CN201044342Y - Turret head wire hoisting device - Google Patents

Turret head wire hoisting device Download PDF

Info

Publication number
CN201044342Y
CN201044342Y CNU2007200851860U CN200720085186U CN201044342Y CN 201044342 Y CN201044342 Y CN 201044342Y CN U2007200851860 U CNU2007200851860 U CN U2007200851860U CN 200720085186 U CN200720085186 U CN 200720085186U CN 201044342 Y CN201044342 Y CN 201044342Y
Authority
CN
China
Prior art keywords
supporting seats
utility
hair thick
leading screw
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007200851860U
Other languages
Chinese (zh)
Inventor
李昌甫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanning Bureau of Extra High Voltage Power Transmission Co
Original Assignee
Nanning Bureau of Extra High Voltage Power Transmission Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanning Bureau of Extra High Voltage Power Transmission Co filed Critical Nanning Bureau of Extra High Voltage Power Transmission Co
Priority to CNU2007200851860U priority Critical patent/CN201044342Y/en
Application granted granted Critical
Publication of CN201044342Y publication Critical patent/CN201044342Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model relates to a lap resistance wire lifting device which comprises two supporting seats. The utility model is characterized in that: the two supporting seats are connected with each other through a leading screw element with adjustable length; vertical leading screws are respectively arranged on the two supporting seat; the lower end of the vertical leading screws can be connected with insulating suspenders; the upper part of the vertical leading screws is connected with leading screw sleeves arranged on the upper part of a pedestal. The utility model has the advantages that: a live wire can be lifted up by integrated use of the utility model and a six splitting wire hook; chain insulators can be exchanged without the need of power cut; the live-wire work of compact lines is made easy and simple; the safety factor is high as well.

Description

A kind of tower head lead lifting device
Technical field
The utility model relates to a kind of instrument to the live wire operation, particularly a kind of tower head lead lifting device.
Background technology
In compact line, the division number of lead and conventional line division number are different, usually adopt six divisions to arrange, promptly every six roots of sensation sub-conductor is separately fixed at by cylindrical arrangement in six through holes of six yoke plates, and the insulator string through being connected with six yoke plates is fixed on the tower bar again.Because the safety operation of compact line distance is smaller, in the regional 500kv compact line of particularly high elevation, at following earth potential of height above sea level 1000m and equal potential working minimum safe distance relatively is 3.2m only, and alternate minimum safe distance only is 4.6m during equal potential working; At height above sea level 1000m and above earth potential and equal potential working minimum safe distance relatively is 3.4m only, and alternate minimum safe distance only is 5.0m during equal potential working.And be damaged when need changing when insulator string, all be that the operating type of taking to have a power failure is changed at present usually, though safe, make troubles for people's the life and the production of enterprise.
In order also to overhaul, change operation under situation about not having a power failure, the present inventor has invented two kinds of instruments, and a kind of is the six-multiple conductor hook that can carry out live line working, and another kind is a lead lifting device of the present utility model.During operation the utility model lead lifting device is fixed on the cross-arm of tower bar, be connected with the six-multiple conductor hook through the insulation suspension rod again, can under electriferous state, hold lead with the six-multiple conductor hook, the weight of lead is transferred on these two instruments, just can have been changed the operation of insulator string.
The utility model content
Technical problem to be solved in the utility model provides a kind of and the six-multiple conductor hook is used the tower head lead lifting device that lead can be mentioned.
The utility model solves the problems of the technologies described above with following technical scheme: two supporting seats are connected by the lead screw assembly of adjustable length, on two supporting seats the vertical hair thick stick is housed respectively, the lower end of vertical hair thick stick can be connected with insulated hanging pole, and top is connected with the leading screw sleeve that places the pedestal top.
The lead screw assembly of two supporting seats of described connection is made of leading screw sleeve, two horizontal hair thick sticks and lengthening rod member and bolt, two horizontal hair thick sticks are connected with the two ends of leading screw sleeve respectively, the other end of two horizontal hair thick sticks is connected with the lengthening rod member respectively again, is connected by bolt between lengthening rod member and the supporting seat.
The bottom of described two supporting seats has the draw-in groove that pedestal can be stuck on the tower bar cross-arm master material.
Have through hole on described two supporting seats, the vertical hair thick stick places through hole.
The utility model tower head lead lifting device and six-multiple conductor hook are used, and electrified wire can be mentioned, and need not to have a power failure and just can change the operation of insulator string, and compact line live line working work is become simply, easily, and coefficient of safety is also high.
Description of drawings
Fig. 1 is the structural representation of the utility model tower head lead lifting device.
Embodiment
As shown in Figure 1, there are the externally threaded horizontal hair thick stick 3 of relative trend and lengthening rod member 5 to be connected by the leading screw sleeve 2 of band handle 1, two between two supporting seats 6 with the lead screw assembly that bolt 4 constitutes, two horizontal hair thick sticks 3 are connected with the two ends of female leading screw sleeve 2 respectively, the other end of two horizontal hair thick sticks 3 is connected with lengthening rod member 5 respectively again, is connected by bolt 4 between lengthening rod member 5 and the supporting seat 6; Have through hole 11 on two supporting seats 6, be equipped with in the through hole and establish externally threaded vertical hair thick stick 7, there is the bolt 12 that can connect insulated hanging pole the lower end of vertical hair thick stick, top is connected with the leading screw sleeve 8 of the band handle 9 that places the pedestal top, the leading screw sleeve has the internal thread that is complementary with vertical hair thick stick external screw thread, the bottom that 10, two supporting seats of packing ring are housed between leading screw sleeve 8 and the supporting seat 6 has draw-in groove 13.
During use, the draw-in groove of supporting seat is stuck on the tower bar cross-arm master material, then turning handle 1 length of regulating lead screw assembly, two supporting seats are tightened up the tower material of tower head both sides, so that when promoting lead, the tower material of tower head only need bear vertical power, horizontal pull just thus device bear.Change, when overhauling the operation of insulator string, lower end at the vertical hair bar connects insulated hanging pole with bolt 12, the other end of insulated hanging pole is connected with the six-multiple conductor hook, because the action of gravity of insulated hanging pole and six-multiple conductor hook, with vertical hair thick stick tension location, this moment turning handle 9, leading screw sleeve 8 along continuous straight runs are rotated, the vertical hair thick stick just moves up and down along the internal thread of leading screw sleeve 8, and the six-multiple conductor hook that is connected with insulated hanging pole also moves up and down simultaneously, thereby also can hook the lead on six yoke plates under the charged situation and they are being held up, the weight of lead is transferred on these two instruments, and the insulator string that connects six yoke plates just can take off and overhauls, change, thereby reach the purpose that insulator is changed in live line working.

Claims (4)

1. tower head lead lifting device, include two supporting seats, it is characterized in that: the lead screw assembly by adjustable length between two supporting seats connects, on two supporting seats the vertical hair thick stick is housed respectively, the lower end of vertical hair thick stick can be connected with insulated hanging pole, and top is connected with the leading screw sleeve that places the pedestal top.
2. tower head lead lifting device according to claim 1, it is characterized in that: the lead screw assembly of two supporting seats of described connection is made of leading screw sleeve, two horizontal hair thick sticks and lengthening rod member and bolt, two horizontal hair thick sticks are connected with the two ends of leading screw sleeve respectively, the other end of two horizontal hair thick sticks is connected with the lengthening rod member respectively again, is connected by bolt between lengthening rod member and the supporting seat.
3. tower head lead lifting device according to claim 1 and 2, it is characterized in that: the bottom of two supporting seats has draw-in groove.
4. tower head lead lifting device according to claim 1 and 2 is characterized in that: have through hole on two supporting seats, the vertical hair thick stick places through hole.
CNU2007200851860U 2007-06-05 2007-06-05 Turret head wire hoisting device Expired - Fee Related CN201044342Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007200851860U CN201044342Y (en) 2007-06-05 2007-06-05 Turret head wire hoisting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007200851860U CN201044342Y (en) 2007-06-05 2007-06-05 Turret head wire hoisting device

Publications (1)

Publication Number Publication Date
CN201044342Y true CN201044342Y (en) 2008-04-02

Family

ID=39259232

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007200851860U Expired - Fee Related CN201044342Y (en) 2007-06-05 2007-06-05 Turret head wire hoisting device

Country Status (1)

Country Link
CN (1) CN201044342Y (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101997281A (en) * 2010-09-21 2011-03-30 河南省电力公司驻马店供电公司 Tower ground wire universal lifting mechanism
CN102623927A (en) * 2012-03-31 2012-08-01 湖南省电力公司株洲电业局 Tool and method for charged replacement of multi-circuit double-split conductor insulators of 200kV line
CN103276941A (en) * 2013-04-27 2013-09-04 国家电网公司 Principal material replacing support assembly of electric transmission line tower
CN105006772A (en) * 2015-07-06 2015-10-28 中国南方电网有限责任公司超高压输电公司南宁局 Improved G5 tower-shaped overhead ground wire lifter, and connection metal tool replacing device and method
CN106129901A (en) * 2016-08-26 2016-11-16 国网青海省电力公司海东供电公司 A kind of 35kV circuit single pole porcelain pole arm repairing instrument
CN104332884B (en) * 2014-09-18 2017-06-30 云南电网公司红河供电局 A kind of conduction wire riser for changing straight line insulator string

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101997281A (en) * 2010-09-21 2011-03-30 河南省电力公司驻马店供电公司 Tower ground wire universal lifting mechanism
CN101997281B (en) * 2010-09-21 2013-04-03 河南省电力公司驻马店供电公司 Tower ground wire universal lifting mechanism
CN102623927A (en) * 2012-03-31 2012-08-01 湖南省电力公司株洲电业局 Tool and method for charged replacement of multi-circuit double-split conductor insulators of 200kV line
CN102623927B (en) * 2012-03-31 2015-09-16 湖南省电力公司株洲电业局 Charged for replacement 220kV circuit multiloop double bundle conductor insulator tool and method
CN103276941A (en) * 2013-04-27 2013-09-04 国家电网公司 Principal material replacing support assembly of electric transmission line tower
CN103276941B (en) * 2013-04-27 2015-12-23 国家电网公司 Electric power line pole tower main material replacing bracket component
CN104332884B (en) * 2014-09-18 2017-06-30 云南电网公司红河供电局 A kind of conduction wire riser for changing straight line insulator string
CN105006772A (en) * 2015-07-06 2015-10-28 中国南方电网有限责任公司超高压输电公司南宁局 Improved G5 tower-shaped overhead ground wire lifter, and connection metal tool replacing device and method
CN106129901A (en) * 2016-08-26 2016-11-16 国网青海省电力公司海东供电公司 A kind of 35kV circuit single pole porcelain pole arm repairing instrument

Similar Documents

Publication Publication Date Title
CN201044342Y (en) Turret head wire hoisting device
CN201846021U (en) Insulating gin for replacing 750 kV tension insulator
CN101820144B (en) Special tool of live line work for replacing rectilinear insulator string of large-section double multiple wire
CN201515166U (en) Adjustable expansion resistant airfoil card
CN105514877A (en) Cross arm clamp for insulator replacement of steel pipe pole of common-tower double-circuit lines
CN202586171U (en) Supporting plate device of special hook card for live line replacement linear horizontal double-division insulator
CN203300937U (en) High-hitching ground wire operating lever
CN202189912U (en) Overhead transmission line grounding device
CN2404241Y (en) Apparatus capable of changing strain insulator-chain electrical insulator
CN203398628U (en) Portable insulator replacing tool
CN203839885U (en) 10kV/35kV double-loop straight-line electrified pole replacing device
CN204920412U (en) Strain insulator tower of low clearance
CN203932808U (en) Replacing insulator under electrified wire lifting device
CN201991295U (en) Insulating cross arm capable of adjusting location of wire
CN203690797U (en) Cross arm side clamp used for insulator chain maintenance
CN201438617U (en) Electric lifting tool for linear insulator string on ZM tower
CN106602465A (en) Power transmission line tangent tower first insulator replacement tool
CN201044341Y (en) Six-divided conductor hook
CN201266807Y (en) Device for replacing insulator
CN200979827Y (en) A hang line insulator
CN103606849A (en) Multi-bundled live conductor lifting device for transmission tower and special fixture of multi-bundled live conductor lifting device
CN104022461B (en) Change the double string horizontal insulator instruments of 500KV straight lines simply connected
CN204243605U (en) Power line tension string composite insulator changes hook special
CN106025918A (en) Adjustable wire-clamping machine
CN206432624U (en) Transmission line tangent tower first insulator changes instrument

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080402

Termination date: 20150605

EXPY Termination of patent right or utility model