CN104879130A - Method for exploiting surface mine slope deformation area - Google Patents
Method for exploiting surface mine slope deformation area Download PDFInfo
- Publication number
- CN104879130A CN104879130A CN201510200327.8A CN201510200327A CN104879130A CN 104879130 A CN104879130 A CN 104879130A CN 201510200327 A CN201510200327 A CN 201510200327A CN 104879130 A CN104879130 A CN 104879130A
- Authority
- CN
- China
- Prior art keywords
- side slope
- exploiting
- slope
- displacement direction
- deformed area
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The invention discloses a method for exploiting a surface mine slope deformation area. The exploiting method comprises the following steps: firstly, establishing an earth surface and deep hole displacement monitoring network for an end slope deformation area so as to determine the slope displacement direction; and then exploiting in the direction opposite to a slope, and discharging soil and pressing feet in a soil discharged space formed by exploiting. The method for exploiting the surface mine slope deformation area is used for discharging the soil and pressing the feed immediately after the soil discharged space is formed by exploiting disclosed coal at the lower part of the deformation area so as to enhance the treatment effect on slope sliding and deformation, so that the recycling rate of mineral resources embedded due to landslide is increased.
Description
Technical field
The present invention relates to opencast mining field, particularly a kind of exploitation method of open mine side slope deformed area.
Background technology
Current domestic surface mine adopts the technical scheme of cutting slope presser feet (exploiting after first cutting slope presser feet) to exploit landslide and deformed region to the improvement of slope sliding, deformed region.
The limitation of the exploitation method of this landslide and deformed region is comparatively large, and production technique is not perfect, and press the mineral resource recovery rate of burying low because of landslide, loss of mineral resources is larger.
The information being disclosed in this background technology part is only intended to increase the understanding to general background of the present invention, and should not be regarded as admitting or imply in any form that this information structure has been prior art that persons skilled in the art are known.
Summary of the invention
The object of the present invention is to provide a kind of exploitation method of open mine side slope deformed area of simple and reasonable steps, deformed region bottom has been disclosed coal extraction and to have formed behind casting space casting presser feet immediately by the exploitation method of this open mine side slope deformed area, strengthen the regulation effect to slope sliding, distortion, improve and pressed the mineral resource recovery utilization rate of burying because of landslide.
For achieving the above object, the invention provides the exploitation method of open mine side slope deformed area, comprise the following steps: first, first set up end wall deformed region earth's surface and deep hole displacement monitoring net, to determine displacement direction of side slope; Then, just to displacement direction of side slope exploitation, and casting presser feet is carried out in the casting space that extraction is formed.
Preferably, in technique scheme, advance with the face width of 40m when just displacement direction of side slope being exploited.
Preferably, in technique scheme, when just displacement direction of side slope being exploited, coal seam is divided into multiple step.
Preferably, in technique scheme, when just displacement direction of side slope being exploited, coal seam is divided into two or three steps.
Preferably, in technique scheme, after casting presser feet, as deformation tendency slows down, displacement monitoring speed diminish or stable after, adopts two excavator cooperatings carry out fast extraction, fast in arrange.
Compared with prior art, the present invention has following beneficial effect: deformed region bottom has been disclosed coal extraction and to have formed behind casting space casting presser feet immediately by the exploitation method of this open mine side slope deformed area, strengthen the regulation effect to slope sliding, distortion, improve and pressed the mineral resource recovery utilization rate of burying because of landslide.
Accompanying drawing explanation
Fig. 1 is the slope displacement polar plot of the exploitation method of open mine side slope deformed area of the present invention;
Fig. 2 is the exploitation engineering arrangement diagram of the exploitation method of open mine side slope deformed area of the present invention;
Fig. 3 is that the exploitation engineering of the exploitation method of open mine side slope deformed area of the present invention develops the first figure;
Fig. 4 is that the exploitation engineering of the exploitation method of open mine side slope deformed area of the present invention develops the second figure;
Fig. 5 is exploitation engineering development the 3rd figure of the exploitation method of open mine side slope deformed area of the present invention.
Detailed description of the invention
Below in conjunction with accompanying drawing, the specific embodiment of the present invention is described in detail, but is to be understood that protection scope of the present invention not by the restriction of detailed description of the invention.
Clearly represent unless otherwise other, otherwise in whole manual and claims, term " comprise " or its conversion as " comprising " or " including " etc. by be understood to include the element of stating or ingredient, and do not get rid of other element or other ingredient.
Exploitation method according to the open mine side slope deformed area of the specific embodiment of the invention comprises the following steps:
As shown in Figure 1, first, first set up end wall deformed region earth's surface and deep hole displacement monitoring net, according to monitored data, draw end wall displacement vector figure, determine displacement direction of side slope.
Then, just to displacement direction of side slope exploitation, and casting presser feet is carried out in the casting space that extraction is formed.
As shown in Figures 2 to 5, concrete exploitation method is as follows:
(1) face width with 40m from east side advances southwards, and the displacement direction of side slope that direction of propulsion and slope displacement monitoring obtain is contrary.During exploitation, coal seam is divided into n step (according to Coal Seam Thickness Change, n gets 2,3), when exploiting the first width, topmost step width is 40+ (n-1) × 30m, in east side, n=2, with WK10 excavator adopt dress, Automobile Transportation carries out back production, shoulder height 12m.
(2) after deformed region bottom having been disclosed coal extraction formation casting space, casting presser feet immediately; If deformation tendency slows down, displacement monitoring speed diminish or stable after, 2 excavator cooperatings can be adopted to carry out fast extraction, fast interior row, reduce the distortion of southeast side side slope, ensure the safety of ground installation (building, transmission line of electricity etc.) and underground installation (drainage pipe etc.); If stability of slope is in bad order in above-mentioned recovery process, a small amount of coal of foot step can be cast out and do not adopt, stay and do end side presser feet, to ensure the stability of end wall.
To sum up, deformed region bottom has been disclosed coal extraction and to have formed behind casting space casting presser feet immediately by the exploitation method of this open mine side slope deformed area, strengthen the regulation effect to slope sliding, distortion, improve and pressed the mineral resource recovery utilization rate of burying because of landslide.
The aforementioned description to concrete exemplary of the present invention is to illustrate and the object of illustration.These descriptions not want the present invention to be defined as disclosed precise forms, and obviously, according to above-mentioned instruction, can much change and change.The object selected exemplary embodiment and describe is to explain certain principles of the present invention and practical application thereof, thus those skilled in the art can be realized and utilize various different exemplary of the present invention and various different selection and change.Scope of the present invention is intended to limited by claims and equivalents thereof.
Claims (5)
1. an exploitation method for open mine side slope deformed area, is characterized in that, comprises the following steps:
First, end wall deformed region earth's surface and deep hole displacement monitoring net is first set up, to determine displacement direction of side slope;
Then, just to displacement direction of side slope exploitation, and casting presser feet is carried out in the casting space that extraction is formed.
2. the exploitation method of open mine side slope deformed area according to claim 1, is characterized in that, advances when just exploiting displacement direction of side slope with the face width of 40m.
3. the exploitation method of open mine side slope deformed area according to claim 2, is characterized in that, when just exploiting displacement direction of side slope, coal seam is divided into multiple step.
4. the exploitation method of open mine side slope deformed area according to claim 3, is characterized in that, when just exploiting displacement direction of side slope, coal seam is divided into two or three steps.
5. the exploitation method of open mine side slope deformed area according to claim 1, is characterized in that, after casting presser feet, as deformation tendency slows down, displacement monitoring speed diminish or stable after, adopt two excavator cooperatings to carry out back production and interior row.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510200327.8A CN104879130A (en) | 2015-04-24 | 2015-04-24 | Method for exploiting surface mine slope deformation area |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510200327.8A CN104879130A (en) | 2015-04-24 | 2015-04-24 | Method for exploiting surface mine slope deformation area |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104879130A true CN104879130A (en) | 2015-09-02 |
Family
ID=53946781
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510200327.8A Pending CN104879130A (en) | 2015-04-24 | 2015-04-24 | Method for exploiting surface mine slope deformation area |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104879130A (en) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1888391A (en) * | 2006-07-25 | 2007-01-03 | 武汉理工大学 | Fast spoil disposal slope protection and ecological recovery open-pit mining technology |
CN203429597U (en) * | 2013-07-10 | 2014-02-12 | 中国水电顾问集团华东勘测设计研究院 | Anti-underwashing protection slope structure for downstream river channel of hydropower plant |
-
2015
- 2015-04-24 CN CN201510200327.8A patent/CN104879130A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1888391A (en) * | 2006-07-25 | 2007-01-03 | 武汉理工大学 | Fast spoil disposal slope protection and ecological recovery open-pit mining technology |
CN203429597U (en) * | 2013-07-10 | 2014-02-12 | 中国水电顾问集团华东勘测设计研究院 | Anti-underwashing protection slope structure for downstream river channel of hydropower plant |
Non-Patent Citations (3)
Title |
---|
易平: "《西露天煤矿南采区到界过程中滑坡区清理方案》", 《露天采矿技术》 * |
王振伟: "《内排及削坡对露天矿边坡稳定性影响的实验分析》", 《实验力学》 * |
谢云燕: "安家岭露天矿南帮边坡不稳定区域防止措施", 《露天开采技术》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103498696B (en) | A kind of method from roadway in the roof grouting filling compacting goaf filling body | |
AU2019376347B2 (en) | A method for coal mining based on frozen aquifer for underground longwall face under water-conservation condition | |
CN103790589A (en) | Transition connection mining technique from outdoor mine to underground mine | |
CN104480974B (en) | Reverse seepage drain system suitable for upstream type tailings pond and upstream type tailings pond | |
CN107687342B (en) | A kind of open coal mine drawing bucket shovel active line segmentation alternative expression exploiting field forward method | |
CN110159267B (en) | Water-bearing stratum sectional grouting curtain water-retention mining method | |
CN104389606A (en) | Novel mine mining technical scheme based on environment protection | |
CN105240014A (en) | Method for reclaiming house type remaining coal pillars based on filling and rebuilding of entry protection coal-pillar band | |
CN102913280B (en) | Method for draining roof water in flood mine | |
CN103235853B (en) | Adopt the multiple base pool layout method based on earthwork balance in limit for coal-mining subsidence rand | |
CN104047621B (en) | Based on the maximum section of passenger flow adit construction method of top small interval basement excavation condition | |
CN104895531A (en) | Single thick coal seam ground mining well extraction process | |
CN204370458U (en) | A kind of open-cut foundation ditch dewatering installation | |
CN103790590A (en) | Technology for preventing and controlling underground floods in transitional period from surface mine to underground mine | |
CN104454001A (en) | In-tunnel dewatering system and method for tunnel in low-permeability silty-fine sand stratum | |
CN107338783B (en) | The method for reducing cohesive soil stock ground earth material water content | |
CN207211100U (en) | Vertical shaft type powerhouse of hydropower station structure | |
CN103557029A (en) | Method for transition from non-pillar sublevel caving method to upward horizontal cut-and-fill method | |
CN104879130A (en) | Method for exploiting surface mine slope deformation area | |
CN204827445U (en) | Tail system gathers at large mining height fully -mechanized working face end | |
CN206359956U (en) | Civil engineering bank protection step brick | |
CN103291303B (en) | A kind ofly stay the exploitation method of establishing strip coal pillar | |
CN204327189U (en) | Precipitation system in hypotonicity thin silt tunnel | |
CN104712000A (en) | Pressure reduction and water drainage system under ultra-deep underground space structure bottom plate | |
CN102061701A (en) | Construction method for installing vertical grounding electrode by punching and pouring pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150902 |
|
RJ01 | Rejection of invention patent application after publication |