CN209923970U - Bailey beam fixing device for suspension pipeline - Google Patents
Bailey beam fixing device for suspension pipeline Download PDFInfo
- Publication number
- CN209923970U CN209923970U CN201920248726.5U CN201920248726U CN209923970U CN 209923970 U CN209923970 U CN 209923970U CN 201920248726 U CN201920248726 U CN 201920248726U CN 209923970 U CN209923970 U CN 209923970U
- Authority
- CN
- China
- Prior art keywords
- steel
- bailey beam
- sleeve
- straight rod
- rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
本实用新型公开了一种悬吊管线用贝雷梁固定装置,包括钢板、预埋钢筋、四组钢筋连接件机构和四组钢套筒件,四组所述钢套筒包括八个钢套筒,所述L型杆和直杆上端均通过外螺纹与对应位置的钢套筒配合连接,L型杆下部一端固定焊接有轴套,所述直杆下端插设于对应位置的轴套内,直杆表面在螺纹轴套下方配合安装有紧固螺母,直杆通过紧固螺母与对应位置的L型杆固定连接。本实用新型安全性好,不用在贝雷梁上施焊,不损耗贝雷梁;预埋的钢板承受贝雷梁荷载后,均匀的传递至钢板下混凝土,提高了贝雷梁支撑面的稳定可靠性,使贝雷梁在悬吊工况下更稳定可靠安装简单,易操作,整个过程对工人技能要求不高,材料获取简单,降低了成本。
The utility model discloses a Bailey beam fixing device for suspending pipelines, which comprises a steel plate, pre-embedded steel bars, four sets of steel bar connecting piece mechanisms and four sets of steel sleeve parts, wherein the four sets of steel sleeves comprise eight steel sleeves The L-shaped rod and the upper end of the straight rod are connected with the steel sleeve at the corresponding position through the external thread, the lower end of the L-shaped rod is fixedly welded with a shaft sleeve, and the lower end of the straight rod is inserted into the shaft sleeve at the corresponding position The surface of the straight rod is fitted with a fastening nut under the threaded bushing, and the straight rod is fixedly connected to the L-shaped rod at the corresponding position through the fastening nut. The utility model has good safety, does not need to weld on the Bailey beam, and does not lose the Bailey beam; after the pre-buried steel plate bears the load of the Bailey beam, it is evenly transmitted to the concrete under the steel plate, which improves the stability of the bearing surface of the Bailey beam. Reliability makes Bailey beam more stable and reliable under suspension conditions. It is simple to install and easy to operate. The whole process does not require high skills of workers, and it is easy to obtain materials and reduce costs.
Description
技术领域technical field
本实用新型涉及贝雷梁技术领域,更具体地说,特别涉及一种悬吊管线用贝雷梁固定装置。The utility model relates to the technical field of Bailey beams, in particular to a Bailey beam fixing device for suspending pipelines.
背景技术Background technique
明挖地铁车站施工时,对横穿车站且不易改迁的管道多采用贝雷梁进行悬吊,悬吊时贝雷梁固定在两端冠梁上,然后用吊杆或钢丝绳吊住所吊管线。During the construction of open-cut subway stations, Bailey beams are often used to suspend the pipelines that cross the station and are not easy to be relocated. During the suspension, the Bailey beams are fixed on the crown beams at both ends, and then the suspended pipelines are suspended by hanging rods or wire ropes. .
以往,多在冠梁上预埋钢筋或钢环,用钢筋焊住贝雷梁或用钢丝绳固定贝雷梁,实际作业时,采用焊接固定会对贝雷梁造成一定损耗,用钢丝绳固定则无法对贝雷梁进行完全固结,造成贝雷梁容易发生晃动的情况,而且安装方式也比较繁琐。In the past, steel bars or steel rings were often embedded in the crown beams, and the Bailey beams were welded with steel bars or fixed with steel wire ropes. In actual operation, the use of welding and fixing will cause certain losses to the Bailey beams, but it is impossible to fix with steel wire ropes. The complete consolidation of the Bailey beam makes the Bailey beam prone to shaking, and the installation method is also cumbersome.
实用新型内容Utility model content
本实用新型的目的在于提供一种方便固定贝雷梁且悬吊稳定的贝雷梁固定装置。The purpose of the utility model is to provide a Bailey beam fixing device which is convenient to fix the Bailey beam and has stable suspension.
为了达到上述目的,本实用新型采用的技术方案如下:一种悬吊管线用贝雷梁固定装置,包括钢板、预埋钢筋、四组钢筋连接件机构和四组钢套筒件,四组所述钢套筒包括八个钢套筒,所述钢板表面两端均开设有四个圆口,所述钢套筒均插设在圆口内,钢套筒上端边缘向外呈90°翻折成翻转部,翻转部与钢板上表面固定焊接,四组所述钢筋连接机构包括八个L型杆和直杆,所述L型杆上端、直杆上端及下端均开设有外螺纹,所述钢套筒内圈表面开设有与外螺纹相互配合的内螺纹,所述L型杆和直杆上端均通过外螺纹与对应位置的钢套筒配合连接,L型杆下部一端固定焊接有轴套,所述直杆下端插设于对应位置的轴套内,直杆表面在轴套下方配合安装有紧固螺母,直杆通过紧固螺母与对应位置的L型杆固定连接。In order to achieve the above-mentioned purpose, the technical scheme adopted by the present utility model is as follows: a Bailey beam fixing device for suspending pipelines, comprising steel plates, pre-embedded steel bars, four groups of steel connecting piece mechanisms and four groups of steel sleeve pieces, four groups of The steel sleeve includes eight steel sleeves, the two ends of the steel plate surface are provided with four circular openings, the steel sleeves are all inserted in the circular openings, and the upper edge of the steel sleeve is folded outward at 90°. The turning part is fixedly welded with the upper surface of the steel plate. The four groups of the steel bar connection mechanisms include eight L-shaped rods and straight rods. The inner surface of the sleeve is provided with an inner thread that cooperates with the outer thread, the upper ends of the L-shaped rod and the straight rod are connected with the steel sleeve at the corresponding position through the outer thread, and the lower end of the L-shaped rod is fixedly welded with a shaft sleeve. The lower end of the straight rod is inserted into the shaft sleeve at the corresponding position, the surface of the straight rod is fitted with a fastening nut under the shaft sleeve, and the straight rod is fixedly connected to the L-shaped rod at the corresponding position through the fastening nut.
优选地,所述钢板上表面固定焊接多组预埋钢筋,预埋钢筋上端经过弯折成弯钩部。Preferably, a plurality of groups of pre-embedded steel bars are fixedly welded on the upper surface of the steel plate, and the upper ends of the pre-embedded steel bars are bent into hooks.
优选地,所述L型杆和直杆均为直径16的圆钢。Preferably, both the L-shaped rod and the straight rod are round steel with a diameter of 16.
优选地,所述步骤S1中的钢板为厚度1-2厘米、宽度50厘米、长度为120厘米的钢Preferably, the steel plate in the step S1 is a steel with a thickness of 1-2 cm, a width of 50 cm and a length of 120 cm
与现有技术相比,本实用新型的优点在于:Compared with the prior art, the advantages of the present utility model are:
1、安全性好,不用在贝雷梁上施焊,不损耗贝雷梁;预埋的钢板承受贝雷梁荷载后,均匀的传递至钢板下混凝土,提高了贝雷梁支撑面的稳定可靠性,使贝雷梁在悬吊工况下更稳定可靠。1. Good safety, no need to weld on the Bailey beam, no loss of Bailey beam; after the pre-buried steel plate bears the load of the Bailey beam, it is evenly transferred to the concrete under the steel plate, which improves the stability and reliability of the bearing surface of the Bailey beam It is more stable and reliable under suspension conditions.
2、安装简单,易操作,整个过程对工人技能要求不高。2. The installation is simple and easy to operate, and the whole process does not require high skills of workers.
3、材料获取简单,降低了成本。3. The material is easy to obtain and the cost is reduced.
附图说明Description of drawings
为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the embodiments of the present utility model or the technical solutions in the prior art, the following briefly introduces the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description These are just some embodiments of the present invention, and for those of ordinary skill in the art, other drawings can also be obtained from these drawings without creative effort.
图1是本实用新型一种悬吊管线用贝雷梁固定装置的结构图;1 is a structural diagram of a Bailey beam fixing device for a suspension pipeline of the present invention;
图2是本实用新型一种悬吊管线用贝雷梁固定装置的安装图。FIG. 2 is an installation diagram of a Bailey beam fixing device for suspending pipelines according to the present invention.
具体实施方式Detailed ways
下面结合附图对本实用新型的优选实施例进行详细阐述,以使本实用新型的优点和特征能更易于被本领域技术人员理解,从而对本实用新型的保护范围做出更为清楚明确的界定。The preferred embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings, so that the advantages and features of the present invention can be more easily understood by those skilled in the art, and the protection scope of the present invention can be more clearly defined.
参阅图1和图2所示,本实用新型提供一种悬吊管线用贝雷梁固定装置,包括钢板1、预埋钢筋8、四组钢筋连接件机构和四组钢套筒件,四组钢套筒包括八个钢套筒2,钢板1表面两端均开设有四个圆口,钢套筒2均插设在圆口内,钢套筒2上端边缘向外呈90°翻折成翻转部3,翻转部3与钢板1上表面固定焊接,增加了钢套筒2与钢板1之间的焊接面,且翻转部3抵挡在圆口表面,提高了钢套筒2与钢板1连接的强度与稳定性,四组钢筋连接机构包括八个L型杆4和直杆5,L型杆4上端、直杆5上端及下端均开设有外螺纹,钢套筒2内圈表面开设有与外螺纹相互配合的内螺纹,L型杆4和直杆5上端均通过外螺纹与对应位置的钢套2筒配合连接,L型杆4下部一端固定焊接有轴套6,直杆5下端插设于对应位置的轴套6内,直杆5表面在轴套6下方配合安装有紧固螺母7,直杆5通过紧固螺母7与对应位置的L型杆4固定连接,连接方式比较灵活且连接稳定性高。Referring to Figures 1 and 2, the present utility model provides a Bailey beam fixing device for suspending pipelines, comprising a
本实施例中,钢板为厚度1-2厘米、宽度50厘米、长度为120厘米的钢板,能够满足吊起贝雷梁的承载力。In this embodiment, the steel plate is a steel plate with a thickness of 1-2 cm, a width of 50 cm, and a length of 120 cm, which can meet the bearing capacity of hoisting the Bailey beam.
本实施例中,钢板1上表面固定焊接多组预埋钢筋8,预埋钢筋8上端经过弯折成弯钩部,通过预埋钢筋8与混凝土构件的钢筋连接,提高了钢板1在混凝土内的稳定性。In this embodiment, multiple groups of pre-embedded
本实施例中,L型杆4和直杆5均为直径16的圆钢,其强度能够满足吊起贝雷梁。In this embodiment, both the L-shaped rod 4 and the
工作原理:在钢板1上方进行混凝土构件钢筋的绑扎,将预埋钢筋8的弯折部与混凝土构件钢筋的分布筋进行固定绑扎,在钢套筒2上端及下端均贴上一层胶带,用于封闭钢套筒2,防止混凝土浇注时,混凝土进入钢套筒2内堵塞钢套筒,然后进行支模板、混凝土浇注工作,在模板底表面放置多组马蹬钢筋用于支撑钢板1,使得钢板1与混凝土构件外表面具有一定距离,能够设置在混凝土内部,提高了钢板1的承载力,待拆模板后,将L型杆4一端与钢套筒2配合连接,L型杆4另一端穿过贝雷梁的主梁后,将直杆5一端与另一组钢套筒2配合连接,然后通过紧固螺母7与L型杆4连接,直到将贝雷梁吊起,然后将L型杆4、直杆5分别与对应位置的钢套筒2焊接,钢板1上的两组钢筋连接件位于贝雷梁主梁两侧,能够防止贝雷梁倾移,如图2所示。Working principle: Bind the steel bars of the concrete members above the
虽然结合附图描述了本实用新型的实施方式,但是专利所有者可以在所附权利要求的范围之内做出各种变形或修改,只要不超过本实用新型的权利要求所描述的保护范围,都应当在本实用新型的保护范围之内。Although the embodiments of the present invention are described in conjunction with the accompanying drawings, the patent owner can make various changes or modifications within the scope of the appended claims, as long as the protection scope described in the claims of the present invention is not exceeded, All should fall within the protection scope of the present invention.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920248726.5U CN209923970U (en) | 2019-02-27 | 2019-02-27 | Bailey beam fixing device for suspension pipeline |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920248726.5U CN209923970U (en) | 2019-02-27 | 2019-02-27 | Bailey beam fixing device for suspension pipeline |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209923970U true CN209923970U (en) | 2020-01-10 |
Family
ID=69067975
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201920248726.5U Expired - Fee Related CN209923970U (en) | 2019-02-27 | 2019-02-27 | Bailey beam fixing device for suspension pipeline |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209923970U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109736352A (en) * | 2019-02-27 | 2019-05-10 | 中建一局集团第一建筑有限公司 | Bailey beam fixing device and method for suspension pipeline |
-
2019
- 2019-02-27 CN CN201920248726.5U patent/CN209923970U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109736352A (en) * | 2019-02-27 | 2019-05-10 | 中建一局集团第一建筑有限公司 | Bailey beam fixing device and method for suspension pipeline |
| CN109736352B (en) * | 2019-02-27 | 2024-02-20 | 中建一局集团第一建筑有限公司 | Beret beam fixing device and method for suspension pipeline |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202055241U (en) | Steel reinforcement cage suspension ring device | |
| CN202717501U (en) | Pile foundation steel reinforcement cage rings | |
| CN109736352B (en) | Beret beam fixing device and method for suspension pipeline | |
| CN209923970U (en) | Bailey beam fixing device for suspension pipeline | |
| CN206720558U (en) | A kind of adjustable steel-reinforcement cage hanger | |
| CN207918257U (en) | Prefabricated post hanger structure | |
| CN103822026A (en) | Mine self-rooting cable hook device | |
| JP5527750B1 (en) | Suspension frame connecting bracket combined use hanging bracket | |
| CN207090779U (en) | One kind auxiliary runner plate turns over instrument | |
| CN104528519A (en) | Clamping tool for assisting in hoisting cement electric poles | |
| CN209618645U (en) | Universal shaft of vertical rolling mill lifting device | |
| CN202467221U (en) | Power plant main workshop steel roof truss hoisting lifting device | |
| CN103362315A (en) | A kind of hanger used for overall hoisting of pipelines and its construction method | |
| CN103010925B (en) | Bundling and hoisting method of loop reactor | |
| CN207671582U (en) | Cable hoisting frame | |
| CN204025904U (en) | A kind of chimney counterpart device | |
| CN210914967U (en) | A reinforced concrete pipe hoisting device | |
| CN209161307U (en) | A kind of inverted T shaped hoisting connecting piece of prefabricated part hanging | |
| CN209890068U (en) | Temporary fixing device for hoisting reinforcement cage and placing grouting pipe | |
| CN206927467U (en) | A kind of lifting pipeline instrument | |
| CN203834974U (en) | High-altitude supporting steel platform used for concrete pouring of top plates of large towering tube structures | |
| CN204057652U (en) | A kind of equal-diameter pole special hanger | |
| CN205002771U (en) | Cast -in -place reinforced concrete wall deviational survey pipe ligature device | |
| CN204431204U (en) | Suspension ring reeving tool in roof in GIS hyperbaric chamber | |
| CN207645611U (en) | A kind of prefabricated small box girder, T beam reinforcement cages suspenders |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |