CN104989918A - 一种设置大面积基础垫铁的方法 - Google Patents

一种设置大面积基础垫铁的方法 Download PDF

Info

Publication number
CN104989918A
CN104989918A CN201510262766.1A CN201510262766A CN104989918A CN 104989918 A CN104989918 A CN 104989918A CN 201510262766 A CN201510262766 A CN 201510262766A CN 104989918 A CN104989918 A CN 104989918A
Authority
CN
China
Prior art keywords
plain cushion
pad iron
iron
grouting
flat pad
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510262766.1A
Other languages
English (en)
Inventor
杜艳军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201510262766.1A priority Critical patent/CN104989918A/zh
Publication of CN104989918A publication Critical patent/CN104989918A/zh
Pending legal-status Critical Current

Links

Abstract

一种设置大面积基础垫铁的方法,依照下列步骤进行:①将平垫铁上表面和斜垫铁组中的每块斜垫铁的上下两个接触面进行研磨,同时在平垫铁上均匀加工排气孔;②在平垫铁上焊接平垫铁固定板;③根据每组平垫铁的布置位置进行基础凿坑打毛,在设备基础相应位置钻螺栓孔并向螺栓孔内灌胶固定螺丝杆,将平垫铁放置于螺丝杆上并由下螺母支撑;④进行平垫铁上表面的标高和水平度调整;⑤制作浆模并灌浆:首先制作浆模并检查其密封性,防止灌浆时浆料漏出,然后将灌浆料灌至平垫铁上表面或低于上表面处;⑥待灌浆墩凝固后进行拆模并切除露出的螺丝杆,清理现场。本发明保证了大面积基础垫铁安装的高精度要求,提高了安装效率。

Description

一种设置大面积基础垫铁的方法
技术领域:
本发明属于一种机械设备的安装方法,特别涉及一种设置大面积基础垫铁的方法,该方法适用于大型高精度机械设备的大面积基础垫铁设置安装。
背景技术:
在大型高精度机械设备安装工程中,基础垫铁的设置安装是整个安装工程的重要基础工作,尤其对于大型机械设备,振动大、精度高、基础垫铁的面积大,其垫铁的设置安装成为难点。目前,在安装工程中通常采用的座浆法仅适用于普通设备的相对较小的基础垫铁,但对于大面积垫铁就存在无法稳定控制其标高和水平度的问题。
发明内容:
本发明的目的就在于克服上述现有技术中存在的不足,而提供一种设置大面积基础垫铁的方法,该方法有效地解决了大面积基础垫铁座浆时标高、水平控制难的问题,保证了大面积基础垫铁安装的高精度要求,提高了安装效率。
如上构思,本发明的技术方案是:一种设置大面积基础垫铁的方法,其特征在于:依照下列步骤进行:
①对平垫铁上表面和斜垫铁组中的每块斜垫铁的上下两个接触面进行研磨,同时在平垫铁上均匀加工排气孔;
②在平垫铁上焊接平垫铁固定板;
③根据每组平垫铁的布置位置进行基础凿坑打毛,再根据平垫铁固定板的位置,在设备基础相应位置钻螺栓孔并向螺栓孔内灌胶固定螺丝杆,将平垫铁放置于螺丝杆上并由下螺母支撑;
④利用螺丝杆上的上下螺母进行平垫铁上表面的标高和水平度调整,达到安装要求标准;
⑤制作浆模并灌浆:首先制作浆模并检查其密封性,然后将灌浆料灌至平垫铁上表面或低于上表面处;
⑥待灌浆墩凝固后进行拆模并切除露出的螺丝杆,清理现场并进行垫铁保护。
上述平垫铁上焊接呈三角支点状的平垫铁固定板。
上述灌浆料采用高强度无收缩灌浆料。
本发明采用先将平垫铁通过螺丝杆灌胶固定于基础上并进行标高和水平调整,再进行灌浆固定的方法,并在平垫铁上制有排气孔以防止因灌浆不充分而导致的垫铁与浆块接触不严密,解决了大面积基础垫铁座浆时标高、水平控制难的问题,保证了大面积基础垫铁安装的高精度要求,提高了安装效率。
附图说明:
图1是本发明的工艺流程图;
图2是垫铁设置示意图;
图3是平垫铁制作示意图;
图4是平垫铁通过螺丝杆固定和调整示意图;
图5是图4的A向视图;
图6是基础垫铁设置完成后的效果图。
具体实施方式:
如图1所示:一种设置大面积基础垫铁的方法,依照下列步骤进行:
①如图2所示:对平垫铁2的上表面和斜垫铁组10中的每块斜垫铁的上下两个接触面进行研磨,即图中A、B、C处共五个接触面进行研磨,保证接触面积达到85%以上。同时,在平垫铁2上均匀加工排气孔3,均匀钻孔可防止灌浆时浆料灌注不充分。
②准备M12螺丝杆6,制作并焊接平垫铁固定板1。用δ=5mm扁钢或板条切割成块,钻Φ14孔,焊接于平垫铁底面成三角支点状,见图3。
③根据每组基础垫铁的布置位置进行基础凿坑4打毛,再根据平垫铁固定板位置,在设备基础9相应位置钻螺栓孔,清理孔内杂物并向螺栓孔内灌胶8固定螺丝杆6;待螺丝杆固定牢固后,将平垫铁放置于螺丝杆上并由下螺母7支撑,见图4、5。
④利用螺丝杆上的上下螺母和水平仪5进行平垫铁上表面的标高和水平度调整,达到安装要求标准,见图4、5。
⑤制作浆模并灌浆:制作适当尺寸并稳定可靠的浆模,放置后检查其密封性,采取相应措施防止灌浆时浆料漏出;复查所有垫铁的标高、水平度及螺母紧固情况;采用高强度无收缩灌浆料进行灌浆,保证灌浆充分到位,灌浆至平垫铁上表面或略低于上表面处;灌浆时密切关注垫铁调整精度有无跑动变化,在灌浆料初凝前,控制好其调整精度。
⑥待灌浆墩11凝固后进行拆模并切除露出的螺丝杆,清理现场并进行垫铁保护,见图6。

Claims (3)

1.一种设置大面积基础垫铁的方法,其特征在于:依照下列步骤进行:
①对平垫铁上表面和斜垫铁组中的每块斜垫铁的上下两个接触面进行研磨,同时在平垫铁上均匀加工排气孔;
②在平垫铁上焊接平垫铁固定板;
③根据每组平垫铁的布置位置进行基础凿坑打毛,再根据平垫铁固定板的位置,在设备基础相应位置钻螺栓孔,清理孔内杂物并向螺栓孔内灌胶固定螺丝杆;待螺丝杆固定牢固后,将平垫铁放置于螺丝杆上并由下螺母支撑;
④利用螺丝杆上的上下螺母进行平垫铁上表面的标高和水平度调整,达到安装要求标准;
⑤制作浆模并灌浆:首先制作浆模并检查其密封性,然后将灌浆料灌至平垫铁上表面或低于上表面处;
⑥待灌浆墩凝固后进行拆模并切除露出的螺丝杆,清理现场并进行垫铁保护。
2.根据权利要求1所述的一种设置大面积基础垫铁的方法,其特征在于:上述平垫铁上焊接呈三角支点状的平垫铁固定板。
3.根据权利要求1所述的一种设置大面积基础垫铁的方法,其特征在于:上述灌浆料采用高强度无收缩灌浆料。
CN201510262766.1A 2015-05-21 2015-05-21 一种设置大面积基础垫铁的方法 Pending CN104989918A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510262766.1A CN104989918A (zh) 2015-05-21 2015-05-21 一种设置大面积基础垫铁的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510262766.1A CN104989918A (zh) 2015-05-21 2015-05-21 一种设置大面积基础垫铁的方法

Publications (1)

Publication Number Publication Date
CN104989918A true CN104989918A (zh) 2015-10-21

Family

ID=54301773

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510262766.1A Pending CN104989918A (zh) 2015-05-21 2015-05-21 一种设置大面积基础垫铁的方法

Country Status (1)

Country Link
CN (1) CN104989918A (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106499676A (zh) * 2016-12-06 2017-03-15 中国电建集团河南工程公司 海水直冷机组循环水泵安装工法
CN107288152A (zh) * 2017-08-18 2017-10-24 湖南省工业设备安装有限公司 一种安装精密设备的工装及其施工方法
CN108151720A (zh) * 2017-12-20 2018-06-12 中国二冶集团有限公司 一种斜面基础混合机托辊座的安装测量方法
CN108560579A (zh) * 2018-06-15 2018-09-21 中国电建集团河南工程有限公司 弹簧式预埋垫铁施工方法
CN109323087A (zh) * 2018-10-12 2019-02-12 安徽马钢设备检修有限公司 一种用于设备安装的找正调平结构及其施工方法
CN111076032A (zh) * 2019-12-31 2020-04-28 广西建工集团第一安装有限公司 一种大型高转速设备垫铁高精度安装装置及方法
CN113638438A (zh) * 2021-08-13 2021-11-12 中材天安(天津)工程有限公司 一种辊式立磨机支架底座的安装方法
CN114960737A (zh) * 2022-04-29 2022-08-30 中国华冶科工集团有限公司 设备安装垫铁座浆装置及方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1966869A (zh) * 2005-11-17 2007-05-23 上海宝钢冶金建设公司 基础垫板螺丝调节法施工工艺
CN101881031A (zh) * 2010-02-11 2010-11-10 中国二十二冶集团有限公司 可调式灌浆料垫板装置及其安装方法
CN102135223A (zh) * 2010-01-26 2011-07-27 五冶集团上海有限公司 高精度机械安装中的垫板调整方法
CN102251537A (zh) * 2011-04-28 2011-11-23 中冶建工集团有限公司 设备安装垫铁座浆施工方法
CN103791200A (zh) * 2012-10-26 2014-05-14 中国机械工业建设集团有限公司 设备安装压浆法施工方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1966869A (zh) * 2005-11-17 2007-05-23 上海宝钢冶金建设公司 基础垫板螺丝调节法施工工艺
CN102135223A (zh) * 2010-01-26 2011-07-27 五冶集团上海有限公司 高精度机械安装中的垫板调整方法
CN101881031A (zh) * 2010-02-11 2010-11-10 中国二十二冶集团有限公司 可调式灌浆料垫板装置及其安装方法
CN102251537A (zh) * 2011-04-28 2011-11-23 中冶建工集团有限公司 设备安装垫铁座浆施工方法
CN103791200A (zh) * 2012-10-26 2014-05-14 中国机械工业建设集团有限公司 设备安装压浆法施工方法

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106499676A (zh) * 2016-12-06 2017-03-15 中国电建集团河南工程公司 海水直冷机组循环水泵安装工法
CN107288152A (zh) * 2017-08-18 2017-10-24 湖南省工业设备安装有限公司 一种安装精密设备的工装及其施工方法
CN107288152B (zh) * 2017-08-18 2022-11-22 湖南省工业设备安装有限公司 一种安装精密设备的工装及其施工方法
CN108151720A (zh) * 2017-12-20 2018-06-12 中国二冶集团有限公司 一种斜面基础混合机托辊座的安装测量方法
CN108560579A (zh) * 2018-06-15 2018-09-21 中国电建集团河南工程有限公司 弹簧式预埋垫铁施工方法
CN108560579B (zh) * 2018-06-15 2023-11-10 中国电建集团河南工程有限公司 弹簧式预埋垫铁施工方法
CN109323087A (zh) * 2018-10-12 2019-02-12 安徽马钢设备检修有限公司 一种用于设备安装的找正调平结构及其施工方法
CN111076032A (zh) * 2019-12-31 2020-04-28 广西建工集团第一安装有限公司 一种大型高转速设备垫铁高精度安装装置及方法
CN113638438A (zh) * 2021-08-13 2021-11-12 中材天安(天津)工程有限公司 一种辊式立磨机支架底座的安装方法
CN114960737A (zh) * 2022-04-29 2022-08-30 中国华冶科工集团有限公司 设备安装垫铁座浆装置及方法

Similar Documents

Publication Publication Date Title
CN104989918A (zh) 一种设置大面积基础垫铁的方法
CN205036392U (zh) 一种隧道初期支护钢拱架锁脚锚杆用锚垫盒
CN103485539B (zh) 大型直埋式钢锚爪预埋件的施工控制方法
CN103669431B (zh) 一种煤矿采动区输电铁塔倾斜调整装置
CN201447879U (zh) 钢柱柱脚校正精调装置
CN203960919U (zh) 煤矿采动区输电铁塔纠偏顶升装置
CN105133677A (zh) 风力发电机组基础加固系统及加固方法
CN104120802B (zh) 一种隔震支座安装定位简易方法
CN103669432A (zh) 一种煤矿采动区输电铁塔纠偏顶升装置
CN104785904A (zh) 大型空分装置冷箱预埋螺栓安装工艺
CN204647554U (zh) 钢结构混凝土泵管支撑架
CN204645079U (zh) 一种大型压缩机贯穿式地脚螺栓组件
CN205228488U (zh) 一种可进行调整的基座
CN202302573U (zh) 一种倾斜座浆用垫板
CN207144953U (zh) 一种高铁使用的预埋槽道
CN203960920U (zh) 煤矿采动区输电铁塔倾斜调整装置
CN103953194B (zh) 一种变截面变坡度大体积混凝土导流槽施工方法
CN103966981B (zh) 风化卸荷岩体上修建拱坝的传力结构及其施工方法
CN103205973B (zh) 一种型钢水泥土搅拌桩内支撑结构及其支撑方法
CN201915420U (zh) 临时门楼基础
CN204262722U (zh) 设备水平校正装置
CN203905046U (zh) 一种新型的多功能泵基础
CN205088703U (zh) 座浆垫铁找平装置
CN207436090U (zh) 一种安装找正支撑垫铁组及其基座结构
CN206220491U (zh) 一种现浇梁支架调整和落架装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20151021

RJ01 Rejection of invention patent application after publication