CN104975710A - 脚手架与主体结构间的连接方法与连接结构 - Google Patents
脚手架与主体结构间的连接方法与连接结构 Download PDFInfo
- Publication number
- CN104975710A CN104975710A CN201410130171.6A CN201410130171A CN104975710A CN 104975710 A CN104975710 A CN 104975710A CN 201410130171 A CN201410130171 A CN 201410130171A CN 104975710 A CN104975710 A CN 104975710A
- Authority
- CN
- China
- Prior art keywords
- sleeve pipe
- connecting rod
- scaffold
- sleeve
- agent structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
本发明公开了一种脚手架与主体结构间的连接方法,包括以下步骤:提供一套管;浇筑主体结构,将所述套管预埋入所述主体结构,并保持所述套管的端部延伸出所述主体结构的混凝土面一第一设定距离;提供一连接杆件,将所述连接杆件可拆卸的插设固定于所述套管,并保持所述连接杆件的端部延伸出所述套管一第二设定距离;将脚手架连接于所述连接杆件延伸出所述套管的端部。本发明通过预埋一套管实现附墙,而将主要起到连接承力作用连接杆件插设固定于套管内,此时套管可以选用强度与成本较低的材料;在拆除时,只要将连接杆件自套管中抽出即可,而附墙的套管由于采用了强度与成本皆较低的材料,也便于切割,不会造成浪费。
Description
技术领域
本发明涉及一种脚手架的附墙连接方法与连接结构。
背景技术
目前大多数高层均使用钢管脚手架,为了保证脚手架的稳定性,将脚手架与主体结构连接,而连接的方式就是采用连墙杆件。现在多数连墙杆件的附墙方法是:将钢管直接预埋入结构反边或梁中,用砼直接浇筑,使钢管与结构结合,再将脚手架连接于钢管上。
但是,该种连接方式在拆除脚手架时需对预埋入主体结构的所有钢管进行切割,由于钢管的强度较大,切割相当费力;且切割后钢管便成了废弃钢管,造成严重的材料浪费。
如何才能在确保外脚手架完全稳定的情况下同时避免浪费,因此有必要提出一种新的外脚手架连墙件的预埋形式。
发明内容
本发明要解决的技术问题在于改进现有脚手架与主体结构的连接方法,使其在拆除时便于清理,并减少浪费。
为解决上述技术问题,本发明公开了一种脚手架与主体结构间的连接方法,包括以下步骤:提供一套管;浇筑主体结构,将所述套管预埋入所述主体结构,并保持所述套管的端部延伸出所述主体结构的混凝土面一第一设定距离;提供一连接杆件,将所述连接杆件可拆卸的插设固定于所述套管,并保持所述连接杆件的端部延伸出所述套管一第二设定距离;将脚手架连接于所述连接杆件延伸出所述套管的端部。
本发明通过预埋一套管实现附墙,而将主要起到连接承力作用连接杆件插设固定于套管内,此时套管可以选用强度与成本较低的材料;在拆除时,只要将连接杆件自套管中抽出即可,而附墙的套管由于采用了强度与成本皆较低的材料,也便于切割,不会造成浪费。
本发明的进一步改进在于,所述套管的材质为PVC。
本发明的进一步改进在于,将所述连接杆件插设入所述套管,并在连接杆件与套管之间插入木楔楔紧固定。
本发明的进一步改进在于,利用双扣件将所述脚手架连接于所述连接杆件延伸出所述套管的端部。
本发明还公开了一种脚手架与主体结构间的连接结构,包括:套管,预埋于所述主体结构,且所述套管的端部延伸出所述主体结构的混凝土面一第一设定距离;连接杆件,插设固定于所述套管,且所述连接杆件的端部延伸出所述套管一第二设定距离;以及脚手架,连接于所述连接杆件延伸出所述套管的端部。
附图说明
图1为本发明连接结构示意图。
图2为图1中a位置放大示意图。
具体实施方式
下面结合具体实施例对本发明作进一步说明。
请参阅图1、2所示,本发明公开了一种脚手架1与主体结构2之间的连接结构,其主要包括一预埋于主体结构2中的套管3与一插设固定于套管3中的连接杆件4,而脚手架1即连接于连接杆件4的端部;套管3可以选用PVC材料,连接杆件4可以选用钢材。
本发明的连接方法主要包括:
1.在主体结构2浇筑前,在反边内或结构梁中预埋400mm长A60PVC套管3,并保证在浇筑后套管3的端部延伸出混凝土面100mm;在浇筑之前,为防止浇筑过程中导致套管3的偏位,应用铁丝将套管3与主体结构3的梁筋(图中未示出)固定。
2.待浇筑完主体结构3之后,连接杆件4插入套管3中,保持连接杆件4的端部延伸出套管一设定距离,并用废旧木方制成的木楔5插设入套管3与连接杆件4之间楔紧固定;该连接杆件4可以采用500mm的A48短钢管。
3.将脚手架1连接于连接杆件4延伸出套管3的端部,两者之间的连接可以通过双扣件6实现。
4.检查校正,防止木楔5漏楔而导致连接杆件4松动;
5.定期巡视检查,防止套管3出露部分遭人为破坏,一旦发现应立即重新塞楔,保证外架的整体稳定性;
6.待脚手架拆除后,自套管3内取出连接杆件4和木楔5,割除出露在主体结构2的混凝土面外的套管3,将各部件分类堆放,可为他用。对套管3与主体结构2上形成的孔洞,后期进行填平处理。
以上结合附图实施例对本发明进行了详细说明,本领域中普通技术人员可根据上述说明对本发明做出种种变化例。因而,实施例中的某些细节不应构成对本发明的限定,本发明将以所附权利要求书界定的范围作为本发明的保护范围。
Claims (8)
1.一种脚手架与主体结构间的连接方法,其特征在于包括以下步骤:
提供一套管;
浇筑主体结构,将所述套管预埋入所述主体结构,并保持所述套管的端部延伸出所述主体结构的混凝土面一第一设定距离;
提供一连接杆件,将所述连接杆件可拆卸的插设固定于所述套管,并保持所述连接杆件的端部延伸出所述套管一第二设定距离;
将脚手架连接于所述连接杆件延伸出所述套管的端部。
2.如权利要求1所述的方法,其特征在于:所述套管的材质为PVC。
3.如权利要求1所述的方法,其特征在于:将所述连接杆件插设入所述套管,并在连接杆件与套管之间插入木楔楔紧固定。
4.如权利要求1所述的方法,其特征在于:利用双扣件将所述脚手架连接于所述连接杆件延伸出所述套管的端部。
5.一种脚手架与主体结构间的连接结构,其特征在于包括:
套管,预埋于所述主体结构,且所述套管的端部延伸出所述主体结构的混凝土面一第一设定距离;
连接杆件,插设固定于所述套管,且所述连接杆件的端部延伸出所述套管一第二设定距离;
以及脚手架,连接于所述连接杆件延伸出所述套管的端部。
6.如权利要求5所述的结构,其特征在于:所述套管的材质为PVC。
7.如权利要求5所述的结构,其特征在于:所述连接杆件与套管之间插设木楔楔紧固定。
8.如权利要求5所述的结构,其特征在于:所述脚手架与所述连接杆件延伸出所述套管的端部通过双扣件连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410130171.6A CN104975710A (zh) | 2014-04-02 | 2014-04-02 | 脚手架与主体结构间的连接方法与连接结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410130171.6A CN104975710A (zh) | 2014-04-02 | 2014-04-02 | 脚手架与主体结构间的连接方法与连接结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104975710A true CN104975710A (zh) | 2015-10-14 |
Family
ID=54272638
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410130171.6A Pending CN104975710A (zh) | 2014-04-02 | 2014-04-02 | 脚手架与主体结构间的连接方法与连接结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104975710A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109441095A (zh) * | 2018-12-24 | 2019-03-08 | 蒿振侠 | 一种同力面承力杆托 |
CN109594761A (zh) * | 2018-12-24 | 2019-04-09 | 蒿振侠 | 一种网格型承力杆增强套 |
CN110259077A (zh) * | 2019-05-09 | 2019-09-20 | 贵州电网有限责任公司 | 一种检修施工平台 |
CN113266171A (zh) * | 2021-05-27 | 2021-08-17 | 广州建筑湾区智造科技有限公司 | 一种新型可调支撑及其使用方法 |
-
2014
- 2014-04-02 CN CN201410130171.6A patent/CN104975710A/zh active Pending
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109441095A (zh) * | 2018-12-24 | 2019-03-08 | 蒿振侠 | 一种同力面承力杆托 |
CN109594761A (zh) * | 2018-12-24 | 2019-04-09 | 蒿振侠 | 一种网格型承力杆增强套 |
CN110259077A (zh) * | 2019-05-09 | 2019-09-20 | 贵州电网有限责任公司 | 一种检修施工平台 |
CN110259077B (zh) * | 2019-05-09 | 2021-07-27 | 贵州电网有限责任公司 | 一种检修施工平台 |
CN113266171A (zh) * | 2021-05-27 | 2021-08-17 | 广州建筑湾区智造科技有限公司 | 一种新型可调支撑及其使用方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104975710A (zh) | 脚手架与主体结构间的连接方法与连接结构 | |
CN203701562U (zh) | 工具式脚手架连墙件 | |
CN104453224A (zh) | 一种地下室外墙的模板支护结构及其施工方法 | |
US9869101B1 (en) | Method and device for removing a non ground-based scaffolding system by a single user | |
CN106013211A (zh) | 地脚螺栓成组固定结构及其施工方法 | |
CN103556819A (zh) | 一种在梁板上预留构造柱孔洞的施工方法 | |
CN203878968U (zh) | 脚手架与主体结构间的连接结构 | |
CN107964944B (zh) | 一种灌注桩钢筋笼组件及其施工方法 | |
CN107762135B (zh) | 建筑物外墙脚手架连墙件的施工方法 | |
CN201809768U (zh) | U型锚头可回收预应力锚索 | |
CN103790160B (zh) | 一种smw工法型钢拔除注浆方法 | |
CN104831832B (zh) | 装配式剪力墙结构及其安装方法 | |
JP5794539B2 (ja) | 床版の撤去方法 | |
CN108487238A (zh) | 一种灌注桩桩头处理装置及其施工方法 | |
CN204299162U (zh) | 悬挑工字钢梁锚固结构 | |
CN107447975A (zh) | 外墙脚手架锥形螺母连墙件 | |
CN206800981U (zh) | 一种可拆卸式悬挑脚手架固定环 | |
CN103306473A (zh) | 悬挑脚手架工具式锚固件 | |
CN202047581U (zh) | 用于脚手架的连墙件 | |
CN204571265U (zh) | 一种可重复使用的预埋锚环 | |
CN205839812U (zh) | 一种后浇带预处理装置 | |
CN103352568A (zh) | 一种在基础垫层上生成构造柱的方法 | |
CN206636182U (zh) | 可拆卸的悬挑脚手架锚固桩 | |
CN206503377U (zh) | 一种钢栈桥的活动栏杆 | |
GB2382096A (en) | Debonding sheath for piles |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20151014 |