CN203582268U - Clamp for unloading front-section column of steel structure on site - Google Patents

Clamp for unloading front-section column of steel structure on site Download PDF

Info

Publication number
CN203582268U
CN203582268U CN201320744499.8U CN201320744499U CN203582268U CN 203582268 U CN203582268 U CN 203582268U CN 201320744499 U CN201320744499 U CN 201320744499U CN 203582268 U CN203582268 U CN 203582268U
Authority
CN
China
Prior art keywords
clamp
clamp body
steel
plug
unloading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320744499.8U
Other languages
Chinese (zh)
Inventor
陈望
苏田中
张吉锐
刘金柱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Steel Structure Tianjin Corp Ltd
Original Assignee
China Construction Steel Structure Corp Ltd Beijing Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Steel Structure Corp Ltd Beijing Branch filed Critical China Construction Steel Structure Corp Ltd Beijing Branch
Priority to CN201320744499.8U priority Critical patent/CN203582268U/en
Application granted granted Critical
Publication of CN203582268U publication Critical patent/CN203582268U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a clamp for unloading a front-section column of a steel structure on site and belongs to the field of steel structure construction tools. The clamp comprises a clamp body, a plug and a lifting lug, wherein the lifting lug is arranged at the top of the clamp body; the clamp body is provided with an opening groove; an opening of the opening groove is located at the bottom end of the clamp body; a plug hole is formed in the clamp body of the opening; and the plug is arranged in the plug hole of the clamping body. According to the clamp, the opening groove of the clamp body is matched with the plug so that the clamp can be conveniently mounted on a bolt hole of a large-size column foot plate of the front-section column; the lifting lug on the clamp body is utilized so that the front-section column of the steel structure can be conveniently and safely hoisted; and the hoisting and unloading efficiencies of the front-section column of the steel structure are improved. The clamp is simple in structure and safe and convenient to use.

Description

Clamp for site unloading of first section column of steel structure
Technical Field
The utility model relates to an anchor clamps for the construction of steel construction especially relates to an anchor clamps that is used for the on-the-spot unloading of first festival post of steel construction.
Background
In the construction of steel structures, steel members are generally transported to a construction site by a member transporting vehicle, and then unloaded from the site by using a tower crane or a large crane. However, the column bottoms of the first-section columns of the steel structures are provided with large column foot plates, the column foot plates are large in specification and size and large in plate thickness, and the column foot plates are not provided with hoisting lugs generally. Taking the second-stage steel structure engineering of Tianjin digital television mansion as an example, the largest section of the first section of steel column is 1200 × 1200 × 30 × 30 of a box opening, the largest thickness of a column foot plate is 100mm, and the steel column can not be unloaded by adopting conventional snap rings, shackles and the like.
At present, when most projects unload the first section of column on site, the conventional snap ring cannot penetrate through the column foot plate due to the large thickness of the column foot plate, and the unloading is usually carried out by adopting a binding type method (commonly called as holding and hanging). As shown in figure 1, before unloading, four rubber wrap corners or corner-free wrap corners 40 are prepared in advance to protect the steel wire rope 10, and then an on-site tower crane is adopted to unload. There are: when the steel wire rope binds the steel column 20, the corner angle of the steel column needs to be protected; the steel wire rope is easily scratched by the edge of the steel column, so that potential safety hazards exist; when unloading, need to pass wire rope from the steel column bottom to set up flitch 30 at the bottom of steel column, waste unloading time scheduling problem relatively.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to provide an anchor clamps for on-spot unloading of steel construction first section post, can conveniently hang on the bolt hole of column base, conveniently hoist the first section post that is equipped with large-scale toe board to solve current bundling method hoist first section post security poor, long problem consuming time.
In order to solve the technical problem, the utility model provides an anchor clamps that are used for on-spot unloading of steel construction first section post, include:
the clamp comprises a clamp body, a bolt and a lifting lug; wherein,
the lifting lug is arranged at the top of the clamp body;
the clamp body is provided with an open slot, the opening of the open slot is positioned at the bottom end of the clamp body, and a bolt hole is formed in the clamp body at the opening;
the bolt is arranged in the bolt hole of the clamp body.
The utility model has the advantages that: the open slot and the bolt cooperation through the anchor clamps body for the first section post of handling steel construction that can be convenient, safety is improved to the first section post handling of steel construction, the efficiency of unloading on the bolt hole of the large-scale toe board of first section post is installed to anchor clamps can be convenient, the lug on the anchor clamps body is utilized. The lifting appliance has simple structure and safe and convenient use.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly described below, and it is obvious that the drawings in the description below are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a schematic view of a prior art lifting for unloading a steel column;
fig. 2 is a schematic structural diagram of a clamp according to an embodiment of the present invention;
fig. 3 is a schematic front structural view of a clamp according to an embodiment of the present invention;
fig. 4 is a schematic view of a using state of the clamp according to an embodiment of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention are described below clearly and completely, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiment of the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The embodiment of the invention provides a clamp for field unloading of a first section of steel structure column, which comprises the following components in parts by weight as shown in figures 2 and 3: the clamp comprises a clamp body 1, a bolt 3 and a lifting lug 2;
wherein the top of the clamp body 1 is provided with a lifting lug 2;
the clamp body 1 is provided with an open slot 11, the opening of the open slot 11 is positioned at the bottom end of the clamp body 1, and a bolt hole 12 is arranged on the clamp body 1 at the opening;
the plug pin 3 is arranged in the plug pin hole 12 of the clamp body 1.
Among the above-mentioned anchor clamps, anchor clamps body 1 adopts the thick steel sheet of 30mm to bend into lower extreme opening, upper end confined n style of calligraphy, and the open slot setting is at the middle part of anchor clamps body, and the open-ended width of the open slot of this anchor clamps body is 70 ~ 110mm, specifically with column foot board thickness phase-match can.
In the above-mentioned anchor clamps, bolt 3 adopts M30 round steel to make, and 3 both ends of bolt are equipped with the screw thread, all are equipped with nut 31 on the screw thread at 3 both ends of bolt.
In the clamp, the lifting lugs 2 are provided with circular ring-shaped lifting holes, and the bottoms of the lifting lugs 2 are fixedly welded with the top of the clamp body 1.
The clamp of the present invention will be further described with reference to the following embodiments.
The clamp provided by the embodiment of the invention is a special clamp suitable for field unloading of the first section of steel structure, and the unloading of the first section of steel column is completed through the clamp by taking the bolt hole of the column base bottom plate as the clamp hole of the clamp.
The clamp body of the clamp is made of a steel plate with the thickness of 30mm, the steel plates are welded by adopting full penetration welding seam equal-strength connection, and after the connection is finished, nondestructive detection of the welding seam is needed, so that the quality of the welding seam is ensured. The bolt on the clamp body is machined by M30 round steel, screw threads are machined at two ends of the bolt by a machine tool, and two nuts are used as fastening bolts. As shown in fig. 4, when unloading, the clamp body clamps the toe board anchor bolt holes of the steel column, and the bolts are inserted into the holes and fastened by bolts. When unloading, the lifting lug 2 at the top of the steel plate on the clamp 100 is used as a lifting point, penetrates through the steel wire rope and is used as a lifting point for lifting the steel wire rope, and then the steel column 20 is smoothly lifted and unloaded.
The clamp has a simple structure, is convenient to construct, can be repeatedly used, and reduces the construction cost; the clamp is made of steel plates, so that the safety coefficient is high, and the safety guarantee is improved; the manufacturing is simple, the weight is light, and the construction is convenient; the device is suitable for on-site unloading of the first section of the steel structure column, facilitates operation of constructors, and greatly accelerates construction efficiency.
The above description is only for the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any changes or substitutions that can be easily conceived by those skilled in the art within the technical scope of the present invention are all covered by the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (5)

1. The utility model provides a anchor clamps that are used for on-spot unloading of steel construction first section post which characterized in that includes:
the clamp comprises a clamp body, a bolt and a lifting lug;
the lifting lug is arranged at the top of the clamp body;
the clamp body is provided with an open slot, the opening of the open slot is positioned at the bottom end of the clamp body, and a bolt hole is formed in the clamp body at the opening;
the bolt is arranged in the bolt hole of the clamp body.
2. The clamp according to claim 1, wherein the clamp body is bent into an n-shaped form with an open lower end and a closed upper end by using a 30mm thick steel plate.
3. The clamp according to claim 1 or 2, wherein the width of the opening of the open slot of the clamp body is 70-110 mm.
4. The clamp of claim 1, wherein the plug is made of M30 round steel, both ends of the plug are provided with threads, and both ends of the plug are provided with nuts.
5. The clamp according to claim 1, wherein the lifting lug is provided with a circular ring-shaped lifting hole, and the bottom of the lifting lug is fixedly welded with the top of the clamp body.
CN201320744499.8U 2013-11-21 2013-11-21 Clamp for unloading front-section column of steel structure on site Expired - Lifetime CN203582268U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320744499.8U CN203582268U (en) 2013-11-21 2013-11-21 Clamp for unloading front-section column of steel structure on site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320744499.8U CN203582268U (en) 2013-11-21 2013-11-21 Clamp for unloading front-section column of steel structure on site

Publications (1)

Publication Number Publication Date
CN203582268U true CN203582268U (en) 2014-05-07

Family

ID=50580219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320744499.8U Expired - Lifetime CN203582268U (en) 2013-11-21 2013-11-21 Clamp for unloading front-section column of steel structure on site

Country Status (1)

Country Link
CN (1) CN203582268U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109733982A (en) * 2019-02-20 2019-05-10 海洋石油工程(青岛)有限公司 The auxiliary tool of blind plate lifting
CN110844794A (en) * 2019-11-29 2020-02-28 深圳宏业基岩土科技股份有限公司 Convenient steel reinforcement cage shackle arrangement method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109733982A (en) * 2019-02-20 2019-05-10 海洋石油工程(青岛)有限公司 The auxiliary tool of blind plate lifting
CN110844794A (en) * 2019-11-29 2020-02-28 深圳宏业基岩土科技股份有限公司 Convenient steel reinforcement cage shackle arrangement method
CN110844794B (en) * 2019-11-29 2021-11-16 深圳宏业基岩土科技股份有限公司 Convenient steel reinforcement cage shackle arrangement method

Similar Documents

Publication Publication Date Title
CN103879886B (en) Steel beam lifting fastening-type special fixture
CN202278359U (en) Welding overturning jig frame
CN203582268U (en) Clamp for unloading front-section column of steel structure on site
CN103879883A (en) Fastening special clamp for girder hoisting
CN203889888U (en) Steel plate hoisting clamp
CN210944509U (en) Plate hoisting clamping part for building construction
CN201728509U (en) Storage battery tray welded installing and fixing device
CN202450548U (en) Adjustable support for fundament of construction elevator on basement top plate
CN206051280U (en) A kind of lifting device
CN204569127U (en) Steel upright post hoisting jig
CN103286706A (en) Movable plate clamp
CN210002934U (en) device capable of preventing floor hole protective cover plate from moving in turnover mode
CN204266603U (en) The interim apparatus for placing of high-strength bolt
CN202465035U (en) Brick lifting device
CN201254424Y (en) Hanging cramp
CN202181614U (en) Steel pipe fixing device for joist steel
CN205011242U (en) Anchor clamps are used in hoist and mount of sound barrier cell board
CN203545456U (en) Movable elevator
CN212924095U (en) Box steel component handling and turning device
CN204751882U (en) Steel sheet stands up hoist device
CN203959666U (en) A kind of safty hoisting fixture
CN103552905A (en) Pipe fitting hoisting box
CN210149781U (en) Storage device convenient to carry sleeve pipe power tong
CN103979406B (en) A kind of safty hoisting fixture
CN103010934B (en) Mold stripping and lifting tool device for drum

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: ZHONGJIAN STEEL STRUCTURE TIANJIN CO., LTD.

Free format text: FORMER OWNER: BEIJING BRANCH OF CHINA CONSTRUCTION STEEL STRUCTURE CORP., LTD.

Effective date: 20150813

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150813

Address after: 300000, Tianjin Xiqing District Xiqing high-end metal products industrial zone, five branch 18

Patentee after: CHINA CONSTRUCTION STEEL STRUCTURE TIANJIN Co.,Ltd.

Address before: 100089, A, block 609, international finance center, No. 87, West Third Ring Road, Beijing, Haidian District

Patentee before: BEIJING BRANCH, CHINA CONSTRUCTION STEEL STRUCTURE Corp.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140507