CN201766314U - Insulator replacing tool - Google Patents

Insulator replacing tool Download PDF

Info

Publication number
CN201766314U
CN201766314U CN2010205261344U CN201020526134U CN201766314U CN 201766314 U CN201766314 U CN 201766314U CN 2010205261344 U CN2010205261344 U CN 2010205261344U CN 201020526134 U CN201020526134 U CN 201020526134U CN 201766314 U CN201766314 U CN 201766314U
Authority
CN
China
Prior art keywords
bracket
cross bar
replacement tool
hoop
insulator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205261344U
Other languages
Chinese (zh)
Inventor
刘继君
李建明
孙延栋
栾继业
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Weifang Power Supply Co of State Grid Shandong Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Weifang Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Weifang Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical Weifang Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority to CN2010205261344U priority Critical patent/CN201766314U/en
Application granted granted Critical
Publication of CN201766314U publication Critical patent/CN201766314U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

本实用新型公开了一种绝缘子更换工具,其包括支架,支架上装有能抱紧线杆的抱箍,支架的顶部固装有外伸的横杆,横杆上装有吊钩;抱箍包括固装在支架上的支撑杆,支撑杆上装有两个能对装在一起的半环形卡箍;两半环形卡箍的一端铰接、另一端螺接在一起;横杆与支架之间装有斜支撑。该绝缘子更换工具的使用不仅替换了吊车的使用,且使用方便,节省了人力的使用及更换绝缘子的耗时,同时也减少停电范围及停电时间所带来的隐形费用。

Figure 201020526134

The utility model discloses an insulator replacement tool, which comprises a bracket, on which a hoop capable of tightly holding a wire rod is arranged, on the top of which the bracket is fixed with an outstretched cross bar, on which a hook is arranged; the hoop includes a fixed The support rod installed on the support rod is equipped with two semi-annular hoops that can be mounted together; one end of the two half-annular hoops is hinged and the other end is screwed together; there is a diagonal between the cross bar and the bracket. support. The use of the insulator replacement tool not only replaces the use of the crane, but also is convenient to use, saves the use of manpower and time-consuming replacement of insulators, and also reduces the hidden costs caused by the scope and time of power outages.

Figure 201020526134

Description

一种绝缘子更换工具 A kind of insulator replacement tool

技术领域technical field

本实用新型涉及一种绝缘子更换工具。The utility model relates to an insulator replacement tool.

背景技术Background technique

为提高设备性能以及避免瓷质绝缘子在检修过程中易发生断裂伤人的情况,需将瓷质支持绝缘子更换为复合支柱绝缘子。目前更换过程中采用的方法是吊车吊装方法,如遇小范围更换时,因更换设备与周围带电设备距离很近,易发生触电事故或损伤相邻设备;吊车吊装时还需将相邻间隔停电后进行,增加了操作停电时间,扩大了停电范围;吊车吊装还需要较多设备与人员且操作繁琐,费时费力。In order to improve the performance of equipment and avoid the situation that porcelain insulators are prone to breakage and injury during maintenance, it is necessary to replace porcelain support insulators with composite post insulators. At present, the method used in the replacement process is the crane hoisting method. In case of small-scale replacement, because the distance between the replacement equipment and the surrounding live equipment is very close, electric shock accidents or damage to adjacent equipment may easily occur; when the crane is hoisted, the adjacent intervals need to be powered off Afterwards, the operation power outage time is increased, and the power outage scope is expanded; crane hoisting also requires more equipment and personnel, and the operation is cumbersome, time-consuming and laborious.

实用新型内容Utility model content

本实用新型要解决的技术问题是提供一种使用方便、节时的绝缘子更换工具。The technical problem to be solved by the utility model is to provide a convenient and time-saving insulator replacement tool.

为解决上述问题,所提供的绝缘子更换工具,其结构特点是包括支架,支架上装有能抱紧线杆的抱箍,支架的顶部固装有外伸的横杆,横杆上装有吊钩。In order to solve the above problems, the provided insulator replacement tool has a structural feature that it includes a bracket on which a hoop capable of holding the pole is mounted, and an outstretched cross bar is fixed on the top of the bracket, and a hook is installed on the cross bar.

采用上述结构后,当需要进行绝缘子更换时,支架通过抱箍连接在线杆上,吊钩上可以悬挂滑轮,用绳索人工就可将需要更换上或者更换下的绝缘子通过滑轮送上或卸下;该绝缘子更换工具的使用不仅替换了吊车的使用,且使用方便,节省了人力的使用及更换绝缘子的耗时,同时也减少停电范围及停电时间所带来的隐形费用。After adopting the above structure, when the insulator needs to be replaced, the bracket is connected to the wire rod through the hoop, the pulley can be hung on the hook, and the insulator that needs to be replaced or replaced can be manually sent or unloaded through the pulley with a rope; The use of the insulator replacement tool not only replaces the use of the crane, but also is convenient to use, saves the use of manpower and time-consuming replacement of insulators, and also reduces the hidden costs caused by the scope and time of power outages.

作为抱箍的一种具体结构形式,所述抱箍包括固装在支架上的支撑杆,支撑杆上装有两个能对装在一起的半环形卡箍。As a specific structural form of the hoop, the hoop includes a support rod fixed on the bracket, and the support rod is equipped with two semi-circular hoops that can be mounted together.

两半环形卡箍的一端铰接、另一端螺接在一起。One end of the two halves of the ring clamp is hinged, and the other end is screwed together.

作为本实用新型的改进,所述横杆与支架之间装有斜支撑,可以增加横杆与支架之间的支撑强度和稳定性。As an improvement of the utility model, a diagonal support is installed between the cross bar and the bracket, which can increase the support strength and stability between the cross bar and the bracket.

作为本实用新型的进一步改进,支架上平行设置两个抱箍,可保证支架的稳定性。As a further improvement of the utility model, two hoops are arranged in parallel on the bracket to ensure the stability of the bracket.

附图说明Description of drawings

下面结合附图对本实用新型作进一步的说明:Below in conjunction with accompanying drawing, the utility model is further described:

图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;

图2为图1中A-A线的剖视图。Fig. 2 is a sectional view of line A-A in Fig. 1 .

具体实施方式Detailed ways

如图1和图2所示的绝缘子更换工具,其包括支架1,支架1为一钢管,支架1上装有能抱紧线杆的抱箍2,在支架1上可设置两个抱箍2,也可以设置多个,支架1的顶部固装有外伸的横杆3,横杆3与支架1之间装有斜支撑5,横杆3上装有吊钩4。所述抱箍2包括固装在支架1上的支撑杆21,支撑杆21上装有两个能对装在一起的半环形卡箍22,两半环形卡箍22的一端通过合页6铰接、另一端通过螺钉7螺接在一起。The insulator replacement tool shown in Figure 1 and Figure 2 includes a bracket 1, the bracket 1 is a steel pipe, the bracket 1 is equipped with a hoop 2 that can hold the pole tightly, and two hoops 2 can be arranged on the bracket 1, Also can be provided with a plurality of, the top of support 1 is equipped with the cross bar 3 that stretches out, and oblique support 5 is housed between cross bar 3 and support 1, and suspension hook 4 is housed on the cross bar 3. The hoop 2 includes a support rod 21 fixedly mounted on the support 1, and the support rod 21 is equipped with two semi-annular hoops 22 that can be mounted together, and one end of the two halves of the annular hoop 22 is hinged by a hinge 6, The other ends are screwed together by screws 7 .

在进行绝缘子更换时,打开用螺钉7螺接的两半环形卡箍22使之套装在线杆上,拧紧螺钉7使该抱箍2抱紧线杆,操作人员将滑轮挂在吊钩4上,操作人员可将更换后使用的绝缘子和需要更换的绝缘子通过滑轮吊上或吊下。When replacing the insulator, open the two halves of the ring clamp 22 screwed with the screw 7 to fit it on the wire pole, tighten the screw 7 to make the hoop 2 hold the wire pole tightly, and the operator hangs the pulley on the hook 4, Operators can hoist up or down the insulators used after replacement and insulators that need to be replaced through pulleys.

Claims (5)

1.一种绝缘子更换工具,其特征是包括支架(1),支架(1)上装有能抱紧线杆的抱箍(2),支架(1)的顶部固装有外伸的横杆(3),横杆(3)上装有吊钩(4)。1. An insulator replacement tool, which is characterized in that it includes a bracket (1), a hoop (2) that can hold the pole tightly on the bracket (1), and an outstretched cross bar ( 3), suspension hook (4) is housed on the cross bar (3). 2.根据权利要求1所述的绝缘子更换工具,其特征是:所述抱箍(2)包括固装在支架(1)上的支撑杆(21),支撑杆(21)上装有两个能对装在一起的半环形卡箍(22)。2. The insulator replacement tool according to claim 1, characterized in that: the hoop (2) includes a support rod (21) fixed on the bracket (1), and the support rod (21) is equipped with two energy Pair the half ring clamps (22) that fit together. 3.根据权利要求2所述的绝缘子更换工具,其特征是:两半环形卡箍(22)的一端铰接、另一端螺接在一起。3. The insulator replacement tool according to claim 2, characterized in that: one end of the two halves of the ring clamp (22) is hinged, and the other end is screwed together. 4.根据权利要求1所述的绝缘子更换工具,其特征是:所述横杆(3)与支架(1)之间装有斜支撑(5)。4. The insulator replacement tool according to claim 1, characterized in that: a diagonal support (5) is installed between the cross bar (3) and the bracket (1). 5.根据权利要求1-4中任一项所述的绝缘子更换工具,其特征是:支架(1)上平行设置两个抱箍(2) 。5. The insulator replacement tool according to any one of claims 1-4, characterized in that: two hoops (2) are arranged in parallel on the bracket (1).
CN2010205261344U 2010-09-13 2010-09-13 Insulator replacing tool Expired - Fee Related CN201766314U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205261344U CN201766314U (en) 2010-09-13 2010-09-13 Insulator replacing tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205261344U CN201766314U (en) 2010-09-13 2010-09-13 Insulator replacing tool

Publications (1)

Publication Number Publication Date
CN201766314U true CN201766314U (en) 2011-03-16

Family

ID=43718921

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205261344U Expired - Fee Related CN201766314U (en) 2010-09-13 2010-09-13 Insulator replacing tool

Country Status (1)

Country Link
CN (1) CN201766314U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103001150A (en) * 2012-12-05 2013-03-27 宁夏电力公司检修公司 Elevating device of working face of high-voltage insulator chain
CN103066531A (en) * 2013-01-14 2013-04-24 义乌市供电局 Supporting frame for 10 KV line live wire
CN103178463A (en) * 2013-04-19 2013-06-26 安徽省电力公司蚌埠供电公司 Hoisting device for electric equipment of transformer substation
CN107492824A (en) * 2017-10-25 2017-12-19 国网河南省电力公司孟津县供电公司 One kind is used for electric power apparatus examination Portable lifting device
CN108281924A (en) * 2018-03-15 2018-07-13 广东省输变电工程有限公司 A kind of dismountable substation's crossbeam framework fixture
CN109081256A (en) * 2018-09-25 2018-12-25 国网辽宁省电力有限公司锦州供电公司 Disconnecting switch Special lifting device
CN111675084A (en) * 2020-03-19 2020-09-18 河南平高通用电气有限公司 An insulator hoisting tool

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103001150A (en) * 2012-12-05 2013-03-27 宁夏电力公司检修公司 Elevating device of working face of high-voltage insulator chain
CN103066531A (en) * 2013-01-14 2013-04-24 义乌市供电局 Supporting frame for 10 KV line live wire
CN103066531B (en) * 2013-01-14 2016-06-15 义乌市供电局 A kind of 10 KV line live wire bracing frames
CN103178463A (en) * 2013-04-19 2013-06-26 安徽省电力公司蚌埠供电公司 Hoisting device for electric equipment of transformer substation
CN107492824A (en) * 2017-10-25 2017-12-19 国网河南省电力公司孟津县供电公司 One kind is used for electric power apparatus examination Portable lifting device
CN108281924A (en) * 2018-03-15 2018-07-13 广东省输变电工程有限公司 A kind of dismountable substation's crossbeam framework fixture
CN108281924B (en) * 2018-03-15 2023-12-19 广东省输变电工程有限公司 A detachable substation beam frame fixture
CN109081256A (en) * 2018-09-25 2018-12-25 国网辽宁省电力有限公司锦州供电公司 Disconnecting switch Special lifting device
CN111675084A (en) * 2020-03-19 2020-09-18 河南平高通用电气有限公司 An insulator hoisting tool

Similar Documents

Publication Publication Date Title
CN103545751B (en) Overhead transmission line ground wire optical cable fittings replacement bracket
CN203247012U (en) Composite insulator lifting fixture
CN103613031A (en) Simple transformer hoisting device
CN203428736U (en) Electrode hoisting fixture of electric melting furnace
CN102040166A (en) Hoisting tool for equipment on pillar
CN105071296A (en) Structurally-improved high-voltage distribution line rod pole-mounted line hoisting device
CN102661057B (en) Power angle tower pull leg main material changing method and special main material clamp
CN204391613U (en) A kind of wire support device of auxiliary replacement porcelain pole arm
CN201517022U (en) Lifting tools for pole-mounted equipment
CN201882847U (en) Hoisting tool of pole-mounted transformer
CN202340093U (en) Equipment live mounting hoist device on power supply circuit post
CN102664377B (en) Double-cross arm assembler for single lever and double-cross arm mounting method
CN203690795U (en) Carriage used for overhaul of insulator chain
CN207303796U (en) One kind is used for electric power apparatus examination Portable lifting device
CN106384964A (en) V-type insulator-chain electrified replacing operation method
CN204324745U (en) A kind of 35KV isolation switch hanging device
CN203976218U (en) A kind of twin columns mounting means distribution transformer upending frame
CN202594699U (en) Power transmission line lifting device for steel pipe tower
CN103341847B (en) A kind of spring stretching device
CN103138204B (en) Strain cross arm is changed and is used multi-functional installing rack
CN106992474A (en) 10kV ends dismount aid
CN206658002U (en) 1000kV extra-high-voltage alternating currents wire clamp changes instrument
CN107069508B (en) Auxiliary tool for replacing post insulator of isolating switch under 110kV
CN202578116U (en) Single-person on-pole assembler for dual-fan cross arm
CN203553744U (en) An ultra extra high voltage AC-DC overhead transmission line ground wire optical cable armour clamp replacing apparatus

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20130709

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130709

Address after: Weifang City, Shandong Province Dongfeng 261021 West Street Weicheng District No. 425 electric power building

Patentee after: Shandong Electric Power Corporation Weifang Power Supply Co., Ltd.

Patentee after: State Grid Corporation of China

Address before: 261021 No. 425 power building, Dongfeng West Street, Shandong, Weifang

Patentee before: Shandong Electric Power Corporation Weifang Power Supply Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110316

Termination date: 20170913