CN206976942U - A kind of power construction wire-sending device - Google Patents

A kind of power construction wire-sending device Download PDF

Info

Publication number
CN206976942U
CN206976942U CN201720947637.0U CN201720947637U CN206976942U CN 206976942 U CN206976942 U CN 206976942U CN 201720947637 U CN201720947637 U CN 201720947637U CN 206976942 U CN206976942 U CN 206976942U
Authority
CN
China
Prior art keywords
halliard
line
wire
connecting plate
part connecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720947637.0U
Other languages
Chinese (zh)
Inventor
齐寓乾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720947637.0U priority Critical patent/CN206976942U/en
Application granted granted Critical
Publication of CN206976942U publication Critical patent/CN206976942U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model discloses a kind of power construction wire-sending device, electric construction tool field is related generally to.Including halliard, wire fixing device and pulley gear, the wire fixing device includes solidus circle and puller bolt, the solidus circle side is detachably connected with halliard, the pulley gear puts line plate, the first middle part connecting plate, the second middle part connecting plate and fixed pulley including top, put line plate and be provided with trunking in the top, cross-arm standing groove is provided between first middle part connecting plate and the second middle part connecting plate, first middle part connecting plate is provided with the bolt that is fixed and clamped.The beneficial effects of the utility model are:Avoid the effect of weight of line, can more easily, easily by wire, either bracing wire is delivered on electric pole or electric tower, alleviate the working strength of workmen;Especially suitable for the fixation of more times Wire terminations on same strain rod tower in the work such as disaster area rescue and disaster area reconstruction, or with fixed on the bar of the more bracing wires of shaft tower (including temporary guy).

Description

A kind of power construction wire-sending device
Technical field
Electric construction tool field is the utility model is related to, specifically a kind of power construction wire-sending device.
Background technology
During power construction, to electric pole, either the bracing wire anchor ear on electric tower carries out wiring or needed electric wire One end is sent on electric pole or electric tower, so that electric wire is connected on insulator, method of the prior art be by bracing wire or One end of electric wire is fixed on the waist of workmen, in passing by tape to electric pole when workmen climbs electric pole or electric tower Or on electric tower, then remove line, line is fixed accordingly.Such a method has the following disadvantages:
1st, the waist for securing the wire in workmen undoubtedly adds the heavy burden of workmen, and workmen can also carry it Its electric construction tool, so, when workmen climbs electric pole or electric tower, heavy burden greatly increases, and climbs process In very expend muscle power.
2nd, in the prior art by the way that bracing wire or electric wire to be fixed on to the waist of workmen, by tape to electric pole or This method on electric tower, the bracing wire or electric wire for being suitable only for negligible amounts carry out wiring work, as disaster area rescue and calamity In the work such as area's reconstruction, usually disposably need more than ten electric wires being connected on corresponding insulator, or an electric pole needs Beat more with bracing wire (containing temporary guy), if also line is sent on electric pole or electric tower using method of the prior art, construction When personnel climb electric pole or electric tower, bearing a heavy burden can be very big, operates very unrealistic, it is necessary to which workmen up and down reciprocatingly climbs Climbing repeatedly could all be installed to line on electric pole or electric tower.
3rd, it is to need to remove line from waist with method of the prior art, workmen, then can be just connected to insulator On, due to the deadweight of line, when holding line, line has on a larger gravity direction workmen to the hand of workmen Pulling force, by fixed bracing wire or terminal during, this pulling force can bring very big inconvenience to work progress, significantly It has impact on efficiency of construction.
Utility model content
The purpose of this utility model is to provide a kind of power construction wire-sending device, it can more easily, it is convenient Line is delivered on electric pole or electric tower, alleviates the working strength of workmen;Especially suitable for as disaster area rescue and calamity In the work such as area's reconstruction, the feelings more than ten electric wires being connected on insulator are disposably needed when being constructed on multi-circuit lines on the same pole Condition, or carry out the fixed bracing wire construction of more stay rod towers (including temporary guy);And line is delivered to electric pole or electric tower , can be to the fixation of line stabilization after upper, workmen without hold line again in work progress, after the joint of line is fixed again Removed from the present apparatus, the deadweight of electric wire will not make troubles to work progress again, substantially increase efficiency of construction.
The utility model to achieve the above object, is achieved through the following technical solutions:
A kind of power construction wire-sending device, including halliard, wire fixing device and pulley gear, the wire fixing device include Solidus circle and puller bolt, the solidus circle are provided with opening, and one end of the opening is hinged with the folding being adapted with opening Button, one end and the folding button hinged place of the opening are provided with torsion spring, are additionally provided with the solidus circle and are threadedly coupled with puller bolt The first bolt hole, the puller bolt end is provided with that arc line ball is raised, and the arc line ball is raised in solidus circle, institute State solidus circle side to be detachably connected with halliard, the pulley gear puts line plate, the first middle part connecting plate, second including top Middle part connecting plate and fixed pulley, the top put line plate and are provided with trunking, and first middle part connecting plate connects with the second middle part The cross-arm standing groove for being used for placing irony cross-arm is provided between fishplate bar, first middle part connecting plate is provided with the second screwed hole, Second screwed hole is provided with the bolt that is fixed and clamped, and the bolt end that is fixed and clamped contacts with irony cross-arm side wall, described Halliard is arranged on fixed pulley, the fixed pulley is arranged at the first middle part connecting plate, in the second middle part connecting plate away from cross-arm The side of standing groove.
The solid coil sides are provided with connecting seat, and the connecting seat is provided with self-locking hook, and the halliard is provided with The shackle being adapted with self-locking hook.
The halliard is provided with balancing weight, and one end of the halliard and the top of balancing weight connect, the halliard The other end connected through the bottom of fixed pulley and balancing weight.
The top is put and is hinged with cover plate by hinge at the top of line plate, and the cover plate is provided with handle.
The bolt that is fixed and clamped is provided with 2~10.
The fixed pulley both sides are provided with retaining wall, and grooving is provided between retaining wall described in both sides.
Put line plate and be provided with 1~6 trunking in the top.
The puller bolt end is provided with annular flange, and the arc line ball projection is provided with what is be adapted with annular flange T-slot, the annular flange are arranged in T-slot.
Prior art is contrasted, the beneficial effects of the utility model are:
1st, the present apparatus is fixed bracing wire or electric wire by wire fixing device, the positional distance electric wire of wire fixing device fixing line Away from 40~60 centimetres at port, pulley gear is arranged on electric pole or electric tower first, then reuses halliard and cunning Line is delivered on electric pole or electric tower by wheel apparatus, can more easily, line is easily delivered to electric pole or electric tower On, alleviate the working strength of workmen;Especially suitable for as more in same shaft tower in the work such as disaster area rescue and disaster area reconstruction Loop line works on road, disposably needs situation about being connected to more than ten electric wires on corresponding insulator, or in more stay rod towers On fixation bracing wire construction;After line is delivered on electric pole or electric tower, workmen together takes wire fixing device and line Under, line is placed into the trunking that top is put on line plate, wire fixing device can be stuck in the one of trunking in the presence of online gravity End, 40~60 centimetres of line can be in free state at port, will not be acted on by other parts line gravity, thus Can to the fixation of line stabilization, in work progress workmen without hold line again, after wire terminal is fixed again by electric wire from Taken out in trunking, wire fixing device is removed from line.Because 40~60 centimetres at port of lines can be in free state, The deadweight of other parts line will not make troubles to work progress again, substantially increase efficiency of construction.
The shackle being adapted with self-locking hook is set the 2nd, by setting self-locking hook on solidus circle, on halliard, The connection of self-locking hook and shackle, it ensure that solidus circle side is detachably connected with halliard, workmen's energy on ground Reach and more easily solidus circle is connected on halliard, the workmen on electric pole or electric tower will more easily can also consolidate Line apparatus and line are removed from halliard.
3rd, halliard is provided with balancing weight, and after single line has been conveyed, in the presence of balancing weight gravity, halliard can Soon decline, can drop to bottom surface faster at the shackle place that halliard is set, then carry out the defeated of lower single line again Work is sent, improves the transfer efficiency of line.
4th, cover plate is set by being put at top at the top of line plate, cover plate can cover the line being placed into trunking, avoid electricity Workmen's imprudence in line bar or electric tower touches out the line in trunking, causes line Crater face to cause thing of constructing Therefore.
5th, 2~10 are set by the bolt that will be fixed and clamped, more stable, safety by pulley gear can be fixed to iron On matter cross-arm, avoid work progress middle pulley device from falling and cause construction accident to bottom surface.
6th, by setting retaining wall in fixed pulley both sides, grooving is provided between the retaining wall of both sides, grooving is used for placing halliard, energy Enough avoid halliard from skidding off in the gap between fixed pulley and the first middle part connecting plate, the second middle part connecting plate, cause to lift Rope can not be used by card master.
7th, 1~6 trunking of setting on line plate is put at top, and multiple trunkings can just place more lines, improve efficiency of construction.
8th, by setting annular flange in puller bolt end, T-slot is set in arc line ball projection, screws puller bolt When annular flange can be rotated in T-slot, and T-slot can block annular flange, avoid annular flange from being taken off out of T-slot Fall, so, when screwing rotation puller bolt, arc line ball projection would not followed by puller bolt rotation, so as to more preferable Ground compresses electric wire.
Brief description of the drawings
Accompanying drawing 1 is the utility model use state figure.
Accompanying drawing 2 is the utility model middle pulley apparatus structure schematic diagram.
Accompanying drawing 3 is wire fixing device structural representation in the utility model.
Label shown in accompanying drawing:
1st, halliard;2nd, wire fixing device;3rd, pulley gear;4th, solidus circle;5th, puller bolt;6th, it is open;7th, folding button;8、 First bolt hole;9th, arc line ball is raised;10th, line plate is put at top;11st, the first middle part connecting plate;12nd, the second middle part connecting plate; 13rd, fixed pulley;14th, trunking;15th, irony cross-arm;16th, cross-arm standing groove;17th, the second screwed hole;18th, be fixed and clamped bolt; 19th, connecting seat;20th, self-locking hook;21st, shackle;22nd, balancing weight;23rd, cover plate;24th, shake hands;25th, retaining wall;26th, grooving;27、 Annular flange;28th, T-slot;29th, insulator.
Embodiment
With reference to specific embodiment, the utility model is expanded on further.It should be understood that these embodiments are merely to illustrate this Utility model rather than limitation the scope of the utility model.In addition, it is to be understood that reading the content of the utility model instruction Afterwards, those skilled in the art can make various changes or modifications to the utility model, and these equivalent form of values equally fall within this Shen Please limited range.
Described in the utility model is a kind of power construction wire-sending device, and agent structure includes halliard 1, wire fixing device 2 With pulley gear 3, the wire fixing device 2 includes solidus circle 4 and puller bolt 5, and the solidus circle 4 is provided with opening 6, described to open One end of mouth 6 is hinged with the folding button 7 being adapted with opening 6, and one end of the opening 6 is provided with torsion spring with the hinged place of folding button 7, When line is put into solidus circle 4, folding button 7 is opened, line is filled in into solidus circle 4 at opening 6, then unclamp folding button 7, folding button 7 can close opening 6 in the presence of torsion spring;, it is necessary to which solidus circle 4 is removed from line after connecting wire on insulator 29 When, folding button 7 is opened, removes solidus circle 4 from line at opening 6, then unclamps folding button 7, folding button 7 can be in torsion spring Opening 6 is closed under effect.The first bolt hole 8 being threadedly coupled with puller bolt 5, the top are additionally provided with the solidus circle 4 The tight end of bolt 5 is provided with arc line ball projection 9, and the arc line ball projection 9 is in solidus circle 4, by screwing puller bolt 5, arc line ball projection 9 can constantly compress line, so as to which line be fixed.The positional distance line of the fixing line of wire fixing device 2 Away from 40~60 centimetres at port.The side of solidus circle 4 is detachably connected with halliard 1, and the pulley gear 3 is put including top Line plate 10, the first middle part connecting plate 11, the second middle part connecting plate 12 and fixed pulley 13, the top put line plate 10 be provided with put line Groove 14, trunking 14 are used for placing the line being delivered on electric pole or electric tower, can be to the fixation of line stabilization.First middle part It is provided between the middle part connecting plate 12 of connecting plate 11 and second and is used to placing the cross-arm standing groove 16 of irony cross-arm 15, in described first Portion's connecting plate 11 is provided with the second screwed hole 17, and second screwed hole 17 is provided with the bolt 18 that is fixed and clamped, the fixed pressure The tight end of bolt 18 contacts with the side wall of irony cross-arm 15, and the bolt 18 that is fixed and clamped can be more stable, safety by pulley gear 3 Fixed on irony cross-arm 15, avoiding work progress middle pulley device 3 from falling construction accident is caused to bottom surface.The halliard 1 Be arranged on fixed pulley 13, the fixed pulley 13 is arranged at the first middle part connecting plate 11, in the second middle part connecting plate 12 away from horizontal The side of standing groove 16 is carried on a shoulder pole, fixed pulley 13 is used for the raising and lowering for ensureing halliard 1, and then the conveying of line in pairs.
In order to ensure that the side of solidus circle 4 is detachably connected with halliard 1, the sidepiece of solidus circle 4 is provided with connecting seat 19, institute State connecting seat 19 and be provided with self-locking hook 20, the halliard 1 is provided with the shackle 21 being adapted with self-locking hook 20.From The connection of locking-type hook 20 and shackle 21, ensure that the side of solidus circle 4 is detachably connected with halliard 1, the constructor on ground Solidus circle 4 more easily can be connected on halliard 1 by member, and the workmen on electric pole or electric tower also can be more easily Wire fixing device 2 and line are removed from halliard 1.
In order to improve the transfer efficiency of line, the halliard 1 is provided with balancing weight 22, and one end of the halliard 1 is with matching somebody with somebody The top connection of pouring weight 22, the other end of the halliard 1 are connected through fixed pulley 13 with the bottom of balancing weight 22.Halliard 1 Balancing weight 22 is provided with, after single line has been conveyed, in the presence of the gravity of balancing weight 22, halliard 1 can soon decline, It can drop to bottom surface faster at the place of shackle 21 that halliard 1 is set, then carry out the transportation work of lower single line again, carry The high transfer efficiency of line.
In order to avoid workmen's imprudence on electric pole or electric tower touches out the line in trunking 14, line is caused to fall Construction accident is caused to ground, the top puts the top of line plate 10 and is hinged with cover plate 23 by hinge, and the cover plate 23 is provided with Handle 24,24 setting of shaking hands more easily can open cover plate 23.
The bolt 18 that is fixed and clamped is provided with 2~10.By that will be fixed and clamped, bolt 18 sets 2~10, and cooperation makes With puller bolt 5, it more stable, safety by pulley gear 3 can be fixed on irony cross-arm 15, avoid sliding in work progress Wheel apparatus 3 falls causes construction accident to bottom surface.
The both sides of fixed pulley 13 are provided with retaining wall 25, and grooving 26 is provided between retaining wall 25 described in both sides.Grooving 26 is used for putting Put halliard 1, can avoid halliard 1 skid off the middle part connecting plate 11 of fixed pulley 13 and first, the second middle part connecting plate 12 it Between gap in, cause halliard 1 to be used by card master.
Put line plate 10 and be provided with 1~6 trunking 14 in the top.Multiple trunkings 14 just can place more lines, improve Efficiency of construction.
The end of puller bolt 5 is provided with annular flange 27, and the arc line ball projection 9 is provided with and the phase of annular flange 27 The T-slot 28 of adaptation, the annular flange 27 are arranged in T-slot 28.Annular flange 27 can be in T when screwing puller bolt 5 Rotated in type groove 28, and T-slot 28 can block annular flange 27, avoid annular flange 27 from being come off out of T-slot 28, such one Come, when screwing rotation puller bolt 5, arc line ball projection 9 would not followed by puller bolt 5 and rotate, so as to preferably by line Compress.
Application method and beneficial effect:
The present apparatus is fixed line by solidus circle 4 and puller bolt 5, the end of the positional distance line of the fixing line of wire fixing device 2 Away from 40~60 centimetres at mouthful, pulley gear 3 is arranged on electric pole or electric tower first, then reuses halliard 1 and pulley Line is delivered on electric pole or electric tower by device 3, can more easily, easily line is delivered on electric pole or electric tower, subtract The light working strength of workmen;Especially suitable for work such as the multi-circuit lines on the same tower repairings as disaster area rescue and disaster area reconstruction In, disposably need situation about ten several threads are connected on corresponding insulator 29;Line is delivered on electric pole or electric tower it Afterwards, wire fixing device 2 and line are removed together by workmen by opening self-locking hook 20, and line is placed into top puts line plate 10 On trunking 14 in, then cover plate 23 is closed, wire fixing device 2 can be stuck in the one of trunking 14 in the presence of online gravity End, 40~60 centimetres of line can be in free state at port, will not be acted on by other parts line gravity, thus Can be to the fixation of line stabilization, workmen without hold line again in work progress, after wire terminal is connected with insulator 29 again Line is taken out from trunking 14, wire fixing device 2 is removed from line.Because 40~60 centimetres at port of lines can be in Free state, the deadweight of other parts line will not make troubles to work progress again, substantially increase efficiency of construction.

Claims (8)

  1. A kind of 1. power construction wire-sending device, it is characterised in that:Including halliard (1), wire fixing device (2) and pulley gear (3), the wire fixing device (2) includes solidus circle (4) and puller bolt (5), and the solidus circle (4) is provided with opening (6), described One end of opening (6) is hinged with the folding button (7) being adapted with opening (6), and one end and the folding button (7) of the opening (6) are cut with scissors Meet place and be provided with torsion spring, the first bolt hole (8) being threadedly coupled with puller bolt (5), the top are additionally provided with the solidus circle (4) Tight bolt (5) end is provided with arc line ball projection (9), and the arc line ball raised (9) is located in solidus circle (4), the solidus Circle (4) side is detachably connected with halliard (1), and the pulley gear (3) puts line plate (10) including top, the first middle part connects Plate (11), the second middle part connecting plate (12) and fixed pulley (13), the top puts line plate (10) and is provided with trunking (14), described The cross-arm for being used to place irony cross-arm (15) is provided between first middle part connecting plate (11) and the second middle part connecting plate (12) to place Groove (16), first middle part connecting plate (11) are provided with the second screwed hole (17), and second screwed hole (17) is provided with solid Determine hold-down bolt (18), the bolt that is fixed and clamped (18) end contacts with irony cross-arm (15) side wall, and the halliard (1) sets Put on fixed pulley (13), the fixed pulley (13) is arranged at the first middle part connecting plate (11), in the second middle part connecting plate (12) Side away from cross-arm standing groove (16).
  2. A kind of 2. power construction wire-sending device according to claim 1, it is characterised in that:Solidus circle (4) sidepiece is set There is connecting seat (19), the connecting seat (19) is provided with self-locking hook (20), and the halliard (1) is provided with hangs with self-locking The adaptable shackle (21) of hook (20).
  3. A kind of 3. power construction wire-sending device according to claim 2, it is characterised in that:The halliard (1) is provided with Balancing weight (22), one end of the halliard (1) are connected with the top of balancing weight (22), and the other end of the halliard (1) is worn The bottom that fixed pulley (13) is crossed with balancing weight (22) is connected.
  4. A kind of 4. power construction wire-sending device according to claim 1, it is characterised in that:Put line plate (10) top in the top Portion is hinged with cover plate (23) by hinge, and the cover plate (23) is provided with handle (24).
  5. A kind of 5. power construction wire-sending device according to claim 1, it is characterised in that:The bolt that is fixed and clamped (18) Provided with 2~10.
  6. A kind of 6. power construction wire-sending device according to claim 1, it is characterised in that:Fixed pulley (13) both sides are set There is retaining wall (25), grooving (26) is provided between retaining wall (25) described in both sides.
  7. A kind of 7. power construction wire-sending device according to claim 1, it is characterised in that:Put on line plate (10) at the top Provided with 1~6 trunking (14).
  8. A kind of 8. power construction wire-sending device according to claim 1, it is characterised in that:Puller bolt (5) end Provided with annular flange (27), the arc line ball raised (9) is provided with the T-slot (28) being adapted with annular flange (27), institute Annular flange (27) is stated to be arranged in T-slot (28).
CN201720947637.0U 2017-07-31 2017-07-31 A kind of power construction wire-sending device Expired - Fee Related CN206976942U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720947637.0U CN206976942U (en) 2017-07-31 2017-07-31 A kind of power construction wire-sending device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720947637.0U CN206976942U (en) 2017-07-31 2017-07-31 A kind of power construction wire-sending device

Publications (1)

Publication Number Publication Date
CN206976942U true CN206976942U (en) 2018-02-06

Family

ID=61393774

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720947637.0U Expired - Fee Related CN206976942U (en) 2017-07-31 2017-07-31 A kind of power construction wire-sending device

Country Status (1)

Country Link
CN (1) CN206976942U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109038387A (en) * 2018-08-22 2018-12-18 刘义强 Electric aerial work auxiliary connection equipment
CN109546373A (en) * 2018-11-22 2019-03-29 中国南方电网有限责任公司超高压输电公司曲靖局 A kind of substation's earthing clamp mounting device and the installation method of earthing clamp

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109038387A (en) * 2018-08-22 2018-12-18 刘义强 Electric aerial work auxiliary connection equipment
CN109546373A (en) * 2018-11-22 2019-03-29 中国南方电网有限责任公司超高压输电公司曲靖局 A kind of substation's earthing clamp mounting device and the installation method of earthing clamp

Similar Documents

Publication Publication Date Title
CN108452451B (en) Mobile transmission line tower climbing personal safety protection method and device
CN201523179U (en) Insulated rope ladder for live working on high-voltage transmission lines with anti-falling device
CN204760890U (en) Wire hoisting device in distribution lines construction
CN104953507A (en) Device and method for lifting wire during distribution line construction
CN209500577U (en) It ascends a height operation foot nail type fall protection equipment
CN202997425U (en) Hoisting device capable of replacing suspension type insulator chain under electrified state
CN206976942U (en) A kind of power construction wire-sending device
CN204663121U (en) Packaged type insulating supporting line bar
CN204615266U (en) Climbing soft ladder anti-fall combination safety protection tool
CN203352053U (en) Chain-type ladder used for maintenance of straight line tower of power transmission line
CN108808544A (en) Pass in and out forceful electric power field device
CN109882065B (en) General type steel frame cat ladder climbing device
CN203598387U (en) Auxiliary device used for aloft work
CN110251858A (en) Safety anti-drop device for power transmission line climbing pole operation
CN210003199U (en) general type steelframe cat ladder climbing equipment
CN202802569U (en) Electric power tower climbing protector
CN203507341U (en) Handheld rotary type slow descent control device
CN206874212U (en) A kind of electrician is with anti-inclination insulating ladder
CN206508420U (en) A kind of transmission line of electricity climbs the anti-fall buckle structure of shaft tower
CN112704858B (en) Climbing device with adjustable bayonet
CN203050216U (en) Dual-opening derrick cap
CN210551103U (en) Toolbox that transformer operation safety maintenance was used
CN202906291U (en) Operation rope ladder hanging equipment
CN211447698U (en) Safety device for electrical construction
CN206259651U (en) A kind of rural area fault maintenance activity device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180206

Termination date: 20180731

CF01 Termination of patent right due to non-payment of annual fee