CN104847362B - 硬岩地层大跨地铁车站暗挖施工方法 - Google Patents

硬岩地层大跨地铁车站暗挖施工方法 Download PDF

Info

Publication number
CN104847362B
CN104847362B CN201510045392.8A CN201510045392A CN104847362B CN 104847362 B CN104847362 B CN 104847362B CN 201510045392 A CN201510045392 A CN 201510045392A CN 104847362 B CN104847362 B CN 104847362B
Authority
CN
China
Prior art keywords
tunnel
arch
station
excavation
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510045392.8A
Other languages
English (en)
Other versions
CN104847362A (zh
Inventor
史宣陶
李德才
敖贵勇
徐亮
喻波
苟明中
张建祥
陈军
林刚
朱宏海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201510045392.8A priority Critical patent/CN104847362B/zh
Publication of CN104847362A publication Critical patent/CN104847362A/zh
Application granted granted Critical
Publication of CN104847362B publication Critical patent/CN104847362B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

硬岩地层大跨地铁车站暗挖施工方法,以有效降低开挖施工风险,提高开挖施工效率。该方法包括如下步骤:车站拱部中间分两个台阶开挖,先开挖隧洞拱部中间上台阶,并施作该部初支拱盖;开挖隧洞拱部中间下台阶;开挖隧洞拱部左侧部、隧洞拱部右侧部,在拱脚位置施作锁脚锚杆,接长拱顶初支拱盖,完成初支拱盖施工;在初支拱盖的保护下,拉槽开挖车站下部岩体,分左、中、右三部分和上、中、下三台阶共9部开挖,并施作相应段的边墙初期支护,直到开挖到底;自下而上顺筑车站主体结构,完成车站施工。

Description

硬岩地层大跨地铁车站暗挖施工方法
技术领域
本发明涉及隧道工程,特别涉及一种适用于硬岩地层的大跨地铁车站暗挖施工方法。
背景技术
为规避常规的明挖或盖挖施工引起大量管线迁改、绿化迁移和交通拥堵等难题,重庆、大连、厦门、青岛等市区基岩埋深浅的城市通过适当下压轨面标高,使部分地铁车站主体结构基本位于硬岩地层中,进而选择采用暗挖法施工。
传统常用的大断面隧洞暗挖工法有分部台阶法、三台阶七步开挖法、双侧壁导坑法、洞桩(柱)法、二衬拱盖法等。其中,双侧壁导坑法和洞桩法(PBA法)适用于软弱围岩地层;在硬岩中使用存在以下不足:一是爆破开挖冲击破坏已完成的临时支护或已完成的柱、拱、中板永久结构,采用弱爆则费用高;二是工期长、风险高、废弃工程大。分部台阶法适用于埋置较深和围岩条件较好的隧洞,三台阶七步开挖法适用于围岩条件一般和沉降控制要求不高的隧洞,二者一般适用于山岭隧洞;在城市地铁暗挖车站中使用存在地面沉降不易控制、影响道路下方管线和路面交通安全等隐患。二衬拱盖法适用于上软下硬围岩大断面暗挖车站,但存在以下不足:拆除临时支护时拱顶沉降大,沉降控制难,风险高;二是拱脚与墙顶接口位置防水层及结构整体性不好,工程质量受影响;三是隧洞下部爆破施工对已完工的拱顶二衬结构可能造成冲击破坏。
基于以上原因,有必要对传统的硬岩地层的大跨地铁车站暗挖施工方法进行重新审视和研究。
发明内容
本发明所要解决的技术问题是提供一种硬岩地层大跨地铁车站暗挖施工方法,以有效降低开挖施工风险,提高开挖施工效率。
本发明硬岩地层大跨地铁车站暗挖施工方法,包括如下步骤:
①车站拱部中间分两个台阶开挖,先开挖隧洞拱部中间上台阶,并施作该部初支拱盖,初支拱盖由喷射混凝土层、格栅钢架、钢筋网、系统锚杆和锁脚锚杆组成,其厚度由拱顶到拱脚逐步加厚,在两侧端部形成大拱脚;
②开挖隧洞拱部中间下台阶;
③开挖隧洞拱部左侧部、隧洞拱部右侧部,在拱脚位置施作锁脚锚杆,接长拱顶初支拱盖,完成初支拱盖施工;
④在初支拱盖的保护下,拉槽开挖车站下部岩体,分左、中、右三部分和上、中、下三台阶共9部开挖,并施作相应段的边墙初期支护,直到开挖到底;
⑤自下而上顺筑车站主体结构,完成车站施工。
本发明的有益效果是,施工空间大,方便机械化施工,可以多作业面平行操作,机械化作业有利于提高开挖效率;采用加强初期支护,通过初支拱盖将拱顶上方荷载传递到拱脚较为稳定的围岩上,利于控制拱顶沉降和地面沉降;同时可避免原二衬拱盖法中下部爆破施工对已完工二衬结构的冲击破坏;在台阶法开挖的基础上,先开挖中槽,左右边墙交错开挖,利于开挖面的稳定;当地质条件发生变化时,可及时转换施工工序,调整施工工法;主体结构自下而上浇筑,可确保防水结构和二次衬砌浇筑质量。
附图说明
本说明书包括如下两副附图:
图1是本发明硬岩地层大跨地铁车站暗挖施工方法开挖步骤示意图;
图2是本发明硬岩地层大跨地铁车站暗挖施工方法车站施工完毕状态示意图。
图中示出部位、构件名称及所对应的标记:隧洞拱部中间上台阶1、隧洞拱部中间下台阶2、隧洞拱部左侧部3a、隧洞拱部右侧部3b、隧洞下部中间上台阶4、隧洞下部中间中台阶5、隧洞下部左侧上台阶6a、隧洞下部右侧上台阶6b、隧洞下部中间下台阶7、隧洞下部左侧中台阶8a、隧洞下部右侧中台阶8b、隧洞下部左侧下台阶9a、隧洞下部右侧下台阶9b、初支拱盖11、锁脚锚杆12、边墙初期支护13、车站主体结构14。
具体实施方式
以下结合附图对本发明作进一步说明。
参照图1和图2,本发明的硬岩地层大跨地铁车站暗挖施工方法,包括如下步骤:
1.车站拱部中间分两个台阶开挖,先开挖隧洞拱部中间上台阶1,并施作该部初支拱盖11。
2.开挖隧洞拱部中间下台阶2。
3.开挖隧洞拱部左侧部3a、隧洞拱部右侧部3b,在拱脚位置施作锁脚锚杆12,接长拱顶初支拱盖11,完成初支拱盖11施工。所述初支拱盖11由喷射混凝土层、格栅钢架、钢筋网、系统锚杆和锁脚锚杆12组成,其厚度由拱顶到拱脚逐步加厚,在两侧端部形成大拱脚,将上方荷载通过大拱脚传递到两侧较为稳定的围岩上。
4.在初支拱盖11的保护下,拉槽开挖车站下部岩体,分左、中、右三部分和上、中、下三台阶共9部开挖,并施作相应段的边墙初期支护13,直到开挖到底。
边墙初期支护13一般由系统锚杆、钢筋网和喷射混凝土组成。
具体而言,该步骤按如下顺序开挖:开挖隧洞下部中间上台阶4、隧洞下部中间中台阶5;开挖隧洞下部左侧上台阶6a、隧洞下部右侧上台阶6b,施作该段边墙初期支护13;开挖隧洞下部中间下台阶7;开挖隧洞下部左侧中台阶8a、隧洞下部右侧中台阶8b和隧洞下部左侧下台阶9a、隧洞下部右侧下台阶9b,并完成剩余边墙初期支护13的施工。
5.自下而上顺筑车站主体结构14,完成车站施工。
上述步骤3和步骤4中,在隧洞拱部左侧部3a、隧洞拱部右侧部3b和隧洞下部左侧上台阶6a、隧洞下部右侧上台阶6b开挖时,采用机械开挖或采用控制爆破措施,以减小对初支拱盖11大拱脚围岩的松动破坏。
以上所述只是用图解说明本发明的基本原理和做法,并非是要将本发明局限在所示和所述的具体做法和参数范围内,故凡是所有可能被利用的相应修改以及等同物,均属于本发明所申请的专利范围。

Claims (3)

1.硬岩地层大跨地铁车站暗挖施工方法,包括如下步骤:
①车站拱部中间分两个台阶开挖,先开挖隧洞拱部中间上台阶(1),并施作该部初支拱盖(11);
②开挖隧洞拱部中间下台阶(2);
③开挖隧洞拱部左侧部(3a)、隧洞拱部右侧部(3b),在拱脚位置施作锁脚锚杆(12),接长拱顶初支拱盖(11),完成初支拱盖(11)施工,初支拱盖(11)由喷射混凝土层、格栅钢架、钢筋网、系统锚杆和锁脚锚杆(12)组成,其厚度由拱顶到拱脚逐步加厚,在两侧端部形成大拱脚;
④在初支拱盖(11)的保护下,拉槽开挖车站下部岩体,分左、中、右三部分和上、中、下三台阶共9部开挖,并施作相应段的边墙初期支护(13),直到开挖到底;
⑤自下而上顺筑车站主体结构(14),完成车站施工。
2.如权利要求1 所述硬岩地层大跨地铁车站暗挖施工方法,其特征是:所述步骤④中按如下顺序开挖:
开挖隧洞下部中间上台阶(4)、隧洞下部中间中台阶(5);
开挖隧洞下部左侧上台阶(6a)、隧洞下部右侧上台阶(6b),施作该段边墙初期支护(13);
开挖隧洞下部中间下台阶(7);
开挖隧洞下部左侧中台阶(8a)、隧洞下部右侧中台阶(8b)和隧洞下部左侧下台阶(9a)、隧洞下部右侧下台阶(9b),并完成剩余边墙初期支护(13)的施工。
3.如权利要求2 所述硬岩地层大跨地铁车站暗挖施工方法,其特征是:所述步骤③和步骤④中,在隧洞拱部左侧部(3a)、隧洞拱部右侧部(3b)和隧洞下部左侧上台阶(6a)、隧洞下部右侧上台阶(6b)开挖时,采用机械开挖或采用控制爆破措施。
CN201510045392.8A 2015-01-29 2015-01-29 硬岩地层大跨地铁车站暗挖施工方法 Active CN104847362B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510045392.8A CN104847362B (zh) 2015-01-29 2015-01-29 硬岩地层大跨地铁车站暗挖施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510045392.8A CN104847362B (zh) 2015-01-29 2015-01-29 硬岩地层大跨地铁车站暗挖施工方法

Publications (2)

Publication Number Publication Date
CN104847362A CN104847362A (zh) 2015-08-19
CN104847362B true CN104847362B (zh) 2017-12-01

Family

ID=53847289

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510045392.8A Active CN104847362B (zh) 2015-01-29 2015-01-29 硬岩地层大跨地铁车站暗挖施工方法

Country Status (1)

Country Link
CN (1) CN104847362B (zh)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106121675A (zh) * 2016-08-22 2016-11-16 北京市市政工程研究院 小型溶洞位于开挖隧道仰拱底时隧道开挖与溶洞处理方法
CN106499417B (zh) * 2016-10-25 2019-01-08 中铁隧道集团二处有限公司 特大断面浅埋地铁车站预留t字岩梁岩柱施工工法
CN106761778B (zh) * 2017-01-24 2018-08-07 山东大学 一种适用于上软下硬地层的地铁车站暗挖施工工艺
CN109538246A (zh) * 2018-12-26 2019-03-29 中铁科学研究院有限公司 拱盖法暗挖地铁车站拱脚加固结构及施工方法
CN109653751A (zh) * 2019-01-09 2019-04-19 济南城建集团有限公司 一种采用减震橡胶拱盖下穿城市快速路隧道施工方法
CN110017149A (zh) * 2019-05-21 2019-07-16 成都市建筑设计研究院 一种拱盖暗挖顺筑地下结构及施工方法
CN111577317A (zh) * 2020-04-30 2020-08-25 中铁隧道局集团有限公司 一种上软下硬地层大跨暗挖地铁车站洞室施工方法
CN112943265A (zh) * 2021-03-10 2021-06-11 中铁二院工程集团有限责任公司 初支拱盖法地铁无柱车站结构及施工方法
CN114109436A (zh) * 2021-12-01 2022-03-01 中铁二局集团有限公司 一种大跨度地铁车站暗挖施工方法
CN114233302B (zh) * 2021-12-29 2024-03-15 中铁四院集团西南勘察设计有限公司 一种适用于暗挖车站的拱盖施工工法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3800046A1 (de) * 1988-01-04 1989-07-13 Sp Kt Bjuro Glavtonnelmetrostr Ausbau fuer einen kalottenschlitz
CN101086209A (zh) * 2007-07-23 2007-12-12 北京交通大学 盾构法与浅埋暗挖法结合建造地铁车站的施工方法
CN101864959A (zh) * 2009-04-17 2010-10-20 中铁工程设计咨询集团有限公司 一种地下车站主体结构的暗挖施工方法
CN102305091A (zh) * 2011-08-25 2012-01-04 中铁十六局集团有限公司 一种硬岩大断面隧道施工的支撑结构及其施工方法
CN102562076A (zh) * 2011-12-23 2012-07-11 中铁十九局集团第五工程有限公司 上软下硬地质条件下大断面地铁车站暗挖施工工艺
CN102644466A (zh) * 2012-04-27 2012-08-22 北京城建设计研究总院有限责任公司 岩质地层中修建超浅埋大跨度暗挖地铁车站的托梁拱盖法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3800046A1 (de) * 1988-01-04 1989-07-13 Sp Kt Bjuro Glavtonnelmetrostr Ausbau fuer einen kalottenschlitz
CN101086209A (zh) * 2007-07-23 2007-12-12 北京交通大学 盾构法与浅埋暗挖法结合建造地铁车站的施工方法
CN101864959A (zh) * 2009-04-17 2010-10-20 中铁工程设计咨询集团有限公司 一种地下车站主体结构的暗挖施工方法
CN102305091A (zh) * 2011-08-25 2012-01-04 中铁十六局集团有限公司 一种硬岩大断面隧道施工的支撑结构及其施工方法
CN102562076A (zh) * 2011-12-23 2012-07-11 中铁十九局集团第五工程有限公司 上软下硬地质条件下大断面地铁车站暗挖施工工艺
CN102644466A (zh) * 2012-04-27 2012-08-22 北京城建设计研究总院有限责任公司 岩质地层中修建超浅埋大跨度暗挖地铁车站的托梁拱盖法

Also Published As

Publication number Publication date
CN104847362A (zh) 2015-08-19

Similar Documents

Publication Publication Date Title
CN104847362B (zh) 硬岩地层大跨地铁车站暗挖施工方法
CN104763433A (zh) 上软下硬地层大跨地铁车站暗挖施工方法
CN102644466B (zh) 岩质地层中修建超浅埋大跨度暗挖地铁车站的托梁拱盖法
CN104989425B (zh) 一种暗挖进洞支护结构及其支护方法
CN102182472B (zh) 隧道塌方空腔的回填修复方法
CN106246201A (zh) 小型溶洞位于开挖隧道四周时隧道的开挖与溶洞处理方法
CN102748040B (zh) 地铁大跨度车站主体结构及其柱拱法施工方法
CN105863650B (zh) 一种先墙后洞的隧道进洞施工方法
CN106121659B (zh) 一种下穿城市主干道上软下硬地层小断面隧道开挖方法
CN101148882A (zh) 破碎软弱岩质路堑高边坡稳定开挖方法
CN108487911A (zh) 复杂地质条件下大跨度隧道双侧墙复合十字交叉法施工方法
CN205013013U (zh) 适用于上软下硬地层的暗挖车站支护结构
CN104329095B (zh) 一种既有隧道拓宽施工方法
CN108625879A (zh) 山区隧道半明半暗结构及其施工方法
CN103883328A (zh) 分离式隧道下穿高陡v型冲沟偏压段的半盖半暗施工方法
CN108643940A (zh) 超大断面浅埋软弱围岩隧道井字形双侧壁支护体系及隧道施工方法
CN103362513A (zh) 暗挖区间既有洞体改造施工工法
CN110259490A (zh) 一种地铁暗挖车站施工方法
KR101536209B1 (ko) 강관 다단 그라우팅 장치를 이용한 개착 및 natm 혼합 굴착 터널 시공방법
CN107503755A (zh) 一种用免扣拱平顶洞桩法建造地铁车站的施工方法
CN111322087A (zh) 山区中软土公路隧道进口半明半暗进洞施工方法
CN102808627A (zh) 钢管棚暗挖施工方法
CN109853399A (zh) 用于拱桥的大截面倾斜隧道式拱座结构及其施工方法
CN109056810A (zh) 既有建筑下方明挖或盖挖地下主体结构的横向扩挖构造及其施工方法
CN208416561U (zh) 一种山区隧道半明半暗结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant