CN105002928A CN201510485168.0A CN201510485168A CN105002928A CN 105002928 A CN105002928 A CN 105002928A CN 201510485168 A CN201510485168 A CN 201510485168A CN 105002928 A CN105002928 A CN 105002928A
Authority
CN
China
Prior art keywords
rubble
wall
cement mortar
soil
stone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510485168.0A
Other languages
Chinese (zh)
Other versions
CN105002928B (en
Inventor
马广生
于科
高存金
汪黄东
解小东
聂红恩
葛振刚
张爱军
辛建龙
谢永辉
孔如意
汪三友
胡帆
张爱中
李应心
李超
李蕾
刘斌
庞茜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong China Eighth Engineering Division Investment and Construction Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201510485168.0A priority Critical patent/CN105002928B/en
Publication of CN105002928A publication Critical patent/CN105002928A/en
Application granted granted Critical
Publication of CN105002928B publication Critical patent/CN105002928B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The invention discloses a gravity type point-adhered rubble stone plant caulking ecological retaining wall and a construction method thereof. The retaining wall comprises compaction pure soil, a concrete cushion and a rubble stone base layer, wherein a trapezoidal wall body is arranged above the rubble stone base layer; the wall body is composed of multiple rubble stone layers and a concrete coping at the upper part; each rubble stone layer is formed by laying multiple blocks of rubble stone through cement mortar; a space between cracks of outer walls of the rubble stone layers on an air face is filled with point-adhered rubble stone or residual soil slurry; cement mortar bricking is carried out between the point-adhered rubble stone and rubble stone; vegetation is uniformly transplanted on the outer wall of cracks of residual soil slurry at intervals; a drainage ditch is formed in the upper end face of the rubble stone base layer; a drainage ditch retaining wall is arranged on the outer side of the drainage ditch. The gravity type point-adhered rubble stone plant caulking ecological retaining wall disclosed by the invention has the advantages as follows: (1), cement dosage is less; (2), the engineering cost is low; (3), plants grow quickly, are attractive and durable, and can absorb heat greatly, reduce the heat island effect, adsorb dust, retain soil and allow water to permeate through; (4), the whole permeability coefficient is high, plenty of moisture can permeate through the wall body while plant roots retain soil; (5), drainage holes are not required to be reserved; (6), the stability is good.

Description

A kind of gravity point adhesive hair stone ecological retaining wall of plant filleting and construction method thereof
Technical field
The present invention relates to a kind of Ecological Wall and construction technology field thereof, particularly relate to the ecological retaining wall of a kind of gravity point adhesive hair stone plant filleting and construction method thereof.
Background technology
Traditional gravity rubble stone retaining wall, divides again masonry of cement mortar and laid dry two kinds, or is referred to as " gravity masonry of cement mortar rubble stone retaining wall " and " gravity dry rubble retaining wall ".The surface of gravity masonry of cement mortar rubble stone retaining wall, divides again pointing with cement mortar and exempts from jointing two kinds, or claims " jointing retaining wall exempted from by gravity masonry of cement mortar, jointing rubble stone retaining wall, gravity dry rubble ".
The shortcoming of gravity masonry of cement mortar, jointing rubble stone retaining wall: 1. use cement in a large number; 2. pointing with cement mortar unsightly, not durable, do not absorb sunlight and heat; Soil in the adjacent part retaining wall of 3. institute's indwelling discharge opening also runs off gradually, once discharge opening blocking, excessive also can the causing of soil pressure is caved in, and there is potential safety hazard; 4. cost is higher.
The shortcoming of gravity dry rubble retaining wall has: 1. monolithic stability difference, and body of wall gap is large; 2. because rubble is irregular, need with less flag liner, operative's difficulty, work efficiency is low; 3. soil is easily run off by body of wall gap; 4. surface unsightly, does not absorb sunlight and heat.
The rubble Problems existing that these two kinds of retaining walls above-mentioned are exposed: one be all with surrounding trees and vegetation extremely inharmonious, be unsightly to the visual experience of people; Two is heats that surface can not absorb the sun, accelerates urban heat land effect; Three is to improve air quality; Four is poor stabilities, there is potential safety hazard; Five is that cost is higher.
Summary of the invention
In order to solve the problem, the invention provides the ecological retaining wall of a kind of gravity point adhesive hair stone plant filleting and construction method thereof.
In order to solve above-mentioned purpose, the invention provides the ecological retaining wall of a kind of gravity point adhesive hair stone plant filleting, wherein, the concrete cushion comprise compacting element soil, being positioned at compacting element soil top and the rubble-mound foundation layer be positioned at above concrete cushion, be provided with trapezoidal body of wall above the layer of described rubble-mound foundation; The back side of described body of wall and be trapezium structure to the water surface; Described body of wall is beared down on one by the concrete of below multiple rubble layer parallel to each other and top and forms; Described rubble layer by polylith all around compact arranged rubble formed by masonry of cement mortar, between the outer wall gap of rubble layer described in back side fill have an adhesive hair stone or remain soil paste, some adhesive hair stone and rubble between by masonry of cement mortar; The described outer wall remaining soil paste filleting keeps at a certain distance away evenly transplant and have vegetation; On the layer upper surface, described rubble-mound foundation of described body of wall back side lower end, be provided with gutter, the arranged outside in described gutter has the gutter barricade be positioned on layer upper surface, described rubble-mound foundation.
Wherein, the ratio remaining the gap quantity that soil paste and described adhesive hair stone are filled described in is 4:1; The described soil paste that remains is that residual soil and water mix.
Wherein, described cement mortar is M7.5 cement mortar.
Wherein, described rubble-mound foundation layer is cement mortar and free stone masonry, and strength grade is C20, and width is 2 meters-3.4 meters, and thickness is 0.4 meter-0.5 meter; The described concrete strength grade that bears down on one is C20, thickness 0.1 meter, width 0.6 meter.
Wherein, the strength grade >=MU30 of described rubble.
Wherein, the slanted angle of described body of wall back side is 55 °-75 °.
Wherein, described vegetation is thin snow 10000 years grass and/or stonecrop, is seedling nursery, and seedling hat diameter is 40-100 millimeter.
Wherein, described gutter is cast-in-place grooved concrete structure.
Wherein, sectional area >=0.15 square metre, gutter, drainage grade >=1.5%.
Wherein, the ecological retaining wall height overall 1.5 meters ~ 5 meters of gravity point adhesive hair stone plant filleting.
In order to solve the problem, present invention also offers the construction method of gravity point adhesive hair stone plant filleting Ecological Wall, wherein, comprising the following steps:
1st step: soil excavation: usage mining machinery carries out soil excavation according to geological condition and wall height and obtains foundation trench, element soil is filled in compacting, obtains tamping plain soil structure;
2nd step: the compacting element soil that the leveling first step obtains, builds concrete cushion above the plain soil of compacting;
3rd step: build rubble-mound foundation layer on concrete cushion by laying bricks or stones, selects large and smooth rubble to use masonry of cement mortar to form;
4th step: on the rubble-mound foundation layer that the 3rd step obtains, releases sideline bottom body of wall, successively builds rubble layer, and the center line according to basis releases wall body inside and outside sideline, and hanging wire divides skin sleeping block, and every skin is to about 300mm; First floor adopts the slurry that completely lays cement, and selects large and plain rubble, first builds corner, junction, then build by laying bricks or stones to centre; Collocation size rubble, large face keeps flat down, expose flush face, angle inwardly, between middle rubble, cement mortar is first clogged in larger space, after use the embedding reality of rubble, back side surface rubble gap use thinner stone level up and use cement mortar point glue, thinner stone sticks into as an adhesive hair stone via cement mortar point; And successively up build by laying bricks or stones successively, build back side by laying bricks or stones and build by laying bricks or stones to water surface stepped cross; In building process, every 0.7m 2select the rubble of a block length bar to build as drawknot barnacle, keep drawknot stone to be staggeredly located, and in same intracutaneous distance≤2m; Often block 3 layers is once levelling, and point fills up cement mortar in sticky gap;
5th step: when building to top, uses cement mortar comprehensively levelling and bears down on one with smooth concrete, obtaining body of wall;
6th step: have gutter in the rubble-mound foundation layer arranged outside of back side, gutter is cast-in-place grooved concrete structure, and plaster by 1:2.5 cement mortar inside gutter and find out the gradient;
7th step: the building wall strength of cement mortar after the 4th step to be detected, after pressure testing reaches 70% of design strength, carries out back backfill; The rubble lamellar spacing on back side surface is not that residual soil and the mixed soil paste that remains of water of the position humidity of an adhesive hair stone masonry of cement mortar fills up;
8th step: thin snow 10000 years grass and stonecrop spacing 200 millimeters are planted in remaining in soil paste seam in quincunx, water with sprayer, protect tide one week, if poor growth, can spray and water nutrient solution, vegetation just can cover 80% of whole surface of wall in 1 year.
Wherein, in described 4th step, when body of wall thick≤40cm time, select the length of the rubble as drawknot stone to equal wall thickness; Or, as the thick > 40cm of body of wall, select the inside and outside overlap joint of two blocks of rubbles, lap length >=15cm, and wherein one block of rubble length >=wall thickness 2/3.
Wherein, the bearing capacity of foundation soil of this Ecological Wall application wants >=0.178 MPa.
Wherein, rubble is deformed building stones, is in the nature that exploitation is later.It is rock gained random-shaped stones after explosion, is in irregular shapely called random rubble, have two almost parallel be called flat rubble.
Wherein, putting adhesive hair stone is select some thinner rubble flags to use as an adhesive hair stone.Point is sticky is that use cement mortar point glues the some adhesive hair stone realizing obtaining.
The beneficial effect that the present invention brings is: the ecological retaining wall of the gravity point adhesive hair stone plant filleting that the present invention obtains, has the following advantages: 1. cement consumption is few; 2. engineering cost is low; 3. plant growth is rapid, surface aesthetic, and durable, plant grows throughout the year, and a large amount of heat absorbing sunlight, reduces urban heat land effect, and absorption dust, purifies air, and root system of plant both can soil conservation, again can be permeable.4. overall transmission coefficient is large, and while root system of plant soil conservation, large quantity of moisture can pass through body of wall; 5. without the need to indwelling spilled water hole; 6. good stability.
figure of description
Fig. 1 is the Facad structure schematic diagram of the embodiment of the present invention 1;
Fig. 2 is the side schematic view of the embodiment of the present invention 1;
In view, wherein, Reference numeral is: 1, compacting element soil; 2, concrete cushion; 3, rubble; 4, soil paste is remained; 5, adhesive hair stone is put; 6, vegetation; 7, concrete bears down on one; 8, gutter; 9, gutter barricade; 10, rubble-mound foundation layer.
Detailed description of the invention
The invention provides the ecological retaining wall of a kind of gravity point adhesive hair stone plant filleting, wherein, the concrete cushion comprise compacting element soil, being positioned at compacting element soil top and the rubble-mound foundation layer be positioned at above concrete cushion, be provided with trapezoidal body of wall above the layer of rubble-mound foundation; The back side of body of wall and be trapezium structure to the water surface; Body of wall is beared down on one by the concrete of below multiple rubble layer parallel to each other and top and forms; Rubble layer by polylith all around compact arranged rubble formed by masonry of cement mortar, between the outer wall gap of back side rubble layer fill have an adhesive hair stone or remain soil paste, some adhesive hair stone and rubble between by masonry of cement mortar; The outer wall remaining soil paste filleting keeps at a certain distance away evenly transplant and have vegetation; On the layer upper surface, rubble-mound foundation of body of wall back side lower end, be provided with gutter, the arranged outside in gutter has the gutter barricade be positioned on layer upper surface, rubble-mound foundation.
Wherein, the ratio remaining the gap quantity that soil paste is filled with some adhesive hair stone is 4:1; Remaining soil paste is that residual soil and water mix.
Wherein, cement mortar is M7.5 cement mortar.
Wherein, rubble-mound foundation layer is cement mortar and free stone masonry, and strength grade is C20, and width is 2 meters-3.4 meters, and thickness is 0.4 meter-0.5 meter; The concrete strength grade that bears down on one is C20, thickness 0.1 meter, width 0.6 meter.
Wherein, the strength grade >=MU30 of rubble.
Wherein, the slanted angle of body of wall back side is 55 °-75 °.
Wherein, vegetation is thin snow 10000 years grass and/or stonecrop, is seedling nursery, and seedling hat diameter is 40-100 millimeter.
Wherein, gutter is cast-in-place grooved concrete structure.
In order to achieve the above object, present invention also offers the construction method of the ecological retaining wall of gravity point adhesive hair stone plant filleting, wherein, comprise following technique:
1st step: soil excavation: usage mining machinery carries out soil excavation according to geological condition and wall height and obtains foundation trench, element soil is filled in compacting, obtains tamping plain soil structure;
2nd step: the compacting element soil that the leveling first step obtains, builds concrete cushion above the plain soil of compacting;
3rd step: build rubble-mound foundation layer on concrete cushion by laying bricks or stones, selects large and smooth rubble to use masonry of cement mortar to form;
4th step: on the rubble-mound foundation layer that the 3rd step obtains, releases sideline bottom body of wall, successively builds rubble layer, and the center line according to basis releases wall body inside and outside sideline, and hanging wire divides skin sleeping block, and every skin is to about 300mm; First floor adopts the slurry that completely lays cement, and selects large and plain rubble, first builds corner, junction, then build by laying bricks or stones to centre; Collocation size rubble, large face keeps flat down, expose flush face, angle inwardly, between middle rubble, cement mortar is first clogged in larger space, after use the embedding reality of rubble, back side surface rubble gap use thinner stone level up and use cement mortar point glue, thinner stone sticks into as an adhesive hair stone via cement mortar point; And successively up build by laying bricks or stones successively, build back side by laying bricks or stones and build by laying bricks or stones to water surface stepped cross; In building process, every 0.7m 2select the rubble of a block length bar to build as drawknot barnacle, keep drawknot stone to be staggeredly located, and in same intracutaneous distance≤2m; Often block 3 layers is once levelling, and point fills up cement mortar in sticky gap;
5th step: when building to top, uses cement mortar comprehensively levelling and bears down on one with smooth concrete, obtaining body of wall;
6th step: have gutter in the rubble-mound foundation layer arranged outside of back side, gutter is cast-in-place grooved concrete structure, and plaster by 1:2.5 cement mortar inside gutter and find out the gradient;
7th step: the building wall strength of cement mortar after the 4th step to be detected, after pressure testing reaches 70% of design strength, carries out back backfill; The rubble lamellar spacing on back side surface is not that residual soil and the mixed soil paste that remains of water of the position humidity of an adhesive hair stone masonry of cement mortar fills up;
8th step: thin snow 10000 years grass and stonecrop spacing 200 millimeters are planted in remaining in soil paste seam in quincunx, water with sprayer, protect tide one week, if poor growth, can spray and water nutrient solution, vegetation just can cover 80% of whole surface of wall in 1 year.
Wherein, in the 4th step, when body of wall thick≤40cm time, select the length of the rubble as drawknot stone to equal wall thickness; Or, as the thick > 40cm of body of wall, select the inside and outside overlap joint of two blocks of rubbles, lap length >=15cm, and wherein one block of rubble length >=wall thickness 2/3.
Below enumerate specific embodiment to be specifically described.
Embodiment 1
As shown in Figure 1, Figure 2, the ecological retaining wall of a kind of gravity point of the present invention adhesive hair stone plant filleting, wherein, the rubble-mound foundation layer 10 comprising compacting element soil 1, be positioned at the concrete cushion 2 above compacting element soil 1 and be positioned at above concrete cushion 2, is provided with trapezoidal body of wall above rubble-mound foundation layer 10; The back side of body of wall and be the trapezium structure of inclination to the water surface; Body of wall is beared down on one by the concrete of below multiple rubble layer parallel to each other and top and 7 to form; Rubble layer by polylith all around compact arranged rubble 3 formed by masonry of cement mortar, filling between the outer wall gap of back side rubble layer has an adhesive hair stone 5 or remains soil paste 4, by masonry of cement mortar between some adhesive hair stone 5 and rubble 3; The outer wall remaining soil paste 4 filleting keeps at a certain distance away evenly transplant and have vegetation 6; On rubble-mound foundation layer 10 upper surface of body of wall back side lower end, be provided with gutter 8, the arranged outside in gutter 8 has the gutter barricade 9 be positioned on rubble-mound foundation layer 10 upper surface.
Wherein, the ratio remaining the gap quantity that soil paste 4 is filled with some adhesive hair stone 5 is 4:1; Remain soil paste 4 to mix for residual soil and water.
Wherein, cement mortar is M7.5 cement mortar.
Wherein, rubble-mound foundation layer 10 is cement mortar and free stone masonry, and strength grade is C20, and width is 2 meters, and thickness is 0.4 meter; Concrete 7 strength grades that bear down on one are C20, thickness 0.1 meter, width 0.6 meter.
Wherein, the strength grade >=MU30 of rubble 3.
Wherein, the slanted angle of body of wall back side is 55 °.
Wherein, vegetation 6 is thin snow 10000 years grass and stonecrop, is seedling nursery, and seedling hat diameter is 40 millimeters.
Wherein, gutter 8 is cast-in-place grooved concrete structure.
In order to achieve the above object, present invention also offers the construction method of the ecological retaining wall of gravity point adhesive hair stone plant filleting, wherein, comprise following technique:
1st step: soil excavation: usage mining machinery carries out soil excavation according to geological condition and wall height and obtains foundation trench, element soil is filled in compacting, obtains tamping plain soil structure;
2nd step: the compacting element soil that the leveling first step obtains, builds concrete cushion above the plain soil of compacting;
3rd step: build rubble-mound foundation layer on concrete cushion by laying bricks or stones, selects large and smooth rubble to use masonry of cement mortar to form;
4th step: on the rubble-mound foundation layer that the 3rd step obtains, releases sideline bottom body of wall, successively builds rubble layer, and the center line according to basis releases wall body inside and outside sideline, and hanging wire divides skin sleeping block, and every skin is to about 300mm; First floor adopts the slurry that completely lays cement, and selects large and plain rubble, first builds corner, junction, then build by laying bricks or stones to centre; Collocation size rubble, large face keeps flat down, expose flush face, angle inwardly, between middle rubble, cement mortar is first clogged in larger space, after use the embedding reality of rubble, back side surface rubble gap use thinner stone level up and use cement mortar point glue, thinner stone sticks into as an adhesive hair stone via cement mortar point; And successively up build by laying bricks or stones successively, build back side by laying bricks or stones and build by laying bricks or stones to water surface stepped cross; In building process, every 0.7m 2select the rubble of a block length bar to build as drawknot barnacle, keep drawknot stone to be staggeredly located, and distance is 1m in same intracutaneous; Often block 3 layers is once levelling, and point fills up cement mortar in sticky gap;
5th step: when building to top, uses cement mortar comprehensively levelling and bears down on one with smooth concrete, obtaining body of wall;
6th step: have gutter in the rubble-mound foundation layer arranged outside of back side, gutter is cast-in-place grooved concrete structure, and plaster by 1:2.5 cement mortar inside gutter and find out the gradient;
7th step: the building wall strength of cement mortar after the 4th step to be detected, after pressure testing reaches 70% of design strength, carries out back backfill; The rubble lamellar spacing on back side surface is not that residual soil and the mixed soil paste that remains of water of the position humidity of an adhesive hair stone masonry of cement mortar fills up;
8th step: thin snow 10000 years grass and stonecrop spacing 200 millimeters are planted in remaining in soil paste seam in quincunx, water with sprayer, protect tide one week, if poor growth, can spray and water nutrient solution, vegetation just can cover 80% of whole surface of wall in 1 year.
Wherein, in the 4th step, body of wall is thick is 40cm, selects the length of the rubble as drawknot stone to equal wall thickness.
Embodiment 2
The ecological retaining wall of a kind of gravity point of the present invention adhesive hair stone plant filleting, the concrete cushion wherein, comprise compacting element soil, being positioned at compacting element soil top and the rubble-mound foundation layer be positioned at above concrete cushion, be provided with trapezoidal body of wall above the layer of rubble-mound foundation; The back side of body of wall and be trapezium structure to the water surface; Body of wall is beared down on one by the concrete of below multiple rubble layer parallel to each other and top and forms; Rubble layer by polylith all around compact arranged rubble formed by masonry of cement mortar, between the outer wall gap of back side rubble layer fill have an adhesive hair stone or remain soil paste, some adhesive hair stone and rubble between by masonry of cement mortar; The outer wall remaining soil paste filleting keeps at a certain distance away evenly transplant and have vegetation; On the layer upper surface, rubble-mound foundation of body of wall back side lower end, be provided with gutter, the arranged outside in gutter has the gutter barricade be positioned on layer upper surface, rubble-mound foundation.
Wherein, the ratio remaining the gap quantity that soil paste is filled with some adhesive hair stone is 4:1; Remaining soil paste is that residual soil and water mix.
Wherein, cement mortar is M7.5 cement mortar.
Wherein, rubble-mound foundation layer is cement mortar and free stone masonry, and strength grade is C20, and width is 3.4 meters, and thickness is 0.5 meter; The concrete strength grade that bears down on one is C20, thickness 0.1 meter, width 0.6 meter.
Wherein, the strength grade >=MU30 of rubble.
Wherein, the slanted angle of body of wall back side is 75 °.
Wherein, vegetation is thin snow 10000 years grass and stonecrop, is seedling nursery, and seedling hat diameter is 100 millimeters.
Wherein, gutter is cast-in-place grooved concrete structure.
In order to achieve the above object, present invention also offers the construction method of the ecological retaining wall of gravity point adhesive hair stone plant filleting, wherein, comprise following technique:
1st step: soil excavation: usage mining machinery carries out soil excavation according to geological condition and wall height and obtains foundation trench, element soil is filled in compacting, obtains tamping plain soil structure;
2nd step: the compacting element soil that the leveling first step obtains, builds concrete cushion above the plain soil of compacting;
3rd step: build rubble-mound foundation layer on concrete cushion by laying bricks or stones, selects large and smooth rubble to use masonry of cement mortar to form;
4th step: on the rubble-mound foundation layer that the 3rd step obtains, releases sideline bottom body of wall, successively builds rubble layer, and the center line according to basis releases wall body inside and outside sideline, and hanging wire divides skin sleeping block, and every skin is to about 300mm; First floor adopts the slurry that completely lays cement, and selects large and plain rubble, first builds corner, junction, then build by laying bricks or stones to centre; Collocation size rubble, large face keeps flat down, expose flush face, angle inwardly, between middle rubble, cement mortar is first clogged in larger space, after use the embedding reality of rubble, back side surface rubble gap use thinner stone level up and use cement mortar point glue, thinner stone sticks into as an adhesive hair stone via cement mortar point; And successively up build by laying bricks or stones successively, build back side by laying bricks or stones and build by laying bricks or stones to water surface stepped cross; In building process, every 0.7m 2select the rubble of a block length bar to build as drawknot barnacle, keep drawknot stone to be staggeredly located, and in same intracutaneous distance≤2m; Often block 3 layers is once levelling, and point fills up cement mortar in sticky gap;
5th step: when building to top, uses cement mortar comprehensively levelling and bears down on one with smooth concrete, obtaining body of wall;
6th step: have gutter in the rubble-mound foundation layer arranged outside of back side, gutter is cast-in-place grooved concrete structure, and plaster by 1:2.5 cement mortar inside gutter and find out the gradient;
7th step: the building wall strength of cement mortar after the 4th step to be detected, after pressure testing reaches 70% of design strength, carries out back backfill; The rubble lamellar spacing on back side surface is not that residual soil and the mixed soil paste that remains of water of the position humidity of an adhesive hair stone masonry of cement mortar fills up;
8th step: thin snow 10000 years grass and stonecrop spacing 200 millimeters are planted in remaining in soil paste seam in quincunx, water with sprayer, protect tide one week, if poor growth, can spray and water nutrient solution, vegetation just can cover 80% of whole surface of wall in 1 year.
Wherein, in the 4th step, when body of wall thick≤40cm time, select the length of the rubble as drawknot stone to equal wall thickness; Or, as the thick > 40cm of body of wall, select the inside and outside overlap joint of two blocks of rubbles, lap length >=15cm, and wherein one block of rubble length >=wall thickness 2/3.
Embodiment 3
The ecological retaining wall of a kind of gravity point of the present invention adhesive hair stone plant filleting, the concrete cushion wherein, comprise compacting element soil, being positioned at compacting element soil top and the rubble-mound foundation layer be positioned at above concrete cushion, be provided with trapezoidal body of wall above the layer of rubble-mound foundation; The back side of body of wall and be trapezium structure to the water surface; Body of wall is beared down on one by the concrete of below multiple rubble layer parallel to each other and top and forms; Rubble layer by polylith all around compact arranged rubble formed by masonry of cement mortar, between the outer wall gap of back side rubble layer fill have an adhesive hair stone or remain soil paste, some adhesive hair stone and rubble between by masonry of cement mortar; The outer wall remaining soil paste filleting keeps at a certain distance away evenly transplant and have vegetation; On the layer upper surface, rubble-mound foundation of body of wall back side lower end, be provided with gutter, the arranged outside in gutter has the gutter barricade be positioned on layer upper surface, rubble-mound foundation.
Wherein, the ratio remaining the gap quantity that soil paste is filled with some adhesive hair stone is 4:1; Remaining soil paste is that residual soil and water mix.
Wherein, cement mortar is M7.5 cement mortar.
Wherein, rubble-mound foundation layer is cement mortar and free stone masonry, and strength grade is C20, and width is 2.5 meters, and thickness is 0.45 meter; The concrete strength grade that bears down on one is C20, thickness 0.1 meter, width 0.6 meter.
Wherein, the strength grade >=MU30 of rubble.
Wherein, the slanted angle of body of wall back side is 60 °.
Wherein, vegetation is thin snow 10000 years grass and stonecrop, is seedling nursery, and seedling hat diameter is 60 millimeters.
Wherein, gutter is cast-in-place grooved concrete structure.
In order to achieve the above object, present invention also offers the construction method of the ecological retaining wall of gravity point adhesive hair stone plant filleting, wherein, comprise following technique:
1st step: soil excavation: usage mining machinery carries out soil excavation according to geological condition and wall height and obtains foundation trench, element soil is filled in compacting, obtains tamping plain soil structure;
2nd step: the compacting element soil that the leveling first step obtains, builds concrete cushion above the plain soil of compacting;
3rd step: build rubble-mound foundation layer on concrete cushion by laying bricks or stones, selects large and smooth rubble to use masonry of cement mortar to form;
4th step: on the rubble-mound foundation layer that the 3rd step obtains, releases sideline bottom body of wall, successively builds rubble layer, and the center line according to basis releases wall body inside and outside sideline, and hanging wire divides skin sleeping block, and every skin is to about 300mm; First floor adopts the slurry that completely lays cement, and selects large and plain rubble, first builds corner, junction, then build by laying bricks or stones to centre; Collocation size rubble, large face keeps flat down, expose flush face, angle inwardly, between middle rubble, cement mortar is first clogged in larger space, after use the embedding reality of rubble, back side surface rubble gap use thinner stone level up and use cement mortar point glue, thinner stone sticks into as an adhesive hair stone via cement mortar point; And successively up build by laying bricks or stones successively, build back side by laying bricks or stones and build by laying bricks or stones to water surface stepped cross; In building process, every 0.7m 2select the rubble of a block length bar to build as drawknot barnacle, keep drawknot stone to be staggeredly located, and in same intracutaneous distance≤2m; Often block 3 layers is once levelling, and point fills up cement mortar in sticky gap;
5th step: when building to top, uses cement mortar comprehensively levelling and bears down on one with smooth concrete, obtaining body of wall;
6th step: have gutter in the rubble-mound foundation layer arranged outside of back side, gutter is cast-in-place grooved concrete structure, and plaster by 1:2.5 cement mortar inside gutter and find out the gradient;
7th step: the building wall strength of cement mortar after the 4th step to be detected, after pressure testing reaches 70% of design strength, carries out back backfill; The rubble lamellar spacing on back side surface is not that residual soil and the mixed soil paste that remains of water of the position humidity of an adhesive hair stone masonry of cement mortar fills up;
8th step: thin snow 10000 years grass and stonecrop spacing 200 millimeters are planted in remaining in soil paste seam in quincunx, water with sprayer, protect tide one week, if poor growth, can spray and water nutrient solution, vegetation just can cover 80% of whole surface of wall in 1 year.
Wherein, in the 4th step, when body of wall thick≤40cm time, select the length of the rubble as drawknot stone to equal wall thickness; Or, as the thick > 40cm of body of wall, select the inside and outside overlap joint of two blocks of rubbles, lap length >=15cm, and wherein one block of rubble length >=wall thickness 2/3.
These are only preferred embodiment of the present invention, not in order to limit the present invention, within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (10)

1. the ecological retaining wall of gravity point adhesive hair stone plant filleting, it is characterized in that, the concrete cushion comprise compacting element soil, being positioned at compacting element soil top and the rubble-mound foundation layer be positioned at above concrete cushion, be provided with trapezoidal body of wall above the layer of described rubble-mound foundation; The back side of described body of wall and be trapezium structure to the water surface; Described body of wall is beared down on one by the concrete of below multiple rubble layer parallel to each other and top and forms; Described rubble layer by polylith all around compact arranged rubble formed by masonry of cement mortar, between the outer wall gap of rubble layer described in back side fill have an adhesive hair stone or remain soil paste, some adhesive hair stone and rubble between by masonry of cement mortar; The described outer wall remaining soil paste filleting keeps at a certain distance away evenly transplant and have vegetation; On the layer upper surface, described rubble-mound foundation of described body of wall back side lower end, be provided with gutter, the arranged outside in described gutter has the gutter barricade be positioned on layer upper surface, described rubble-mound foundation.
2. the ecological retaining wall of gravity point adhesive hair stone plant filleting according to claim 1, is characterized in that, described in remain the gap quantity that soil paste and described adhesive hair stone are filled ratio be 4:1; The described soil paste that remains is that residual soil and water mix.
3. the ecological retaining wall of gravity point adhesive hair stone plant filleting according to claim 1 and 2, it is characterized in that, described cement mortar is M7.5 cement mortar.
4. the ecological retaining wall of the gravity point adhesive hair stone plant filleting according to any one of claims 1 to 3, it is characterized in that, described rubble-mound foundation layer is cement mortar and free stone masonry, and strength grade is C20, and width is 2 meters-3.4 meters, and thickness is 0.4 meter-0.5 meter; The described concrete strength grade that bears down on one is C20, thickness 0.1 meter, width 0.6 meter.
5. the ecological retaining wall of the gravity point adhesive hair stone plant filleting according to any one of Claims 1-4, is characterized in that, the strength grade >=MU30 of described rubble.
6. the ecological retaining wall of the gravity point adhesive hair stone plant filleting according to any one of claim 1 to 5, it is characterized in that, the slanted angle of described body of wall back side is 55 °-75 °.
7. the ecological retaining wall of the gravity point adhesive hair stone plant filleting according to any one of claim 1 to 6, is characterized in that, described vegetation is thin snow 10000 years grass and/or stonecrop, is seedling nursery, and seedling hat diameter is 40-100 millimeter.
8. the ecological retaining wall of the gravity point adhesive hair stone plant filleting according to any one of claim 1 to 7, it is characterized in that, described gutter is cast-in-place grooved concrete structure.
9. a construction method for the ecological retaining wall of the gravity point adhesive hair stone plant filleting according to any one of claim 1-8, is characterized in that, comprise following technique:
1st step: soil excavation: usage mining machinery carries out soil excavation according to geological condition and wall height and obtains foundation trench, element soil is filled in compacting, obtains tamping plain soil structure;
2nd step: the compacting element soil that the leveling first step obtains, builds concrete cushion above the plain soil of compacting;
3rd step: build rubble-mound foundation layer on concrete cushion by laying bricks or stones, selects large and smooth rubble to use masonry of cement mortar to form;
4th step: on the rubble-mound foundation layer that the 3rd step obtains, releases sideline bottom body of wall, successively builds rubble layer, and the center line according to basis releases wall body inside and outside sideline, and hanging wire divides skin sleeping block, and every skin is to about 300mm; First floor adopts the slurry that completely lays cement, and selects large and plain rubble, first builds corner, junction, then build by laying bricks or stones to centre; Collocation size rubble, large face keeps flat down, expose flush face, angle inwardly, between middle rubble, cement mortar is first clogged in larger space, after use the embedding reality of rubble, back side surface rubble gap use thinner stone level up and use cement mortar point glue, thinner stone sticks into as an adhesive hair stone via cement mortar point; And successively up build by laying bricks or stones successively, build back side by laying bricks or stones and build by laying bricks or stones to water surface stepped cross; In building process, every 0.7m 2select the rubble of a block length bar to build as drawknot barnacle, keep drawknot stone to be staggeredly located, and in same intracutaneous distance≤2m; Often block 3 layers is once levelling, and point fills up cement mortar in sticky gap;
5th step: when building to top, uses cement mortar comprehensively levelling and bears down on one with smooth concrete, obtaining body of wall;
6th step: have gutter in the rubble-mound foundation layer arranged outside of back side, gutter is cast-in-place grooved concrete structure, and plaster by 1:2.5 cement mortar inside gutter and find out the gradient;
7th step: the building wall strength of cement mortar after the 4th step to be detected, after pressure testing reaches 70% of design strength, carries out back backfill; The rubble lamellar spacing on back side surface is not that residual soil and the mixed soil paste that remains of water of the position humidity of an adhesive hair stone masonry of cement mortar fills up;
8th step: thin snow 10000 years grass and stonecrop spacing 200 millimeters are planted in remaining in soil paste seam in quincunx, water with sprayer, protect tide one week, if poor growth, can spray and water nutrient solution, vegetation just can cover 80% of whole surface of wall in 1 year.
10. the construction method of the ecological retaining wall of gravity point adhesive hair stone plant filleting according to claim 9, is characterized in that, in described 4th step, when body of wall thick≤40cm time, select the length of the rubble as drawknot stone to equal wall thickness; Or, as the thick > 40cm of body of wall, select the inside and outside overlap joint of two blocks of rubbles, lap length >=15cm, and wherein one block of rubble length >=wall thickness 2/3.
CN201510485168.0A 2015-08-10 2015-08-10 A kind of gravity type point adhesive hair stone plant filleting ecology retaining wall and construction method thereof Active CN105002928B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510485168.0A CN105002928B (en) 2015-08-10 2015-08-10 A kind of gravity type point adhesive hair stone plant filleting ecology retaining wall and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510485168.0A CN105002928B (en) 2015-08-10 2015-08-10 A kind of gravity type point adhesive hair stone plant filleting ecology retaining wall and construction method thereof

Publications (2)

Publication Number Publication Date
CN105002928A true CN105002928A (en) 2015-10-28
CN105002928B CN105002928B (en) 2016-10-26

Family

ID=54375772

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510485168.0A Active CN105002928B (en) 2015-08-10 2015-08-10 A kind of gravity type point adhesive hair stone plant filleting ecology retaining wall and construction method thereof

Country Status (1)

Country Link
CN (1) CN105002928B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113250241A (en) * 2021-06-11 2021-08-13 厦门理工学院 Method and device for intelligently building retaining wall

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05230845A (en) * 1992-02-25 1993-09-07 Toyo Giken Kk L-shaped block retaining wall structure and construction method thereof
CN102061707A (en) * 2009-11-11 2011-05-18 贵阳铝镁设计研究院 Construction method of masoning drainage ditch at toe of retaining wall adopting spread foundation
CN204343246U (en) * 2014-12-11 2015-05-20 唐永华 A kind of split type retaining wall for hydraulic engineering

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05230845A (en) * 1992-02-25 1993-09-07 Toyo Giken Kk L-shaped block retaining wall structure and construction method thereof
CN102061707A (en) * 2009-11-11 2011-05-18 贵阳铝镁设计研究院 Construction method of masoning drainage ditch at toe of retaining wall adopting spread foundation
CN204343246U (en) * 2014-12-11 2015-05-20 唐永华 A kind of split type retaining wall for hydraulic engineering

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
周青生等: "《建筑施工现场质量控制手册》", 31 July 2007 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113250241A (en) * 2021-06-11 2021-08-13 厦门理工学院 Method and device for intelligently building retaining wall

Also Published As

Publication number Publication date
CN105002928B (en) 2016-10-26

Similar Documents

Publication Publication Date Title
CN101451355B (en) Water retention method of back fill course
CN106368238B (en) A kind of honeycomb geotechnical grid retaining wall and its construction method with ecological recovery function
CN102444134A (en) Slope protecting method based on slope with soil layer as upper part and rock layer as lower part
US10233595B2 (en) Hard pavement construction method for natural groundwater recharge
CN106193066A (en) A kind of Loess landslide administering method based on restoration of the ecosystem
CN201826318U (en) Simple ecological slope protecting structure for loose soil of road
CN207295737U (en) Suitable for the ecological revetment system in plateau mountainous region
CN106759399A (en) A kind of side slope vegetation ecological recovery system and method
CN110249813B (en) Method for greening high and steep rocky slope in mining pit
CN101403209B (en) Fast water-permeable brick for stopping pad and laying method
CN103485321A (en) Karst landform stony desertification treatment method
CN110839368A (en) Plant growth bag device for slope ecological restoration, protective structure and construction method
CN102425175A (en) Reinforcement protective structure of large spoil disposal area in mountainous area
CN206157760U (en) Honeycomb geotechnique check room retaining wall with ecological recovery function
CN204875846U (en) Gravity type point adhesive hair stone plant filleting ecological retaining wall
CN105002928B (en) A kind of gravity type point adhesive hair stone plant filleting ecology retaining wall and construction method thereof
CN207553123U (en) A kind of high-speed railway rock matter cut slope green safeguard structure
CN216475115U (en) Recyclable slope lamination green protection grid
CN109339072A (en) A kind of highway engineering highly weathered rock protecting slope ecology method
CN104695454A (en) Steep slope reinforcement and protection device and paving method thereof
CN111501667B (en) Ecological slope protection structure for hydraulic engineering
CN111663624B (en) Urban road green belt sponge water storage device and water storage method thereof
CN211713983U (en) Ecological slope protection for water and soil conservation
CN202954368U (en) Side slope ecological concrete protective structure
CN208844608U (en) A kind of assembled ecological anchor rod retaining wall structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201228

Address after: No.3099 national highway bridge section no.3099, Tianqiao District, Jinan City, Shandong Province

Patentee after: Shandong China Construction Eighth bureau investment and Construction Co.,Ltd.

Address before: No. 89, Gongye South Road, Lixia District, Jinan City, Shandong Province

Patentee before: THE FIRST CONSTRUCTION Co.,Ltd. OF CHINA CONSTRUCTION EIGHTH ENGINEERING BUREAU

TR01 Transfer of patent right