CN104912100B - Pipe gallery synthetic assembly mouth - Google Patents

Pipe gallery synthetic assembly mouth Download PDF

Info

Publication number
CN104912100B
CN104912100B CN201510393845.6A CN201510393845A CN104912100B CN 104912100 B CN104912100 B CN 104912100B CN 201510393845 A CN201510393845 A CN 201510393845A CN 104912100 B CN104912100 B CN 104912100B
Authority
CN
China
Prior art keywords
pipeline
installing port
storehouse
electric power
mouth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510393845.6A
Other languages
Chinese (zh)
Other versions
CN104912100A (en
Inventor
崔铭俊
宋宏宇
鞠凤
王姣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Municipal Design & Research Institute Co Ltd
Original Assignee
Dalian Municipal Design & Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Municipal Design & Research Institute Co Ltd filed Critical Dalian Municipal Design & Research Institute Co Ltd
Priority to CN201510393845.6A priority Critical patent/CN104912100B/en
Publication of CN104912100A publication Critical patent/CN104912100A/en
Application granted granted Critical
Publication of CN104912100B publication Critical patent/CN104912100B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ventilation (AREA)

Abstract

The invention discloses a kind of pipe gallery synthetic assembly mouth, including installing port pipeline storehouse and the installing port electric power storehouse being arranged at side, installing port pipeline storehouse, it is provided with pipeline groove bottom described installing port pipeline storehouse, under pipeline in installing port pipeline storehouse curved to pipeline groove, described pipeline groove is arranged over way pipe trench cover plate;Being provided with electric power groove bottom described installing port electric power storehouse, curved to electric power groove under the cable in installing port electric power storehouse, described electric power groove is arranged over electric power Ditch cover board;Described installing port pipeline storehouse is arranged over Pipe installing mouth;Being equipped with ventilating opening above described installing port electric power storehouse and installing port pipeline storehouse, described ventilating opening passes through air channel and ft connection.The present invention saves cost, reduces view and the impact of environment;Improve reliability and security that dog-house uses;Staircase design is conducive to personnel to overhaul, and time of crisis is escaped;Improve construction quality and progress;Use and ventilate in a organized way, improve air ambient in piping lane.

Description

Pipe gallery synthetic assembly mouth
Technical field
The present invention relates to city integrated piping lane technical field, be specifically related to a kind of pipe gallery synthetic assembly mouth.
Background technology
The set-up mode of existing pipe gallery synthetic assembly mouth is that force ventilation mouth is provided separately with dog-house, throws Material mouth is positioned at directly over piping lane personnel channel, and every 200 meters arrange one, arrange vertical cat ladder, it is ensured that personnel Urgent discrepancy, dog-house takes into account gravity-flow ventilation.Force ventilation is positioned at pipe gallery fire resistant doorsets, and each is prevented Fire subregion about 200m, 2 side fire resistant doorsets respectively arrange a force ventilation.To sum up prior art pipe gallery is often There are 3 structures on 200m ground, affect attractive in appearance.Dog-house position and piping lane position consistency, installation The scope of operation is little, and part is positioned under road, causes installation and repairing inconvenience, affects road.
Summary of the invention
The present invention is directed to existing piping lane installing port set forth above be difficult to construction, affect attractive in appearance, installation and repairing not Just and affect the problem of road, and research and design one pipe gallery synthetic assembly mouth.The present invention uses Technological means as follows:
A kind of pipe gallery synthetic assembly mouth, including installing port pipeline storehouse be arranged at side, installing port pipeline storehouse Installing port electric power storehouse, be provided with pipeline groove, the pipe in installing port pipeline storehouse bottom described installing port pipeline storehouse Under road curved to pipeline groove, described pipeline groove is arranged over way pipe trench cover plate;Described installing port electric power Electric power groove it is provided with bottom storehouse, curved to electric power groove under the cable in installing port electric power storehouse, described electric power ditch Groove is arranged over electric power Ditch cover board;Described installing port pipeline storehouse is arranged over Pipe installing mouth;Described installation Being equipped with ventilating opening above mouth electric power storehouse and installing port pipeline storehouse, described ventilating opening passes through air channel and ft connection.
Further, described Pipe installing mouth is the rectangle peace in direction and direction, installing port pipeline storehouse relative set Dress mouth.
Further, the building connected bottom pipeline installing port and safe mouth pipeline storehouse it is provided with in installing port pipeline storehouse Ladder.
Further, the width of described pipe gallery synthetic assembly mouth is more than the width of piping lane standard paragraphs, described The transition that pipe gallery synthetic assembly mouth is tapered into by width with piping lane standard paragraphs is connected.
Further, described piping lane standard paragraphs is connected by movement joint with transition, and described deformation joint is provided with Waterstop and power transmission rod member, limit joint vertical deformation.
Further, described Pipe installing mouth is arranged over removable cover, is provided with anti-below described removable cover Fall safety net.
Further, the top board beam of described pipe gallery synthetic assembly mouth is upper reversed beam, i.e. top board beam is arranged on Above top board.
Further, present invention additionally comprises exhaust system, described exhaust system coordinates with ventilating opening and air channel and sets Putting, described exhaust system is natural ventilation system and/or mechanical ventilation system.
Compared with the prior art, pipe gallery synthetic assembly mouth of the present invention has the advantage that
1, reduce ground structures quantity, save cost, reduce view and the impact of environment;
2, reduce ground well head quantity, improve reliability and security that dog-house uses;
3, using staircase design to be conducive to personnel to overhaul, time of crisis is escaped;
4, construction quality and progress are improved;
5, employing is ventilated in a organized way, improves air ambient in piping lane.
Accompanying drawing explanation
Fig. 1 is the plan structure schematic diagram of pipe gallery synthetic assembly mouth of the present invention.
Fig. 2 is the A-A sectional view of Fig. 1.
Fig. 3 is the B-B sectional view of Fig. 2.
Fig. 4 is the C-C sectional view of Fig. 2.
Fig. 5 is deformation joint structure schematic diagram of the present invention.
Fig. 6 is exhaust system schematic diagram of the present invention.
Detailed description of the invention
As shown in Figures 1 to 4, a kind of pipe gallery synthetic assembly mouth, including installing port pipeline storehouse 1 with set It is placed in the installing port electric power storehouse 2 of side, installing port pipeline storehouse 1, bottom described installing port pipeline storehouse 1, is provided with pipeline Groove 11, curved to pipeline groove 11 under the pipeline in installing port pipeline storehouse 1, on described pipeline groove 11 Side is provided with way pipe trench cover plate 12;Electric power groove 21, installing port electricity it is provided with bottom described installing port electric power storehouse 2 Under cable in power storehouse 2 curved to electric power groove 21, described electric power groove 21 is arranged over electric power groove lid Plate 22;Described installing port pipeline storehouse 1 is arranged over Pipe installing mouth 13;Described installing port electric power storehouse 2 and peace Being equipped with ventilating opening 3 above dress mouth pipeline storehouse 1, described ventilating opening 3 is by air channel 4 and ft connection, air channel 4 are perpendicular to Pipe installing mouth 13 is horizontally disposed with, one end of laminating Pipe installing mouth 13, the port in air channel 4 41 with ventilating opening 3 not on same position;Side wall between installing port pipeline storehouse 1 and installing port electric power storehouse 2 On be communicated with the fire prevention in two spaces and pass through door 5, convenient pass through back and forth, pipe gallery synthetic assembly mouth is steel Tendon concrete structure.The present embodiment by installing port interior conduit installation form is adjusted, make piping lane each Bin is interconnected, and accomplishes that single dog-house meets each bin equipment hoisting demand, thus avoids routine to do The problem that dog-house that method is brought is too much, can be prevented effectively from dog-house and be positioned under car lane, shadow during construction The problem ringing traffic.
Described Pipe installing mouth 13 is the rectangle installing port in direction and direction, installing port pipeline storehouse 1 relative set, The size of Pipe installing mouth 13 is arranged according to conventional equipment and line size, it is ensured that under an economic specification, Every kind of pipeline can be installed smoothly, after specification standardization, is greatly saved construction period and corresponding mould expense, Reduce difficulty of construction.
The stair 14 connected bottom pipeline installing port 13 and safe mouth pipeline storehouse 1 it are provided with in installing port pipeline storehouse 1, Cat ladder is changed into stair, facilitates personnel carrying device to pass in and out, and the personnel that realize import and export independent unlatching, stair The setting direction of 14 is cascaded surface one end towards Pipe installing mouth, it is ensured that in the case of personal security turnover to the greatest extent End may be leaned on to arrange, it would however also be possible to employ the form that independent persons is imported and exported is set in Pipe installing mouth 13 one end Build.
The width of described pipe gallery synthetic assembly mouth is more than the width of piping lane standard paragraphs 6, piping lane standard paragraphs 6 The part of the most non-installing port, described pipe gallery synthetic assembly mouth is gradually become by width with piping lane standard paragraphs 6 Little transition 7 connects, and entirety increases the inner space of pipe gallery synthetic assembly mouth, reduces construction Difficulty.The present embodiment specifically uses the mode that side width increases, and keeping side side plate is that straight line is arranged, separately The form of side outwardly convex.Owing to installing port pipeline storehouse 1 is relatively big, according to the position of Pipe installing mouth 13 and The requirement that pipeline transports after entering piping lane, reasonably arranges top board beam 15 and column, reduces the thickness of top board, Meet structural safety requirement.
As it is shown in figure 5, described piping lane standard paragraphs 6 is connected by movement joint 8 with transition 7, described deformation Stitch and at 8, be provided with waterstop 81 and power transmission rod member 82, limit joint vertical deformation.
Described Pipe installing mouth 13 is arranged over removable cover 16, removable cover 16 be set to Facing material with Pavement square brick recessive cover plate always, can open from inside and out, respectively in the situation ensureing safety Under do not affect the appearance, be provided with dropproof safety net 17 below described removable cover 16, it is ensured that inside and outside pipe gallery The safety of personnel.
The top board beam 15 of described pipe gallery synthetic assembly mouth is upper reversed beam, i.e. top board beam 15 is arranged on top board Top, the top board of pipe gallery synthetic assembly mouth is internal is flat configuration, and Wu Liangge is comprehensive with pipe gallery Before and after installing port, piping lane standard paragraphs no visual is poor, and eliminates the harmful effect to construction of the beam lattice.
As shown in Figure 6, present invention additionally comprises exhaust system 9, common building ventilating system can be used, described Exhaust system 9 is equipped with ventilating opening 3 and air channel 4, described exhaust system 9 be natural ventilation system and/ Or mechanical ventilation system, exhaust system 9 includes being arranged in piping lane standard paragraphs and pipe gallery synthetic assembly mouth Air pipeline 91, air pipeline 91 is all connected with air or force ventilation auxiliary equipment by connecting line, Pipeline storehouse and electric power storehouse can be respectively provided with independent exhaust system.
The above, the only present invention preferably detailed description of the invention, but protection scope of the present invention not office Being limited to this, any those familiar with the art is in the technical scope that the invention discloses, according to this The technical scheme of invention and inventive concept thereof in addition equivalent or change, all should contain the protection in the present invention Within the scope of.

Claims (8)

1. a pipe gallery synthetic assembly mouth, it is characterised in that: include installing port pipeline storehouse and be arranged at peace The installing port electric power storehouse of dress side, mouth pipeline storehouse, is provided with pipeline groove bottom described installing port pipeline storehouse, installs Under pipeline in mouthful pipeline storehouse curved to pipeline groove, described pipeline groove is arranged over way pipe trench cover plate; Electric power groove it is provided with bottom described installing port electric power storehouse, curved to electric power groove under the cable in installing port electric power storehouse In, described electric power groove is arranged over electric power Ditch cover board;Described installing port pipeline storehouse is arranged over pipeline peace Dress mouth;Being equipped with ventilating opening above described installing port electric power storehouse and installing port pipeline storehouse, described ventilating opening passes through Air channel and ft connection.
Pipe gallery synthetic assembly mouth the most according to claim 1, it is characterised in that: described pipeline is pacified Dress mouth is the rectangle installing port in direction and direction, installing port pipeline storehouse relative set.
Pipe gallery synthetic assembly mouth the most according to claim 2, it is characterised in that: installing port pipeline The stair connected bottom pipeline installing port and safe mouth pipeline storehouse it are provided with in storehouse.
Pipe gallery synthetic assembly mouth the most according to claim 3, it is characterised in that: described integrated pipe The width of Lang Zongheanzhuankou is more than the width of piping lane standard paragraphs, described pipe gallery synthetic assembly mouth and piping lane The transition that standard paragraphs is tapered into by width connects.
Pipe gallery synthetic assembly mouth the most according to claim 4, it is characterised in that: described piping lane mark Quasi-section is connected by movement joint with transition, and described deformation joint is provided with waterstop and power transmission rod member, and it is right to limit Connect place's vertical deformation.
Pipe gallery synthetic assembly mouth the most according to claim 4, it is characterised in that: described pipeline is pacified Dress mouth is arranged over removable cover, is provided with dropproof safety net below described removable cover.
Pipe gallery synthetic assembly mouth the most according to claim 6, it is characterised in that: described integrated pipe The top board beam of Lang Zongheanzhuankou is upper reversed beam.
Pipe gallery synthetic assembly mouth the most as claimed in any of claims 1 to 7, its feature exists In: also include that exhaust system, described exhaust system are equipped with ventilating opening and air channel, described exhaust system For natural ventilation system and/or mechanical ventilation system.
CN201510393845.6A 2015-07-06 2015-07-06 Pipe gallery synthetic assembly mouth Active CN104912100B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510393845.6A CN104912100B (en) 2015-07-06 2015-07-06 Pipe gallery synthetic assembly mouth

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510393845.6A CN104912100B (en) 2015-07-06 2015-07-06 Pipe gallery synthetic assembly mouth

Publications (2)

Publication Number Publication Date
CN104912100A CN104912100A (en) 2015-09-16
CN104912100B true CN104912100B (en) 2016-09-07

Family

ID=54081504

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510393845.6A Active CN104912100B (en) 2015-07-06 2015-07-06 Pipe gallery synthetic assembly mouth

Country Status (1)

Country Link
CN (1) CN104912100B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105604089B (en) * 2016-02-02 2024-03-08 上海市政工程设计研究总院(集团)有限公司 Semi-underground utility tunnel
CN109736348A (en) * 2018-08-31 2019-05-10 上海二十冶建设有限公司 The precast section of prefabricated assembled piping lane and the transition processing method of Cast-in-Situ Segment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2658103A1 (en) * 1975-12-29 1977-07-07 Tiefbauamt Der Stadt Leipzig Small-bore driving between tunnel and basements - holes in tunnel wall lined up with bore axis and target entry to basement, abutment formed for drill
DE19922830A1 (en) * 1999-05-19 2000-11-23 Mueller Karl Fr Accessible tunnel system for all municipal services is constructed from individual modular components, connection and sealing units
CN101182781A (en) * 2007-08-06 2008-05-21 上海市政工程设计研究总院 Breathing place used for synthesis pipe canal
CN204401649U (en) * 2014-12-08 2015-06-17 张楸长 Arch resistance to compression longitudinal prestressing pin-connected panel underground pipe gallery
CN204803915U (en) * 2015-07-06 2015-11-25 大连市市政设计研究院有限责任公司 Synthesize piping lane and synthesize installing port

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2658103A1 (en) * 1975-12-29 1977-07-07 Tiefbauamt Der Stadt Leipzig Small-bore driving between tunnel and basements - holes in tunnel wall lined up with bore axis and target entry to basement, abutment formed for drill
DE19922830A1 (en) * 1999-05-19 2000-11-23 Mueller Karl Fr Accessible tunnel system for all municipal services is constructed from individual modular components, connection and sealing units
CN101182781A (en) * 2007-08-06 2008-05-21 上海市政工程设计研究总院 Breathing place used for synthesis pipe canal
CN204401649U (en) * 2014-12-08 2015-06-17 张楸长 Arch resistance to compression longitudinal prestressing pin-connected panel underground pipe gallery
CN204803915U (en) * 2015-07-06 2015-11-25 大连市市政设计研究院有限责任公司 Synthesize piping lane and synthesize installing port

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
城市综合管廊特点及设计要点解析;胡静文等;《城市道桥与防洪》;20121215(第12期);第196-199页 *
广州亚运城综合管廊结构设计综述;杨先华;《市政技术》;20120910;第30卷(第5期);第71-73页 *
综合管廊断面型式选用分析;汪胜;《中国市政工程》;20140825(第4期);第34-35、38页 *

Also Published As

Publication number Publication date
CN104912100A (en) 2015-09-16

Similar Documents

Publication Publication Date Title
CN106906846B (en) Prefabricated comprehensive pipe gallery
CN104912100B (en) Pipe gallery synthetic assembly mouth
CN204803915U (en) Synthesize piping lane and synthesize installing port
CN207700219U (en) A kind of pipe gallery in more cabins
CN109914644A (en) A kind of assembled heat insulation masonry wall and preparation method thereof
CN107447782A (en) A kind of ventilation of underground pipe gallery and escape structure
CN209323565U (en) A kind of integration node of underground pipe gallery
CN107060152A (en) Attachment means and method between a kind of prefabricated internal partition wall of transformer station and floor
CN206742817U (en) It is easy to the cable duct of cable maintenance
CN201614665U (en) Air conditioner mounting plate connecting joint
CN206976968U (en) Adjustable distribution box
CN206554318U (en) Wall is built in a kind of room
CN104499625A (en) Profiled steel sheet and composite floor
CN210369035U (en) Subway station structure
CN211735501U (en) Connection node from control center to comprehensive pipe gallery
CN204266444U (en) A kind of profiled sheet and composite floor
CN105089024B (en) Underground power house outlet arrangement and structure
CN208685813U (en) A kind of plug-in parapet connecting node construction of clear-water concrete
CN208309591U (en) One kind not landing elevator foundation pit
CN106193685A (en) Prefabricated assembled communications equipment room structure
CN208293821U (en) A kind of construction wall leads wet structure
CN207121927U (en) Prefabricated pipe gallery
CN206888010U (en) Comprehensive pipe gallery structure with tool car Vomitory
CN206844447U (en) Villa roof structure
CN205577358U (en) Pipe in water baffle

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Integrated installation opening of integrated pipe gallery

Effective date of registration: 20221031

Granted publication date: 20160907

Pledgee: Industrial Bank Limited by Share Ltd. Dalian branch

Pledgor: DALIAN MUNICIPAL DESIGN & RESEARCH INSTITUTE Co.,Ltd.

Registration number: Y2022980020373

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20160907

Pledgee: Industrial Bank Limited by Share Ltd. Dalian branch

Pledgor: DALIAN MUNICIPAL DESIGN & RESEARCH INSTITUTE Co.,Ltd.

Registration number: Y2022980020373

PC01 Cancellation of the registration of the contract for pledge of patent right