reference numerals:1st, lifting arm;11st, insertion groove;2nd, nut;3rd, support;4th, bolt;41st, rubber sleeve;5th, unload Button;6th, aerial earth wire;7th, connection gold utensil;8th, aerial earth wire support;9th, rolling bearing;10th, sleeve member;12nd, rod member;13rd, extend Bar.
Embodiment
With reference to embodiment, the present invention is further illustrated.
It refer to shown in Fig. 1, a kind of modified G5 turriform overhead-groundwire lifters, it includes lifting arm 1, nut 2, support 3 and rolling bearing 9, open up an insertion groove 11, the correspondence of lifting arm 1 of the both sides of insertion groove 11 in the lower end of lifting arm 1 Mounting hole is offered on position, support 3 and rolling bearing 9 are placed on lifting arm 1, and nut 2 is threadedly coupled with lifting arm 1, Support 3 and rolling bearing 9 are located between nut 2 and insertion groove 11, and rolling bearing 9 compared with support 3 closer to nut 2.If Put rolling bearing 9 so that during rotation nut 2, the friction between the lower surface of nut 2 and the upper surface of support 3 is rubbed by sliding Wiping is changed into rolling friction, and frictional force is greatly reduced, and personnel's physical demand is reduced while the service life of extending bracket 3.
Support 3 is to use channel-section steel material, and the wide * waists thickness of the high * legs of its waist is 55mm*145mm*5mm concave structure, certainly, The leg of support 3 is wide otherwise less than the hanging point angle steel width on the upside of aerial earth wire support.The center of support 3 sets a circular hole, directly Footpath 30mm, is available for lifting arm 1 to pass through.Lifting arm 1 is based on a diameter of 28mm whole rod iron.The one end of lifting arm 1 is provided with outer Screw thread, the high 60mm of nut 2 of the steel material supporting with it, lifting arm 1 and nut 2 are passed through by the threaded connection matched The vertical movement for being converted into lifting arm 1 of nut 2.Insertion groove 11 is wide to be arranged at the other end end of lifting arm 1 21mm rectangular recess, symmetrical mounting hole is offered on the position of lifting arm 1 of the both sides of insertion groove 11, wherein, The mounting hole of side can be threaded, and can screw supporting bolt through the mounting hole.
It refer to shown in Fig. 2, the present invention sets one and the matching used sleeve assembly of nut 2, sleeve assembly includes sleeve Part 10 and the rod member 12 for being fixedly connected on the side of sleeve member 10, the inside of sleeve member 10 are provided with one and the external dimensions phase of nut 2 The hollow slots of matching, the behaviour that the periphery that the hollow slots of sleeve member 10 are placed on into nut 2 can be screwed or be unclamped to nut 2 Make, the structure of sleeve member 10 and rod member 12 is only used when normally using, can be using extension when aerial earth wire load is excessive Bar 13 increases torque, reduces personnel's physical demand.One end end of the rod member 12 away from sleeve member 10 sets a groove, in extension One end setting one of bar 13 and the projection of the groove match realize the grafting of extension rod 13 and rod member 12.Due to sleeve member 10 with Nut 2 is nested together, and is not in using as not causing tightly because grasping when the instruments such as spanner are screwed to nut 2 The situation that handle high-altitude is dropped.
One end of the connection gold utensil 7 of aerial earth wire is installed on aerial earth wire 6, and the other end is installed on flat with aerial earth wire 6 On capable aerial earth wire support 8.The Renewal process of connection gold utensil 7 refer to shown in Fig. 3.
Electrician carries transmission rope, tower on corner block in step 1, tower, fastens seat belts, and is hung at aerial earth wire operating point Good transmission rope, corner block.
Step 2, ground electrician are using the matching relationship of transmission rope and corner block by two above-mentioned modified G5 turriforms Overhead-groundwire lifter is sent to aerial earth wire operating point in two times.Specifically:Angle pulley is installed at aerial earth wire operating point Steel tower on, transmission rope one end binding modified G5 turriform overhead-groundwire lifters, the other end pass through corner block, ground electrician The other end of the transmission rope is pulled such as being twisted machine with hand or other equipment so that modified G5 turriform overhead-groundwire lifters It is transported to aerial earth wire operating point.
Two modified G5 turriform overhead-groundwire lifters are positioned on aerial earth wire support 8 by electrician in step 3, tower, Aerial earth wire support 8 is made up of two L-type angle steel, and (vertical edge of the two is mutually close, laterally into back-to-back distribution for two angle steel While being located remotely from each other) and form space (between vertical edge) therebetween, two modified G5 turriform overhead-groundwire lifters are carried Rising stem 1 passes through space, while support 3 is stuck in into angle steel both sides.Support 3 is one invertedType structure, it includes support sheet Body and the supporting plate that rack body both sides are symmetric is fixedly connected on, rack body and supporting plate are into vertical relation, branch Frame body is provided with the circular hole for being placed on lifting arm 1, and it is the widthwise edge by its supporting plate and two angle steel that support 3, which is stuck in angle steel both sides, Phase clamping, the distance of preferably two supporting plates is slightly more than the distance of two angle steel vertical edges so that the medial surface of two supporting plates Just fitted with the lateral surface (i.e. the side away from space) of two angle steel vertical edges.
Step 4, the bolt 4 in the lower end mounting hole of lifting arm 1 taken out, the insertion groove 11 of the lower end of lifting arm 1 is stuck in On aerial earth wire 6, bolt 4 and screwing bolts 4 are inserted into, two modified G5 turriforms overhead-groundwire lifters are located at connect respectively The both sides of gold utensil 7 are connect, preferably corresponding connection gold utensil 7 is symmetrical.And if the diameter of aerial earth wire 6 is more than insertion groove 11 Width or lifting arm 1 length fall short of (be less than angle steel upper surface to aerial earth wire 6 distance or be not enough to lifting The upper end of bar 1 is installed by nut 2) when, shackle 5 can be used to be coordinated, i.e. the bolt 4 in by the lower end mounting hole of lifting arm 1 After taking-up, shackle 5 is connected on aerial earth wire 6 so that aerial earth wire 6 is through in shackle 5, and the stud of shackle 5 is installed to On mounting hole.
After the completion of step 5, connection, the non-stress of lifting arm 1 now, electrician rotates and upgrades the nut of bar by using hand on tower 2 by the pre-tightening of lifting arm 1.
After step 6, pre-tightening lifting arm 1, electrician rotates nut 2 using pipe wrench or sleeve assembly on tower, gradually hoisting frame Vacant lot line 6, until the load of aerial earth wire 6 is fully transferred on lifting arm 1.
After step 7, inspection connection are errorless, electrician can carry out maintenance defect elimination work on tower, and recovery routine is in contrast.
Whether step 8, the pin of inspection aerial earth wire connector are seated, and whether in place socket, checks errorless rear dismounting work Tool.Electrician carries tower under transmission rope and angle pulley, prune job scene, finishing tool, power cut-off on tower.
Above-listed detailed description is illustrating for possible embodiments of the present invention, and the embodiment simultaneously is not used to limit this hair Bright the scope of the claims, all equivalence enforcements or change without departing from carried out by the present invention are intended to be limited solely by the scope of the claims of this case.

Claims (2)

1. a kind of aerial earth wire connection gold utensil replacing options, it is realized by modified G5 turriforms overhead-groundwire lifter, and it is special Levy and be, the modified G5 turriform overhead-groundwire lifters, including lifting arm (1), nut (2), support (3) and rolling bearing (9) an insertion groove (11), the lifting arm of insertion groove (11) both sides, are opened up in the lower end of the lifting arm (1) (1) offered on correspondence position and bolt (4), the support (3) and rolling bearing (9) are provided with mounting hole, the mounting hole Be placed on lifting arm (1), the nut (2) is threadedly coupled with lifting arm (1), the support (3) be located at rolling bearing (9) and Between insertion groove (11), the rolling bearing (9) is located between support (3) and nut (2);
The aerial earth wire connection gold utensil replacing options, it comprises the following steps:
Electrician carries transmission rope, tower on corner block in step 1, tower, fastens seat belts, biography is hung up properly at aerial earth wire operating point Pass rope, corner block;
Step 2, ground electrician are maked somebody a mere figurehead two above-mentioned modified G5 turriforms using the matching relationship of transmission rope and corner block Ground wire raiser is sent to aerial earth wire operating point in two times;
Two modified G5 turriform overhead-groundwire lifters are positioned on aerial earth wire support (8) by electrician in step 3, tower, institute State aerial earth wire support (8) to be made up of two L-type angle steel, two angle steel Relative distributions and form space therebetween, two The lifting arm (1) of modified G5 turriform overhead-groundwire lifters passes through space, while support (3) is stuck in into angle steel both sides;
Step 4, by the mounting hole of lifting arm (1) lower end bolt (4) take out, by the insertion groove (11) of lifting arm (1) lower end It is stuck on aerial earth wire (6), is inserted into bolt (4) and screwing bolts (4), two modified G5 turriform overhead-groundwire lifters It is located at the both sides for the connection gold utensil (7) being connected between aerial earth wire (6) and aerial earth wire support (8) respectively;
After the completion of step 5, connection, lifting arm (1) non-stress now, electrician rotates and upgrades the nut of bar by using hand on tower (2) by lifting arm (1) pre-tightening;
After step 6, pre-tightening lifting arm (1), electrician rotates nut (2) using pipe wrench or sleeve assembly on tower, gradually hoisting frame Vacant lot line (6), until the load of aerial earth wire (6) is fully transferred on lifting arm (1);
Step 7, the bearing pin removed in connection gold utensil (7), are changed to connection gold utensil (7).
2. aerial earth wire connection gold utensil replacing options according to claim 1, it is characterised in that in the step 4, if The length of width or lifting arm (1) that the diameter of aerial earth wire (6) is more than insertion groove (11) is less than angle steel upper surface to frame Vacant lot line (6) apart from when, by the mounting hole of lifting arm (1) lower end bolt (4) take out after, a shackle (5) is connected to frame On vacant lot line (6), and the stud of shackle (5) is installed on mounting hole.
CN201510392458.0A 2015-07-06 2015-07-06 Modified G5 turriforms overhead-groundwire lifter, connection gold utensil change device and method Active CN105006772B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510392458.0A CN105006772B (en) 2015-07-06 2015-07-06 Modified G5 turriforms overhead-groundwire lifter, connection gold utensil change device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510392458.0A CN105006772B (en) 2015-07-06 2015-07-06 Modified G5 turriforms overhead-groundwire lifter, connection gold utensil change device and method

Publications (2)

Publication Number Publication Date
CN105006772A CN105006772A (en) 2015-10-28
CN105006772B true CN105006772B (en) 2017-09-05

Family

ID=54379342

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510392458.0A Active CN105006772B (en) 2015-07-06 2015-07-06 Modified G5 turriforms overhead-groundwire lifter, connection gold utensil change device and method

Country Status (1)

Country Link
CN (1) CN105006772B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107706822A (en) * 2017-11-15 2018-02-16 国家电网公司 Equipotential suspension clamp changes instrument

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2598041B3 (en) * 1986-04-25 1989-03-03 Electricite De France DEVICE FOR LIFTING AND TEMPORARY CABLE SUPPORT
CN201044342Y (en) * 2007-06-05 2008-04-02 中国南方电网有限责任公司超高压输电公司南宁局 Turret head wire hoisting device
JP3140486U (en) * 2008-01-15 2008-03-27 関西電力株式会社 Overhead wire lifting device
CN101710681A (en) * 2009-12-30 2010-05-19 江苏省电力公司镇江供电公司 Special conductor lifting device for 220KV horizontal double bundle conductor
CN204967123U (en) * 2015-07-06 2016-01-13 中国南方电网有限责任公司超高压输电公司南宁局 Improved generation G5 turriform overhead earth wire lifting mechanism and link fitting change device

Also Published As

Publication number Publication date
CN105006772A (en) 2015-10-28

Similar Documents

Publication Publication Date Title
WO2012088987A1 (en) Maintenance tool for insulator of direct current transmission line
CN101154797B (en) Auxiliary means for changing porcelain insulator of telegraph pole
CN205429581U (en) A locking lever structure for electron field
CN204649955U (en) The special external voltage pincers of tester
CN104538887B (en) A kind of lightning conducter lifts converter
CN204835359U (en) Drive electrified installation device of bird ware
WO2012088986A1 (en) Maintenance tool used for direct current transmission line
CN108551009B (en) Grounding wire suspension device
CN201766314U (en) Insulator replacing tool
CN105006772B (en) Modified G5 turriforms overhead-groundwire lifter, connection gold utensil change device and method
CN201758338U (en) Motor stator lifting fixture
CN102820621B (en) Node heating method for ground potential treatment substation equipment
CN209786641U (en) Electric power liftable unwrapping wire pulley gear
CN202978098U (en) Overhead ground wire lifter
CN206976942U (en) A kind of power construction wire-sending device
CN105591317B (en) A kind of device of suspended cables hook
CN209322298U (en) A kind of steel tower hanging piece fixture
CN207010085U (en) The adjustable soft bottle supporting device of 500kV transmission lines of electricity V strings
CN105071307B (en) A kind of device of auxiliary connection and the method that wiring is carried out using the device
CN201048254Y (en) Auxiliary tool for wire pole insulator replacement
CN202259718U (en) Movable-type grounding pile
CN202265304U (en) Hoisting device for support insulator
CN205151528U (en) Heavy -duty car frame Assembly hoist
CN108963870A (en) A kind of electric power tower hanger for power equipment maintaining
CN209918604U (en) Splicing sleeve straightener for overhead transmission line construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant