CN104863373A - Glass curtain wall construction technology - Google Patents

Glass curtain wall construction technology Download PDF

Info

Publication number
CN104863373A
CN104863373A CN201510300284.0A CN201510300284A CN104863373A CN 104863373 A CN104863373 A CN 104863373A CN 201510300284 A CN201510300284 A CN 201510300284A CN 104863373 A CN104863373 A CN 104863373A
Authority
CN
China
Prior art keywords
curtain wall
crossbeam
water
construction technology
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510300284.0A
Other languages
Chinese (zh)
Other versions
CN104863373B (en
Inventor
张武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Ge Li Photoelectric Curtain Wall Co Ltd
Original Assignee
Zhejiang Ge Li Photoelectric Curtain Wall Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Ge Li Photoelectric Curtain Wall Co Ltd filed Critical Zhejiang Ge Li Photoelectric Curtain Wall Co Ltd
Priority to CN201510300284.0A priority Critical patent/CN104863373B/en
Publication of CN104863373A publication Critical patent/CN104863373A/en
Application granted granted Critical
Publication of CN104863373B publication Critical patent/CN104863373B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a glass curtain wall construction technology. According to the technical scheme, the glass curtain wall construction technology comprises the steps of construction preparing, curtain wall installing and quality treating. The construction preparing comprises the steps of pre-embedded component installing and material machining. The curtain wall installing comprises the steps of measuring and setting out, stand installing, vertical beam installing, cross beam installing and glass plate installing. The material machining comprises the steps that the machining is carried out on cross beams, a water leaking hole is formed in each cross beam during cross beam machining, and each cross beam is provided with a channel used for connecting the water leaking holes and a water source. During cross beam installing, the water leaking holes face downward, water leaked by the water leaking holes reaches on the glass curtain wall, the good cleaning effect is achieved, the efficiency is high, and the effect that the cleaning can be carried out on the glass curtain wall safely and conveniently can be achieved.

Description

The construction technology of curtain wall
Technical field
The present invention relates to a kind of architectural construction technology, more particularly, it relates to a kind of construction technology of curtain wall.
Background technology
Curtain wall is a kind of construction wall trailing of novelty attractive in appearance, it is the notable feature in modernism highrise building epoch, the curtain wall of modernization highrise building have employed the combination by two-way mirror and simple glass, interlayer is filled with the hollow glass of dry air or inert gas, when outside temperature is-10 DEG C, temperature before layer glass window is-2 DEG C, and uses the interior temperature of three layers of hollow glass to be 13 DEG C.And at hot summer, double layer glass can block the solar radiant heat of 90%, sunlight still can through curtain wall, but shines and scarcely can feel hot with it.Use the room of hollow glass curtain wall can accomplish cool in summer and warm in winter, significantly improve living environment.But curtain wall, in outdoor, is easy to cover dust, needs regularly to clean, because curtain wall is often contained in the outside of highrise building, during scouring, need to hang lower cable to clean from roof, more difficult, nor safety.For solving above problem, can application reference number be 201220740619.2 patent, above curtain wall, storage tank is set, bottom storage tank, leaking hole is set, by the water spilt in leaking hole, whole curtain wall is cleaned.Above mode solves the problem of cleaning to a certain extent, but it is arranged on the top of curtain wall, and the whole height of curtain wall is very high, water is difficult to from very high place the middle part and the below that cover whole curtain wall, good cleaning effect can not be reached, and the curtain wall that only leaks from top cleans, water flows to below needs long time, and efficiency is not high.
Summary of the invention
For the deficiency that prior art exists, the object of the present invention is to provide a kind of construction technology of curtain wall, constructed that rear curtain wall cleaning effect is good, efficiency is high and can the carrying out of safe ready clean.
For achieving the above object, the invention provides following technical scheme: a kind of construction technology of curtain wall, comprise preparation of construction, curtain wall is installed and quality treatment, preparation of construction comprises installation of embedded parts and materials processing, and curtain wall is installed and comprised surveying setting-out, bearing installation, vertical beam installation, crossbeam installation and glass plate installation, and materials processing comprises crossbeam processing, each crossbeam adds and all on crossbeam, arranges leaking hole man-hour, and crossbeam is provided with the runner for connecting leaking hole and water source; When crossbeam is installed by leaking hole down, the water that leaking hole spills arrives on curtain wall.
Preferably, runner is water pipe, first on water pipe, offers leaking hole, starts to install water pipe, be fixed on below crossbeam by water pipe after crossbeam installs.
Preferably, quality treatment comprises weather-resistant glue and executes note, cleans before construction to injecting glue region, pastes protective tapes, then start to execute note, execute after having noted glue and removed by adhesive tape immediately at the position that may cause polluting.
Preferably, crossbeam is detachably fixedly connected with Diversion Plate, side and the crossbeam of Diversion Plate are fixed, and opposite side is near glass plate, and leaking hole is positioned at above Diversion Plate.
Preferably, Diversion Plate is upwards bent to form catch basin near glass plate side, and the cell wall of catch basin is horizontally disposed with.
Preferably, materials processing comprises glass plate processing, after glass plate completion of processing, the face of glass is connected with diaphragm in peelable mode, is torn off by diaphragm after quality treatment completes.
Preferably, vertical beam is hollow structure, when installing vertical beam, is provided with water inlet pipe, water inlet pipe and flow passage in vertical beam.
By adopting technique scheme, after completing the construction of curtain wall, leaking hole is communicated with water source by runner, when water flows to curtain wall from leaking hole through runner, can clean curtain wall, owing to being equipped with crossbeam between adjacent glass plate setting up and down, then the water of each glass plate all by its upper cross-beam flows down cleans, fully can clean to each part of curtain wall, can not be not easy to clean to middle part and bottom from curtain wall overhead stream due to water, can clean full wafer curtain wall simultaneously, improve operating efficiency.
Accompanying drawing explanation
Fig. 1 is segment glass curtain wall construction schematic diagram;
Fig. 2 is Diversion Plate detonation configuration schematic diagram;
Fig. 3 is segment glass curtain wall construction lateral view;
Fig. 4 is segment glass curtain wall construction schematic diagram two;
Fig. 5 is segment glass curtain wall construction schematic diagram three.
Reference numeral: 1, vertical beam; 11, through hole; 2, crossbeam; 3, glass plate; 4, Diversion Plate; 41, catch basin; 5, water pipe; 51, water inlet pipe; 52, leaking hole; 6, tee junction.
Detailed description of the invention
Be described further with reference to the construction technology embodiment of accompanying drawing to curtain wall of the present invention.
A kind of construction technology of curtain wall, comprise preparation of construction, curtain wall is installed and quality treatment, curtain wall installation comprises surveying setting-out, bearing is installed, vertical beam 1 is installed, crossbeam 2 installs and glass plate 3 is installed, materials processing comprises crossbeam 2 and processes, crossbeam 2 adds when man-hour or crossbeam 2 are installed arrange leaking hole 52 on crossbeam 2, and crossbeam 2 is provided with the runner for connecting leaking hole 52 and water source, when crossbeam 2 is installed by leaking hole 52 down, the water that leaking hole 52 spills arrives on curtain wall, after completing the construction of curtain wall, leaking hole 52 is communicated with water source by runner, when water flows to curtain wall from leaking hole 52 through runner, can clean curtain wall, owing to being equipped with crossbeam 2 between adjacent glass plate 3 setting up and down, then the water of each glass plate 3 all by its upper cross-beam 2 flows down cleans, fully can clean to each part of curtain wall, can not be not easy to clean to middle part and bottom from curtain wall overhead stream due to water, can clean full wafer curtain wall simultaneously, improve operating efficiency.
Preparation of construction comprises installation of embedded parts and materials processing, during installation of embedded parts, first carry out surveying setting-out, carry out embedded board location again, embedded board is installed fixing afterwards, then carry out embedded board and check is installed, installation of embedded parts can (can with reference to the form of construction work in http://wenku.baidu.com/link url=NzN50dSoock5bcLQsPVHxNbpkOAQNVnHlJtvphQJv06YaklaEa6F 7kc2h2H1rm7Qn1-iV7P6a3W_l9Jsw9MR3OPk7EDfcjMS1IdzigP3EdS) by existing construction technology, therefore not in this to go forth.Materials processing comprises crossbeam 2 processing and vertical beam 1 is processed, for bright frame glass curtain wall (being the embodiment of bright frame glass curtain wall below), crossbeam 2 and vertical beam 1 are hollow structure, and such mode reduces the weight of himself, are conducive to the stable of curtain wall entirety.When processing crossbeam 2, existing crossbeam 2 can be adopted again to process, crossbeam 2 is offered leaking hole 52, when processing vertical beam 1, vertical beam 1 being offered through hole 11, is more than the preparation in early stage, runner can be water pipe 5, and water pipe 5 is laid when installing vertical beam 1 and crossbeam 2.Before installation vertical beam 1 and crossbeam 2, first carry out surveying setting-out, the reference center's line provided by civil engineering, horizon, unwrapping wire is started after reviewing, need during unwrapping wire to match with thematic structure, horizontal absolute altitude will successively from ground be drawn, avoid accumulated error, simultaneously, should notice during surveying setting-out that timing is carried out in every day, to reduce the impact of the temperature difference, during measurement, wind-force should not be greater than level Four, concrete operations can with reference to existing constructure scheme, but the installation of water pipe 5 will be noted when constructing, water pipe 5 can be arranged on the inside of crossbeam 2 and vertical beam 1, vertical beam 1 inside be water inlet pipe 51 when installing vertical beam 1, water inlet pipe 51 with joint is inserted in vertical beam 1, joint can be tee junction 6, the two ends of tee junction 6 connect upper and lower water inlet pipe 51, the other end is aimed at the through hole 11 on vertical beam 1 (being connected with the water pipe 5 in crossbeam 2 to facilitate), certainly, in order to ensure that the other end of tee junction 6 is aimed at the through hole 11 on vertical beam 1, to measure water pipe 5 length and through hole 11 position before water pipe 5 inserts, after vertical beam 1 installs, carry out the installation of crossbeam 2, when crossbeam 2 is installed, first by the water pipe 5 in water pipe 5(crossbeam 2 with weep hole, weep hole aim at leaking hole 52, Diversion Plate 4 can be coordinated to use, hereafter can specifically set forth) insert in crossbeam 2, again by water pipe 5 and the fittings in vertical beam 1, start to install crossbeam 2(installation herein afterwards and can adopt existing construction method, not in this to go forth).In this explanation, below not only just can use tee junction 6, also can use the joint of four-way, the water pipe 5 between adjacent beams 2 is communicated with, can keep like this water yield of water pipe 5 in crossbeam 2 and hydraulic pressure basically identical, there will not be the situation of water pipe 5 not water outlet in indivedual crossbeam 2.Above embodiment, is arranged on water pipe 5 in crossbeam 2, makes water pipe 5 be not easy to damage by the protection of crossbeam 2; fixing of water pipe 5 is also comparatively firm; profile also comparatively attractive in appearance, but it installs trouble comparatively, and the water in leaking hole 52 also not too easily arrives on glass.
Another kind of mode, water pipe 5 can be set to the outside of crossbeam 2, water pipe 5 is fixed with the bottom of crossbeam 2, water pipe 5 under crossbeam 2 runs through vertical beam 1 and is connected that (water can enter from the two ends of water pipe 5, ensure that in curtain wall middle water pipe 5 have the more water yield so to a certain extent, ensure that the curtain wall at middle part also can be cleaned preferably), weep hole on water pipe 5 is leaking hole 52, time fixing by leaking hole 52 towards glass, this kind of embodiment can carry out installation water pipe 5 after installing vertical beam 1 and crossbeam 2, it installs convenience comparatively, also the maintenance of water pipe 5 is facilitated, but the protection losing crossbeam 2 easily damages, the outward appearance of curtain wall is also relatively poor.As preferably, water inlet pipe 51(set-up mode is set in vertical beam 1 with reference to above embodiment), be communicated with the water pipe 5 outside crossbeam 2 by joint, such setting can ensure that the every a part of scupper of curtain wall all has enough water to flow out, on crossbeam 2, fix Diversion Plate 4 afterwards shelter from water pipe 5, side and the crossbeam 2 of Diversion Plate 4 are fixed, opposite side is near glass plate 3, leaking hole 52 is positioned at above Diversion Plate 4, such embodiment Diversion Plate 4 can shelter from water pipe 5, water pipe 5 is played a protective role, when blowing and raining, water pipe 5 can not be moved by wind, ensure that water pipe 5 is connected firmly, simultaneously, water in leaking hole 52 can directly drip on Diversion Plate 4, glass can be avoided like this to be subject to the impact of water for a long time and to damage, and Diversion Plate 4 is upwards bent to form catch basin 41 near glass plate 3 side, the water dripped on Diversion Plate 4 is assembled in catch basin 41, then can spill-over out, and catch basin 41 is near glass, spill-over water out can flow down along glass, by the setting of catch basin 41, make the water stable and uniform comparatively on runner glass, can comprehensively cover full wafer glass, ensure that clean effect, and this scheme installs convenience comparatively comparatively speaking, also certain protective effect is served to water pipe 5.
After installing vertical beam 1, crossbeam 2 and water pipe 5, carry out the installation of glass plate 3, the installation of glass plate 3 with reference to existing Glass Curtain Wall Construction technique, only can need extra care, does not collide with water pipe 5 during installation.Carry out quality treatment afterwards; quality treatment comprises weather-resistant glue and executes note; before construction, injecting glue region is cleaned; anhydrous, oil stain, dust and other impurities in seam should be ensured; paste protective tapes at the position that may cause polluting, then start to execute note, execute after having noted glue and immediately adhesive tape is removed; such mode can ensure the cleaning of glass, glass of can not making dirty.Should be noted at this, Diversion Plate 4 is installed after weather-resistant glue executes note, and what such mode can ensure weather-resistant glue normally executes note, can not be subject to the stop of Diversion Plate 4.
Materials processing comprises glass plate 3 and processes; after glass plate 3 completion of processing; the face of glass is connected with diaphragm in peelable mode; after quality treatment completes, diaphragm is torn off; arranging like this can ensure that glass is not easy to be made dirty in the process of transporting or install; when construction all completes, then diaphragm is torn off, this ensure that the clean and tidy of glass.Diaphragm can use some conventional plastic sheetings, and not in this to go forth.
The above is only the preferred embodiment of the present invention, protection scope of the present invention be not only confined to above-described embodiment, and all technical schemes belonged under thinking of the present invention all belong to protection scope of the present invention.It should be pointed out that for those skilled in the art, some improvements and modifications without departing from the principles of the present invention, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (7)

1. the construction technology of a curtain wall, comprise preparation of construction, curtain wall is installed and quality treatment, preparation of construction comprises installation of embedded parts and materials processing, curtain wall is installed and is comprised surveying setting-out, bearing installation, vertical beam installation, crossbeam installation and glass plate installation, it is characterized in that: materials processing comprises crossbeam processing, and each crossbeam adds and all on crossbeam, arranges leaking hole man-hour, and crossbeam is provided with the runner for connecting leaking hole and water source; When crossbeam is installed by leaking hole down, the water that leaking hole spills arrives on curtain wall.
2. the construction technology of the curtain wall according to right 1, is characterized in that: described runner is water pipe, first on water pipe, offers leaking hole, starts to install water pipe, be fixed on below crossbeam by water pipe after crossbeam installs.
3. the construction technology of the curtain wall according to right 1; it is characterized in that: described quality treatment comprises weather-resistant glue and executes note, before construction, injecting glue region is cleaned, paste protective tapes at the position that may cause polluting; then start to execute note, execute after having noted glue and immediately adhesive tape is removed.
4. the construction technology of the curtain wall according to right 1 or 2 or 3, is characterized in that: crossbeam is detachably fixedly connected with Diversion Plate, side and the crossbeam of Diversion Plate are fixed, and opposite side is near glass plate, and leaking hole is positioned at above Diversion Plate.
5. the construction technology of the curtain wall according to right 4, is characterized in that: Diversion Plate is upwards bent to form catch basin near glass plate side, and the cell wall of catch basin is horizontally disposed with.
6. the construction technology of the curtain wall according to right 1, is characterized in that: materials processing comprises glass plate processing, after glass plate completion of processing, the face of glass is connected with diaphragm in peelable mode, is torn off by diaphragm after quality treatment completes.
7. the construction technology of the curtain wall according to right 1, is characterized in that: vertical beam is hollow structure, when installing vertical beam, is provided with water inlet pipe, water inlet pipe and flow passage in vertical beam.
CN201510300284.0A 2015-06-05 2015-06-05 The construction technology of glass curtain wall Expired - Fee Related CN104863373B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510300284.0A CN104863373B (en) 2015-06-05 2015-06-05 The construction technology of glass curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510300284.0A CN104863373B (en) 2015-06-05 2015-06-05 The construction technology of glass curtain wall

Publications (2)

Publication Number Publication Date
CN104863373A true CN104863373A (en) 2015-08-26
CN104863373B CN104863373B (en) 2017-03-01

Family

ID=53909504

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510300284.0A Expired - Fee Related CN104863373B (en) 2015-06-05 2015-06-05 The construction technology of glass curtain wall

Country Status (1)

Country Link
CN (1) CN104863373B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108078481A (en) * 2018-02-05 2018-05-29 江达飞 A kind of glass curtain wall equipped with automatic brush cleaner

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09111934A (en) * 1995-10-23 1997-04-28 Ykk Architect Prod Kk Face material support member of curtain wall
CN2925374Y (en) * 2006-06-13 2007-07-25 上海市莘格高级中学 External-wall wiper of glass screen wall
CN102058345A (en) * 2010-12-20 2011-05-18 上海市莘格高级中学 Automatic cleaning device of glass curtain wall
CN202604728U (en) * 2012-03-31 2012-12-19 沈阳远大铝业工程有限公司 Glass curtain wall washer utilizing recycled rainwater
CN102979314A (en) * 2012-12-19 2013-03-20 中国江苏国际经济技术合作公司 Construction method for curved surface point supported type glass curtain wall
CN203113568U (en) * 2012-12-31 2013-08-07 江苏华艺装饰工程有限公司 Glass curtain wall
CN103610420A (en) * 2013-12-08 2014-03-05 奚望 Environment-friendly cleaning device for high-rise building glass curtain wall
CN203846652U (en) * 2014-05-26 2014-09-24 江西新威动力能源科技有限公司 Glass curtain wall

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09111934A (en) * 1995-10-23 1997-04-28 Ykk Architect Prod Kk Face material support member of curtain wall
CN2925374Y (en) * 2006-06-13 2007-07-25 上海市莘格高级中学 External-wall wiper of glass screen wall
CN102058345A (en) * 2010-12-20 2011-05-18 上海市莘格高级中学 Automatic cleaning device of glass curtain wall
CN202604728U (en) * 2012-03-31 2012-12-19 沈阳远大铝业工程有限公司 Glass curtain wall washer utilizing recycled rainwater
CN102979314A (en) * 2012-12-19 2013-03-20 中国江苏国际经济技术合作公司 Construction method for curved surface point supported type glass curtain wall
CN203113568U (en) * 2012-12-31 2013-08-07 江苏华艺装饰工程有限公司 Glass curtain wall
CN103610420A (en) * 2013-12-08 2014-03-05 奚望 Environment-friendly cleaning device for high-rise building glass curtain wall
CN203846652U (en) * 2014-05-26 2014-09-24 江西新威动力能源科技有限公司 Glass curtain wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108078481A (en) * 2018-02-05 2018-05-29 江达飞 A kind of glass curtain wall equipped with automatic brush cleaner
CN108078481B (en) * 2018-02-05 2023-06-09 欣叶安康建设工程有限公司 Glass curtain wall with automatic brushing cleaning machine

Also Published As

Publication number Publication date
CN104863373B (en) 2017-03-01

Similar Documents

Publication Publication Date Title
WO2017118342A1 (en) Energy-saving house, energy-saving curtain wall, decorative wall, and plastered wall
CN103726597B (en) Adopt the frame type cell curtain wall of auxiliary mounting deck and profile of tooth corner brace and profile of tooth bearing
CN105672656A (en) Construction method of exterior hidden frame supported glass curtain wall
CN104499658B (en) Active breathing type damp-proof and steam-exhausting inverted roof system and construction method thereof
CN106223650A (en) Dismounting Combined multifunctional energy-conservation tea booth
CN108040673B (en) Construction method of vertical greening plant curtain wall
CN210798092U (en) Green energy-saving roofing for building
CN205637190U (en) Energy -conserving room and energy -conserving curtain, decorative wall, whitewash wall
CN106436983A (en) Assembled external wall structure and construction method
CN109184284A (en) One builds the building of multi-purpose multifunctional nature temperature control canopy
CN104863294A (en) Glass curtain wall construction process
CN104863373A (en) Glass curtain wall construction technology
CN105649241B (en) The installation method of restricted clearance Curtain Wall glass
CN106638995B (en) A kind of shower room water-blocking bank structure and construction method
CN112064841A (en) Built-in internal-replaceable unit window system
CN105064533B (en) Back-positioned type afforests wall construction method
CN206337689U (en) Bright frame glass curtain wall
CN102839803A (en) Construction method for installing decorating and modeling concrete slab
CN207110907U (en) French window drainage system
CN105464299B (en) A kind of gable waterproof construction
CN209723421U (en) A kind of anti-ponding skylight curtain wall construction of totally enclosed type
CN208917976U (en) A kind of no ponding drainage system
CN205373968U (en) Outer wall water pouring test system
CN104878933A (en) Construction method for setting up over roof curtain wall hanging basket support scaffolding
CN203716365U (en) Fracturing bridge thermal insulation natural ventilation independent unit type curtain wall system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170301

Termination date: 20180605