CN209322298U - A kind of steel tower hanging piece fixture - Google Patents

A kind of steel tower hanging piece fixture Download PDF

Info

Publication number
CN209322298U
CN209322298U CN201822115704.XU CN201822115704U CN209322298U CN 209322298 U CN209322298 U CN 209322298U CN 201822115704 U CN201822115704 U CN 201822115704U CN 209322298 U CN209322298 U CN 209322298U
Authority
CN
China
Prior art keywords
bolt
bottom plate
hanging piece
shaft
screw rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822115704.XU
Other languages
Chinese (zh)
Inventor
王晓刚
陈孝阳
王李君
陈治明
李雪红
王健
范龙华
李丰硕
雍建
吕孝栋
吕均
范业斌
吴元香
程晓岩
加布
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Shu Neng Utilities Electric Co Ltd
State Grid Tibet Electric Power Co Ltd
Original Assignee
Sichuan Shu Neng Utilities Electric Co Ltd
State Grid Tibet Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Shu Neng Utilities Electric Co Ltd, State Grid Tibet Electric Power Co Ltd filed Critical Sichuan Shu Neng Utilities Electric Co Ltd
Priority to CN201822115704.XU priority Critical patent/CN209322298U/en
Application granted granted Critical
Publication of CN209322298U publication Critical patent/CN209322298U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a kind of steel tower hanging piece fixtures, including two clamp assemblies and two suspension centre ropes, suspension centre rope upper and lower ends to be equipped with rope sling;Clamp assembly includes that there are two the U-shaped buttons of strut for tool, the shaft of protrusion, mutually perpendicular bolt II and screw rod and bolt I and bottom plate are equipped in the middle part of two end faces, the end of two struts is respectively equipped with port ring eye and interior loop coil eye, and U-shaped button and the rope sling of suspension centre rope lower end link;Shaft is located between two pieces of support plates of substrate, and the protrusion of both ends of the shaft passes through support plate, and bolt I sequentially passes through port ring eye and shaft and is spirally connected with interior loop coil eye;Bolt II and screw flight end are bolted with nut, and right angle block is equipped on bolt II and screw rod, and bolt II from top to bottom passes perpendicularly through bottom plate, and the screw rod other end and substrate weld.The device clamp assembly can firmly clamp main material angle steel, can adapt to various sizes of hanging piece, can be effectively reduced safety accident odds.

Description

A kind of steel tower hanging piece fixture
Technical field
The utility model is specifically related to a kind of steel tower hanging piece fixture.
Background technique
Currently, when tower erection construction hoisting operation, usually using steel wire loop directly in the main material angle steel 17 of hanging piece Upper to wind a few, then rope end merges is connect by shackle with suspension centre rope 2 again, which even pads in place, is also easy to make At steel wire loop torsional deformation, liner easily causes the damage of steel wire loop if not handling properly, easily causes to pacify when serious Full accident.
Utility model content
The shortcomings that the purpose of the utility model is to overcome the prior arts provides a kind of steel tower hanging piece fixture, to solve iron Using the main material angle steel of wirerope and the fixed hanging piece of liner when tower vertical construction lifting operation, steel wire loop distortion is be easy to cause to become The problem of shape, liner easily causes steel wire loop to damage, safety accident is easily caused when serious if not handling properly.
To achieve the above object, technical solution adopted in the utility model is: providing a kind of steel tower hanging piece fixture, hanging piece Main material angle steel include rectangular edge and two outer seamed edges parallel to each other, including for fixing hanging piece two clamp assemblies and Two suspension centre ropes, suspension centre rope upper and lower ends are equipped with rope sling, and the rope sling of suspension centre rope lower end is connect with a clamp assembly;The folder Tool component includes tool there are two the U-shaped button of strut, and two end faces middle part is equipped with the shaft of cylindrical protrusion, orthogonal Bolt II and screw rod and bolt I and bottom plate, the end of two struts be respectively equipped with coaxial port ring eye and interior loop coil Eye, U-shaped button and the rope sling of suspension centre rope lower end link;
The opposite two sides of the substrate are vertically welded with support plate parallel to each other, shaft be located at two pieces of support plates it Between, the protrusion of both ends of the shaft passes through adjacent support plate, shaft be located at port ring eye on U-shaped button and interior loop coil eye it Between, bolt I sequentially passes through port ring eye and shaft and is spirally connected with interior loop coil eye;
The bolt II and screw flight end are bolted with nut, are equipped on bolt II and screw rod for catching on one The right angle block of outer seamed edge, right angle block are bonded with main material angle steel medial surface, and bolt II from top to bottom passes perpendicularly through bottom plate, screw rod The other end and substrate weld, and right angle block is between nut and bottom plate.
Preferably, the strut, bolt I, shaft, bottom plate, bolt II, screw rod, right angle block, nut, U-shaped button and Support plate surface is all covered with zinc coat.
Preferably, below the bottom plate and right angle block inboard side is pasted with the dottle pin being bonded with main material angle steel.
Preferably, the dottle pin is made of engineering plastics.
The bolt II from top to bottom passes perpendicularly through bottom plate and is welded and fixed.
Preferably, the bottom plate is equipped with two bolt II and two piece screw rods.
The utility model has the following beneficial effects:
1. after the utility model tightens the nut on bolt II and screw rod, clamp assembly passes through on bolt II and screw rod Right angle block can firmly clamp main material angle steel;Shaft can arbitrarily rotate between two pieces of support plates, and bolt I can be It is arbitrarily rotated in shaft, U-shaped button is connect by port ring eye, interior loop coil eye with bolt I, to form a universal hinging point So that U type button obtains rotation space by a relatively large margin, while cooperation is adjusted nut, can adapt to various sizes of Hanging piece;Give up the method using steel wire loop and the main material angle steel for padding fixed hanging piece, can be effectively reduced safety accident Odds.
2. the utility model strut, bolt I, shaft, bottom plate, bolt II, screw rod, right angle block, nut, U-shaped button and Support plate surface is all covered with zinc coat, these components can be prevented to be rusted, and achievees the purpose that extend the fixture service life.
3. below the utility model bottom plate and right angle block inboard side is pasted with dottle pin, dottle pin is by main material angle steel and bottom Plate, right angle block separate, and the zinc coat of bottom plate, right angle block and main material angle steel surface can be prevented to be worn.
4. the utility model bolt II from top to bottom passes perpendicularly through bottom plate and is welded and fixed, bolt II is made to be fixed on bottom plate On, it is more convenient in installs fixture component in this way.
5. the utility model bottom plate is equipped with two bolt II and two piece screw rods, so that two outer seamed edges are respectively by two A right angle block is caught on, and can fix main material angle steel more firm.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of steel tower hanging piece fixture;
Fig. 2 is the example structure schematic diagram of steel tower hanging piece fixture.
Wherein: 1, clamp assembly;2, suspension centre rope;3, rope sling;4, strut;5, bolt I;6, port ring eye;7, shaft;8, interior Loop coil eye;9, bottom plate;10, bolt II;11, dottle pin;12, protrusion;13, screw rod;14, right angle block;15, nut;16, U-shaped Button;17, main material angle steel;18, outer seamed edge;19, rectangular edge;20, support plate.
Specific embodiment
It is specific below in conjunction with the utility model to keep the purpose of this utility model, technical solution and advantage clearer Technical solutions of the utility model are clearly and completely described in embodiment and corresponding attached drawing.
With reference to Fig. 1-2, the present embodiment provides a kind of steel tower hanging piece fixture, the main material angle steel 17 of hanging piece includes parallel to each other Rectangular edge 19 and two outer seamed edges 18, including two clamp assemblies and two suspension centre ropes 2 for fixing hanging piece, suspension centre rope 2 Upper and lower ends are equipped with rope sling 3, and the rope sling 3 of 2 lower end of suspension centre rope is connect with a clamp assembly;The clamp assembly includes having The U-shaped button 16 of two struts 4, two end faces middle part are equipped with the shaft 7 of cylindrical protrusion 12, mutually perpendicular bolt II 10 and screw rod 13 and bolt I 5 and bottom plate 9, the end of two struts 4 be respectively equipped with coaxial port ring eye 6 and interior loop coil eye 8, U-shaped button 16 and the rope sling 3 of 2 lower end of suspension centre rope link.
Opposite two sides are vertically welded with support plate 20 parallel to each other above the bottom plate 9, and shaft 7 is located at two pieces of supports Between plate 20, the protrusion 12 at 7 both ends of shaft passes through adjacent support plate 20, and shaft 7 is located at the port ring on U-shaped button 16 Between eye 6 and interior loop coil eye 8, bolt I 5 sequentially passes through port ring eye 6 and shaft 7 and is spirally connected with interior loop coil eye 8.
The end of thread of the bolt II 10 and screw rod 13 is bolted with nut 15, is all provided on bolt II 10 and screw rod 13 useful In the right angle block 14 for catching on an outer seamed edge 18, right angle block 14 is bonded with 17 medial surface of main material angle steel, and bolt II 10 is by upper Pass perpendicularly through bottom plate 9 under, 13 other end of screw rod and bottom plate 9 weld above, right angle block 14 be located at nut 15 and bottom plate 9 it Between.
The strut 4, bolt I 5, shaft 7, bottom plate 9, bolt II 10, screw rod 13, right angle block 14, nut 15, U type are buckled Body 16 and 20 surface of support plate are all covered with zinc coat.
The bottom plate 9 is below and block 14 medial surface in right angle is pasted with the dottle pin 11 being bonded with main material angle steel 17.
The dottle pin 11 is made of engineering plastics.
The bolt II 10 from top to bottom passes perpendicularly through bottom plate 9 and is welded and fixed.
The bottom plate 9 is equipped with two bolts II 10 and two screw rods 13.
In implementation process, the bottom plate of clamp assembly 9 is pressed in 17 lateral surface of main material angle steel first, bottom plate 9 is equipped with spiral shell Other than the side expenditure to rectangular edge 19 of bolt II 10, then the right angle block 14 on bolt II 10 and screw rod 13 is hooked respectively A firmly outer seamed edge 18 tightens the nut 15 on bolt II 10 and screw rod 13, so that main material angle steel 17 firmly be clamped.Finally The rope sling 3 of 2 upper end of suspension centre rope is stacked, is connect by the same shackle with wirerope used in lifting operation, can be incited somebody to action The firm lifting of hanging piece is got up.
Shaft 7 is located between two pieces of support plates 20 above bottom plate 9, and the protrusion 12 at 7 both ends of shaft passes through adjacent branch Fagging 20, shaft 7 can arbitrarily rotate between two pieces of support plates 20;Shaft 7 is located at 6 He of port ring eye on U-shaped button 16 Between interior loop coil eye 8, bolt I 5 sequentially passes through port ring eye 6 and shaft 7 and is spirally connected with interior loop coil eye 8, and bolt I 5 can turn It is arbitrarily rotated on axis 7;U-shaped button 16 is connect by port ring eye 6, interior loop coil eye 8 with bolt I 5, to form a universal hinge Contact makes the rotation space of the U-shaped acquisition of button 16 by a relatively large margin, while cooperation is adjusted nut 15, can adapt to difference The hanging piece of size;The method using steel wire loop 3 and the main material angle steel 17 for padding fixed hanging piece is given up, can be effectively reduced Safety accident odds.
Bottom plate 9, right angle block 14, strut 4, bolt I 5, shaft 7, bottom plate 9, bolt II 10, screw rod 13, right angle block 14, Nut 15, U-shaped button 16 and 20 surface of support plate are all covered with zinc coat, these components can be prevented to be rusted, reach extension The purpose of the fixture service life.
Bottom plate 9 is below and block 14 medial surface in right angle is pasted with dottle pin 11, dottle pin 11 by main material angle steel 17 and bottom plate 9, Right angle block 14 separates, and the zinc coat on 17 surface of bottom plate 9, right angle block 14 and main material angle steel can be prevented to be worn.
Bolt II 10 from top to bottom passes perpendicularly through bottom plate 9 and is welded and fixed, and is fixed on bolt II 10 on bottom plate 9, in this way It is more convenient in installs fixture component.
Bottom plate 9 is equipped with two bolts II 10 and two screw rods 13, so that two outer seamed edges 18 are straight by two respectively Angle block 14 is caught on, and can fix more firm by main material angle steel 17.
Above embodiment is used to illustrate the utility model, rather than limits the utility model, in this reality With in novel spirit and scope of protection of the claims, to any modifications and changes that the utility model is made, this is both fallen within The protection scope of utility model.

Claims (6)

1. a kind of steel tower hanging piece fixture, the main material angle steel (17) of hanging piece includes rectangular edge parallel to each other (19) and two outer ribs Side (18), it is characterised in that: including for fixing hanging piece two clamp assemblies and two suspension centre ropes (2), suspension centre rope (2) is up and down Both ends are equipped with rope sling (3), and the rope sling (3) of suspension centre rope (2) lower end is connect with a clamp assembly;The clamp assembly includes tool There are two the U-shaped button (16) of strut (4), it is equipped with the shaft (7) of cylindrical protrusion (12) in the middle part of two end faces, hangs down mutually Straight bolt II (10) and screw rod (13) and bolt I (5) and bottom plate (9), the end of two struts (4) are respectively equipped with coaxially Port ring eye (6) and interior loop coil eye (8), U-shaped button (16) and the rope sling (3) of suspension centre rope (2) lower end link;
Opposite two sides are vertically welded with support plate parallel to each other (20) bottom plate (9) above, and shaft (7) is located at two pieces of branch Between fagging (20), the protrusion (12) at shaft (7) both ends passes through adjacent support plate (20), and shaft (7) is located at U-shaped button (16) between the port ring eye (6) and interior loop coil eye (8) on, bolt I (5) sequentially pass through port ring eye (6) and shaft (7) and with Interior loop coil eye (8) is spirally connected;
The end of thread of the bolt II (10) and screw rod (13) is bolted with nut (15), on bolt II (10) and screw rod (13) Equipped with the right angle block (14) for catching on an outer seamed edge (18), face paste on the inside of right angle block (14) and main material angle steel (17) It closes, bolt II (10) from top to bottom passes perpendicularly through bottom plate (9), and screw rod (13) other end welds above with bottom plate (9), right angle block (14) between nut (15) and bottom plate (9).
2. steel tower hanging piece fixture according to claim 1, it is characterised in that: the strut (4), bolt I (5), shaft (7), bottom plate (9), bolt II (10), screw rod (13), right angle block (14), nut (15), U-shaped button (16) and support plate (20) Surface is all covered with zinc coat.
3. steel tower hanging piece fixture according to claim 2, it is characterised in that: the bottom plate (9) below with right angle block (14) medial surface is pasted with the dottle pin (11) being bonded with main material angle steel (17).
4. steel tower hanging piece fixture according to claim 3, it is characterised in that: the dottle pin (11) uses engineering plastics system At.
5. steel tower hanging piece fixture according to claim 1-4, it is characterised in that: the bolt II (10) by up to Under pass perpendicularly through bottom plate (9) and be welded and fixed.
6. steel tower hanging piece fixture according to claim 5, it is characterised in that: the bottom plate (9) is equipped with two bolts II (10) He Lianggen screw rod (13).
CN201822115704.XU 2018-12-17 2018-12-17 A kind of steel tower hanging piece fixture Expired - Fee Related CN209322298U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822115704.XU CN209322298U (en) 2018-12-17 2018-12-17 A kind of steel tower hanging piece fixture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822115704.XU CN209322298U (en) 2018-12-17 2018-12-17 A kind of steel tower hanging piece fixture

Publications (1)

Publication Number Publication Date
CN209322298U true CN209322298U (en) 2019-08-30

Family

ID=67727052

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822115704.XU Expired - Fee Related CN209322298U (en) 2018-12-17 2018-12-17 A kind of steel tower hanging piece fixture

Country Status (1)

Country Link
CN (1) CN209322298U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111661009A (en) * 2020-06-12 2020-09-15 浙江驿公里智能科技有限公司 Safety mechanism for preventing wind machine from falling

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111661009A (en) * 2020-06-12 2020-09-15 浙江驿公里智能科技有限公司 Safety mechanism for preventing wind machine from falling
CN111661009B (en) * 2020-06-12 2021-03-23 浙江驿公里智能科技有限公司 Safety mechanism for preventing wind machine from falling

Similar Documents

Publication Publication Date Title
CN105398990B (en) Electric power angle steel tower auxiliary lifting apparatus
CN203247012U (en) Composite insulator hoisting fixture
CN201713215U (en) Flange pipe hanger
CN209322298U (en) A kind of steel tower hanging piece fixture
CN205772848U (en) A kind of novel H profile steel hoisting gripping member
CN203754331U (en) Hoisting device applied to telegraph pole top end
CN207566717U (en) A kind of I-shaped floor steel beam lifting structure
CN207158609U (en) A kind of crane tailored version anti-dropout suspension hook
CN204265218U (en) A kind of power station unit internal head cover special hanger
CN203998572U (en) A kind of hanging apparatus
CN105236261B (en) A kind of cylindrical clamping suspender
CN103193148A (en) Railway locomotive roof lifting component and lifting frame
CN216444881U (en) Hook for heat treatment of large-scale seal head
CN208361713U (en) A kind of mine card wheel hub overturning tooling
CN105712183B (en) A kind of high angle belt conveyer special hanger
CN209923970U (en) Bailey beam fixing device for suspension pipeline
CN208802743U (en) Assembled self-locking assault boat boom hoisting
CN208054724U (en) A kind of wire picking device for power transmission line construction
CN208268551U (en) A kind of stable type piping lane suspension and support
CN203582268U (en) Clamp for unloading front-section column of steel structure on site
CN207537004U (en) A kind of steel billet hanging device
CN106185650B (en) A kind of suspender installation method
CN205932955U (en) Tight hoist device of spiral shell twistlock
CN212095009U (en) Box spin welding frock
CN205932943U (en) Ejection pincers

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190830

Termination date: 20201217

CF01 Termination of patent right due to non-payment of annual fee