CN104947577B - 地震紧急救援多山地区通道快速铺设车 - Google Patents
地震紧急救援多山地区通道快速铺设车 Download PDFInfo
- Publication number
- CN104947577B CN104947577B CN201510392750.2A CN201510392750A CN104947577B CN 104947577 B CN104947577 B CN 104947577B CN 201510392750 A CN201510392750 A CN 201510392750A CN 104947577 B CN104947577 B CN 104947577B
- Authority
- CN
- China
- Prior art keywords
- car body
- extension
- unit head
- electric hammer
- slab bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Maintenance And Inspection Apparatuses For Elevators (AREA)
- Emergency Lowering Means (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510392750.2A CN104947577B (zh) | 2015-07-07 | 2015-07-07 | 地震紧急救援多山地区通道快速铺设车 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510392750.2A CN104947577B (zh) | 2015-07-07 | 2015-07-07 | 地震紧急救援多山地区通道快速铺设车 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104947577A CN104947577A (zh) | 2015-09-30 |
CN104947577B true CN104947577B (zh) | 2017-09-01 |
Family
ID=54162602
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510392750.2A Expired - Fee Related CN104947577B (zh) | 2015-07-07 | 2015-07-07 | 地震紧急救援多山地区通道快速铺设车 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104947577B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107988909B (zh) * | 2017-07-28 | 2019-12-10 | 中铁二十四局集团有限公司 | 一种铁路便梁快速运输架设用拖车 |
CN112144373B (zh) * | 2019-06-28 | 2022-01-07 | 比亚迪股份有限公司 | 轨道车辆换乘方法、系统、装置、电子设备及存储介质 |
CN111472276B (zh) * | 2020-03-30 | 2021-10-19 | 中联重科股份有限公司 | 架桥车及其架设系统的控制方法和控制系统、存储介质 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB191511080A (en) * | 1915-07-30 | 1916-07-31 | Joseph Henry Woodington | Improvements in and relating to Portable Bridges, Landing Stages or the like. |
CN101949127A (zh) * | 2010-09-29 | 2011-01-19 | 王贵宣 | 移动式抢险救援便桥车 |
CN203713662U (zh) * | 2014-01-26 | 2014-07-16 | 于永东 | 全路面平跨式抢险救援车 |
CN203904810U (zh) * | 2014-05-12 | 2014-10-29 | 陈武浩 | 一种移动式抢险救援桥车 |
CN204212046U (zh) * | 2014-08-19 | 2015-03-18 | 中国人民解放军理工大学 | 一种伸缩式应急桥梁 |
CN204023395U (zh) * | 2014-08-20 | 2014-12-17 | 青岛理工大学 | 一种抢险救援架桥车 |
CN204780561U (zh) * | 2015-07-07 | 2015-11-18 | 徐州工程学院 | 地震紧急救援多山地区通道快速铺设车 |
-
2015
- 2015-07-07 CN CN201510392750.2A patent/CN104947577B/zh not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN104947577A (zh) | 2015-09-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104947577B (zh) | 地震紧急救援多山地区通道快速铺设车 | |
CN106823190B (zh) | 一种倒l形深井救援器及方法 | |
CN206737388U (zh) | 吊装式电梯井施工平台装置 | |
CN206267026U (zh) | 一种桥梁施工升降安全梯 | |
CN108190685A (zh) | 一种移动式超高层施工电梯导轨架附着装置及其施工方法 | |
CN204780561U (zh) | 地震紧急救援多山地区通道快速铺设车 | |
CN111609209B (zh) | 一种顶管施工用支撑装置 | |
CN107512668A (zh) | 重力自锁式附墙爬升装置 | |
CN105804633B (zh) | 一种辅助装置和应用该辅助装置的多功能登高梯 | |
CN206048019U (zh) | 一种高空狭小处螺栓紧固装置 | |
CN104818995B (zh) | 一种拼装约束混凝土拱架的方法 | |
CN103556603B (zh) | 面板堆石坝塑性止水施工台车及施工方法 | |
CN204849564U (zh) | 紧急救援通道铺设车的伸缩板桥的安全扶手结构 | |
CN205822193U (zh) | 静力拔桩机 | |
CN210507165U (zh) | 桥梁装修用脚手架装置及桥梁装修作业结构 | |
CN203475435U (zh) | 自动锁紧式杠杆拔桩器 | |
CN209967522U (zh) | 一种绳网桥 | |
CN204709677U (zh) | 地震救援紧急通道快速铺设车 | |
CN103321565A (zh) | 用于攀爬杆塔的折叠式软梯 | |
CN206934483U (zh) | 一种倒l形深井救援器 | |
CN104922825B (zh) | 地震救援紧急通道快速铺设车 | |
CN203961329U (zh) | 一种建筑用安全防护结构 | |
CN204081977U (zh) | 便携式叉梁爬梯 | |
CN204983610U (zh) | 室外装修铝塑窗的移动悬挑作业车 | |
CN203888790U (zh) | 一种架空装置乘人吊椅 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Sun Jian Inventor after: Li Fuxing Inventor after: Huang Chuanhui Inventor after: Zhang Yuanyue Inventor after: Lu Xinghua Inventor after: Zhang Jianhua Inventor before: Li Fuxing Inventor before: Huang Chuanhui Inventor before: Li Peilin |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170901 Termination date: 20180707 |