CN102623927B - Charged for replacement 220kV circuit multiloop double bundle conductor insulator tool and method - Google Patents

Charged for replacement 220kV circuit multiloop double bundle conductor insulator tool and method Download PDF

Info

Publication number
CN102623927B
CN102623927B CN201210091265.8A CN201210091265A CN102623927B CN 102623927 B CN102623927 B CN 102623927B CN 201210091265 A CN201210091265 A CN 201210091265A CN 102623927 B CN102623927 B CN 102623927B
Authority
CN
China
Prior art keywords
cross
arm
screw
card
wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210091265.8A
Other languages
Chinese (zh)
Other versions
CN102623927A (en
Inventor
王密
罗金林
张尧
夏伟
肖运军
万彭
丁文晖
唐名峰
肖云
易嘉
袁海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHUZHOU POWER BUREAU HUNAN ELECTRIC POWER Co
State Grid Corp of China SGCC
Original Assignee
Zhuzhou Power Bureau Hunan Electric Power Co
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuzhou Power Bureau Hunan Electric Power Co, State Grid Corp of China SGCC filed Critical Zhuzhou Power Bureau Hunan Electric Power Co
Priority to CN201210091265.8A priority Critical patent/CN102623927B/en
Publication of CN102623927A publication Critical patent/CN102623927A/en
Application granted granted Critical
Publication of CN102623927B publication Critical patent/CN102623927B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

本发明提供了一种带电更换220kV线路多回路双分裂导线绝缘子工具,包括横担卡、联板卡、卡具钩、两个丝杆组件和两个绝缘拉板;横担卡一端与横担固定联接,另一端通过丝杆组件、绝缘拉板与联板卡联接;丝杆组件包括丝杆和把手,丝杆穿设于横担卡上,把手位于丝杆上端部,丝杆下端部与绝缘拉板联接;联板卡上设有用于嵌入连板的凹槽,联板卡一端与一个绝缘拉板联接,联板卡另一端通过卡具钩与另一个绝缘拉板联接。本发明还提供了采用本发明提供的工具带电更换绝缘子的地电位作业方法。采用本发明提供的工具,结合本发明提供的方法,能顺利更换220kV线路多回路杆塔中、上相双分裂导线绝缘子,方法简单、操作容易,保证作业人员安全作业。

The invention provides a tool for live replacement of 220kV line multi-circuit double-split conductor insulators, which includes a cross arm clamp, a connecting plate clamp, a clamp hook, two screw rod assemblies and two insulating pull plates; one end of the cross arm clamp and the cross arm Fixed connection, the other end is connected through the screw assembly, the insulating pull plate and the connecting plate card; the screw assembly includes the screw and the handle, the screw is installed on the cross-arm card, the handle is located at the upper end of the screw, and the lower end of the screw is connected to the Insulated pull-plate connection; there is a groove for embedding the connecting plate on the connecting plate card, one end of the connecting plate card is connected with an insulating pulling plate, and the other end of the connecting plate card is connected with another insulating pulling plate through a clamp hook. The invention also provides a ground potential working method for live replacement of an insulator by using the tool provided by the invention. Using the tool provided by the invention, combined with the method provided by the invention, can smoothly replace the insulators of the middle and upper phase double-split wires of the 220kV line multi-circuit tower, the method is simple, the operation is easy, and the operator can work safely.

Description

带电更换220kV线路多回路双分裂导线绝缘子工具和方法Tools and methods for live replacement of 220kV line multi-circuit double-split conductor insulators

技术领域 technical field

本发明涉及带电更换绝缘子领域,具体涉及一种带电更换220kV线路多回路双分裂导线绝缘子的工具和方法。 The invention relates to the field of live replacement of insulators, in particular to a tool and method for live replacement of multi-circuit double-split wire insulators of 220kV lines.

背景技术 Background technique

株洲输电网现有110kV及以上线路136条、1792公里,其中220kV线路30条、706公里,同杆架设多回路220kV线路20条,共计467公里。每年因雷击、自爆、检测,线路上需要更换的绝缘子约为30余支,其中,带电作业更换20支左右。带电作业能够减少停电时间,提升供电量,提高电网可靠性。但自08年冰灾之后,株洲地区新建、改建110kV-220kV输电线路10多条、400余公里,其中增加了大量的新型加强型杆塔和多回路铁塔,以往的带电作业工具不能满足在新型杆塔上开展带电作业的要求。 The Zhuzhou transmission network currently has 136 110kV and above lines with a length of 1,792 kilometers, including 30 220kV lines with a length of 706 kilometers, and 20 multi-circuit 220kV lines with a total length of 467 kilometers on the same pole. Every year, due to lightning strikes, self-explosion, and detection, more than 30 insulators need to be replaced on the line, of which about 20 are replaced for live work. Live work can reduce power outage time, increase power supply, and improve grid reliability. However, since the ice disaster in 2008, more than 10 110kV-220kV transmission lines with a length of more than 400 kilometers have been newly built or rebuilt in Zhuzhou area, among which a large number of new reinforced towers and multi-circuit towers have been added. Requirements for carrying out live work.

例如拉门塔、酒杯加强型铁塔、加强型横担结构等特殊塔型,均没有相适应的横担卡具,同时针对双分裂导线,不便于开展地电位带电作业。尤其是多回共杆的双分裂导线线路,存在无针对性的地电位带电作业工具,中、上相绝缘子因为等电位作业人员难以进入等电位进行作业,所以更换难度最大。 For example, there are no suitable cross-arm fixtures for special tower types such as sliding door towers, wine glass reinforced iron towers, and reinforced cross-arm structures. At the same time, it is not convenient to carry out ground potential live work for double-split conductors. In particular, there are untargeted ground potential live working tools in the double-split conductor line with multiple common poles. The middle and upper phase insulators are the most difficult to replace because it is difficult for equipotential operators to enter the equipotential operation.

目前110kV-220kV多回路铁塔以及双分裂导线上更换绝缘子的带电作业工作主要采取等电位作业的方式进行。等电位作业方法,工作强度大、人员多、工序复杂,且等电位作业人员承受的电场辐射以及作业安全风险很大。而且针对双回路共杆线路,导线间距小,带电设备分布密集,安全距离和作业间隙过小而不便于进行等电位作业。另外,针对双分裂导线绝缘子带电更换作业过程中,由于与绝缘子脱离之后连板不受控制,无法固定。 At present, the live work of replacing insulators on 110kV-220kV multi-circuit iron towers and double-split conductors is mainly carried out by means of equipotential work. The equipotential operation method has high work intensity, many personnel, and complicated procedures, and the electric field radiation and operation safety risks suffered by the equipotential operators are very high. Moreover, for the double-circuit common-rod line, the distance between the conductors is small, the live equipment is densely distributed, and the safety distance and working gap are too small to facilitate equipotential work. In addition, during the live replacement operation of the double-split wire insulator, the connecting plate cannot be fixed because it is out of control after it is separated from the insulator.

因此,研究开发出新的带电更换多回路铁塔绝缘子的作业方法和工具,对于攻克带电作业的难点项目、推进带电作业事业的发展、维护电网的安全稳定运行有着重要的意义。 Therefore, the research and development of new operation methods and tools for live replacement of multi-circuit iron tower insulators is of great significance for overcoming difficult projects of live work, promoting the development of live work, and maintaining the safe and stable operation of the power grid.

发明内容 Contents of the invention

本发明解决了现有技术中带电更换多回路杆塔双分裂导线绝缘子中缺乏针对性的带电作业工具、连板无法固定、以及作业方法工作强度大、工序复杂、作业人员安全风险大的技术问题。 The invention solves the technical problems in the prior art of live replacement of double-split wire insulators of multi-circuit poles and towers, lack of targeted live working tools, unfixable connection plates, high working intensity, complicated procedures, and high safety risks for operators.

本发明提供了一种带电更换220kV线路多回路双分裂导线绝缘子工具,包括横担卡、联板卡、卡具钩、两个丝杆组件和两个绝缘拉板; The invention provides a tool for live replacement of 220kV line multi-circuit double-split wire insulators, which includes a cross arm clip, a connecting board clip, a clip hook, two screw rod assemblies and two insulating pull plates;

所述横担卡一端用于与杆塔的横担固定联接,另一端通过丝杆组件、绝缘拉板与联板卡联接; One end of the cross-arm card is used for fixed connection with the cross-arm of the pole tower, and the other end is connected with the connecting board card through the screw assembly, the insulating pull plate;

所述丝杆组件包括丝杆和把手;所述丝杆穿设于横担卡上,把手位于丝杆的上端部,丝杆的下端部与绝缘拉板联接; The screw assembly includes a screw and a handle; the screw is passed through the cross arm card, the handle is located at the upper end of the screw, and the lower end of the screw is connected with the insulating pull plate;

所述联板卡上设有用于嵌入导线侧连板的凹槽,联板卡的一端与一个绝缘拉板联接,联板卡的另一端通过卡具钩与另一个绝缘拉板联接。 The connecting plate is provided with a groove for embedding the side connecting plate of the wire, one end of the connecting plate is connected with an insulating pull plate, and the other end of the connecting plate is connected with another insulating pull plate through a clamp hook.

本发明还提供了一种采用本发明提供的工具带电更换220kV线路多回路双分裂导线绝缘子的方法,包括以下步骤: The present invention also provides a method for live replacement of 220kV line multi-circuit double-split wire insulators using the tool provided by the present invention, comprising the following steps:

A、登杆:地电位作业人员携带吊绳登上杆塔至横担侧,挂号吊绳;地电位操作人员登上杆塔至导线侧; A. Boarding pole: The ground potential operator carries the sling to the pole tower to the side of the cross arm, and registers the sling; the ground potential operator climbs the pole tower to the wire side;

B、安装工具:地面配合人员将横担卡起吊至横担侧,地电位作业人员将横担卡固定安装于杆塔的横担上;地面配合人员将装配好的丝杆组件、绝缘拉板、联板卡和卡具钩整体起吊至横担侧,地电位作业人员将整体与横担卡固定安装,使导线侧联板卡紧于联板卡的凹槽内; B. Installation tools: The ground coordination personnel will lift the cross-arm card to the side of the cross-arm, and the ground potential operator will fix the cross-arm card on the cross-arm of the tower; the ground coordination personnel will assemble the assembled screw rod assembly, insulating pull plate, The connecting board and fixture hook are hoisted to the side of the cross arm as a whole, and the ground potential operator fixes the whole and the cross arm, so that the connecting board on the wire side is clamped tightly in the groove of the connecting board;

C、收紧丝杆:地电位作业人员摇动把手收紧丝杆,通过联板卡提升导线,使待更换绝缘子不承受导线的重力; C. Tighten the screw: the ground potential operator shakes the handle to tighten the screw, and lifts the wire through the connecting board, so that the insulator to be replaced does not bear the gravity of the wire;

D、更换绝缘子:地电位操作人员拔出导线端弹簧销,地电位作业人员用吊绳系好待更换绝缘子,然后拔出横担侧弹簧销,将待更换绝缘子采用吊绳放至底面;底面配合人员起吊新绝缘子至横担侧,地电位作业人员安装横担侧弹簧销,将新绝缘子与横担固定,地电位操作人员安装导线侧弹簧销,将新绝缘子与导线固定; D. Replace the insulator: The ground potential operator pulls out the spring pin at the wire end, the ground potential operator uses a sling to tie the insulator to be replaced, then pulls out the spring pin on the side of the cross arm, and puts the insulator to be replaced to the bottom with a sling; Cooperate with the personnel to lift the new insulator to the side of the cross arm, the ground potential operator installs the spring pin on the side of the cross arm to fix the new insulator and the cross arm, and the ground potential operator installs the spring pin on the wire side to fix the new insulator and the wire;

E、拆除工具:地电位作业人员依次拆除所有工具,采用吊绳放至地面,然后携带吊绳下杆,作业完成。 E. Removal tools: ground potential operators remove all tools in turn, put them on the ground with a sling, and then carry the sling down the pole, and the work is completed.

本发明提供的工具,结合本发明提供的地电位作业方法,在连板与绝缘子脱离之后能通过联板卡将其固定,能顺利更换220kV线路多回路中、上相双分裂导线绝缘子,适用于各种复杂特殊塔形的横担,例如水泥杆横担、拉门塔横担、加强型铁塔横担。另外,通过地电位带电作业,方法简单、操作容易,而且还可以避免等电位作业的风险,保证作业人员安全作业。 The tool provided by the present invention, combined with the ground potential operation method provided by the present invention, can fix the connecting plate and the insulator through the connecting plate after it is separated, and can smoothly replace the double-split wire insulators of the middle and upper phases of the 220kV line multi-circuit, and is suitable for Various complex and special tower-shaped cross arms, such as concrete pole cross arms, lamen tower cross arms, and reinforced iron tower cross arms. In addition, the method is simple and easy to operate through the ground potential live work, and it can also avoid the risk of equipotential work and ensure the safe operation of the operators.

附图说明 Description of drawings

图1是本发明实施例一提供的带电更换220kV线路多回路双分裂导线绝缘子工具的结构示意图。 Fig. 1 is a schematic structural diagram of a tool for live replacement of insulators for multi-circuit double-split conductors of a 220kV line provided by Embodiment 1 of the present invention.

图2是图1中横担卡的结构示意图。 Fig. 2 is a schematic structural diagram of the cross-arm card in Fig. 1 .

图3是图1中联板卡的结构示意图。 FIG. 3 is a schematic structural diagram of the Zhonglian board in FIG. 1 .

图4是图1中卡具钩与绝缘拉板的结构示意图。 Fig. 4 is a schematic structural diagram of the clamp hook and the insulating pull plate in Fig. 1 .

图5是本发明实施例二提供的带电更换220kV线路多回路双分裂导线绝缘子工具的结构示意图。 Fig. 5 is a schematic structural diagram of a tool for live replacement of insulators of multi-circuit double-split conductors of a 220kV line provided by Embodiment 2 of the present invention.

图6是图5中横担卡的结构示意图。 Fig. 6 is a schematic structural diagram of the cross-arm card in Fig. 5 .

图中,1——丝杆组件,2——横担卡,3——绝缘拉板,4——联板卡,5——卡具钩;11——丝杆,12——把手;21——横担固定部,22——丝杆固定部,23——主体,24——垫块,220——凹陷槽;31——卡接孔;40——凹槽,41——单卡I,42——单卡II;50——钩本体,51——波环组件,52——波环拉手,501——钩部,502——杆部。 In the figure, 1—screw assembly, 2—cross arm clamp, 3—insulation pull plate, 4—connecting board, 5—clamp hook; 11—screw rod, 12—handle; 21 ——crossarm fixing part, 22—screw fixing part, 23—main body, 24—pad, 220—depressed groove; 31—clip hole; 40—groove, 41—single card I, 42—single card II; 50—hook body, 51—wave ring assembly, 52—wave ring handle, 501—hook portion, 502—rod portion.

具体实施方式 Detailed ways

为了使本发明所解决的技术问题、技术方案及有益效果更加清楚明白,以下结合附图及实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。 In order to make the technical problems, technical solutions and beneficial effects solved by the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

实施例一 Embodiment one

如图1所示,本实施例提供了一种带电更换220kV线路多回路双分裂导线绝缘子工具,包括横担卡2、联板卡4、卡具钩5、两个丝杆组件1和两个绝缘拉板3。 As shown in Figure 1, this embodiment provides a tool for live replacement of 220kV line multi-circuit double-split conductor insulators, including cross-arm clamp 2, connecting board clamp 4, clamp hook 5, two screw rod assemblies 1 and two Insulation pull plate 3.

所述横担卡2一端用于与杆塔的横担固定联接,另一端通过丝杆组件1、绝缘拉板3与联板卡4联接。 One end of the cross-arm card 2 is used for fixed connection with the cross-arm of the pole tower, and the other end is connected with the connecting board card 4 through the screw assembly 1 and the insulating pull plate 3 .

本实施例中,所述横担卡2的结构如图2所示,包括一体结构的横担固定部21和丝杆固定部22。如图2所示,所述横担固定部21为L形弯折结构,用于悬挂于横担上。本发明中,在实际使用过程中,将横担固定部21悬挂于横担上之后,还需采用螺栓进一步锁紧固定,防止横担卡受力后发生反转,从横担上脱落。如图2所示,所述丝杆固定部22上设有凹陷槽220。该凹陷槽220的底部设有丝杆孔,用于穿设丝杆11。本实施例中,所述横担卡2的个数为两个。因此,通过两个横担卡2上设置的丝杆孔,可穿设两个丝杆11。 In this embodiment, the structure of the cross-arm card 2 is shown in FIG. 2 , which includes a cross-arm fixing part 21 and a threaded rod fixing part 22 in an integrated structure. As shown in FIG. 2 , the cross arm fixing portion 21 is an L-shaped bent structure for hanging on the cross arm. In the present invention, in the actual use process, after the cross-arm fixing part 21 is suspended on the cross-arm, it is necessary to further lock and fix it with bolts, so as to prevent the cross-arm card from reversing and falling off from the cross-arm after being stressed. As shown in FIG. 2 , the screw fixing part 22 is provided with a concave groove 220 . The bottom of the concave groove 220 is provided with a screw hole for passing the screw 11 . In this embodiment, the number of the cross-arm cards 2 is two. Therefore, two screw mandrels 11 can be passed through the screw mandrel holes provided on the two cross-arm cards 2 .

所述丝杆组件1的结构如图1所示,包括丝杆11和把手12。所述丝杆11穿设于横担卡2的丝杆孔内,且丝杆11的两端均延伸至横担卡2外侧。其中,把手12位于丝杆11的上端部,即位于横担卡2的上方。丝杆11的下端部与绝缘拉板3联接。通过旋转把手12,能控制丝杆11上下运动,从而调节联板卡4与横担卡2之间的距离,实现对导线的提升或放下。 The structure of the screw assembly 1 is shown in FIG. 1 , including a screw 11 and a handle 12 . The threaded rod 11 is installed in the threaded hole of the cross-arm card 2 , and both ends of the threaded rod 11 extend to the outside of the cross-arm card 2 . Wherein, the handle 12 is located at the upper end of the screw rod 11 , that is, above the cross arm card 2 . The lower end of the screw rod 11 is connected with the insulating pull plate 3 . By rotating the handle 12, the screw rod 11 can be controlled to move up and down, so as to adjust the distance between the connecting board card 4 and the cross arm card 2, so as to realize lifting or lowering of the wire.

所述联板卡4的结构如图3所示,联板卡4上设有用于嵌入导线侧连板的凹槽40。如图1所示,联板卡4的一端与一个绝缘拉板3联接,联板卡4的另一端通过卡具钩5与另一个绝缘拉板3联接。所述联板卡4一方面可以通过凹槽40用于固定导线侧连板,另一方面还可用于起吊双分裂导线,从而将导线提升,使绝缘子不再承受导线的重力,从而可拆卸绝缘子并对其进行更换。 The structure of the connecting board 4 is shown in FIG. 3 , and the connecting board 4 is provided with a groove 40 for embedding the wire side connecting board. As shown in FIG. 1 , one end of the link card 4 is connected to an insulating pull plate 3 , and the other end of the link card 4 is connected to another insulating pull plate 3 through a clamp hook 5 . On the one hand, the connecting board 4 can be used to fix the side connecting plate of the wire through the groove 40, and on the other hand, it can also be used to lift the double-split wire, thereby lifting the wire so that the insulator no longer bears the gravity of the wire, so that the insulator can be disassembled and replace it.

如图3所示,所述联板卡4由两个三角形单卡(即单卡I 41和单卡II 42)组成。具体的,所述联板卡4通过单卡I 41和单卡II 42的底部固定联接而成,同时在单卡I 41和单卡II 42的顶部之间具有间隙,即所述凹槽40。凹槽40用于固定连板,因此在连板与绝缘子脱离之后,能通过联板卡4上的间隙将连板固定。如图3所示,单卡I 41远离单卡II 42的一端上设有通孔。如图1所示,单卡I 41上的该通孔用于穿设螺栓从而与一个绝缘拉板3固定联接。单卡II 42远离单卡I 41的一端上也设有通孔。如图1所示,单卡II 42上的该通孔用于穿设穿设螺栓与卡具钩5联接。 As shown in Figure 3, the said joint board 4 is made up of two triangular single cards (ie single card I 41 and single card II 42). Specifically, the connecting board 4 is formed by fixedly connecting the bottom of the single card I 41 and the single card II 42, and at the same time, there is a gap between the tops of the single card I 41 and the single card II 42, that is, the groove 40 . The groove 40 is used to fix the connecting plate, so after the connecting plate is detached from the insulator, the connecting plate can be fixed through the gap on the connecting plate card 4 . As shown in Figure 3, the end of the single card I 41 away from the single card II 42 is provided with a through hole. As shown in Figure 1, the through hole on the single card 141 is used to pass through the bolt so as to be fixedly connected with an insulating pull plate 3. Single card II 42 is also provided with through hole on one end away from single card I 41. As shown in Figure 1, this through hole on the single card II 42 is used for threading the threading bolt to connect with the fixture hook 5.

如图4所示,所述卡具钩5包括钩本体50波环组件51。所述钩本体50包括钩部501和杆部502。如图1所示,钩部501用于与联板卡4的一端联接。如图1所示,杆部502与绝缘拉板3之间通过波环组件51活动联接。 As shown in FIG. 4 , the clip hook 5 includes a hook body 50 and a wave ring assembly 51 . The hook body 50 includes a hook portion 501 and a rod portion 502 . As shown in FIG. 1 , the hook portion 501 is used to connect with one end of the connecting card 4 . As shown in FIG. 1 , the rod portion 502 is movably connected to the insulating pull plate 3 through a wave ring assembly 51 .

所述波环组件51包括内置的压簧和与压簧联接的波环。波环的一端设有波环把手52,另一端与绝缘拉板3联接。具体地,如图4所示,绝缘拉板3上设有多个卡接孔31。所述波环穿设于绝缘拉板3的卡接孔31内,从而将绝缘拉板3与卡具钩5卡接固定。通过拉紧波环拉手52,压簧收缩,波环离开绝缘板3上的卡接孔31,此时即可将卡具钩5上下移动至合适位置,然后松开波环拉手52,压簧自动复位,将波环51推动至绝缘拉板3上对应位置的卡接孔31内,即可将绝缘拉板3与卡具钩5卡接固定。本发明中,通过拉动波环拉手52将波环卡接于绝缘拉板3上不同的卡接孔31内,即可调节绝缘拉板3与联板卡4之间的距离。 The wave ring assembly 51 includes a built-in compression spring and a wave ring coupled with the compression spring. One end of the wave ring is provided with a wave ring handle 52 , and the other end is connected with the insulating pull plate 3 . Specifically, as shown in FIG. 4 , a plurality of clamping holes 31 are provided on the insulating pull plate 3 . The corrugated ring passes through the clamping hole 31 of the insulating pull plate 3 , so as to clamp and fix the insulating pull plate 3 and the clamp hook 5 . By tightening the wave ring handle 52, the compression spring shrinks, and the wave ring leaves the clamping hole 31 on the insulating plate 3. At this time, the clamp hook 5 can be moved up and down to a suitable position, and then the wave ring handle 52 is released, and the pressure spring Automatically reset, push the wave ring 51 into the engaging hole 31 at the corresponding position on the insulating pull plate 3, and then the insulating pull plate 3 and the fixture hook 5 can be snapped and fixed. In the present invention, the distance between the insulating pull plate 3 and the connecting plate 4 can be adjusted by pulling the wave ring handle 52 to clamp the wave rings in different engaging holes 31 on the insulating pull plate 3 .

如图1所示,本发明中,两个绝缘拉板4所在的平面相互垂直。因此联板卡4(单卡I 41和单卡II 42)上用于穿设螺栓的通孔的方向也相互垂直。 As shown in FIG. 1 , in the present invention, the planes where the two insulating pull plates 4 are located are perpendicular to each other. Therefore, the directions of the through holes for passing the bolts on the connecting board 4 (single card I 41 and single card II 42) are also perpendicular to each other.

本发明中,所述工具还包括用于拔出导线端弹簧销的绝缘操作杆。 In the present invention, the tool further includes an insulating operating rod for pulling out the spring pin of the wire end.

采用本实施例的工具带电更换220kV线路多回路双分裂导线绝缘子的方法,包括以下步骤: The method for live replacement of 220kV line multi-circuit double-split wire insulators using the tool of this embodiment includes the following steps:

A、登杆:地电位作业人员携带吊绳登上杆塔至横担侧,挂好吊绳;地电位操作人员登上杆塔至导线侧; A. Boarding pole: The ground potential operator carries the sling to the pole tower to the side of the cross arm, and hangs the sling; the ground potential operator climbs the pole tower to the wire side;

B、安装工具:地面配合人员将两个具有图2所示结构的横担卡2起吊至横担侧,地电位作业人员将两个横担卡2的横担固定部21分别放置于杆塔的横担角钢上,并上紧螺栓使其与横担角钢固定联接;地面配合人员在地面上将两个丝杆组件1的丝杆11的下端部分别与两个绝缘拉板3的上端部联接,然后将其中一个绝缘拉板3的下端部直接与联板卡4的一端联接,联板卡4的另一端与卡具钩5的钩部501联接,然后将卡具钩5的杆部502通过波环组件51与另一个绝缘拉板3的联接,通过拉紧波环拉手52 然后上下移动卡具钩5调节另一个绝缘拉板3至合适长度,然后松开波环拉手52将卡具钩5通过波环与另一个绝缘拉板3卡接固定,形成U形工具半成体;然后将该U形工具半成体起吊至横担侧,地电位作业人员将前述U形工具半成体与两个横担卡2固定安装,具体为将两个丝杆组件1的丝杆11分别穿设于两个横担卡2的丝杆固定部22上凹陷槽220底部的丝杆孔内,把手12位于丝杆11的上端部,即分别位于两个横担卡2的上方,将导线侧联板卡紧于联板卡4的凹槽40内; B. Installation tools: The ground coordinators lift the two cross-arm cards 2 with the structure shown in Figure 2 to the cross-arm side, and the ground potential operators place the cross-arm fixing parts 21 of the two cross-arm cards 2 on the pole towers respectively. On the cross-arm angle steel, and tighten the bolts to make it fixedly connected with the cross-arm angle steel; ground coordinators connect the lower ends of the screw rods 11 of the two screw rod assemblies 1 with the upper ends of the two insulating pull plates 3 respectively on the ground , and then directly connect the lower end of one of the insulating pull plates 3 with one end of the connecting board card 4, and connect the other end of the connecting board card 4 with the hook portion 501 of the clamp hook 5, and then connect the rod portion 502 of the clamp hook 5 Through the connection between the wave ring assembly 51 and another insulating pull plate 3, by tightening the wave ring handle 52 and then moving the clamp hook 5 up and down to adjust the other insulating pull plate 3 to a suitable length, then loosen the wave ring handle 52 to place the clamp The hook 5 is clamped and fixed with another insulating pull plate 3 through the corrugated ring to form a U-shaped tool semi-finished body; Two cross-arm cards 2 are fixedly installed, specifically, the screw rods 11 of the two screw rod assemblies 1 are respectively passed through the screw holes at the bottom of the screw rod fixing parts 22 of the two cross-arm cards 2, and the handle 12 It is located at the upper end of the screw rod 11, that is, above the two cross-arm cards 2 respectively, and clamps the wire side connecting plate in the groove 40 of the connecting plate card 4;

C、收紧丝杆:地电位作业人员同时摇动两个丝杆组件1的把手12,收紧丝杆11,通过联板卡4提升导线,使待更换绝缘子不承受导线的重力; C. Tighten the screw: the ground potential operator shakes the handles 12 of the two screw assemblies 1 at the same time, tightens the screw 11, and lifts the wire through the connecting board 4, so that the insulator to be replaced does not bear the gravity of the wire;

D、更换绝缘子:地电位操作人员采用绝缘操作杆拔出导线端弹簧销,地电位作业人员用吊绳系好待更换绝缘子,然后拔出横担侧弹簧销,将待更换绝缘子采用吊绳放至底面;地面配合人员起吊新绝缘子至横担侧,地电位作业人员安装横担侧弹簧销,将新绝缘子与横担固定,地电位操作人员安装导线侧弹簧销,将新绝缘子与导线固定; D. Replacement of insulators: The ground potential operator pulls out the spring pin at the end of the conductor using the insulation operating lever, and the ground potential operator uses a sling to fasten the insulator to be replaced, then pulls out the spring pin on the side of the cross arm, and puts the insulator to be replaced with a sling To the bottom surface; the ground coordination personnel lift the new insulator to the side of the cross arm, the ground potential operator installs the spring pin on the cross arm side to fix the new insulator and the cross arm, and the ground potential operator installs the wire side spring pin to fix the new insulator and the wire;

E、拆除工具:地电位作业人员依次拆除所有工具,采用吊绳放至地面,然后携带吊绳下杆,作业完成。 E. Removal tools: ground potential operators remove all tools in turn, put them on the ground with a sling, and then carry the sling down the pole, and the work is completed.

实施例二 Embodiment two

本实施例提供的带电更换220kV线路多回路双分裂导线绝缘子工具,具有图5所示结构。本实施例提供的工具中,联板卡4、卡具钩5以及两个丝杆组件1和两个绝缘拉板3的结构与实施例一中完全相同,此处不再赘述。 The tool provided in this embodiment for live replacement of 220kV line multi-circuit double-split conductor insulators has the structure shown in FIG. 5 . In the tool provided in this embodiment, the structures of the connecting plate clamp 4 , the clamp hook 5 , the two screw rod assemblies 1 and the two insulating pull plates 3 are completely the same as those in the first embodiment, and will not be repeated here.

本实施例中,所述横担卡2的个数为一个,其结构与实施例一种的横担卡的结构不同。具体地,本实施例中,如图6所示,所述横档卡2包括固定联接的主体23和垫块24。如图6所示,两个垫块24均位于主体23的下方,用于承载主体23。主体23和垫块24之间通过螺栓固定联接(附图中未示出)。本实施例的横档卡2在使用过程中,将所述横担卡2的垫块24放置于横担上,即保持主体23位于横担的上方。 In this embodiment, the number of the cross-arm card 2 is one, and its structure is different from that of the cross-arm card in the first embodiment. Specifically, in this embodiment, as shown in FIG. 6 , the crosspiece card 2 includes a main body 23 and a spacer 24 fixedly coupled. As shown in FIG. 6 , two pads 24 are located below the main body 23 for supporting the main body 23 . The main body 23 and the spacer 24 are fixedly connected by bolts (not shown in the drawings). During the use of the crossarm card 2 in this embodiment, the spacer 24 of the crossarm card 2 is placed on the crossarm, that is, the main body 23 is kept above the crossarm.

如图6所示,所述主体23的两端均设有丝杆固定部,该丝杆固定部与实施例一种横担卡上的丝杆固定部的结构相同。具体地,本实施例中,丝杆固定部上设有凹陷槽,凹陷槽底部设有丝杆孔,用于穿设丝杆11。由于本实施例中主体上设有两个丝杆固定部,因此通过一个横担卡2即可实现与两个丝杆组件1的联接,即在主体23的两端的丝杆固定部上分别穿设丝杆11。 As shown in FIG. 6 , both ends of the main body 23 are provided with screw fixing parts, and the screw fixing parts have the same structure as the screw fixing parts on the cross-arm card in the embodiment. Specifically, in this embodiment, a concave groove is provided on the fixing part of the screw rod, and a screw hole is provided at the bottom of the concave groove for passing the screw rod 11 . Since there are two screw fixing parts on the main body in this embodiment, the connection with the two screw assemblies 1 can be realized through a cross arm card 2, that is, the screw fixing parts at both ends of the main body 23 are respectively threaded Establish screw mandrel 11.

采用本实施例的工具带电更换220kV线路多回路双分裂导线绝缘子的方法,与实施例一中大致相同,具体包括: The method of using the tool of this embodiment to replace the multi-circuit double-split wire insulators of the 220kV line is roughly the same as that in Embodiment 1, specifically including:

A、登杆:地电位作业人员携带吊绳登上杆塔至横担侧,挂好吊绳;地电位操作人员登上杆塔至导线侧; A. Boarding pole: The ground potential operator carries the sling to the pole tower to the side of the cross arm, and hangs the sling; the ground potential operator climbs the pole tower to the wire side;

B、安装工具:地面配合人员将一个具有图6所示结构的横担卡2起吊至横担侧,地电位作业人员将横担卡2的垫块24放置于杆塔的横担包板上;地面配合人员在地面上将两个丝杆组件1的丝杆11的下端部分别与两个绝缘拉板3的上端部联接,然后将其中一个绝缘拉板3的下端部直接与联板卡4的一端联接,联板卡4的另一端与卡具钩5的钩部501联接,然后将卡具钩5的杆部502通过波环组件51与另一个绝缘拉板3联接,通过拉紧波环拉手52 然后上下移动卡具钩5调节另一个绝缘拉板3至合适长度,然后松开波环拉手52将卡具钩5通过波环与另一个绝缘拉板3卡接固定,形成U形工具半成体;然后将该U形工具半成体起吊至横担侧,地电位作业人员将前述U形工具半成体与横担卡2固定安装,具体为将两个丝杆组件1的丝杆11分别穿设于横担卡2上主体23两端的丝杆固定部凹陷槽底部的丝杆孔内,把手12位于丝杆11的上端部,即位于横担卡2的上方,将导线侧联板卡紧于联板卡4的凹槽40内; B. Installation tools: the ground coordination personnel lift a cross-arm card 2 with the structure shown in Figure 6 to the cross-arm side, and the ground potential operator places the pad 24 of the cross-arm card 2 on the cross-arm cladding board of the pole tower; The ground coordinators connect the lower ends of the screw rods 11 of the two screw rod assemblies 1 with the upper ends of the two insulating pull plates 3 respectively on the ground, and then directly connect the lower end of one of the insulating pull plates 3 to the connecting plate 4 The other end of the connecting plate card 4 is connected with the hook portion 501 of the clamp hook 5, and then the rod portion 502 of the clamp hook 5 is connected with another insulating pull plate 3 through the wave ring assembly 51, and the wave is tightened Ring handle 52 Then move the fixture hook 5 up and down to adjust the other insulating pull plate 3 to a suitable length, then loosen the corrugated ring handle 52 to clamp and fix the fixture hook 5 with the other insulating pull plate 3 through the corrugated ring to form a U shape The semi-finished tool; then lift the semi-finished U-shaped tool to the side of the cross arm, and the operator at the ground potential will fix the semi-finished U-shaped tool and the cross-arm card 2, and specifically install the screw rods 11 of the two screw rod assemblies 1 The screw fixing parts at the two ends of the main body 23 of the cross-arm card 2 respectively pass through the screw holes at the bottom of the recessed groove. The handle 12 is located at the upper end of the screw rod 11, that is, above the cross-arm card 2. Fastened in the groove 40 of the connecting board 4;

C、收紧丝杆:地电位作业人员同时摇动两个丝杆组件1的把手12,收紧丝杆11,通过联板卡4提升导线,使待更换绝缘子不承受导线的重力; C. Tighten the screw: the ground potential operator shakes the handles 12 of the two screw assemblies 1 at the same time, tightens the screw 11, and lifts the wire through the connecting board 4, so that the insulator to be replaced does not bear the gravity of the wire;

D、更换绝缘子:地电位操作人员采用绝缘操作杆拔出导线端弹簧销,地电位作业人员用吊绳系好待更换绝缘子,然后拔出横担侧弹簧销,将待更换绝缘子采用吊绳放至底面;地面配合人员起吊新绝缘子至横担侧,地电位作业人员安装横担侧弹簧销,将新绝缘子与横担固定,地电位操作人员安装导线侧弹簧销,将新绝缘子与导线固定; D. Replacement of insulators: The ground potential operator pulls out the spring pin at the end of the conductor using the insulation operating lever, and the ground potential operator uses a sling to fasten the insulator to be replaced, then pulls out the spring pin on the side of the cross arm, and puts the insulator to be replaced with a sling To the bottom surface; the ground coordination personnel lift the new insulator to the side of the cross arm, the ground potential operator installs the spring pin on the cross arm side to fix the new insulator and the cross arm, and the ground potential operator installs the wire side spring pin to fix the new insulator and the wire;

E、拆除工具:地电位作业人员依次拆除所有工具,采用吊绳放至地面,然后携带吊绳下杆,作业完成。 E. Removal tools: ground potential operators remove all tools in turn, put them on the ground with a sling, and then carry the sling down the pole, and the work is completed.

以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。 The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present invention should be included in the protection of the present invention. within range.

Claims (6)

1.一种带电更换220kV线路多回路双分裂导线绝缘子工具,其特征在于,所述工具包括横担卡、联板卡、卡具钩、两个丝杆组件和两个绝缘拉板; 1. A live replacement 220kV line multi-circuit double-split wire insulator tool is characterized in that the tool includes a crossarm clamp, a connecting board clamp, a clamp hook, two screw mandrel assemblies and two insulating pull plates; 所述横担卡一端用于与杆塔的横担固定联接,另一端通过丝杆组件、绝缘拉板与联板卡联接; One end of the cross-arm card is used for fixed connection with the cross-arm of the pole tower, and the other end is connected with the connecting board card through the screw assembly, the insulating pull plate; 所述丝杆组件包括丝杆和把手;所述丝杆穿设于横担卡上,把手位于丝杆的上端部,丝杆的下端部与绝缘拉板联接; The screw assembly includes a screw and a handle; the screw is passed through the cross arm card, the handle is located at the upper end of the screw, and the lower end of the screw is connected with the insulating pull plate; 所述联板卡上设有用于嵌入导线侧连板的凹槽,联板卡的一端与一个绝缘拉板联接,联板卡的另一端通过卡具钩与另一个绝缘拉板联接; The connecting plate is provided with a groove for embedding the side connecting plate of the wire, one end of the connecting plate is connected with an insulating pull plate, and the other end of the connecting plate is connected with another insulating pull plate through a clamp hook; 所述卡具钩包括钩本体和波环组件;所述钩本体包括钩部和杆部;钩部用于与联板卡的一端联接,杆部与绝缘拉板之间通过波环组件活动联接; The clamp hook includes a hook body and a wave ring assembly; the hook body includes a hook portion and a rod portion; the hook portion is used to connect with one end of the connecting board card, and the rod portion and the insulating pull plate are movably connected through the wave ring assembly ; 两个绝缘拉板所在的平面相互垂直; The planes where the two insulating pull plates are located are perpendicular to each other; 所述工具还包括用于拔出导线侧弹簧销的绝缘操作杆。 The tool also includes an insulated operating lever for extracting the wire side spring pin. 2.根据权利要求1所述的带电更换220kV线路多回路双分裂导线绝缘子工具,其特征在于,所述横担卡的个数为两个,每个横担卡上分别穿设一个丝杆;所述横担卡包括一体结构的横担固定部和丝杆固定部;所述横担固定部为L形弯折结构,用于悬挂于横担上;所述丝杆固定部上设有凹陷槽,凹陷槽底部设有丝杆孔。 2. The tool for live replacement of 220kV line multi-circuit double-split wire insulators according to claim 1, characterized in that, the number of the cross-arm cards is two, and each cross-arm card is respectively pierced with a screw rod; The cross-arm card includes a cross-arm fixing part and a screw fixing part of an integrated structure; the cross-arm fixing part is an L-shaped bending structure for hanging on the cross-arm; the screw fixing part is provided with a depression Groove, the bottom of the concave groove is provided with a screw hole. 3.根据权利要求1所述的带电更换220kV线路多回路双分裂导线绝缘子工具,其特征在于,所述横担卡的个数为一个;所述横担卡包括固定联接的主体和两个垫块;两个垫块均位于主体的下方,用于承载主体;主体的两端均设有丝杆固定部,所述丝杆固定部上设有凹陷槽,凹陷槽底部设有丝杆孔。 3. The live replacement 220kV line multi-circuit double-split wire insulator tool according to claim 1, wherein the number of the cross-arm card is one; the cross-arm card includes a fixedly connected main body and two pads block; the two pads are located below the main body for carrying the main body; both ends of the main body are provided with a screw fixing part, the screw fixing part is provided with a concave groove, and the bottom of the concave groove is provided with a screw hole. 4.根据权利要求1所述的带电更换220kV线路多回路双分裂导线绝缘子工具,其特征在于,所述联板卡由两个三角形单卡通过底部固定联接而成,两个三角形单卡的顶部之间具有用于嵌入导线侧连板的间隙;两个三角形单卡远离间隙的一端上均设有通孔,其中一个通孔通过穿设螺栓与绝缘拉板固定联接,另一个通孔通过穿设螺栓与卡具钩联接。 4. The tool for live replacement of 220kV line multi-circuit double-split conductor insulators according to claim 1, characterized in that, the connecting plate card is formed by two triangular single cards fixedly connected at the bottom, and the tops of the two triangular single cards There is a gap for embedding the side connecting plate of the wire; the ends of the two triangular single cards away from the gap are provided with through holes, one of which is fixedly connected with the insulating pull plate through the piercing bolt, and the other through hole is passed through the through hole. The bolt is connected with the clamp hook. 5.根据权利要求4所述的带电更换220kV线路多回路双分裂导线绝缘子工具,其特征在于,所述波环组件包括内置的压簧和与压簧联接的波环,波环的另一端与绝缘拉板联接。 5. The tool for live replacement of 220kV line multi-circuit double-split conductor insulators according to claim 4, wherein the wave ring assembly includes a built-in compression spring and a wave ring connected with the compression spring, the other end of the wave ring is connected to the Insulation pull plate connection. 6.采用权利要求1所述的工具带电更换220kV线路多回路双分裂导线绝缘子的方法,包括以下步骤: 6. adopt the method for live replacement of 220kV line multi-circuit double-split conductor insulators with the live tool described in claim 1, comprise the following steps: A、登杆:地电位作业人员携带吊绳登上杆塔至横担侧,挂好吊绳;地电位作业人员登上杆塔至导线侧; A. Boarding pole: The ground potential operator carries the sling to the pole tower to the side of the cross arm, and hangs the sling; the ground potential operator climbs the pole tower to the wire side; B、安装工具:地面配合人员将横担卡起吊至横担侧,地电位作业人员将横担卡固定安装于杆塔的横担上;地面配合人员将装配好的丝杆组件、绝缘拉板、联板卡和卡具钩整体起吊至横担侧,地电位作业人员将整体与横担卡固定安装,使导线侧联板卡紧于联板卡的凹槽内; B. Installation tools: The ground coordination personnel will lift the cross-arm card to the side of the cross-arm, and the ground potential operator will fix the cross-arm card on the cross-arm of the tower; the ground coordination personnel will assemble the assembled screw rod assembly, insulating pull plate, The connecting board and fixture hook are hoisted to the side of the cross arm as a whole, and the ground potential operator fixes the whole and the cross arm, so that the connecting board on the wire side is clamped tightly in the groove of the connecting board; C、收紧丝杆:地电位作业人员摇动把手收紧丝杆,通过联板卡提升导线,使待更换绝缘子不承受导线的重力; C. Tighten the screw: the ground potential operator shakes the handle to tighten the screw, and lifts the wire through the connecting board, so that the insulator to be replaced does not bear the gravity of the wire; D、更换绝缘子:地电位作业人员采用绝缘操作杆拔出导线侧弹簧销,地电位作业人员用吊绳系好待更换绝缘子,然后拔出横担侧弹簧销,将待更换绝缘子采用吊绳放至底面;地面配合人员起吊新绝缘子至横担侧,地电位作业人员安装横担侧弹簧销,将新绝缘子与横担固定,地电位作业人员安装导线侧弹簧销,将新绝缘子与导线固定; D. Replacement of insulators: The ground potential operator uses the insulation operating lever to pull out the spring pin on the wire side. The ground potential operator uses a sling to fasten the insulator to be replaced, then pulls out the spring pin on the side of the cross arm, and puts the insulator to be replaced with a sling. To the bottom surface; the ground coordination personnel lift the new insulator to the side of the cross arm, the ground potential operator installs the spring pin on the cross arm side to fix the new insulator and the cross arm, and the ground potential operator installs the wire side spring pin to fix the new insulator and the wire; E、拆除工具:地电位作业人员依次拆除所有工具,采用吊绳放至地面,然后携带吊绳下杆,作业完成。 E. Removal tools: ground potential operators remove all tools in turn, put them on the ground with a sling, and then carry the sling down the pole, and the work is completed.
CN201210091265.8A 2012-03-31 2012-03-31 Charged for replacement 220kV circuit multiloop double bundle conductor insulator tool and method Active CN102623927B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210091265.8A CN102623927B (en) 2012-03-31 2012-03-31 Charged for replacement 220kV circuit multiloop double bundle conductor insulator tool and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210091265.8A CN102623927B (en) 2012-03-31 2012-03-31 Charged for replacement 220kV circuit multiloop double bundle conductor insulator tool and method

Publications (2)

Publication Number Publication Date
CN102623927A CN102623927A (en) 2012-08-01
CN102623927B true CN102623927B (en) 2015-09-16

Family

ID=46563672

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210091265.8A Active CN102623927B (en) 2012-03-31 2012-03-31 Charged for replacement 220kV circuit multiloop double bundle conductor insulator tool and method

Country Status (1)

Country Link
CN (1) CN102623927B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103219671A (en) * 2013-04-18 2013-07-24 国家电网公司 Operating method for replacing 220 kV U210B/170 type strain insulator string in live mode
CN104167687B (en) * 2014-07-18 2017-01-11 国网河南省电力公司漯河供电公司 Tool for live-line replacement of suspension insulator and using working method thereof
CN108899805B (en) * 2018-09-26 2024-07-05 广东电网有限责任公司 A multifunctional fixture for replacing large-diameter glass insulators on power transmission lines
CN110829279B (en) * 2019-12-16 2024-07-30 国网辽宁省电力有限公司鞍山供电公司 Insulating hanger for live connection and telescopic clamp and operation method
CN114069471B (en) * 2021-11-18 2024-03-08 国网福建省电力有限公司漳州供电公司 A modular insulating short pole and its use method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200994046Y (en) * 2006-12-15 2007-12-19 湖北省电力公司咸宁供电公司 Double split lead live-line indirect lifting device
CN201044342Y (en) * 2007-06-05 2008-04-02 中国南方电网有限责任公司超高压输电公司南宁局 Turret head wire hoisting device
CN201518396U (en) * 2009-06-16 2010-06-30 福建省福州电业局 220kV line conductor live replacement tension insulator string tool
CN202121254U (en) * 2011-05-24 2012-01-18 福建省电力有限公司漳州电业局 Cross arm lateral side clamp of double-fission double-suspension insulator string for erecting tower
CN202602171U (en) * 2012-03-31 2012-12-12 湖南省电力公司株洲电业局 A tool for power-on replacing multi-loop double split conductor insulator of 220kV line

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4073086B2 (en) * 1998-08-10 2008-04-09 中部電力株式会社 Insulator replacement device for double tension insulators

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200994046Y (en) * 2006-12-15 2007-12-19 湖北省电力公司咸宁供电公司 Double split lead live-line indirect lifting device
CN201044342Y (en) * 2007-06-05 2008-04-02 中国南方电网有限责任公司超高压输电公司南宁局 Turret head wire hoisting device
CN201518396U (en) * 2009-06-16 2010-06-30 福建省福州电业局 220kV line conductor live replacement tension insulator string tool
CN202121254U (en) * 2011-05-24 2012-01-18 福建省电力有限公司漳州电业局 Cross arm lateral side clamp of double-fission double-suspension insulator string for erecting tower
CN202602171U (en) * 2012-03-31 2012-12-12 湖南省电力公司株洲电业局 A tool for power-on replacing multi-loop double split conductor insulator of 220kV line

Also Published As

Publication number Publication date
CN102623927A (en) 2012-08-01

Similar Documents

Publication Publication Date Title
WO2012088987A1 (en) Maintenance tool for insulator of direct current transmission line
CN102623927B (en) Charged for replacement 220kV circuit multiloop double bundle conductor insulator tool and method
CN104505766B (en) The instrument and method of a kind of charged for replacement transformer station 500kV strain insulator strings
CN103606854A (en) Operating method for replacing tension insulator on super and ultra-high voltage direct current transmission line in electrified mode
CN102231492A (en) Multifunctional suspension insulator string cross arm side hardware fitting replacement fixture
WO2016023141A1 (en) Process for live replacement of tension hard-tube bus-bar jumper insulator of +/- 800kv ultra-high-voltage dc transmission line
CN203932813U (en) Power equipment maintaining cable insulation support device
WO2012088986A1 (en) Maintenance tool used for direct current transmission line
CN108847612A (en) The specific purpose tool of charged for replacement 35kV strain insulator string
CN202602171U (en) A tool for power-on replacing multi-loop double split conductor insulator of 220kV line
CN101546894B (en) Method for replacing 220KV steel pipe tower composite insulator electrifiedly
CN106450835A (en) Shoe manufacturer high voltage wire landing device
CN204391613U (en) A kind of wire support device of auxiliary replacement porcelain pole arm
CN102255261B (en) Shifting device for two-circuit hot-line work of transmission line
CN106033872B (en) Equipotential changes the instrument of the double soft bus strain insulators of simply connected
CN204424804U (en) Equipotential changes the instrument of the two soft bus strain insulator of simply connected
CN105162028A (en) Method for replacing linear insulator of 220kV steel pipe tower in live working state
CN203289006U (en) Insulation adjustable yoke plate
CN102664377A (en) Double-cross arm assembler for single lever and double-cross arm mounting method
CN201440584U (en) The device for replacing the insulator and accessories of the tension tower of the transmission line by the ground potential
CN105449612A (en) A conductive wire insulation support plate apparatus
CN104852324A (en) Lead support device assisting in replacing porcelain cross arm
CN203690799U (en) Device for replacing suspension angle tower insulator string in live state
CN205882560U (en) Special circulation cord rack device of distribution live working earth potential
CN204144800U (en) The special cross-arm card of a kind of ZML type tower

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20121018

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121018

Address after: 412008 No. 586, Wenhua Road, lotus pond area, Hunan, Zhuzhou

Applicant after: Zhuzhou Power Bureau Hunan Electric Power Company

Applicant after: State Grid Corporation of China

Address before: 412008 No. 586, Wenhua Road, lotus pond area, Hunan, Zhuzhou

Applicant before: Zhuzhou Power Bureau Hunan Electric Power Company

C14 Grant of patent or utility model
GR01 Patent grant