CN104947694A - Earth slope grouting reinforcement construction method - Google Patents

Earth slope grouting reinforcement construction method Download PDF

Info

Publication number
CN104947694A
CN104947694A CN201510250989.6A CN201510250989A CN104947694A CN 104947694 A CN104947694 A CN 104947694A CN 201510250989 A CN201510250989 A CN 201510250989A CN 104947694 A CN104947694 A CN 104947694A
Authority
CN
China
Prior art keywords
earth
construction method
soil
grid
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510250989.6A
Other languages
Chinese (zh)
Inventor
兰泽民
孟祥开
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510250989.6A priority Critical patent/CN104947694A/en
Publication of CN104947694A publication Critical patent/CN104947694A/en
Pending legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention discloses an earth slope grouting reinforcement construction method. The method comprises the steps that firstly, a square grid net diagram is drawn on an earth slope needed to be reinforced according to construction design needs; secondly, ditched are dug and earth is loosened according to the construction design needs, and grooves are dug according to the square grid net diagram; holes are dug in the earth according to the crossed grid points of the square grid; then steel wires are pre-buried into the dug ditches in a vertically and horizontally crossed mode, steel bars are vertically pre-buried in the dug holes, and the steel bars are connected with the steel wires to form a whole through hook rings; straight cement sizing agents are intensively injected into the crossed grid points until the grooves are fully filled; finally, checking is conducted on the square grid structure formed after solidification, and it is guaranteed that the earth stabilizing intensity reaches an satisfied effect. The earth slope grouting reinforcement construction method has the advantages that the construction is easy, no crack exists between the square grid structure formed after the grouting and the original earth, and therefore a water permeation prevention whole body is formed; the square grid structure is a beam-pillar whole body, and the orderliness and the beauty are achieved; the degree of mechanization is high, the construction cost is low, the construction period is short, and the earth slope grouting reinforcement construction method is suitable for the reinforcement construction of earth slopes around mountain roads, railways, bridges and buildings.

Description

Soil-slope construction method for grouting reinforcement
Technical field
The present invention relates to the protection of building Soil Surrounding, furthermore relate to the protection of the periphery soil-slope of highway, railway or bridge, particularly relate to the strengthening construction of soil-slope.
Background technology
As everyone knows, and even highway, railway, bridge periphery Sloping field in mountain area, soil property situation is complicated, and slope and land slide landslide phenomenon occurs frequently, especially more when rainy season seeps water.Once there is landslide landslide, not only can obstruction, and the life security of entail dangers to people.In order to reduce consequent loss, must prevent trouble before it happens, needing to carry out soil-slope to reinforce.But, because the destabilizing factor of soil-slope is complicated and changeable, not a duck soup is reinforced to it.The reinforcement means that soil-slope is conventional has the dark bolt anchorage of grid and free stone masonry, sprayed mortar etc.This method not only long construction period, mechanization degree is low, and material delivery is difficult, construction cost is high, and consolidation effect is still undesirable.Therefore, soil-slope strengthening construction is a technical barrier always.Up to now, there is no better solution.
The Chinese patent application part relating to soil-slope reinforcing is at present few, only have No. ZL2010101850611 " a kind of its support reinforcement method of deep soil-slope ", No. ZL2012100875254 " a kind of safeguard structure for reinforcing high liquid limit soil matter side slope ", No. 2012100063942 " stretch-draw self-locking umbrella type anchor and soil-slope reinforcement means ", No. ZL2013104364924 " a kind of method that composite curing agent is reinforced the domatic ecology of soil-slope ", No. 2012201250369, ZL " a kind of safeguard structure for reinforcing high liquid limit soil matter side slope " and No. ZL2014204696953 " reinforcement type soil-slope plants generating apparatus ".Although above patent has it to act on, a strengthening construction difficult problem for soil-slope can not be solved up hill and dale, because the destabilizing factor of soil-slope is a lot, need more to reinforce new technology.
Summary of the invention
The present invention aims to provide a kind of soil-slope construction method for grouting reinforcement, to increase the reinforcing technique scheme solving soil-slope, thus solves the technical barrier of strengthening construction.
For reaching goal of the invention, the soil-slope construction method for grouting reinforcement that inventor provides, comprises the following steps:
The first step, according to working design requirement on the soil-slope needed reinforcement, draws grid figure;
According to working design, second step, requires that ditching is loosened the soil, and digs out groove according to grid figure, require the condition that the hierarchy structure of groove meets design requirement; Object of loosening the soil is in order to cement grouting, and digging groove object is to bury wire rope underground;
3rd step, earth size fixing as required in soft earth, dig pit in the lattice point place intersected according to grid figure; Hole object of digging pit is structural integrity and the steadiness of copying tree root principle to increase grouting band and side slope soil, similarly is one tree after the hole grouting of a hole;
4th step, pre-buried wire rope across in length and breadth in the ditch dug out, vertical embedded bar in the hole of digging out, the top staple for strap of described reinforcing bar, reinforcing bar is connected to become entirety by shackle and wire rope, or reinforcing bar and wire rope are welded into entirety;
5th step, the lattice point slurry filling machine injection straight cement slurry intersected at grid figure is full to groove, and slip casting point is intensive, can not occur fracture;
6th step, grid structure cement slurry being solidified to formation checks, guarantees its solid native intensity; If soil property is too soft, namely increases anchor cable and reinforce, until the solid soil of grid structure reaches promising result.
In the said method first step, the size of described grid figure must be determined according to soil property situation, and common grid size is that length and width are 1500mm.
In said method second step, the width of described groove is generally 300 ~ 500mm, and the degree of depth is generally 200 ~ 500mm.
In said method the 3rd step, described in the diameter of digging pit be 200 ~ 300mm, the degree of depth is 500 ~ 1000 mm.
In said method the 4th step, described wire rope is corrosion-resistant steel wire rope, and described shackle diameter is 100 mm.
In said method the 5th step, described straight cement slurry is employing No. 425 cement plus water mixing, well-beaten slurry.
In 6th step of said method, described cement slurry setting time is 4 hours, and described anchor cable is reinforced as general method.
Inventor points out: the slurry injection technique that the inventive method is taked, be based on the principle of the solid soil of the woods, intersection grid structure is just as the horizontal branch of trees in length and breadth, and wherein vertically pre-buried reinforcing bar is just as the thribble of trees, horizontal branch and thribble form a stable solid soil structure, can guarantee that soil-slope is stablized.The thribble degree of depth can decide according to the soft degree of soil property, can reinforce conbined usage if desired with anchor cable.
The inventive method has the following advantages: in soil-slope ditching, easily construction of digging pit, the grid structure formed after slip casting and the fissureless entirety of original soil property, thus forms the entirety prevented water penetration; Grid structure is that post and beam is overall, neat appearance, just as the solid soil of tree root, is a kind of stereoscopic protective structure; The mechanization degree of the technology of the present invention is high, construction cost is low, the construction period is short, is applicable to the strengthening construction of soil-slope around mountain highway, railway, bridge and construction of structures.
Accompanying drawing explanation
Fig. 1 is the construction schematic diagram of ditching and local of digging pit, and Fig. 2 is reinforcing bar is connected local schematic diagram with wire rope, and Fig. 3 is local grid structure schematic diagram.In figure: 1 is ditch, 2 is hole, and 3 is wire rope, and 4 is reinforcing bar, and 5 is shackle.
Detailed description of the invention
Embodiment is on-the-spot at certain soil-slope, and the size needed reinforcement is 10m 3, first on the soil-slope needed reinforcement according to working design requirement, draw grid figure, grid length and width are 1500mm; Require that ditching is loosened the soil according to working design again, and dig out groove according to grid figure, the width of groove is 300mm, and the degree of depth is often 200mm; Then dig pit in the lattice point place intersected according to grid in earth, the diameter in hole is 200mm, and the degree of depth is 500mm; Afterwards in the ditch dug out in length and breadth across pre-buried 8 #wire rope, vertical embedded bar in the hole of digging out, the top band diameter of described reinforcing bar is the shackle of 100mm, and reinforcing bar is connected to become entirety by shackle and wire rope; Finally, the lattice point slurry filling machine intersected at grid figure injects employing No. 425 cement plus water mixing, well-beaten slurry, and full to groove, slip casting point is intensive, can not occur fracture; Solidify the grid structure namely forming solid soil after 4 hours, grid structure is checked, guarantee that its solid native intensity reaches promising result.

Claims (7)

1. a soil-slope construction method for grouting reinforcement, its feature comprises the following steps:
The first step, according to working design requirement on the soil-slope needed reinforcement, draws grid figure;
According to working design, second step, requires that ditching is loosened the soil, and digs out groove according to grid figure, require the condition that the hierarchy structure of groove meets design requirement;
3rd step, earth size fixing as required in soft earth, dig pit in the lattice point place intersected according to grid figure;
4th step, pre-buried wire rope across in length and breadth in the ditch dug out, vertical embedded bar in the hole of digging out, the top staple for strap of described reinforcing bar, reinforcing bar is connected to become entirety by shackle and wire rope, or reinforcing bar and wire rope are welded into entirety;
5th step, the lattice point slurry filling machine intensive injection straight cement slurry intersected at grid figure is full to groove;
6th step, grid structure cement slurry being solidified to formation checks, guarantees its solid native intensity; If soil property is too soft, namely increases anchor cable and reinforce, until the solid soil of grid structure reaches promising result.
2. construction method as claimed in claim 1, it is characterized in that in the first step, the size of described grid figure must be determined according to soil property situation, and normal length and width are 1500mm.
3. construction method as claimed in claim 1, it is characterized in that in second step, the width of described groove is generally 300 ~ 500mm, and the degree of depth is generally 200 ~ 500mm.
4. construction method as claimed in claim 1, is characterized in that in the 3rd step, described in the diameter of digging pit be 200 ~ 300mm, the degree of depth is 500 ~ 1000mm.
5. construction method as claimed in claim 1, it is characterized in that, in the 4th step, described wire rope is corrosion-resistant steel wire rope, described shackle diameter is 8mm.
6. construction method as claimed in claim 1, is characterized in that in the 5th step, and described straight cement slurry adopts fast hard quick hardening cement to add water mixing, well-beaten slurry.
7. construction method as claimed in claim 1, is characterized in that, in the 6th step, described cement slurry setting time is 4 hours, and described anchor cable is reinforced as general method.
CN201510250989.6A 2015-05-18 2015-05-18 Earth slope grouting reinforcement construction method Pending CN104947694A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510250989.6A CN104947694A (en) 2015-05-18 2015-05-18 Earth slope grouting reinforcement construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510250989.6A CN104947694A (en) 2015-05-18 2015-05-18 Earth slope grouting reinforcement construction method

Publications (1)

Publication Number Publication Date
CN104947694A true CN104947694A (en) 2015-09-30

Family

ID=54162712

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510250989.6A Pending CN104947694A (en) 2015-05-18 2015-05-18 Earth slope grouting reinforcement construction method

Country Status (1)

Country Link
CN (1) CN104947694A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024628A (en) * 2018-08-27 2018-12-18 深圳花果山生态科技有限公司 A kind of method of quick ecological slope controlling
CN109098189A (en) * 2018-08-02 2018-12-28 北京易成市政工程有限责任公司 Road slope landslide reinforcement construction method
CN113322980A (en) * 2021-03-04 2021-08-31 河海大学 Engineering side slope landslide hazard protection method based on self-dense cement soil
CN113700010A (en) * 2021-09-26 2021-11-26 江西理工大学 Reinforcing method, reinforcing material and reinforcing structure for leaching slag pile of rare earth heap leaching tank

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001172981A (en) * 1999-12-20 2001-06-26 Nisshoku Corp Slope reinforcing method
CN1699701A (en) * 2005-05-23 2005-11-23 邓敬森 Method for slope reinforcement
CN204112346U (en) * 2014-10-09 2015-01-21 宿迁华夏建设(集团)工程有限公司 High slope massif grid beams under complex geological condition
CN204212162U (en) * 2014-09-22 2015-03-18 中建四局第五建筑工程有限公司 A kind of side slope grouting reinforcement structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001172981A (en) * 1999-12-20 2001-06-26 Nisshoku Corp Slope reinforcing method
CN1699701A (en) * 2005-05-23 2005-11-23 邓敬森 Method for slope reinforcement
CN204212162U (en) * 2014-09-22 2015-03-18 中建四局第五建筑工程有限公司 A kind of side slope grouting reinforcement structure
CN204112346U (en) * 2014-10-09 2015-01-21 宿迁华夏建设(集团)工程有限公司 High slope massif grid beams under complex geological condition

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109098189A (en) * 2018-08-02 2018-12-28 北京易成市政工程有限责任公司 Road slope landslide reinforcement construction method
CN109024628A (en) * 2018-08-27 2018-12-18 深圳花果山生态科技有限公司 A kind of method of quick ecological slope controlling
CN113322980A (en) * 2021-03-04 2021-08-31 河海大学 Engineering side slope landslide hazard protection method based on self-dense cement soil
CN113700010A (en) * 2021-09-26 2021-11-26 江西理工大学 Reinforcing method, reinforcing material and reinforcing structure for leaching slag pile of rare earth heap leaching tank

Similar Documents

Publication Publication Date Title
CN104032758B (en) Extra-high reinforced construction method in discarded pit
CN106638673B (en) A kind of construction method of compound retaining structure
CN102518135B (en) Horizontal jet grouting soil anchor and castinplace pile Composite Foundation Pit supporting construction engineering method
CN107503257B (en) One kind being close to mountain high-filled subgrade stabilization and Deformation control structure and construction method
CN106498953A (en) Cut slope composite supporting construction and its construction method
CN204000901U (en) The vertical high slope prestressing anchor support of a kind of massif device
CN203741868U (en) Reinforced concrete retaining wall structure with combined anchor wire
CN102002956B (en) Multi-level fully-closed reinforcement technology of exposed fault zone of excavated side slope
CN107060774A (en) A kind of anti-tunnel portal wall damage device and construction method
CN104947694A (en) Earth slope grouting reinforcement construction method
CN102080381B (en) Method for managing landslip of side slope landslide for transformer substation
CN206599785U (en) A kind of campshed anchor draws cement earth pile diaphragm wall supporting construction
CN212077981U (en) Combined slope supporting structure
CN102425181A (en) Side slope greening restoration method
CN107012874A (en) A kind of upper-soft lower-hard ground subway station building enclosure
CN109083164A (en) Slope protection structure, tunnel advanced support structure and tunnel slope construction method
KR20090080230A (en) The grouting structure of tunnel and tunnel construction method using the same
CN107060837B (en) A kind of Shallow-buried asymmetry formula shield arch construction method
CN206245321U (en) Cut slope composite supporting construction
CN205605215U (en) Big section loess tunnel is grooving method construction structures in advance
CN107869143A (en) Ruggedized construction for loose crushing Dangerous Rock Body
CN107447775A (en) Landslide disaster body makes ground draining reinforced earth retaining wall structure
CN210459233U (en) Pile anchor foundation pit supporting structure for soft soil area
CN204311463U (en) A kind of Composite Bolt stake for slope reinforcement
CN104863166A (en) Reinforcement and rescuing construction method used after landslide and collapse of soil slope

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150930

WD01 Invention patent application deemed withdrawn after publication