CN102383408A - Greening method for high water level impermeable saline and alkaline lands and greening system - Google Patents

Greening method for high water level impermeable saline and alkaline lands and greening system Download PDF

Info

Publication number
CN102383408A
CN102383408A CN2011102798296A CN201110279829A CN102383408A CN 102383408 A CN102383408 A CN 102383408A CN 2011102798296 A CN2011102798296 A CN 2011102798296A CN 201110279829 A CN201110279829 A CN 201110279829A CN 102383408 A CN102383408 A CN 102383408A
Authority
CN
China
Prior art keywords
infiltration
blind pipe
sand bed
filling type
greening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011102798296A
Other languages
Chinese (zh)
Other versions
CN102383408B (en
Inventor
于德发
王玉磊
刘彦红
邵绿洲
张会琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Zhenghe Hengji Binshui Ecology Environmental Management Co., Ltd.
Original Assignee
BEIJING ZHENGHE HENGJIBIN AQUATIC ECOSYSTEM ENVIRONMENT CONTROL CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING ZHENGHE HENGJIBIN AQUATIC ECOSYSTEM ENVIRONMENT CONTROL CO LTD filed Critical BEIJING ZHENGHE HENGJIBIN AQUATIC ECOSYSTEM ENVIRONMENT CONTROL CO LTD
Priority to CN201110279829.6A priority Critical patent/CN102383408B/en
Publication of CN102383408A publication Critical patent/CN102383408A/en
Application granted granted Critical
Publication of CN102383408B publication Critical patent/CN102383408B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The invention relates to a greening method for high water level impermeable saline and alkaline lands and a greening system adopting the method. The greening method adopts a landfill type drainage ditch to discharge water and salt, longitudinal blind pipes are buried at the bottom of the landfill type drainage ditch, and a water seepage sand layer is paved above the blind pipes. Water is collected through the water seepage sand layer, guided into the blind pipes through water seepage holes arranged on the upper portions of the blind pipes, and discharged into drainage pipes and/or water collecting wells through water outlets of the blind pipes. One side or two sides of the bottom of the landfill type drainage ditch are provided with one or a plurality of landfill type water seepage slope faces, the landfill type water seepage slope faces are provided with a water seepage sand layer, the water seepage sand layer is connected with the water seepage sand layer above the blind pipes into a whole, and the landfill type water seepage slope faces extend to a specific drainage area. By means of the method, the greening system can be formed. The greening method for high water level impermeable saline and alkaline lands and the greening system adopting the method facilitate water discharge and salt discharge, improve growing environment of plants and are particularly suitable for survival and growth of plants in high water level clay saline and alkaline lands.

Description

The greening method in the waterproof salt-soda soil of high water level and greening system
Technical field
The present invention relates to the greening method in the waterproof salt-soda soil of a kind of high water level, also relate to a kind of greening system that adopts the waterproof salt-soda soil of high water level of this method, mainly be adapted to the greening in the salt-soda soil that viscosity is big, water level is high.
Background technology
The salt-soda soil exists at coastal region in a large number, and existence form also is not quite similar, and the method for therefore administering also is not quite similar; For example the soil in certain park, strand is rubbery black clay; Groundwater table is 20cm only apart from the face of land, soil compaction, and soil is moistening for a long time behind the rain; Surface pond is bronzing, and maintains the original state for a long time.Raining and wash away back testing soil pH value in the face of land is 8.6; Underground 20cm-60cm place soil salt content 0.42%; On this type soil; If adopt conventional trees planting patterns to be difficult to guarantee existence and the growth of trees, therefore be necessary to develop a kind of trees kind method for planting that is adapted to the clay salt-soda soil of this high water level.
Summary of the invention
In order to overcome the above-mentioned defective of prior art; The invention provides greening method and a kind of greening system that adopts the waterproof salt-soda soil of high water level of this method in the waterproof salt-soda soil of a kind of high water level, with survival and the growth of trees in the clay salt-soda soil that is adapted to high water level.
The present invention realizes that the technical scheme of above-mentioned purpose is:
The greening method in the waterproof salt-soda soil of a kind of high water level; It adopts the filling type gutter to carry out the draining salt discharge; The bottom of trench in said filling type gutter is embedded with blind pipe longitudinally; The top of said blind pipe is equipped with the infiltration sand bed, catchments and with in the infiltration hole introducing blind pipe of water through said blind pipe top through the infiltration sand bed, and the outfall through blind pipe enters drainage pipe and/or collecting well with water.
It is domatic that one or more filling type infiltrations can be set in the one or both sides of bottom, said filling type gutter; On said filling type infiltration is domatic the infiltration sand bed is set and this infiltration sand bed and the infiltration sand bed that is positioned at said blind pipe top are connected as a single entity; The infiltration of said filling type is domatic to extend to specific drainage; Said drainage can be provided with or also the sand bed that catchments can be set; Infiltration sand bed on said sand bed and the said filling type infiltration of catchmenting is domatic can be connected as a single entity usually, guides the water of said drainage into blind pipe through the domatic infiltration sand bed of filling type infiltration thus.
Preferably; On blind pipe both sides and top with rubble soft flocks landfill; The said infiltration sand bed that is positioned at blind pipe top be laid immediately on said rubble soft flocks above, the water in the sand bed that will seep water thus infiltrate said blind pipe around also through in the entering of the infiltration hole on the said blind pipe blind pipe.
The greening system in the waterproof salt-soda soil of a kind of high water level; It is provided with the filling type gutter, and the bottom in said filling type gutter is embedded with blind pipe longitudinally, and the top of said blind pipe is furnished with the some infiltrations hole that penetrates its tube wall; The bottom of said blind pipe is provided with the outfall that is communicated with collecting well or drainage pipe; It is domatic that the bottom margin in said filling type gutter connects oblique upwardly extending filling type infiltration, and the bottom in the domatic and said filling type of said filling type infiltration gutter is equipped with the infiltration sand bed, and said blind pipe is positioned at the below of the infiltration sand bed of bottom, said filling type gutter; Tamp with soil the top of said infiltration sand bed, can be filled to concordant with ground surface usually.
The outside of said blind pipe can be provided with the silk screen that covers said infiltration hole usually, to avoid earth permeable hole is clogged.The both sides of said blind pipe and top are by rubble soft flocks landfill; Formation is trapped among the rubble soft flocks layer around the said blind pipe; Said infiltration sand bed be laid immediately on said rubble soft flocks layer above; Thus above blind pipe and around form good infiltration zone, to realize catchmenting and purpose through the permeable hole draining.
Said infiltration sand bed preferably adopts thick river sand, oozes/permeable effect with raising.
The thickness that is positioned at the said rubble soft flocks layer of said blind pipe top can be 1-10cm usually, can form good oozing/permeable effect thus.Simultaneously, match, can form good penetration and filter effect with the thick river sand that constitutes said infiltration sand bed.
The thickness of said infiltration sand bed can be 8-25cm usually, has both guaranteed thus to ooze/permeable effect, avoids blocked up sand bed to influence root growth again.
Said blind pipe can be the cement blind pipe usually, reducing the cost, and increases the service life.
The external diameter of said blind pipe can be 15-40cm usually.
The domatic gradient of said filling type infiltration can be the 5-45 degree usually; Can confirm as the case may be; The water that can effectively the zone that needs draining be oozed out is thus introduced the filling type gutter; And then entering collecting well or drainage pipe through blind pipe, said drainage pipe can adopt existing municipal drainage pipeline.
The invention has the beneficial effects as follows: owing to be provided with the filling type gutter and in the filling type gutter, buried the blind pipe of infiltration usefulness underground; And be provided be used to catchment with permeable infiltration sand bed; Can water be collected in the infiltration sand bed and then through blind pipe thus and discharge, realize carrying out the purpose of draining and salt discharge thus at regional area; Owing to can with the infiltration sand bed of infiltration on domatic the water of close region be introduced in the gutter through infiltration is domatic; Can realize draining thus, this drainage pattern is applied in the trees plantation the specific region, can be with the water in the plant pit through the domatic introducing of infiltration; When this drainage pattern is applied to roadbed and wall base protection; Can near the ponding draining the roadbed and the wall base be reduced these regional water levels, can be conveniently implemented in many-sided application thus.
Description of drawings
Fig. 1 is the structural representation under a kind of application scenarios of the present invention;
Fig. 2 is the structural representation under the another kind of application scenarios of the present invention.
The specific embodiment
Below, in conjunction with accompanying drawing, introduce the embodiment of the present invention under several kinds of concrete conditions in detail.
Embodiment shown in Figure 1 is a kind of application of the present invention aspect the trees plantation.According to the Greening Design requirement, the strip of the trees 9 such as Chinese wax, ginkgo of on the soil 1 of afforested areas, planting tree battle array, for example each tree battle array 4 row tree; Spacing in the rows 3m; Partition strip cloves, winged euonymus, the midget crabapple tree battle array of planting of forming a team, the gold leaf glossy privet of planting down is to realize three-dimensional comprehensive greening.
The present invention at first adopts following manner to carry out surface management and forms plant pit in this embodiment:
(1) strengthen the plant pit soil moved in to improve the original, the ginkgo of diameter of a cross-section of a tree trunk 1.3 meters above the ground 8cm, the plant pit of Chinese wax 8 diameters can be 120cm, dark 100cm, and low shop 20cm thick thick river sand in cave forms described cave bed-sit layer 7.
(2) the thick planting soil of shop one deck 20-30cm on the face of land is smooth, and makes 0.2% drainage grade.
(3) face of land 30cm mixes river sand.
The draining salt discharge that on the basis of above-mentioned work, the present invention relates to, the specific embodiment is:
(1) admixture 1/3 river sand in the planting soil forms and mixes husky planting soil, is used for the landfill plant pit.
(2) between adjacent two row trees, dig the filling type gutter 2 of dark 120cm strip, lay the cement blind pipe 6 that is provided with permeable hole of diameter 20cm in the ditch, said cement blind pipe is communicated with the municipal drainage pipeline through its outfall.
(3) ditching of every strain plant pit is communicated with adjacent filling type gutter, and the domatic degree of depth at the plant pit place of bottom of trench is 100cm, and the degree of depth at nearly blind pipe place is 120cm, forms by plant pit domatic to the filling type infiltration in filling type gutter thus.
(4) the thick thick river sand of 20cm is laid in river sand place, plant pit bottom to blind pipe top; Formation is laid on the domatic infiltration sand bed of going up with bottom, said filling type gutter 3,4 of said filling type infiltration; Make cave bed-sit layer and infiltration sand bed be communicated as one thus; Formation is filled out river sand or other rubble soft flocks to blind pipe mouths top 3cm by the penetrating passage of plant pit bottom to blind pipe top around the blind pipe, form said rubble soft flocks layer 5.
(5) backfill forms complete ground surface to original state.
Through after the above-mentioned draining salt discharge, the whole well-growns of 120 strain ginkgo of plantation, growth root system diameter reaches 0.3 meter after 1 year.
Embodiment shown in Figure 2 is a kind of application of the present invention aspect the tracery wall plantation.According to designing requirement, in the roadside, garden tracery wall is set, and the outside, garden road has been provided with the embossment wall, this garden road is positioned at the lowered zones in high water level salt-soda soil.
According among this embodiment of the present invention, adopted following embodiment:
(1) through gutter 2 being set apart from embossment wall 10 and middle part, garden road dewatering: drainage trenching 2 on the other soil 1 of embossment wall, ditch depth 80cm, wide 30cm, the gutter trend is as the criterion with the garden road.
(2) lower and the existing rainwater in gutter are collected catch pit UNICOM.
(3) it is domatic to dig infiltration: dig dark 50cm in that the embossment wall is vertical with the garden Road Edge, the edge, gutter digs dark 60cm, is the both sides height after having dug, middle low shape, and will dig afterwards soil and transport outward.
(4) the cement blind pipe 6 of laying diameter 20cm in the gutter, the entrance, infiltration hole of blind pipe upper end is tight with the steel wire guard, and gauze wire cloth is sealed with the rubble of diameter 2-3cm in the outside; Outfall is established in the lower end of blind pipe, inserts the rainwater collecting well through pipeline.
(5) both sides of blind pipe and upper end landfill rubble soft flocks, until cover blind pipe 2-3cm, the rubble place that the infiltration hole is sealed in the blind pipe upper end also uses rubble hair nitre landfill, forms rubble soft flocks layer 5.
(6) the thick thick river sand of 10cm is all laid at all excavation positions, forms infiltration sand bed 3,4.
(7) backfill planting soil to designing requirement absolute altitude on thick river sand.
Through after the above-mentioned draining salt discharge, the tracery wall well-grown of plantation.
According to applicant's experimental analysis, the present invention has following effect to improving the clay salt-soda soil: (1) is dewatering fully, and realizes the purpose of salt discharge.(2) big according to alkaline land soil density, soil property is hard, and fluid-tight characteristics are directly used thick river sand separation layer, have saved many trouble technology and earth volumes such as lower berth rubble, reduce a large amount of engineering costs.(3) utilize gravity waters such as greening is watered, rainwater to reach the desalinization of soil by flooding or leaching, salt discharge and prevent the purpose of saline and alkaline rising.

Claims (10)

1. the greening method in the waterproof salt-soda soil of high water level; It is characterized in that adopting the filling type gutter to carry out the draining salt discharge; The bottom of trench in said filling type gutter is embedded with blind pipe longitudinally; The top of said blind pipe is equipped with the infiltration sand bed, catchments and with in the infiltration hole introducing blind pipe of water through said blind pipe top through the infiltration sand bed, and the outfall through blind pipe enters drainage pipe and/or collecting well with water.
2. the greening method in the waterproof salt-soda soil of high water level as claimed in claim 2; It is characterized in that in the one or both sides of bottom, said filling type gutter one or more filling types being set seeps water domatic; On said filling type infiltration is domatic the infiltration sand bed is set and this infiltration sand bed and the infiltration sand bed that is positioned at said blind pipe top are connected as a single entity; The infiltration of said filling type is domatic to extend to specific drainage; Said drainage setting or the sand bed that catchments is not set, the infiltration sand bed on said catchment sand bed and the infiltration of said filling type are domatic is connected as a single entity, and guides the water of said drainage into blind pipe through the domatic infiltration sand bed of filling type infiltration thus.
3. according to claim 1 or claim 2 the greening method in the waterproof salt-soda soil of high water level; It is characterized in that on blind pipe both sides and top with rubble soft flocks landfill; The said infiltration sand bed that is positioned at blind pipe top be laid immediately on said rubble soft flocks above, the water in the sand bed that will seep water thus infiltrate said blind pipe around also through in the entering of the infiltration hole on the said blind pipe blind pipe.
4. the greening system in the waterproof salt-soda soil of high water level; It is characterized in that being provided with the filling type gutter; The bottom in said filling type gutter is embedded with blind pipe longitudinally, and the top of said blind pipe is furnished with the some infiltrations hole that penetrates its tube wall, and the bottom of said blind pipe is provided with the outfall that is communicated with collecting well or drainage pipe; It is domatic that the bottom margin in said filling type gutter connects oblique upwardly extending filling type infiltration; The bottom in the domatic and said filling type of said filling type infiltration gutter is equipped with the infiltration sand bed, and said blind pipe is positioned at the below of the infiltration sand bed of bottom, said filling type gutter, and tamp with soil the top of said infiltration sand bed.
5. the greening method in the waterproof salt-soda soil of high water level as claimed in claim 4 and greening system; The outside that it is characterized in that said blind pipe is provided with the silk screen that covers said infiltration hole; The both sides of said blind pipe and top are by rubble soft flocks landfill; Formation is trapped among the rubble soft flocks layer around the said blind pipe, said infiltration sand bed be laid immediately on said rubble soft flocks layer above.
6. like the greening method and the greening system in claim 4 or the waterproof salt-soda soil of 5 described high water level, it is characterized in that said infiltration sand bed adopts thick river sand.
7. the greening method in the waterproof salt-soda soil of high water level as claimed in claim 6 and greening system, the thickness that it is characterized in that being positioned at the said rubble soft flocks layer of said blind pipe top is 1-10cm, the thickness of said infiltration sand bed is 8-25cm.
8. the greening method in the waterproof salt-soda soil of high water level as claimed in claim 7 and greening system is characterized in that said blind pipe is the cement blind pipe.
9. the greening method in the waterproof salt-soda soil of high water level as claimed in claim 8 and greening system, the external diameter that it is characterized in that said blind pipe is 15-40cm.
10. like the greening method and the greening system in claim 4 or the waterproof salt-soda soil of 5 described high water level, it is characterized in that the domatic gradient of said filling type infiltration is the 5-45 degree.
CN201110279829.6A 2011-09-20 2011-09-20 Greening method for high water level impermeable saline and alkaline lands and greening system Active CN102383408B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110279829.6A CN102383408B (en) 2011-09-20 2011-09-20 Greening method for high water level impermeable saline and alkaline lands and greening system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110279829.6A CN102383408B (en) 2011-09-20 2011-09-20 Greening method for high water level impermeable saline and alkaline lands and greening system

Publications (2)

Publication Number Publication Date
CN102383408A true CN102383408A (en) 2012-03-21
CN102383408B CN102383408B (en) 2014-04-09

Family

ID=45823209

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110279829.6A Active CN102383408B (en) 2011-09-20 2011-09-20 Greening method for high water level impermeable saline and alkaline lands and greening system

Country Status (1)

Country Link
CN (1) CN102383408B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102792846A (en) * 2012-09-05 2012-11-28 中国科学院遗传与发育生物学研究所农业资源研究中心 Wheat-corn double cropping symbiotic cultivation method in moderate saline-alkali soil based on buried pipe drainage and salt elimination
CN102828556A (en) * 2012-07-17 2012-12-19 天津三建建筑工程有限公司 Linear water collection port structure of stone ground of dry fountain basin
CN103243694A (en) * 2013-05-29 2013-08-14 云南农业大学 Reinforced soil composite structure drainage ditch
CN103477952A (en) * 2013-08-29 2014-01-01 石河子大学 Agriculture water and soil improvement irrigation and drainage system
CN103999708A (en) * 2014-06-07 2014-08-27 安徽省农业科学院园艺研究所 Arched cultivation pool capable of preventing accumulation of salt in surface soil
CN106304996A (en) * 2015-06-17 2017-01-11 国投新疆罗布泊钾盐有限责任公司 Method for planting herbaceous plant in furrow-shaped out-soil in saline and alkaline land

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101117798A (en) * 2006-08-04 2008-02-06 朱明亮 Underground pipe line type seepagefiltrationn alkali-discharging technology
CN101138294A (en) * 2006-09-08 2008-03-12 沧州市农林科学院 High-water level halomorphic soil region selective controlling and greening technique
RU2324029C1 (en) * 2006-10-17 2008-05-10 Государственное научное учреждение Всероссийский научно-исследовательский институт гидротехники и мелиорации им. А.Н. Костякова Россельхозакадемии Saline soils desalination method
CN102177830A (en) * 2011-04-12 2011-09-14 天津海林园艺环保科技工程有限公司 Coastal protection forest construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101117798A (en) * 2006-08-04 2008-02-06 朱明亮 Underground pipe line type seepagefiltrationn alkali-discharging technology
CN101138294A (en) * 2006-09-08 2008-03-12 沧州市农林科学院 High-water level halomorphic soil region selective controlling and greening technique
RU2324029C1 (en) * 2006-10-17 2008-05-10 Государственное научное учреждение Всероссийский научно-исследовательский институт гидротехники и мелиорации им. А.Н. Костякова Россельхозакадемии Saline soils desalination method
CN102177830A (en) * 2011-04-12 2011-09-14 天津海林园艺环保科技工程有限公司 Coastal protection forest construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吴睿等: "盐碱地绿化施工的排盐工程", 《中国园艺文摘》, no. 07, 31 July 2011 (2011-07-31), pages 72 - 73 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102828556A (en) * 2012-07-17 2012-12-19 天津三建建筑工程有限公司 Linear water collection port structure of stone ground of dry fountain basin
CN102828556B (en) * 2012-07-17 2013-11-27 天津三建建筑工程有限公司 Linear water collection port structure of stone ground of dry fountain basin
CN102792846A (en) * 2012-09-05 2012-11-28 中国科学院遗传与发育生物学研究所农业资源研究中心 Wheat-corn double cropping symbiotic cultivation method in moderate saline-alkali soil based on buried pipe drainage and salt elimination
CN103243694A (en) * 2013-05-29 2013-08-14 云南农业大学 Reinforced soil composite structure drainage ditch
CN103477952A (en) * 2013-08-29 2014-01-01 石河子大学 Agriculture water and soil improvement irrigation and drainage system
CN103999708A (en) * 2014-06-07 2014-08-27 安徽省农业科学院园艺研究所 Arched cultivation pool capable of preventing accumulation of salt in surface soil
CN106304996A (en) * 2015-06-17 2017-01-11 国投新疆罗布泊钾盐有限责任公司 Method for planting herbaceous plant in furrow-shaped out-soil in saline and alkaline land

Also Published As

Publication number Publication date
CN102383408B (en) 2014-04-09

Similar Documents

Publication Publication Date Title
CN202232370U (en) Greening system for treatment of high water level impervious saline-alkali soil
CN106869237B (en) A kind of gardens rainwater-collecting water storage system and its construction method
CN105862887B (en) A kind of ion type rareearth mine ecological slope protection structure
CN202232063U (en) Saline-alkali soil treatment system
CN102383408B (en) Greening method for high water level impermeable saline and alkaline lands and greening system
CN106381880B (en) The processing method of the peat soil dam foundation
CN104412751A (en) Improvement method for viscous seashore saline soil of saline-alkali wasteland
CN105706555A (en) Saline-alkali soil greening engineering original soil improvement structure and construction method thereof
CN211143522U (en) Planting roofing convenient to drainage and irrigation
CN105421314B (en) A kind of construction method of the three-dimensional regulator control system of accumulated water Farmland Water
CN209099438U (en) A kind of light-duty seepage well of Dry Farmland storage rain water drainage
CN106836243A (en) A kind of sponge greenery patches of suitable mountain topography and its building method
CN208578054U (en) A kind of embed-type shallow-layer combined water drain pipe
CN113718711B (en) Anti-scouring water and soil conservation slope protection structure and construction method thereof
CN206034603U (en) Airport height fill construction three -dimensional drainage system
CN106149736B (en) The stable construction method of hillside fields bury excavation slope is kept based on draining is cut
CN210797471U (en) Saline-alkali region water resource regulation, storage and utilization system containing biological retention tank
CN209397606U (en) A kind of sinking tunnel Support of Foundation Pit Excavation near a river and drop water sealing structure
CN111543134A (en) Saline soil drainage and salt discharge structure and drainage and salt discharge method without influencing ground greening planting and landscape
CN112726775A (en) Ecological drainage ditch and construction method
CN219660337U (en) Foundation section structure based on concealed pipe improved mucilage saline-alkali soil
CN218788974U (en) Be suitable for afforestation of weak ground to arrange saline and alkaline structure and arrange salt alkali system
CN220369199U (en) Ponding prevention ground cover planting device
CN217460624U (en) Reinforced water guide structure for preventing mine side slope soil covering water and soil loss
CN109006122A (en) The nursery stock water discharge method in the stronger muck soil of water-retaining property

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Yu Defa

Inventor after: Wang Yulei

Inventor after: Jiang Baozhong

Inventor after: Qi Huan

Inventor after: Liu Yanhong

Inventor after: Shao Lvzhou

Inventor after: Jiang Xuehao

Inventor before: Yu Defa

Inventor before: Wang Yulei

Inventor before: Liu Yanhong

Inventor before: Shao Lvzhou

Inventor before: Zhang Huiqin

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: YU DEFA WANG YULEI LIU YANHONG SHAO LVZHOU ZHANG HUIQIN TO: YU DEFA WANG YULEI JIANG BAOZHONG QI HUAN LIU YANHONG SHAO LVZHOU JIANG XUEHAO

C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: BEIJING ZHENGHE HENGJI WATERFRONT ECOLOGICAL ENVIR

Free format text: FORMER NAME: BEIJING ZHENGHE HENGJI WATERFRONT ECOLOGICAL ENVIRONMENTAL TREATMENT CO., LTD.

CP03 Change of name, title or address

Address after: 100084 Beijing Road, Zhongguancun, Tsinghua Science and Technology Park, No. 1, science and technology building, block B, layer 21, layer

Patentee after: Beijing Zhenghe Hengji Binshui Ecology Environmental Management Co., Ltd.

Address before: 100094, Beijing, Yongfeng Haidian District industrial base, No. 3 North Wing Road, block A, room 314, room 3

Patentee before: Beijing Zhenghe Hengjibin Aquatic Ecosystem Environment Control Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Greening method for high water level impermeable saline and alkaline lands and greening system

Effective date of registration: 20190117

Granted publication date: 20140409

Pledgee: Huaxia Bank Limited by Share Ltd Zhongguancun Beijing branch

Pledgor: Beijing Zhenghe Hengji Binshui Ecology Environmental Management Co., Ltd.

Registration number: 2019990000052

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220402

Granted publication date: 20140409

Pledgee: Huaxia Bank Limited by Share Ltd. Zhongguancun Beijing branch

Pledgor: BEIJING ZEHO WATERFRONT ECOLOGICAL ENVIRONMENT TREATMENT Corp.

Registration number: 2019990000052