CN106223650A - Dismounting Combined multifunctional energy-conservation tea booth - Google Patents
Dismounting Combined multifunctional energy-conservation tea booth Download PDFInfo
- Publication number
- CN106223650A CN106223650A CN201610730287.2A CN201610730287A CN106223650A CN 106223650 A CN106223650 A CN 106223650A CN 201610730287 A CN201610730287 A CN 201610730287A CN 106223650 A CN106223650 A CN 106223650A
- Authority
- CN
- China
- Prior art keywords
- railing
- column
- triangle
- ceiling
- square tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 241001122767 Theaceae Species 0.000 title claims abstract description 41
- 238000004134 energy conservation Methods 0.000 title claims abstract description 20
- 239000002699 waste material Substances 0.000 claims abstract description 16
- 239000012530 fluid Substances 0.000 claims abstract description 4
- 239000000565 sealant Substances 0.000 claims abstract description 4
- 229910000831 Steel Inorganic materials 0.000 claims description 44
- 239000010959 steel Substances 0.000 claims description 44
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 28
- 238000005406 washing Methods 0.000 claims description 20
- 230000035622 drinking Effects 0.000 claims description 11
- 239000000203 mixture Substances 0.000 claims description 7
- 241001634884 Cochlicopa lubricella Species 0.000 claims description 6
- 238000003754 machining Methods 0.000 claims description 4
- 210000000481 breast Anatomy 0.000 claims description 3
- 239000004576 sand Substances 0.000 claims description 3
- 238000009628 steelmaking Methods 0.000 claims description 3
- 238000012857 repacking Methods 0.000 claims description 2
- 239000000463 material Substances 0.000 abstract description 7
- 239000002023 wood Substances 0.000 description 10
- 238000010586 diagram Methods 0.000 description 8
- 238000009434 installation Methods 0.000 description 6
- 101150046224 ABAT gene Proteins 0.000 description 5
- 238000010276 construction Methods 0.000 description 5
- 230000005611 electricity Effects 0.000 description 5
- WWJZWCUNLNYYAU-UHFFFAOYSA-N temephos Chemical compound C1=CC(OP(=S)(OC)OC)=CC=C1SC1=CC=C(OP(=S)(OC)OC)C=C1 WWJZWCUNLNYYAU-UHFFFAOYSA-N 0.000 description 5
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 4
- 238000005286 illumination Methods 0.000 description 4
- 239000003651 drinking water Substances 0.000 description 3
- 235000020188 drinking water Nutrition 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 229910052742 iron Inorganic materials 0.000 description 2
- 239000013589 supplement Substances 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 230000008676 import Effects 0.000 description 1
- 230000009545 invasion Effects 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/343—Structures characterised by movable, separable, or collapsible parts, e.g. for transport
- E04B1/34315—Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B7/00—Roofs; Roof construction with regard to insulation
- E04B7/02—Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs
- E04B7/028—Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs consisting of structures of pyramidal or conical shape
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/18—Balustrades; Handrails
- E04F11/181—Balustrades
- E04F11/1817—Connections therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/18—Balustrades; Handrails
- E04F11/181—Balustrades
- E04F11/1842—Balusters; Grille-type elements
- E04F11/1844—Grille-type elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/12—Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
- E04H1/1205—Small buildings erected in the open air
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/18—Balustrades; Handrails
- E04F11/181—Balustrades
- E04F11/1817—Connections therefor
- E04F2011/1819—Connections therefor between balustrade posts and horizontal or sloping balustrade members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/18—Balustrades; Handrails
- E04F11/181—Balustrades
- E04F11/1817—Connections therefor
- E04F2011/1823—Connections therefor between balustrade filling members, e.g. balusters or panels, and horizontal or sloping balustrade members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/18—Balustrades; Handrails
- E04F11/181—Balustrades
- E04F11/1817—Connections therefor
- E04F2011/1831—Connections therefor between balustrade filling members, e.g. panels, and balustrade posts
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Steps, Ramps, And Handrails (AREA)
Abstract
The present invention relates to a kind of dismounting Combined multifunctional energy-conservation tea booth.It includes column, railing, ceiling, cutting means enclosure, ceiling lower end is by some upright supports on the ground, railing is contained between adjacent upright posts, it is to be fitted without railing to form tea booth entrance between one of them adjacent upright posts, side, ceiling lower end is designed with cutting means enclosure and is loaded between adjacent upright posts, ceiling includes main support and triangle refractory slab, main support is fitted with some pieces of triangle refractory slabs, it is connected through the hinge between adjacent triangle refractory slab and gap scribbles between adjacent triangle refractory slab fluid sealant or is embedded with rubber water-proof bar, the surrounding of the ceiling i.e. outward flange of triangle refractory slab is designed with gutter.Advantage is that design is simple, easy to use, tea booth integral material all job sites waste and scrap again with, and Whole-dismountable, can assemble, can be used repeatedly.
Description
Technical field
The present invention relates to tea booth field, be specifically related to a kind of dismounting Combined multifunctional energy-conservation tea booth.
Background technology
The tea booth of construction site design in the past, is non-removable, or is difficult to secondary utilization after dismounting again, builds tea
Water booth is also required to certain cost, and conventional tea booth is exactly the place that simple sunshade is had a rest, and does not has any auxiliary facility, the most not
Convenient, in order to meet workman's demand, in the case of not increasing cost, how reasonable construction one is energy-conservation, and environmental protection is conveniently torn open
Unload, can utilize with secondary, it is provided that more convenient services are the directions of research at present.
Summary of the invention
In order to solve the problems referred to above, the present invention proposes a kind of dismounting Combined multifunctional energy-conservation tea booth, and design is simple,
Easy to use, tea booth integral material all job sites waste and scrap again with, and Whole-dismountable, can assemble, can
It is used repeatedly.
Technical scheme:
Dismantling Combined multifunctional energy-conservation tea booth, it includes column, railing, ceiling, cutting means enclosure, and ceiling lower end is by some vertical
Post supports on the ground, and railing is contained between adjacent upright posts, is to be fitted without railing to form tea between one of them adjacent upright posts
Water booth entrance, side, ceiling lower end is designed with cutting means enclosure and is loaded between adjacent upright posts, and ceiling includes main support and triangle refractory slab, main
Support is fitted with some pieces of triangle refractory slabs, is connected through the hinge and gap between adjacent triangle refractory slab between adjacent triangle refractory slab
In scribble fluid sealant or be embedded with rubber water-proof bar, the surrounding of the ceiling i.e. outward flange of triangle refractory slab is designed with gutter, in ceiling
Between lower end equipped with fan, be also devised with daylight lamp at the fan and be contained in below ceiling, equipped with washing one's hands inside one of them column
Pond, tea booth bosom is provided with stub collection device equipped with drinking device, the side of drinking device, and the leg of main support leads to
Cross bolt and nut and be fixedly connected on column upper end.The main support of ceiling and column are bolted readily accessible assembling.Column
Tiltedly upper end is welded with the U-shaped supporting plate of inclination, and the location footprint of main support is contained in the U-shaped supporting plate of inclination, if main support uses wood
Side makes and is just screwed, and uses bolt and nut to fix if main support uses square steel just to make.Side, the upper end welding of column
Having horizontally U-shaped supporting plate, connected by stull between adjacent upright posts, stull two ends are fixed in horizontally U-shaped supporting plate, and stull lower end fills
There is cutting means enclosure.
Described column is selected the galvanized pipe of job site interim fire-fighting dismounting or selects outer builder's jack to remove
16#, 18# I-steel, channel-section steel are made;Described column design becomes telescopic or upper and lower separate type, and telescopic post is one
Individual thin pillar type column and a thick pillar type column are constituted, and thin pillar type column lower end is inserted in thick pillar type column upper end and is connected by latch;Up and down
Separate type is then that column and following column are I-steel or channel-section steel making above, and upper and lower two columns are by bolt and nut even
Connect.
The safe poster square tube frame that described railing selects job site machining shed, protection canopy, external scaffolding to remove makes
Form.
Described railing includes three railings, upper slice connected by spring hinge between railing and middle railing, middle hurdle
Being connected by spring hinge between bar with bottom sheet railing, upper slice railing two ends are vertically fixedly connected on both sides by bolt and nut
On column, described balustrade design has two kinds of forms, and a kind of state is upper slice railing and middle railing forms an entirety up and down,
Together with the upset folding of bottom sheet railing is overlapping with middle railing, another kind of state is that railing forms seat state, and bottom sheet railing is vertical
Supporting on the ground, middle railing is connected horizontally between a railing and bottom sheet railing;The two ends of middle railing and bottom sheet hurdle
Being respectively provided with hasp between the two ends of bar, hasp one end is rotatably connected on bottom sheet railing, and the hasp other end has a bayonet socket, middle
Being designed with bayonet lock on railing, bayonet socket is stuck on bayonet lock.
Described triangle refractory slab includes that square tube master is stupefied and sunshading board, and two square tube master stupefied composition V-type shapes, tional sun visor design has
Several be sequentially fixed at constitute two square tube masters of V-type shape stupefied above, the trapezoidal shape of sunshading board and the most elongated,
A sunshading board outward flange is pressed on a following sunshading board inward flange above, and two ends, gutter are connected to two stupefied structures of square tube master
Becoming the oral area of V-type shape, the sunshading board outward flange of bottom is pressed in above a side in gutter;The described stupefied employing of square tube master is executed
The on-the-spot waste and old flitch of work or safe poster square tube are made;Sunshading board selects waste and old template or carport, movable plank house dismounting
Under sunlight board, color steel is made.Stupefied being connected through the hinge of the square tube master of adjacent triangle refractory slab forms main support together.
Described triangle refractory slab includes that square tube master is stupefied and sunshading board, and two square tube master stupefied composition V-type shapes, sunshading board is triangle
Shape plate, sunshading board be contained in two square tube masters of V-type shape stupefied between, sunshading board front edge is pressed on a side in gutter
Face, the described waste and old flitch in square tube master stupefied employing job site or safe poster square tube are made;Carport selected by sunshading board
Or sunlight board, the color steel under movable plank house dismounting is made;The square tube master of adjacent triangle refractory slab is stupefied is connected through the hinge one
Rise and form main support.
The described color steel after the dismounting of selection job site, gutter or PVC drain pipe are processed making, color steel
The gutter side of making spill channel-shaped, the gutter of PVC drain pipe is semicircle channel-shaped;Adjacent gutter is formed in stud
One discharge outlet.
Described gutter is end to end and opens a discharge outlet in the stud installing hand washing sink, also opens above column
Having water inlet, discharge outlet connects water inlet, column lower end Seal Design, and column side has a hole and hole site and installs water
Pipe, water pipe connects hand washing sink, and hand washing sink side connects running water pipe water supply joint.
Triangle refractory slab on the sunny side on described ceiling is designed to solar energy photovoltaic panel, and solar energy photovoltaic panel is by wire even
Connecing storage mechanism, storage mechanism connects daylight lamp, fan, drinking device by guiding, and daylight lamp, fan, drinking device also connect
Connect stand-by power supply joint.
Described cutting means enclosure selects the curtain for door or window under interim office, living area dismounting, sand window to carry out repacking and make.
It is an advantage of the invention that design is simple, easy to use, tea booth integral material all job sites waste and scrap
Again with, and Whole-dismountable, can assemble, can be used repeatedly;Auxiliary facility includes booth intraoral illumination lamp, tea furnace, electricity
Fan, warmer, hand washing sink faucet all select unnecessary facility after the dismounting of job site, and all energy saving and environment friendly devices
Tool;Power supply normally uses solar photovoltaic panel to generate electricity, and uses temporary source to supplement when solar energy is unsatisfactory for use demand;Water source tea
Water stove normally uses drinking water, and hand washing sink normally uses rainwater after collection.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of the present invention.
Fig. 2 is the ceiling schematic top plan view of the present invention.
Fig. 3 is the schematic top plan view of the triangle refractory slab of the present invention.
Fig. 4 is the schematic side view of the triangle refractory slab of the present invention.
Fig. 5 is the side-looking partial schematic diagram one of the present invention.
Fig. 6 is a kind of view of the railing of the present invention.
Fig. 7 is the another kind of seat state schematic diagram of the railing of the present invention.
Fig. 8 is the connection diagram of the telescopic post of the present invention.
Fig. 9 is the side-looking partial schematic diagram two of the present invention.
Figure 10 is the connection diagram of the column of separate type up and down of the present invention.
Figure 11 is the column main support connection diagram with ceiling of the present invention.
Figure 12 is the schematic diagram being connected by stull between the column of the present invention and column.
Detailed description of the invention
1-12 referring to the drawings, dismantles Combined multifunctional energy-conservation tea booth, and it includes column 1, railing 2, ceiling 3, protection
Curtain 4, ceiling 3 lower end supports on the ground by some columns 1, and railing 2 is contained between adjacent upright posts 1, and one of them is adjacent vertical
Being to be fitted without railing 2 to form tea booth entrance between post 1, side, ceiling 3 lower end is designed with cutting means enclosure 4 and is loaded on adjacent upright posts 1
Between, ceiling 3 includes main support 31 and triangle refractory slab 32, and main support 31 is fitted with some pieces of triangle refractory slabs 32, adjacent triangle
It is connected through the hinge between refractory slab 32 and gap scribbles between adjacent triangle refractory slab 32 fluid sealant or is embedded with rubber water-proof bar, top
The surrounding of the canopy 3 i.e. outward flange of triangle refractory slab 32 is designed with gutter 5, and the middle lower end of ceiling 3 is equipped with fan, at fan also
Being designed with daylight lamp and be contained in below ceiling 3, equipped with hand washing sink 6 inside one of them column 1, tea booth bosom is equipped with drinking-water
Device 7, the side of drinking device 7 is provided with stub collection device 10, and the leg of main support 31 connects by bolt and nut is fixing
In column 1 upper end.Main support 31 and the column 1 of ceiling 3 are bolted readily accessible assembling.Figure 11, the oblique upper end of column 1 is welded
Being connected to the U-shaped supporting plate 8 tilted, the location footprint of main support 31 is contained in the U-shaped supporting plate 8 of inclination, if main support 31 uses flitch
Make and be just screwed, use bolt and nut to fix if main support 31 uses square steel just to make.Figure 12, the upper end one of column 1
Side is welded with horizontally U-shaped supporting plate 9, is connected by stull 15 between adjacent upright posts 1, and stull 15 two ends are fixed on horizontally U-shaped supporting plate 9
In, stull 15 lower end is equipped with cutting means enclosure 4.
Described column 1 is selected the galvanized pipe of job site interim fire-fighting dismounting or selects outer builder's jack to remove
16#, 18# I-steel, channel-section steel are made;Described column 1 is designed to telescopic or upper and lower separate type, Fig. 5 and Fig. 8, stretches
Formula column is a thin pillar type column 11 and a thick pillar type column 12 is constituted, thin pillar type column 11 lower end be inserted in thick pillar type column 12 upper end and
Connected by latch 13;Fig. 9 and Figure 10, upper and lower separate type is then that column and following column are I-steel or channel-section steel system above
Making, upper and lower two columns 1 are connected by bolt and nut and steel plate 14.Column 1 lower end is fixed on ground by flange bolt nut
On, convenient dismounting.
The safe poster square tube frame that described railing 2 selects job site machining shed, protection canopy, external scaffolding to remove makes
Form.
Described railing 2 includes three railings, upper slice connected by spring hinge 25 between railing 21 and middle railing 22,
Middle railing 22 is connected by spring hinge between bottom sheet railing 23, and upper slice railing 21 two ends are vertically fixed by bolt and nut
Being connected on the column 1 of both sides, described railing 2 is designed with two kinds of forms, (such as Fig. 6) a kind of state be upper slice railing 21 and in
Sheet railing about 22 forms an entirety, bottom sheet railing 23 upset fold overlapping with middle railing 22 together with, (such as Fig. 7) is another kind of
State is that railing forms seat state, and on the ground, middle railing 22 is connected horizontally on a hurdle to bottom sheet railing 23 vertical support
Between bar 21 and bottom sheet railing 23;It is respectively provided with hasp 24 between two ends and the two ends of bottom sheet railing 23 of middle railing 22, takes
Detaining 24 one end to be rotatably connected on bottom sheet railing 23, hasp 24 other end has bayonet socket, and middle railing 22 is designed with bayonet lock, card
Mouth is stuck on bayonet lock.The design of railing not only can be played lateral connection and support, protective action, it is also possible to stop for people as seat
Breath, by bolt and nut and column dismounting easy to connect.
Fig. 2-4, described triangle refractory slab 32 includes that square tube master stupefied 321 and sunshading board 322, two square tube masters stupefied 321 constitute V
Type shape, sunshading board 322 is designed with several and is sequentially fixed at above two the square tube masters stupefied 321 constituting V-type shape, sunshading board 322
Trapezoidal shape and the most elongated, above sunshading board 322 outward flange be pressed in following sunshading board 322 inward flange
On, two ends, gutter 5 are connected to two square tube masters stupefied 321 and constitute the oral area of V-type shape, the sunshading board 322 outward flange pressure of bottom
On a side in gutter 5;Described square tube master stupefied 321 uses the waste and old flitch in job site or safe poster square tube to make
Form;Sunshading board 322 selects the sunlight board under waste and old template or carport, movable plank house dismounting, color steel to be made.Adjacent
The square tube master stupefied 321 of triangle refractory slab 32 is connected through the hinge and forms main support 31 together.
Described triangle refractory slab 32 includes that square tube master stupefied 321 and sunshading board 322, two square tube masters stupefied 321 constitute V-type shape,
Sunshading board 322 is triangular shape plate, and sunshading board 322 is contained between two square tube masters stupefied 321 of V-type shape, sunshading board 322 front end edge
Edge is pressed in above a side in gutter 5, and described square tube master stupefied 321 uses the waste and old flitch in job site or safe poster square tube
It is made;Sunshading board selects the sunlight board under carport or movable plank house dismounting, color steel to be made;Adjacent triangle refractory slab
Stupefied being connected through the hinge of square tube master form main support together
Fig. 5 and Fig. 9, described gutter 5 select job site remove after color steel or PVC drain pipe be processed making,
The gutter side of the making spill channel-shaped of color steel, the gutter of PVC drain pipe is semicircle channel-shaped;Adjacent gutter is in column position
Put one discharge outlet of formation.
Fig. 1-2, described gutter 5 is end to end and opens a discharge outlet in column 1 position installing hand washing sink 6, vertical
Post 1 also has water inlet above, and discharge outlet connects water inlet, column 1 lower end Seal Design, column 1 side have a hole and
Water pipe is installed in hole site, and water pipe connects hand washing sink 6, and hand washing sink 6 side connects running water pipe water supply joint.
Triangle refractory slab 32 on the sunny side on described ceiling 3 is designed to solar energy photovoltaic panel, and solar energy photovoltaic panel is by leading
Line connects storage mechanism, and storage mechanism connects daylight lamp, fan, drinking device, daylight lamp, fan, drinking device 7 by guiding
It is also connected with stand-by power supply joint.
One, dismounting Combined multifunctional energy-conservation tea booth main material is selected:
Main material all building engineering constructions scene waste and scrap again with, particularly as follows:
1, column: select the galvanized pipe (DN150, DN125, DN100) that the interim fire-fighting in job site is removed, or select outer foot of encorbelmenting
16#, 18# I-steel of hand cradle dismounting, channel-section steel;
2, railing, seat between column: select the safe poster square tube frame that job site machining shed, protection canopy, external scaffolding are removed
(50*90,40*60,30*40,20*40,20*20 square tube);
3, ceiling: main support selects the waste and old flitch in job site or safe poster square tube, refractory slab select waste and old template or carport,
Movable plank house remove under sunlight board, color steel etc.;
4, abat vent between column: select the curtain for door or window under interim office, living area dismounting, sand window etc. to reequip;
5, roof solar photovoltaic panel: select the part solar energy photovoltaic panel of the dismountings such as temporary facility street lamp, generating to reequip.
6, the auxiliary facility such as booth intraoral illumination lamp, tea furnace, electric fan, warmer, hand washing sink: select interim office, life
Redundance facility under district removes reuses.
7, gutter: color steel or PVC drain pipe after selecting job site to remove are processed;
8, installation zero, accessory: the spare and accessory parts after the dismounting of all job sites.
Two, dismounting Combined multifunctional energy-conservation tea booth spelling and installation:
Tea booth all detachable, can assemble, packaged type, assembled simple, conveniently moving, safety and comfort, the four seasons are suitable for, greatly
I is adjusted flexibly according to place actual demand, can be used repeatedly.
Tea booth profile is overlooked as hexagon, and side-looking is the square ceiling triangle that adds of booth height, by column, railing, ceiling,
Abat vent and auxiliary facility composition.In facade effect five limits be railing, while for access way, standard size is that column is high
2.2m, column spacing 1.8m, clear height 0.38m in ceiling;Concrete size can be carried out according to actual place size, when processing and fabricating
Adjust.
1, column: in view of on-the-spot spelling, installation requirements, column spelling mode is 6 integral hoistings or single assembling.Single
Root post can be overall or two assemblings (single high 1.1m), and two assemblings can use telescopic (combination of size pipe) or solid
Fixed pattern (pipe, I-steel, channel-section steel).Column bottom welding iron plate base (4~6 fixing threaded holes), with installation concrete ground
Employing setscrew is fixed, and welded top spill channel-section steel is main stupefied with fixing horizontal steel, wood.
2, railing: monolateral railing is to connect into entirety with spring hinge after length direction three welds, railing during normal use
Form common guard rail after folding, after opening, form backrest type seat, personnel station, seat needs when can meet use.With column
Between use fixture to be anchored, it is simple to individually assembly and disassembly.
3, ceiling: point wooden and steel two kinds.Steel, the wooden ceiling four seasons are suitable for, and wooden ceiling can effectively block sun summer
Light, steel sunlight board ceiling can absorb sunlight heating winter.
1) wooden: to be spliced by 6 pieces of triangle flitch plate hinges, every piece of plank is stupefied and wood lath by 2 flitch masters
Be spliced (wood lath is 150~180 mm width, and wood stupefied between fix for iron nail, arrange from bottom to top from triangle base during nail
Row, after plank should be pressed in above 20~50 mm on plank, during making, wood lath and press strip size should be unified, it is ensured that alien invasion
Effect), between every block of flitch plate, gap is embedded with rubber water-proof bar, it is ensured that the most water-tight.Two dual-purpose hinge set shape can be closed time assembled
Become assembly after 3 bulks, it is possible to monolithic is assembled with hinge.And fixing between column, it is respectively provided with 6 in column top outer and diagonal angle
And 3 main wood of 50*100mm or 100*100mm level are stupefied, it is stupefied that 3 stupefied intersection location of wood arrange 1 vertical wood, for a support
Canopy.
2) steel: be anchored by 6 pieces of triangle square tube sunshading boards and form, every block of plate is stupefied and sunshading board or coloured silk by 2 square tube masters
Steel plate is anchored, during making can integral installation after 6 pieces of assembly, can first install square tube master stupefied after triangle sunshading board is installed, it is possible to 6 pieces
Entirety becomes umbrella to install after strutting.Between every block of plate, gap is embedded with rubber water-proof bar, it is ensured that the most water-tight.And it is fixing between column,
It is respectively provided with 6 and 3 50*90mm or 40*60mm level masters are stupefied, 3 square tube intersection location in column top outer and diagonal angle
1 vertical square tube is set, is used for supporting ceiling.
3) ceiling draining: ceiling cornice end opening arranges gutter, gutter material uses steel side's spill or pvc pipe (to open
Half), gutter is formed hands over circle, and arrange gap central drainage at two (gap must not be arranged on tea booth and import and export in side
Top).If circular abutment, at square column top-side opening, gutter is connected with circular abutment;If channel-section steel or I-steel,
Installing PVC drain pipe at every channel-section steel or I-steel side, bottom lock, open top is connected with gutter;When raining, water stores
In circular abutment or PVC standpipe, after storage is full, superfluous water is discharged by gutter gap.
4, abat vent: arranging vertical stealth between column and draw hanging or level to closing formula abat vent, abat vent is fixed on vertical
Stupefied or the column side of capital steel wood, can keep the sun off summer, and winter can shield cold wind;
5, auxiliary facility
1) solar energy photovoltaic panel: be arranged on ceiling top (installation site and quantity can be determined according to actual needs), and between ceiling
Using wooden or steel support to fix (coordinating wooden or steel ceiling), solar power system is accessed in bottom, to meet in booth
The needs for electricity such as illumination, tea furnace, electric fan, warmer;
2) tea furnace: be arranged on middle or close side stud in booth, power supply is solar energy and on-the-spot temporary source two-way
Power supply, electric wire is pre-buried when floor construction;
3) electric fan or ceiling fan, warmer, illuminating lamp: electric fan is fixed on column, ceiling fan, illuminating lamp are fixed on 3, top
Horizon bar middle lower portion, warmer can be the most mobile on terrace in booth, and power supply is solar energy and on-the-spot temporary source two-way confession
Electricity, electric wire is reserved in column;
4) hand washing sink: be arranged on close side stud in booth, water source is column or pvc pipe interior collection rainwater and uses water temporarily
Two-way supplies water, and hand washing sink installs save-water faucet, and be available for washing one's hands, washing one's face use,;
Three, energy-conserving and environment-protective:
Tea booth integral material all job sites waste and scrap again with, and Whole-dismountable, can assemble, can repeatedly weigh
Multiple utilization;Auxiliary facility includes that booth intraoral illumination lamp, tea furnace, electric fan, warmer, hand washing sink faucet all select construction existing
Unnecessary facility after the dismounting of field, and all energy saving and environment friendly utensils;Power supply normally uses solar photovoltaic panel to generate electricity, at solar energy not
Temporary source is used to supplement when meeting use demand;Water source tea furnace normally uses drinking water, after hand washing sink normally uses collection
Rainwater.
Claims (10)
1. dismounting Combined multifunctional energy-conservation tea booth, it is characterised in that it includes column, railing, ceiling, cutting means enclosure, ceiling
By some upright supports on the ground, railing is contained between adjacent upright posts in lower end, is not have between one of them adjacent upright posts
Installing railing and form tea booth entrance, side, ceiling lower end is designed with cutting means enclosure and is loaded between adjacent upright posts, and ceiling includes main
Frame and triangle refractory slab, main support is fitted with some pieces of triangle refractory slabs, is connected through the hinge and adjacent between adjacent triangle refractory slab
Gap scribbles between triangle refractory slab fluid sealant or is embedded with rubber water-proof bar, the outward flange design of the i.e. triangle refractory slab of the surrounding of ceiling
Having lower end in the middle of gutter, ceiling equipped with fan, to be also devised with daylight lamp and be contained in below ceiling at fan, one of them stands
Equipped with hand washing sink inside post, tea booth bosom is provided with stub collection device equipped with drinking device, the side of drinking device,
The leg of main support is fixedly connected on column upper end by bolt and nut;The main support of ceiling is bolted with column;Vertical
The oblique upper end of post is welded with the U-shaped supporting plate of inclination, and the location footprint of main support is contained in the U-shaped supporting plate of inclination;The upper end one of column
Side is welded with horizontally U-shaped supporting plate, is connected by stull between adjacent upright posts, and stull two ends are fixed in horizontally U-shaped supporting plate, stull
Lower end is equipped with cutting means enclosure.
Dismounting Combined multifunctional the most according to claim 1 energy-conservation tea booth, it is characterised in that described column is selected
Galvanized pipe that job site interim fire-fighting is removed or select 16#, 18# I-steel that outer builder's jack removes, channel-section steel making and
Become;Described column design becomes telescopic or upper and lower separate type, and telescopic post is a thin pillar type column and a thick pillar type column
Constituting, thin pillar type column lower end is inserted in thick pillar type column upper end and is connected by latch;Up and down separate type is then column and following above
Column is I-steel or channel-section steel making, and upper and lower two columns are connected by bolt and nut.
Dismounting Combined multifunctional the most according to claim 1 energy-conservation tea booth, it is characterised in that described railing is selected
The safe poster square tube frame that job site machining shed, protection canopy, external scaffolding are removed is made.
Dismounting Combined multifunctional the most according to claim 1 energy-conservation tea booth, it is characterised in that described railing includes
Three railings, upper slice connected by spring hinge between railing and middle railing, pass through bullet between middle railing and bottom sheet railing
Spring chain connection, upper slice railing two ends are vertically fixedly connected on the column of both sides by bolt and nut, described balustrade design
Having two kinds of forms, a kind of state is upper slice railing and middle railing forms an entirety up and down, the upset of bottom sheet railing fold with in
Together, another kind of state is that railing forms seat state to sheet railing overlap, bottom sheet railing vertical support on the ground, middle railing
It is connected horizontally between a railing and bottom sheet railing;It is respectively provided with between two ends and the two ends of bottom sheet railing of middle railing and takes
Button, hasp one end is rotatably connected on bottom sheet railing, and the hasp other end has bayonet socket, and middle railing is designed with bayonet lock, bayonet socket
It is stuck on bayonet lock.
Dismounting Combined multifunctional the most according to claim 1 energy-conservation tea booth, it is characterised in that described triangle refractory slab
Stupefied and the sunshading board including square tube master, two square tube master stupefied composition V-type shapes, tional sun visor design has several to be sequentially fixed at composition V
Above two square tube masters of type shape are stupefied, the trapezoidal shape of sunshading board and the most elongated, above a sunshading board outward flange
Being pressed on a following sunshading board inward flange, two ends, gutter are connected to the oral area of two square tube master stupefied composition V-type shapes, bottom
Sunshading board outward flange be pressed in above a side in gutter;The described waste and old flitch in square tube master stupefied employing job site or safety
Poster square tube is made;Sunshading board selects waste and old template construct to form;The square tube master of adjacent triangle refractory slab is stupefied by hinge even
Connect and form main support together.
Dismounting Combined multifunctional the most according to claim 1 energy-conservation tea booth, it is characterised in that described triangle refractory slab
Stupefied and the sunshading board including square tube master, two square tube master stupefied composition V-type shapes, sunshading board is triangular shape plate, and sunshading board is contained in V-type shape
Two square tube masters stupefied between, sunshading board front edge is pressed in above a side in gutter, and the described stupefied employing of square tube master is executed
The on-the-spot waste and old flitch of work or safe poster square tube are made;The sunlight under carport or movable plank house dismounting selected by sunshading board
Plate, color steel are made;Stupefied being connected through the hinge of the square tube master of adjacent triangle refractory slab forms main support together.
Dismounting Combined multifunctional the most according to claim 1 energy-conservation tea booth, it is characterised in that described gutter choosing
Color steel or PVC drain pipe after removing with job site are processed making, the gutter side of the making spill channel-shaped of color steel,
The gutter of PVC drain pipe is semicircle channel-shaped;Adjacent gutter forms a discharge outlet in stud.
Dismounting Combined multifunctional the most according to claim 1 energy-conservation tea booth, it is characterised in that described gutter is first
Tail connects and opens a discharge outlet in the stud installing hand washing sink, also has water inlet above column, and discharge outlet connects
The mouth of a river, column lower end Seal Design, column side has a hole and hole site and installs water pipe, and water pipe connects hand washing sink, washes one's hands
Side, pond connects running water pipe water supply joint.
Dismounting Combined multifunctional the most according to claim 1 energy-conservation tea booth, it is characterised in that on described ceiling
Triangle refractory slab on the sunny side is designed to solar energy photovoltaic panel, and solar energy photovoltaic panel connects storage mechanism by wire, and storage mechanism is led to
Crossing guiding and connect daylight lamp, fan, drinking device, daylight lamp, fan, drinking device are also connected with stand-by power supply joint.
Dismounting Combined multifunctional the most according to claim 1 energy-conservation tea booth, it is characterised in that described cutting means enclosure
Curtain for door or window, sand window under selecting interim office, living area to remove carry out repacking and make.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610730287.2A CN106223650A (en) | 2016-08-26 | 2016-08-26 | Dismounting Combined multifunctional energy-conservation tea booth |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610730287.2A CN106223650A (en) | 2016-08-26 | 2016-08-26 | Dismounting Combined multifunctional energy-conservation tea booth |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN106223650A true CN106223650A (en) | 2016-12-14 |
Family
ID=57554672
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610730287.2A Pending CN106223650A (en) | 2016-08-26 | 2016-08-26 | Dismounting Combined multifunctional energy-conservation tea booth |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN106223650A (en) |
Cited By (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106801385A (en) * | 2017-03-24 | 2017-06-06 | 史洋昊 | The system that a kind of empty iron prevents disaster caused by a windstorm |
| CN107012997A (en) * | 2017-03-22 | 2017-08-04 | 无锡市卡德姆机械科技有限公司 | The outdoor fire-fighting rack escaped by all kinds of means |
| CN107178222A (en) * | 2017-07-10 | 2017-09-19 | 中国水利水电第十二工程局有限公司 | Landscape architectural structure and preparation method thereof, assembled Landscape Architecture and its method of construction |
| CN108071242A (en) * | 2017-11-10 | 2018-05-25 | 上海曼斐电器贸易有限公司 | A kind of multi-functional wayside pavilion |
| CN108425511A (en) * | 2017-09-21 | 2018-08-21 | 汝州市中鼎科技有限公司 | A kind of marketing outdoor promotional ceiling |
| CN108894449A (en) * | 2018-08-13 | 2018-11-27 | 苏州傲达通信设备有限公司 | A kind of steel construction guardrail |
| CN108915183A (en) * | 2018-08-13 | 2018-11-30 | 苏州傲达通信设备有限公司 | A kind of steel construction guard bar device being easily installed for open air |
| CN109138506A (en) * | 2018-07-09 | 2019-01-04 | 温州海德能环保设备科技有限公司 | A kind of energy-saving and environment-friendly bus-stop |
| CN109339240A (en) * | 2018-11-20 | 2019-02-15 | 华北水利水电大学 | Eco-friendly simple building structure |
| CN112854461A (en) * | 2021-01-29 | 2021-05-28 | 广州国盛高新科技发展有限公司 | Synchronous linkage telescopic structure |
| CN113622695A (en) * | 2021-08-06 | 2021-11-09 | 高惠芬 | Sunshade device for building roof construction and installation method thereof |
| US12134909B2 (en) | 2022-08-26 | 2024-11-05 | Zhejiang Jiansheng Leisure Products Co., Ltd | Outdoor fixed tent with assembly structure, buckle mechanism, and assembly method for fixed tent |
-
2016
- 2016-08-26 CN CN201610730287.2A patent/CN106223650A/en active Pending
Cited By (14)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107012997A (en) * | 2017-03-22 | 2017-08-04 | 无锡市卡德姆机械科技有限公司 | The outdoor fire-fighting rack escaped by all kinds of means |
| CN106801385A (en) * | 2017-03-24 | 2017-06-06 | 史洋昊 | The system that a kind of empty iron prevents disaster caused by a windstorm |
| CN107178222A (en) * | 2017-07-10 | 2017-09-19 | 中国水利水电第十二工程局有限公司 | Landscape architectural structure and preparation method thereof, assembled Landscape Architecture and its method of construction |
| CN107178222B (en) * | 2017-07-10 | 2023-06-13 | 中国水利水电第十二工程局有限公司 | Manufacturing method of landscape building structure and construction method of assembled landscape building |
| CN108425511A (en) * | 2017-09-21 | 2018-08-21 | 汝州市中鼎科技有限公司 | A kind of marketing outdoor promotional ceiling |
| CN108071242A (en) * | 2017-11-10 | 2018-05-25 | 上海曼斐电器贸易有限公司 | A kind of multi-functional wayside pavilion |
| CN109138506A (en) * | 2018-07-09 | 2019-01-04 | 温州海德能环保设备科技有限公司 | A kind of energy-saving and environment-friendly bus-stop |
| CN108915183A (en) * | 2018-08-13 | 2018-11-30 | 苏州傲达通信设备有限公司 | A kind of steel construction guard bar device being easily installed for open air |
| CN108915183B (en) * | 2018-08-13 | 2020-06-19 | 中机建(上海)钢结构股份有限公司 | An easy-to-install steel structure guardrail device for outdoor use |
| CN108894449A (en) * | 2018-08-13 | 2018-11-27 | 苏州傲达通信设备有限公司 | A kind of steel construction guardrail |
| CN109339240A (en) * | 2018-11-20 | 2019-02-15 | 华北水利水电大学 | Eco-friendly simple building structure |
| CN112854461A (en) * | 2021-01-29 | 2021-05-28 | 广州国盛高新科技发展有限公司 | Synchronous linkage telescopic structure |
| CN113622695A (en) * | 2021-08-06 | 2021-11-09 | 高惠芬 | Sunshade device for building roof construction and installation method thereof |
| US12134909B2 (en) | 2022-08-26 | 2024-11-05 | Zhejiang Jiansheng Leisure Products Co., Ltd | Outdoor fixed tent with assembly structure, buckle mechanism, and assembly method for fixed tent |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202535808U (en) | Greenhouse trellis structure for modular solar installations | |
| KR20200009934A (en) | Solar Panel Fixing System | |
| KR101347971B1 (en) | The railing of the roof of the building for waterproofing and drainage | |
| CN111425017B (en) | Construction method of assembled multifunctional modeling pavilion | |
| CN104124913B (en) | The installation method of newly-built solar energy roof integrated power generation system | |
| CN103352549A (en) | Steel-structure backflow-type double-layer colorful-plate rain tent | |
| CN205840177U (en) | Steel structure canopy | |
| CN206071106U (en) | Dismounting Combined multifunctional energy-conservation tea booth | |
| CN204401911U (en) | Integration roof of photovoltaic construction structure | |
| CN214461927U (en) | A photovoltaic sunshine pavilion for rural house roof | |
| CN211647596U (en) | Hydraulic engineering is with easy to detach's guard fence | |
| CN104481087A (en) | Light firm canopy easy for discharging water | |
| CN215407700U (en) | Electric vehicle parking shed based on building design | |
| KR20130113678A (en) | The awning to be equipped the solar lighting | |
| CN109183978B (en) | Module assembling energy-saving environment-friendly building | |
| CN108104583B (en) | Sky curtain wall system | |
| JP3414711B2 (en) | Balcony with solar panels | |
| CN104612341A (en) | Canopy | |
| CN213390562U (en) | Environment-friendly simple and convenient assembled type integration box | |
| KR101437324B1 (en) | For rooftop rainwater and snow and icicles blocking the anti-fall device | |
| JP3782802B2 (en) | Renovation structure of building | |
| EP2141295A2 (en) | Structural element | |
| CN103362259A (en) | Back-flow-type rain cover adopting steel structure | |
| CN221346085U (en) | Prefabricated capping beam structure of fabricated building parapet | |
| KR20110119136A (en) | Cap for prop |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161214 |