CN204370458U - Open cut foundation ditch drainage device - Google Patents
Open cut foundation ditch drainage device Download PDFInfo
- Publication number
- CN204370458U CN204370458U CN201420792939.1U CN201420792939U CN204370458U CN 204370458 U CN204370458 U CN 204370458U CN 201420792939 U CN201420792939 U CN 201420792939U CN 204370458 U CN204370458 U CN 204370458U
- Authority
- CN
- China
- Prior art keywords
- water tank
- water
- gutter
- foundation ditch
- open
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 45
- 238000010276 construction Methods 0.000 claims abstract description 32
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 6
- 239000010959 steel Substances 0.000 claims abstract description 6
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 12
- 238000009434 installation Methods 0.000 claims description 10
- 239000000706 filtrate Substances 0.000 claims description 7
- 229910052742 iron Inorganic materials 0.000 claims description 6
- 238000009412 basement excavation Methods 0.000 abstract description 8
- 239000003673 groundwater Substances 0.000 abstract description 5
- 238000000034 method Methods 0.000 abstract description 2
- 238000001556 precipitation Methods 0.000 abstract description 2
- 238000007796 conventional method Methods 0.000 abstract 1
- 239000000463 material Substances 0.000 abstract 1
- 230000002093 peripheral effect Effects 0.000 abstract 1
- 239000004576 sand Substances 0.000 description 3
- 238000005086 pumping Methods 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 239000000758 substrate Substances 0.000 description 2
- 241000251468 Actinopterygii Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 239000003351 stiffener Substances 0.000 description 1
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
The utility model provides an open cut foundation ditch drainage device, includes the sump pit, with the drain pipe of sump pit intercommunication and set up the filter material around the drain pipe, the device places in one side that a back construction section leaned on preceding construction section, the sump pit lower half is the water tank of a cube, is equipped with the water pump in the water tank, is connected with the mouth of hanging that a perpendicular setting directly over the water tank, the middle part of hanging a mouthful periphery is provided with a water proof steel sheet, one side of water tank with open the drain pipe connection who has a plurality of wash ports, the outer parcel of drain pipe has the one deck filter screen. The utility model is suitable for a construction of city subway open cut station bottom plate, ground water level is higher, and the well point precipitation is done to peripheral residential area unconditional, can carry out the drainage at excavation to near floor elevation. Namely, the clear water is drained to a drainage device and then is pumped to a designated place. Compared with the conventional method, the method has the advantages of cost saving, underground water resource protection, simple construction method, high efficiency, time and labor saving and reusability.
Description
Technical field
The utility model relates to a kind of drainage of foundation pit device, the device of particularly a kind of open-cut foundation ditch draining.
Background technology
Various drainage of foundation pit work is a very important job in high-building construction; in city underground open-cut station construction of bottom plates; groundwater table is higher; well-points dewatering is unconditionally done by nearby residents district; and well-points dewatering need be constructed for 1 month before soil excavation; precipitation need last till that station base plate is completely closed, and pumping cycle is long, is unfavorable for protection of groundwater resource.
Conventional well point dewatering is strict to site requirements, in the construction plant that residential building stands in great numbers, because place restriction does not reach the requirement of totally-enclosed layout, excavation sump is often taked to draw water bright row's scheme, the scheme of this bright row that draws water easily is caved at layer of sand excavation, cause excavation area large, substrate undisturbed soil is destroyed large, affect substrate earth bearing strength; Not only efficiency of construction is low, and construction effect is poor, and can not control excavation area, can not recycle, very large on workmanship impact.
Utility model content
The purpose of this utility model is to provide a kind of open-cut foundation ditch dewatering installation, solve drainage of foundation pit and destroy base large, the technical problem that excavation area is large; And solve that dewatering installation can recycle, cost-saving problem.
For achieving the above object, the utility model adopts following technical scheme:
A kind of open-cut foundation ditch dewatering installation, the filtrate comprising collecting well, the gutter be communicated with collecting well and be arranged on around gutter, the side of the forward construction section of a construction section after this device is positioned over, described collecting well Lower Half is a cubical water tank, water pump is provided with in water tank, be connected with one directly over water tank and vertically disposedly hang mouth, described middle part of hanging mouthful periphery is provided with a water proof steel plate, the side of described water tank is connected with the gutter having some drain holes, and described gutter is wrapped with one deck filter screen.
Described gutter is the iron pipe of φ 150mm, and iron pipe pipe shaft has the hole of several 1-2cm.
Described filtrate is backfill cobble or sandstone.
Compared with prior art the utility model has following characteristics and beneficial effect:
The utility model is applicable to city underground open-cut station construction of bottom plates, and groundwater table is higher, and well-points dewatering is unconditionally done by nearby residents district, can carry out water-pumping/draining being excavated to absolute altitude near floor.Namely adopt and brightly drain into dewatering installation, then pump drainage is to appointed place.Can effectively control excavation area at 1500*1500*1500, compare Normal practice escapable cost, protection groundwater resources, construction method is simple, efficiency is high, time and labour saving, and can reuse.
The pipe shaft of gutter of the present utility model has some holes, and outside is tied with filter screen again, can effectively prevent fine sand between stake to run off.Dewatering installation is laid all in foundation ditch, can not take the foundation ditch external space, dramatically saves on construction space, due to without the need to carrying out dewatering well construction, can reduce construction cost, using method is simple, efficiency is high, time and labour saving, and can recycle.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is described in more detail.
Fig. 1 is structural representation of the present utility model;
Fig. 2 is work progress schematic diagram of the present utility model.
Reference numeral: 1-collecting well, 2-water tank, 3-hang a construction section after mouth, 4-water pump, 5-water proof steel plate, 6-gutter, 7-filtrate, 8-filter screen, 9-drain hole, the last construction section of 10-, 11-.
Detailed description of the invention
Embodiment is see shown in Fig. 1 and Fig. 2, and the arrow in Fig. 1 is water (flow) direction.This open-cut foundation ditch dewatering installation, the filtrate 7 comprising collecting well 1, the gutter 6 be communicated with collecting well and be arranged on around gutter, the side of the forward construction section 10 of a construction section 11 after this device is positioned over, described collecting well Lower Half is a cubical water tank 2, water pump 4 is provided with in water tank 2, be connected with one directly over water tank 2 and vertically disposedly hang mouth 3, described middle part of hanging mouthful periphery is provided with a water proof steel plate 5, the side of described water tank is connected with the gutter 6 having some drain holes 9, and described gutter 6 is wrapped with one deck filter screen 8.
Described gutter 6 is the iron pipe of φ 150mm, and iron pipe pipe shaft has the hole of several 1-2cm.The outside of hole is tied with filter screen again, can effectively prevent fine sand between stake to run off.Described filtrate 7 is backfill cobble or sandstone.
The size of collecting well of the present utility model and the flow of water pump are determined according to on-the-spot actual requirement, according to the water yield of foundation ditch, calculate the flow of water pump in the capacity of this device and collecting well, ensure that a upper construction section water level is below water proof steel plate.According to the division of station construction section, be guided to by last construction section underground water in the collecting well of a rear construction section, start the water pump in collecting well, in pump drainage collecting well, water is to appointed place.
Course of work step of the present utility model is as follows: according to the division of station construction section, step 1: be guided to by last construction section underground water in the collecting well of a rear construction section; Step 2: start the water pump in collecting well, in pump drainage collecting well, water is to appointed place; Step 3: lay Polypropylence Sheet at last construction section, 10cm waterproof of constructing successively bed course, then do the thick pea gravel concreten of 5cm and do fish tail and waterproof layer; Step 4: colligation baseplate reinforcing bar, construction underplate concrete; Step 5: the construction repeating step 1-4, to final stage construction section, at baseplate reinforcing bar, the place of punching performs stiffener, and performs concrete, step 6: reserved opening, hangs out unnecessary water pump; Step 7: seal with water proof Plate Welding and fill up opening with the concrete higher than a base plate label.
Claims (3)
1. an open-cut foundation ditch dewatering installation, comprise collecting well (1), the gutter (6) be communicated with collecting well and the filtrate (7) be arranged on around gutter, it is characterized in that: the side of the forward construction section (10) of a construction section (11) after this device is positioned over, described collecting well Lower Half is a cubical water tank (2), water pump (4) is provided with in water tank (2), be connected with one directly over water tank (2) and vertically disposedly hang mouth (3), described middle part of hanging mouthful periphery is provided with a water proof steel plate (5), the side of described water tank is connected with the gutter (6) having some drain holes (9), described gutter (6) is wrapped with one deck filter screen (8).
2. open-cut foundation ditch dewatering installation according to claim 1, is characterized in that: the iron pipe that described gutter (6) is φ 150mm, iron pipe pipe shaft has the hole of several 1-2cm.
3. open-cut foundation ditch dewatering installation according to claim 1, is characterized in that: described filtrate (7) is backfill cobble or sandstone.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420792939.1U CN204370458U (en) | 2014-12-16 | 2014-12-16 | Open cut foundation ditch drainage device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420792939.1U CN204370458U (en) | 2014-12-16 | 2014-12-16 | Open cut foundation ditch drainage device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204370458U true CN204370458U (en) | 2015-06-03 |
Family
ID=53326690
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420792939.1U Expired - Fee Related CN204370458U (en) | 2014-12-16 | 2014-12-16 | Open cut foundation ditch drainage device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204370458U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104912091A (en) * | 2015-06-19 | 2015-09-16 | 济南轨道交通集团有限公司 | Karst water guiding device and method |
CN106149740A (en) * | 2016-08-26 | 2016-11-23 | 上海二十冶建设有限公司 | Method with water construction draw-well and auxiliary device thereof |
CN109488372A (en) * | 2018-12-27 | 2019-03-19 | 湖南省交通规划勘察设计院有限公司 | A kind of tunnel drainage device and its water discharge method |
CN111119192A (en) * | 2019-12-31 | 2020-05-08 | 中铁十六局集团北京轨道交通工程建设有限公司 | Foundation pit excavation method |
CN112112175A (en) * | 2020-09-07 | 2020-12-22 | 无锡踏达机电科技有限公司 | Drainage system for building foundation pit construction |
CN115217134A (en) * | 2022-08-31 | 2022-10-21 | 中国二十二冶集团有限公司 | Water reducing method for ground surface pore water in pebble bed and weathered rock region in narrow region |
-
2014
- 2014-12-16 CN CN201420792939.1U patent/CN204370458U/en not_active Expired - Fee Related
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104912091A (en) * | 2015-06-19 | 2015-09-16 | 济南轨道交通集团有限公司 | Karst water guiding device and method |
CN106149740A (en) * | 2016-08-26 | 2016-11-23 | 上海二十冶建设有限公司 | Method with water construction draw-well and auxiliary device thereof |
CN109488372A (en) * | 2018-12-27 | 2019-03-19 | 湖南省交通规划勘察设计院有限公司 | A kind of tunnel drainage device and its water discharge method |
CN109488372B (en) * | 2018-12-27 | 2024-07-16 | 湖南省交通规划勘察设计院有限公司 | Tunnel drainage device and drainage method thereof |
CN111119192A (en) * | 2019-12-31 | 2020-05-08 | 中铁十六局集团北京轨道交通工程建设有限公司 | Foundation pit excavation method |
CN111119192B (en) * | 2019-12-31 | 2021-11-02 | 中铁十六局集团北京轨道交通工程建设有限公司 | Foundation pit excavation method |
CN112112175A (en) * | 2020-09-07 | 2020-12-22 | 无锡踏达机电科技有限公司 | Drainage system for building foundation pit construction |
CN115217134A (en) * | 2022-08-31 | 2022-10-21 | 中国二十二冶集团有限公司 | Water reducing method for ground surface pore water in pebble bed and weathered rock region in narrow region |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204370458U (en) | Open cut foundation ditch drainage device | |
CN201896316U (en) | System for reducing and draining confined water in deep foundation pit of rock foundation | |
CN102418347B (en) | Drainage construction method for blind drain and sump wells in deep foundation pit | |
CN104711994A (en) | Foundation pit deep well rainfall and plugging construction method | |
CN205242419U (en) | Steel sheet caisson of usefulness that secretly blocks water | |
CN105002913A (en) | Strongly-permeable stratum deep foundation pit bottom sealing water stopping structure and construction method thereof | |
CN102787236B (en) | Ion-absorbing type rare earth in-situ mineral leaching mother liquor recovery process | |
CN105544576A (en) | Foundation ditch dewatering and drainage excavation structure and application method | |
CN205152970U (en) | Underground structure oozes drainage system | |
CN103967015B (en) | A kind of water seal for deep foundation pit excavation method and structure thereof | |
CN105484277A (en) | Component for tubular well precipitation construction in elevator foundation pit or sump and construction method | |
CN105133619A (en) | Construction method for deep foundation pit of elevator shaft | |
CN102383408A (en) | Greening method for high water level impermeable saline and alkaline lands and greening system | |
CN105569063A (en) | Collecting and utilizing method for underground water on periphery of basement retaining wall and water collecting structure | |
CN205662938U (en) | Drainage excavation structure falls in foundation ditch | |
CN104805873A (en) | Multi-defense line type anti-floating system capable of monitoring release of water pressure of basement | |
CN105696611A (en) | Foundation pit dewatering device for sand layer with high water permeability | |
CN204418194U (en) | For high water-permeability layer of sand foundation pit dewatering device | |
CN209760299U (en) | light and shade of avoiding house to tear open and move is dug and is combined subway station structure | |
CN104131570A (en) | Steel box enclosure device for foundation pit construction and construction method thereof | |
CN107023013A (en) | A kind of green precipitation method for making full use of hydrogeological characteristic | |
CN110185051A (en) | Deep narrow excavation water discharge method | |
CN203320576U (en) | Waterproof and drainage system for basement external wall of super high-rise buildings | |
CN101229951B (en) | Bottom soft vacuum method for pumping surface water of sullage yard | |
CN102061701A (en) | Construction method for installing vertical grounding electrode by punching and pouring pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150603 |