CN109339072A - A kind of highway engineering highly weathered rock protecting slope ecology method - Google Patents
A kind of highway engineering highly weathered rock protecting slope ecology method Download PDFInfo
- Publication number
- CN109339072A CN109339072A CN201811338772.0A CN201811338772A CN109339072A CN 109339072 A CN109339072 A CN 109339072A CN 201811338772 A CN201811338772 A CN 201811338772A CN 109339072 A CN109339072 A CN 109339072A
- Authority
- CN
- China
- Prior art keywords
- slope
- side slope
- weathered rock
- stone
- wire netting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
- E02D17/202—Securing of slopes or inclines with flexible securing means
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/23—Dune restoration or creation; Cliff stabilisation
Abstract
The invention discloses a kind of highway engineering highly weathered rock protecting slope ecology methods, it is included in after the cleaning of highly weathered rock side slope brush slope, it slots to highly weathered rock side slope, constitute the trough with mesh shape, then galvanized wire mesh is laid on entire side slope face, pine paving is fixed in slot, then it is grouted in slot using block stone, wire netting is fully pressed against under mortar flag stone, finally to carrying out Spray turfing in grid, after a period of time, various vegetation grow in sash, afforestation effect is all good, protection effect is good, present invention process is simple, the lower afforestation effect of construction cost is good, it should be widely promoted.
Description
Technical field
The invention belongs to highway engineering highly weathered rock side slope protection fields, and it is strong to be specifically related to a kind of highway engineering
Effloresce Rock Slope ecological protection method.
Background technique
Currently, the ground such as Guizhou highway is mostly by mountain area, side slope is more, especially highly weathered rock side slope in rainwater and
It can successively be peeled off under slacking, landslide can even be generated by accumulating over a long period.Some framed framework protection of traditional means of defence,
Then native greening is returned, the native effect of this method time is poor, and afforestation effect is poor, and there are also carry out using the plant cover concrete occurred in recent years
Protection and greening, this method effect is preferable, but cost is higher, deficiency in economic performance.So we propose that one kind is new herein
Means of defence, not only can guarantee that side slope did not generated peeling and landslide in its natural state, but also have relatively good afforestation effect, it is this
Method meets the afforestation ecological theory and Environmental Protection Idea of current expressway construction very much, and cost is lower, to high speed
Highway construction side can also create preferable economic benefit.
Summary of the invention
The technical problems to be solved by the present invention are: providing simple process, the good highway of the lower afforestation effect of construction cost
Engineering highly weathered rock protecting slope ecology method.
In order to solve the above-mentioned technical problem, inventor obtains technical solution of the present invention by practice and summary, the present invention
Disclose a kind of highway engineering highly weathered rock protecting slope ecology method, comprising the following steps:
Step 1: side slope brush slope: after the completion of earthwork evacuation, reserving the 30cm-60cm thickness cubic metre of earth and stone not on side slope direction
It excavates, side slope carries out brush slope, and the brush slope gradient chooses 1:1.5, guarantees Slope leveling, cannot be uneven, if there is recess, adopt
It is filled up with mortar flag stone;
Step 2: preliminary side slope cleaning: further cleaning out float stone, surface dust, the sundries etc. in side slope, it is ensured that side slope
Upper smooth, no-sundries;
Step 3: side slope is slotted: slotting on side slope is lateral and vertical, slot dimension width 20cm-40cm, depth
15cm, fluting spacing are laterally and vertically 2m, and fluting is slotted using hand fit's pneumatic pick;
Step 4: being laid with wire netting: being laid with wire netting in entire slope surface;
Step 5: mortar flag stone: being grouted using M15 mortar to block stone, mortar flag stone is set to the slot excavated
It is interior;
Step 6: Spray turfing: using Spray turfing in grid;
Step 7: virescence maintenance: after Spray turfing construction is completed, non-woven fabrics is covered on side slope surface, to keep slope surface
Moisture simultaneously reduces rainfall and washes away to seed, promotes seed growth.
Preferably, wire netting is fixed using short brad in the step 4, wire netting carries out loose paving in slot, really
Wire netting will not generate stretching force after protecting mortar flag stone construction.
Preferably, wire netting is galvanized wire mesh in step 4.
Preferably, mortar flag stone accomplishes that mortar is full in step 5, is firmly bonded, and appearance accomplishes that lines are straight, and surface is flat
Whole, each working lining perps of mortar flag stone should mutually stagger, and must not penetrate through;Jointing uses recessed joint, and jointing equivalent width must not
Hollowing falls off.
Preferably, greening is existed with grass-seed and water-retaining agent, adhesive, green fiber covering and fertilizer in the step 6
Gelatinous mixed serum is mixed into stirring container with water, is sowed grass seeds by duster with pressure pump in wait broadcast in side slope.
Compared with prior art, the present invention can obtain following technical effect:
1. the present invention slots to highly weathered rock side slope after to the cleaning of highly weathered rock side slope brush slope, tool is constituted
There is the trough of mesh shape, be then laid with galvanized wire mesh on entire side slope face, pine paving is fixed in slot, is then adopted in slot
It is grouted with block stone, wire netting is fully pressed against under mortar flag stone, finally to carrying out Spray turfing in grid, when by one section
Between after, various vegetation grow in sash, and afforestation effect is all good, and protection effect is good, and present invention process is simple, and construction cost is lower
Afforestation effect is good, should be widely promoted.
2. the present invention, due to being highly weathered rock side slope, fluting is opposite to be easier to, it is noted that fluting range in grooving process
Outer rock tries not to be destroyed.
3. containing water-keeping material in mixed serum of the present invention is mainly covering effect.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, those of ordinary skill in the art are come
It says, without creative efforts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is plan view of the present invention;
Fig. 2 is side view of the present invention.
In figure: 1. wire nettings, 2. mortar flag stones, 3. grass plantings, 4. flutings.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to embodiments, to the present invention
It is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not used to
Limit the present invention.
With reference to the accompanying drawing and specific embodiment is further described application principle of the invention.
Embodiment 1
It is as shown in Figs. 1-2: a kind of highway engineering highly weathered rock protecting slope ecology method, comprising the following steps:
Step 1: side slope brush slope: after the completion of earthwork evacuation, reserving the 30cm-60cm thickness cubic metre of earth and stone not on side slope direction
It excavates, side slope carries out brush slope, and the brush slope gradient chooses 1:1.5, guarantees Slope leveling, cannot be uneven, if there is recess, adopt
It is filled up with mortar flag stone;
Step 2: preliminary side slope cleaning: further cleaning out float stone, surface dust, the sundries etc. in side slope, it is ensured that side slope
Upper smooth, no-sundries;
Step 3: side slope is slotted: slotting on side slope is lateral and vertical, slot 4 dimension width 20cm-40cm, deep
15cm is spent, fluting spacing is laterally and vertically 2m, and fluting is slotted using hand fit's pneumatic pick;
Step 4: being laid with wire netting: being laid with wire netting 1 in entire slope surface;
Step 5: mortar flag stone: being grouted using M15 mortar to block stone, mortar flag stone 2 is set to the slot excavated
It is interior;
Step 6: Spray turfing 3: using Spray turfing in grid;
Step 7: virescence maintenance: after Spray turfing construction is completed, non-woven fabrics is covered on side slope surface, to keep slope surface
Moisture simultaneously reduces rainfall and washes away to seed, promotes seed growth.
Wherein: wire netting being fixed using short brad in the step 4, wire netting carries out loose paving in slot, it is ensured that
Wire netting will not generate stretching force after mortar flag stone construction;Wire netting is galvanized wire mesh in step 4;Piece is grouted in step 5
Stone accomplishes that mortar is full, is firmly bonded, and appearance accomplishes that lines are straight, surfacing, and each working lining perps of mortar flag stone should be mutual
It is staggered, must not penetrate through;Jointing use recessed joint, jointing equivalent width, must not hollowing, fall off;It will greening in the step 6
Gelatinous mixing slurry is mixed into water in stirring container with grass-seed and water-retaining agent, adhesive, green fiber covering and fertilizer
Liquid is sowed grass seeds by duster with pressure pump in wait broadcast in side slope.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie
In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter
From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power
Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims
Variation is included within the present invention.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped
Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should
It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art
The other embodiments being understood that.
Claims (5)
1. a kind of highway engineering highly weathered rock protecting slope ecology method, which comprises the following steps:
Step 1: side slope brush slope: after the completion of earthwork evacuation, the 30cm-60cm thickness cubic metre of earth and stone is reserved on side slope direction and is not excavated,
Side slope carries out brush slope, and the brush slope gradient chooses 1:1.5, guarantees Slope leveling, cannot be uneven, if there is recess, using slurry
Slabstone is built to be filled up;
Step 2: preliminary side slope cleaning: further cleaning out float stone, surface dust, the sundries etc. in side slope, it is ensured that put down in side slope
It is whole, no-sundries;
Step 3: side slope is slotted: slotting on side slope is lateral and vertical, slot dimension width 20cm-40cm, depth
15cm, fluting spacing are laterally and vertically 2m, and fluting is slotted using hand fit's pneumatic pick;
Step 4: being laid with wire netting: being laid with wire netting in entire slope surface;
Step 5: mortar flag stone: being grouted using M15 mortar to block stone, mortar flag stone is set in the slot excavated;
Step 6: Spray turfing: using Spray turfing in grid;
Step 7: virescence maintenance: after Spray turfing construction is completed, non-woven fabrics is covered on side slope surface, to keep slope surface moisture
And reduce rainfall and seed is washed away, promote seed growth.
2. a kind of highway engineering highly weathered rock protecting slope ecology method according to claim 1, it is characterised in that: institute
It states in step 4 and wire netting is fixed using short brad, wire netting carries out loose paving in slot, it is ensured that after mortar flag stone construction
Wire netting will not generate stretching force.
3. a kind of highway engineering highly weathered rock protecting slope ecology method according to claim 1, it is characterised in that: step
Wire netting is galvanized wire mesh in rapid four.
4. a kind of highway engineering highly weathered rock protecting slope ecology method according to claim 1, it is characterised in that: step
Mortar flag stone accomplishes that mortar is full in rapid five, is firmly bonded, and appearance accomplishes that lines are straight, and surfacing, mortar flag stone respectively works
Layer perps should mutually stagger, and must not penetrate through;Jointing use recessed joint, jointing equivalent width, must not hollowing, fall off.
5. a kind of highway engineering highly weathered rock protecting slope ecology method according to claim 1, it is characterised in that: institute
It states in step 6 and mixes greening with water in stirring container with grass-seed and water-retaining agent, adhesive, green fiber covering and fertilizer
Gelatinous mixed serum is synthesized, is sowed grass seeds by duster with pressure pump in wait broadcast in side slope.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811338772.0A CN109339072A (en) | 2018-11-12 | 2018-11-12 | A kind of highway engineering highly weathered rock protecting slope ecology method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811338772.0A CN109339072A (en) | 2018-11-12 | 2018-11-12 | A kind of highway engineering highly weathered rock protecting slope ecology method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109339072A true CN109339072A (en) | 2019-02-15 |
Family
ID=65314831
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811338772.0A Pending CN109339072A (en) | 2018-11-12 | 2018-11-12 | A kind of highway engineering highly weathered rock protecting slope ecology method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109339072A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110720360A (en) * | 2019-11-26 | 2020-01-24 | 四川省草原科学研究院 | Slope protection hydraulic spray seeding matrix and preparation method and application thereof |
CN113293776A (en) * | 2021-05-12 | 2021-08-24 | 大连交通大学 | Prefabricated lattice beam structure for ecological slope protection and construction method |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20090047094A (en) * | 2007-11-07 | 2009-05-12 | 에스케이건설 주식회사 | Greening work method for rock slope |
CN105220698A (en) * | 2015-08-21 | 2016-01-06 | 武汉沃田生态科技有限公司 | A kind of rock slope ecological protection method |
-
2018
- 2018-11-12 CN CN201811338772.0A patent/CN109339072A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20090047094A (en) * | 2007-11-07 | 2009-05-12 | 에스케이건설 주식회사 | Greening work method for rock slope |
CN105220698A (en) * | 2015-08-21 | 2016-01-06 | 武汉沃田生态科技有限公司 | A kind of rock slope ecological protection method |
Non-Patent Citations (2)
Title |
---|
程鑫等: ""浅谈浆砌片石骨架植草护坡"", 《四川建筑》 * |
袁国栋: ""钢筋混凝土框格喷射植被混凝土护坡绿化技术"", 《贵州水力发电》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110720360A (en) * | 2019-11-26 | 2020-01-24 | 四川省草原科学研究院 | Slope protection hydraulic spray seeding matrix and preparation method and application thereof |
CN110720360B (en) * | 2019-11-26 | 2021-10-19 | 四川省草原科学研究院 | Slope protection hydraulic spray seeding matrix and preparation method and application thereof |
CN113293776A (en) * | 2021-05-12 | 2021-08-24 | 大连交通大学 | Prefabricated lattice beam structure for ecological slope protection and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102444134B (en) | Slope protecting method based on slope with soil layer as upper part and rock layer as lower part | |
CN108589743B (en) | Ecological geogrid for slope protection | |
CN104314087B (en) | A kind of side-slope greening and protection structure and construction method thereof | |
CN204305674U (en) | Anchor pole grid is utilized to carry out shale side slope plantation greening structure | |
CN110249813B (en) | Method for greening high and steep rocky slope in mining pit | |
CN207295737U (en) | Suitable for the ecological revetment system in plateau mountainous region | |
CN108951667B (en) | Integrated reinforcing method for green ecological side slope | |
CN105178340A (en) | Anti-scouring structure used for ecological regreening of rock slope and concrete material used for anti-scouring structure | |
CN107237334B (en) | A kind of road foundation execavated rockmass frame gird type slope protection code builds the construction method of plant biological bag greening | |
CN106193066A (en) | A kind of Loess landslide administering method based on restoration of the ecosystem | |
CN109339072A (en) | A kind of highway engineering highly weathered rock protecting slope ecology method | |
CN113235623A (en) | Thick-layer base material foreign soil spray-seeding structure suitable for ecological restoration of high and steep slope and construction method thereof | |
CN206245284U (en) | A kind of slope type ecological revetment modular structure | |
CN109208618A (en) | A kind of ecological restoring method for concrete slope | |
CN108222036A (en) | A kind of ecology flexible water drainage ditch and its construction method | |
CN111636444A (en) | Water and soil conservation method for side slope in high-altitude area | |
CN110670607A (en) | Ecological restoration construction process | |
CN110226431A (en) | A kind of planting technique structure and its construction method for high precipitous rock slope | |
CN114059566B (en) | Soft rock slope semi-rigid supporting and retaining structure and construction method thereof | |
KR101104691B1 (en) | Reinforcement constructing method for embankment using vegetation cemented sand and gravel | |
CN212670597U (en) | Ecological repair system for mountain slope | |
CN211713983U (en) | Ecological slope protection for water and soil conservation | |
CN210529617U (en) | Ecological revetment is used in water pollution control with deposit water function | |
CN208227617U (en) | A kind of heavy clay soil improvement structure | |
CN106917408B (en) | A kind of slope shoulder building stones gap sprinkling irrigation concrete construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190215 |
|
RJ01 | Rejection of invention patent application after publication |