CN205011242U - Anchor clamps are used in hoist and mount of sound barrier cell board - Google Patents
Anchor clamps are used in hoist and mount of sound barrier cell board Download PDFInfo
- Publication number
- CN205011242U CN205011242U CN201520584163.9U CN201520584163U CN205011242U CN 205011242 U CN205011242 U CN 205011242U CN 201520584163 U CN201520584163 U CN 201520584163U CN 205011242 U CN205011242 U CN 205011242U
- Authority
- CN
- China
- Prior art keywords
- rod
- sound barrier
- hollow tube
- barrier unit
- hoisting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
本实用新型涉及一种用于声屏障单元板的吊装用夹具,其包括固定架、活动杆(1)、固定杆(2)和端部锁合装置,其一次性可将位于同一组H型钢内的数个单元板夹住并装入H型钢之间,拆装过程容易,不但可保证上下相邻的声屏障单元板位置的一致性,而且夹具本身结构简单,安全性能优异,不会出现在吊装的过程中声屏障单元板掉落的情况。利用上述夹具的施工方法不但有效提高了施工效率,而且节约了大量的人力物力,真正达到了低耗、高效的施工,保证了工期和施工质量,利于大规模推广应用。
The utility model relates to a jig for hoisting a sound barrier unit plate, which comprises a fixed frame, a movable rod (1), a fixed rod (2) and an end locking device, which can place the same group of H-shaped steel Several unit plates inside are clamped and put into the H-shaped steel, the disassembly process is easy, not only can ensure the consistency of the position of the upper and lower adjacent sound barrier unit plates, but also the fixture itself has a simple structure, excellent safety performance, and will not appear The case where the sound barrier unit board falls during hoisting. The construction method using the above fixture not only effectively improves the construction efficiency, but also saves a lot of manpower and material resources, truly achieves low-consumption and high-efficiency construction, ensures the construction period and construction quality, and is conducive to large-scale promotion and application.
Description
技术领域 technical field
本实用新型涉及一种路面配套设施的施工用具,特别是涉及一种用于安装声屏障单元板的夹具。 The utility model relates to a construction tool for pavement supporting facilities, in particular to a fixture for installing a sound barrier unit plate.
背景技术 Background technique
现有的声屏障包括H型钢和位于各H型钢间的板状隔声元件,板状隔声元件包括一板材壳体和位于板材壳体内部的隔声衬件,板材壳体包括吸声板、隔声板和连接吸声板和隔声板的侧面板,吸声板上设置有透声孔。声屏障安装时,均是通过吊装将声屏障单元板由上自下插入H型钢中,具体的,通常是逐块将声屏障单元板安装到H型钢中,不但工作效率低下,浪费人力物力,而且相邻的声屏障单元板之间无法准确定位,带来工程上的风险。 The existing sound barrier includes H-shaped steel and plate-shaped sound-insulating elements located between the H-shaped steels. The plate-shaped sound-insulating element includes a plate shell and a sound-insulating lining inside the plate shell. The plate shell includes a sound-absorbing plate , a sound insulation board and a side panel connecting the sound absorption board and the sound insulation board, and the sound absorption board is provided with sound holes. When installing the sound barrier, the sound barrier unit plate is inserted into the H-shaped steel from top to bottom by hoisting. Specifically, the sound barrier unit plate is usually installed into the H-shaped steel piece by piece, which not only reduces work efficiency, but also wastes manpower and material resources. Moreover, the adjacent sound barrier unit panels cannot be accurately positioned, which brings engineering risks.
实用新型内容 Utility model content
本实用新型要解决的技术问题是:提供了一种可进一步提高声屏障单元板安装定位的准确性、提高安装效率、节约人力物力、方便卸出的声屏障单元板吊装用夹具。 The technical problem to be solved by the utility model is to provide a clamp for hoisting the sound barrier unit plate which can further improve the accuracy of the installation and positioning of the sound barrier unit plate, improve the installation efficiency, save manpower and material resources, and facilitate unloading.
本实用新型要解决该技术问题所采用的技术方案为: The technical scheme that the utility model will solve this technical problem adopts is:
一种用于声屏障单元板的吊装用夹具,其包括固定架、活动杆、固定杆和端部锁合装置,所述固定架为井字形,其包括第一长杆、第二长杆和同时固定连接所述第一长杆和第二长杆的两短杆,所述活动杆和固定杆分别为两个,所述两短杆的一端分别固定连接一所述固定杆,另一端通过圆环分别活动连接一所述活动杆,当装上声屏障时,位于同一短杆上的活动杆和固定杆的一端通过螺钉螺帽固定连接,另一端通过锁合装置连接,所述锁合装置包括一L形空心管和一钢棒,所述L形空心管的短边通过圆环与所述固定杆活动连接,所述钢棒穿过所述L形空心管的长边和所述活动杆上端部的孔。 A clamp for hoisting a sound barrier unit panel, which includes a fixed frame, a movable rod, a fixed rod and an end locking device, the fixed frame is in the shape of a well, and it includes a first long rod, a second long rod and At the same time, two short rods that are fixedly connected to the first long rod and the second long rod, the movable rod and the fixed rod are respectively two, and one end of the two short rods is fixedly connected to a fixed rod respectively, and the other end passes through The rings are respectively movably connected to one of the movable rods. When the sound barrier is installed, one end of the movable rod and the fixed rod on the same short rod are fixedly connected by a screw nut, and the other end is connected by a locking device. The device includes an L-shaped hollow tube and a steel rod, the short side of the L-shaped hollow tube is movably connected with the fixed rod through a ring, and the steel rod passes through the long side of the L-shaped hollow tube and the The hole in the upper end of the movable rod.
所述锁合装置包括一L形空心管和一钢棒,所述L形空心管的短边通过圆环与所述固定杆活动连接,所述钢棒穿过所述L形空心管的长边和所述活动杆端部的孔。 The locking device includes an L-shaped hollow tube and a steel rod, the short side of the L-shaped hollow tube is flexibly connected to the fixed rod through a ring, and the steel rod passes through the long length of the L-shaped hollow tube. side and the hole at the end of the movable rod.
所述钢棒的端部设置一弯钩。 A hook is provided at the end of the steel rod.
所述L形空心管的横截面为方形或圆形。 The cross section of the L-shaped hollow tube is square or circular.
本实用新型的有益效果为:本实用新型提供的声屏障单元板吊装用夹具,其一次性可将位于同一组H型钢内的数个单元板夹住并装入H型钢之间,拆装过程容易,不但可保证上下相邻的声屏障单元板位置的一致性,而且夹具本身结构简单,安全性能优异,不会出现在吊装的过程中声屏障单元板掉落的情况。利用上述夹具的施工方法不但有效提高了施工效率,而且节约了大量的人力物力,真正达到了低耗、高效的施工,保证了工期和施工质量,利于大规模推广应用。 The beneficial effects of the utility model are: the fixture for hoisting the sound barrier unit panel provided by the utility model can clamp several unit panels located in the same group of H-shaped steels at one time and put them between the H-shaped steels. Easy, not only can ensure the consistency of the position of the upper and lower adjacent sound barrier unit plates, but also the fixture itself has a simple structure and excellent safety performance, and the sound barrier unit plate will not fall during the hoisting process. The construction method using the above fixture not only effectively improves the construction efficiency, but also saves a lot of manpower and material resources, truly achieves low-consumption and high-efficiency construction, ensures the construction period and construction quality, and is conducive to large-scale promotion and application.
附图说明 Description of drawings
图1为本实用新型实施例的整体结构示意图。 Figure 1 is a schematic diagram of the overall structure of an embodiment of the utility model.
具体实施方式 detailed description
以下结合附图和具体实施方式对本实用新型作进一步详细说明。 The utility model will be described in further detail below in conjunction with the accompanying drawings and specific embodiments.
如图1所示,本实施例提供了一种用于声屏障的吊装用夹具,其包括固定架、活动杆1、固定杆2和端部锁合装置,所述固定架为井字形,其包括第一长杆8、第二长杆9和同时固定连接所述第一长杆8和第二长杆9的两短杆10,所述活动杆1和固定杆2分别为两个,所述两短杆10的一端分别固定连接一所述固定杆2,另一端通过圆环7分别活动连接一所述活动杆1,当装上声屏障单元板时,位于同一短杆10上的活动杆1和固定杆2的一端通过螺钉螺帽固定连接,另一端通过锁合装置连接,所述锁合装置包括一L形空心管3和一钢棒4,所述L形空心管3的短边通过圆环6与所述固定杆2活动连接,所述钢棒4穿过所述L形空心管的长边和所述活动杆1上端部的孔5。具体地,L形空心管3的横截面可为方形或圆形,即可为L形方形管或L形圆形管。 As shown in Figure 1, this embodiment provides a clamp for hoisting a sound barrier, which includes a fixed frame, a movable rod 1, a fixed rod 2 and an end locking device, the fixed frame is in the shape of a well, and its Comprising a first long rod 8, a second long rod 9 and two short rods 10 fixedly connected to the first long rod 8 and the second long rod 9 at the same time, the movable rod 1 and the fixed rod 2 are respectively two, so One end of the two short rods 10 is respectively fixedly connected to the fixed rod 2, and the other end is respectively movably connected to the movable rod 1 through the ring 7. One end of the rod 1 and the fixed rod 2 is fixedly connected by a screw nut, and the other end is connected by a locking device. The locking device includes an L-shaped hollow tube 3 and a steel rod 4. The short length of the L-shaped hollow tube 3 The side is movably connected with the fixed rod 2 through a ring 6, and the steel rod 4 passes through the long side of the L-shaped hollow tube and the hole 5 at the upper end of the movable rod 1 . Specifically, the cross section of the L-shaped hollow tube 3 can be square or circular, that is, an L-shaped square tube or an L-shaped circular tube.
所述锁合装置包括一L形空心管3和一钢棒4,所述L形空心管3的短边通过圆环6与所述固定杆2活动连接,所述钢棒4穿过所述L形空心管3的长边和所述活动杆1端部的孔5,圆环6同时穿过固定杆2的端部的孔和L形空心管3的短边的孔。 The locking device includes an L-shaped hollow tube 3 and a steel rod 4, the short side of the L-shaped hollow tube 3 is movably connected with the fixed rod 2 through a ring 6, and the steel rod 4 passes through the The long side of the L-shaped hollow tube 3 and the hole 5 at the end of the movable rod 1, and the ring 6 pass through the hole at the end of the fixed rod 2 and the short side of the L-shaped hollow tube 3 simultaneously.
吊装的具体操作过程为:抽出钢棒4,旋转L形空心管3,拧松螺钉上的螺帽,旋转活动杆1,将声屏障单元板置于两固定杆2上,调整好重心位置,将活动杆1复位,拧紧螺帽,将L形空心管3复位,穿入钢棒4,即可实现将声屏障单元板夹设在所述夹具上。 The specific operation process of hoisting is: pull out the steel rod 4, rotate the L-shaped hollow tube 3, loosen the nut on the screw, rotate the movable rod 1, place the sound barrier unit plate on the two fixed rods 2, adjust the position of the center of gravity, Reset the movable rod 1, tighten the nut, reset the L-shaped hollow tube 3, and penetrate the steel rod 4, so that the sound barrier unit plate can be clamped on the clamp.
为防止在吊装过程中钢棒4脱出而造成声屏障的掉落,在所述钢棒4的端部设置一弯钩,锁止状态时,该弯钩钩住L形空心管3的一端部或者钩住孔5的侧边。 In order to prevent the falling of the sound barrier caused by the protruding of the steel rod 4 during the hoisting process, a hook is provided at the end of the steel rod 4. In the locked state, the hook hooks one end of the L-shaped hollow pipe 3 Or hook the side of hole 5.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520584163.9U CN205011242U (en) | 2015-08-06 | 2015-08-06 | Anchor clamps are used in hoist and mount of sound barrier cell board |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520584163.9U CN205011242U (en) | 2015-08-06 | 2015-08-06 | Anchor clamps are used in hoist and mount of sound barrier cell board |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205011242U true CN205011242U (en) | 2016-02-03 |
Family
ID=55209856
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520584163.9U Expired - Lifetime CN205011242U (en) | 2015-08-06 | 2015-08-06 | Anchor clamps are used in hoist and mount of sound barrier cell board |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205011242U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116281564A (en) * | 2022-12-19 | 2023-06-23 | 宁波公路市政设计有限公司 | Hoisting equipment for bridge construction |
-
2015
- 2015-08-06 CN CN201520584163.9U patent/CN205011242U/en not_active Expired - Lifetime
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116281564A (en) * | 2022-12-19 | 2023-06-23 | 宁波公路市政设计有限公司 | Hoisting equipment for bridge construction |
| CN116281564B (en) * | 2022-12-19 | 2024-03-26 | 宁波公路市政设计有限公司 | Hoisting equipment for bridge construction |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN205421070U (en) | Stand clamping device | |
| CN203905491U (en) | Adjustable device for supporting shear wall casting die and upright post casting die | |
| CN105544970A (en) | Composite floor slab cast-in-place slab fixing device with bottom mold and construction method | |
| CN204781970U (en) | Template fixing device with adjustable | |
| CN103579961A (en) | Adjustable lifting type fixing device applied to cable connector manufacturing and achieving method thereof | |
| CN205011242U (en) | Anchor clamps are used in hoist and mount of sound barrier cell board | |
| CN204199667U (en) | Detachable builder's jack corner tripod | |
| CN204608825U (en) | A kind of three-chip type stone bolt locating rack | |
| CN106884505A (en) | A kind of adjustable frame post reinforcing bar spacer ferrule and its installation and method for dismounting | |
| CN214925589U (en) | Be used for prefabricated building PC wall conversion layer to reserve joint bar positioner | |
| CN202073313U (en) | Beam fixture | |
| CN204139622U (en) | Adjustable segmented column steel bar positioning fixture | |
| CN204400502U (en) | Bottle gouard moved by hands support | |
| CN204079316U (en) | A kind of harmless circular steel tube concrete post tower crane attachment anchor ear device | |
| CN206752855U (en) | A kind of adjustable frame post reinforcing bar spacer ferrule | |
| CN203531376U (en) | Grouted aggregate concrete wall formwork | |
| CN207569004U (en) | A kind of hanger fixing device of a Preembedded | |
| CN201202276Y (en) | Beam side panels fixture | |
| CN216340861U (en) | Diagonal bracing structure for aluminum alloy template | |
| CN203808540U (en) | Hanging tool for mounting safety plain net in engineering elevator shaft | |
| CN202181614U (en) | Steel pipe fixing device for joist steel | |
| CN206107514U (en) | Deck passageway frame connection structure | |
| CN202577975U (en) | Clamping apparatus for right-angled die plate | |
| CN111561051A (en) | Mounting structure and mounting method of top surface spherical net rack | |
| CN206308809U (en) | A kind of building built-in part installs fixed structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CP01 | Change in the name or title of a patent holder |
Address after: North Building No. 1839 fortune 108 square 201101 Shanghai city Minhang District seven Xin Road, room 2508 Patentee after: TIBET ZHONGCHI GROUP CO.,LTD. Address before: North Building No. 1839 fortune 108 square 201101 Shanghai city Minhang District seven Xin Road, room 2508 Patentee before: SHANGHAI ZHONGCHI GROUP Co.,Ltd. |
|
| CP01 | Change in the name or title of a patent holder | ||
| CX01 | Expiry of patent term |
Granted publication date: 20160203 |
|
| CX01 | Expiry of patent term |