CN104831921B - 用于固定混凝土方形柱模板不需对拉杆的环形箍 - Google Patents
用于固定混凝土方形柱模板不需对拉杆的环形箍 Download PDFInfo
- Publication number
- CN104831921B CN104831921B CN201510066147.5A CN201510066147A CN104831921B CN 104831921 B CN104831921 B CN 104831921B CN 201510066147 A CN201510066147 A CN 201510066147A CN 104831921 B CN104831921 B CN 104831921B
- Authority
- CN
- China
- Prior art keywords
- template
- sliding shoe
- pull bar
- steel strand
- strand wires
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
本发明用于固定混凝土方形柱模板不需对拉杆的环形箍主要用于建筑施工浇筑混凝土柱固定模板使用,属于建筑施工领域。它是将4个伸缩梁(1)及弧形架(9)分别放在柱模板的4个边上,将钢绞线(2)放入4个弧形架(9)的凹槽内,敲击张紧器(3)的滑动块(6)的下端,滑动块(6)带动钢绞线(2)对4个弧形架(9)施加径向力,弧形架(9)通过伸缩梁(1)对固定模板的方木(5)施加压应力,将模板固定,伸缩梁(1)对固定模板的方木(5)施加的压应力是一致的,可以不需要对拉杆固定,浇筑混凝土时模板不会变形。模板需拆模时,只需敲击张紧器(3)的滑动块(6)的上端,钢绞线(2)松开,拆除伸缩梁(1)及模板即可。
Description
技术领域
本发明主要用于建筑施工浇筑混凝土柱固定模板使用,属于建筑施工模板领域。
背景技术
我国目前建筑施工使用的方形柱模板固定方法普遍采用双钢管配合对拉杆固定模板,柱子截面较大时还需在柱模板中间用对拉杆对拉加固(因为浇筑混凝土柱时长边模板中间最容易起鼓变形),安装拆除均不方便,本人提交并受理的发明专利《用于固定混凝土方形柱模板能快速装卸且不需对拉杆的环形箍》,申请号201510022522.6,申请日2015年01月17日,该专利存在弧形架不能通用的问题,特别是用于长方形柱时不能通用的问题。
发明内容
本发明克服了上述问题,它是将4个伸缩梁(1)及弧形架(9)分别放在柱模板的4个边上,将钢绞线(2)放入4个弧形架(9)的凹槽内,敲击张紧器(3)的滑动块(6)的下端,滑动块(6)带动钢绞线(2)对4个弧形架(9)施加径向力,弧形架(9)通过伸缩梁(1)对固定模板的方木(5)施加压应力,将模板固定,伸缩梁(1)对固定模板的方木(5)施加的压应力是一致的,可以不需要对拉杆固定,浇筑混凝土时模板不会变形。模板需拆模时,只需敲击张紧器(3)的滑动块(6)的上端,钢绞线(2)松开,拆除伸缩梁(1)及模板即可。
本发明主要由伸缩梁(1)、钢绞线(2)、张紧器(3)、弧形架(9)组成;伸缩梁(1)主要由主梁(11)、伸缩节(10)组成,主梁(11)有螺丝孔(12);张紧器(3)又由滑动块(6),杆(7),孔(8)组成;杆(7)穿过滑动块(6)的孔(8),滑动块(6)可以沿杆(7)滑动,钢绞线(2)一端与滑动块(6)的侧面固定,另一端与杆(7)固定;弧形架(9)有丝杆(13),其一端与弧形架固定。需说明:弧形架(9)外侧有固定钢绞线(2)的凹槽;钢绞线(2)也可以是钢带或其它高强材料制造;孔(8)的高度略大于杆(7)的高度。
附图说明
附图标记说明:1-伸缩梁、2-钢绞线、3-张紧器、4-模板、5-木方、6-滑动块、7-杆、8-孔、9-弧形架、10-伸缩节、11-主梁、12-螺丝孔、13-丝杆。
图1是本发明的平面图。
图2是本发明张紧器(3)的放大图。
图3是本发明张紧器(3)的滑动块(6)的侧立面图。
图4是本发明伸缩梁(1)的示意图。
图5是本发明弧形架(9)的示意图。
具体实施方式
下面结合附图说明本发明的具体实施方式。
参见图1、图2、图3、图4、图5,先安装好柱模板(4)及木方(5),将4个弧形架(9)的丝杆(13)旋入伸缩梁(1)的主梁(11)的螺丝孔(12)内,将两个伸缩节(10)分别插入主梁(11)空腔内,并调节伸缩节(10)的长度,使整个伸缩梁(1)的长度与每侧模板的宽度基本一致,将安装好的4个伸缩梁(1)临时固定在柱模板四边的木方(5)上,调整4个弧形架(9)的丝杆(13),使4个弧形架(9)的外边缘对模板(4)的形心距离一致,即4个弧形架(9)的外边缘对模板(4)的形心可以形成一个假想圆形,再将钢绞线(2)放入4个弧形架(9)的凹槽内,将杆(7)的自由端穿过滑动块(6)的孔(8),最后敲击滑动块(6)的下端,滑动块(6)会沿着杆(7)滑动,滑动块(6)带动钢绞线(2)会越敲越紧(这是根据建筑工程领域广泛使用的步步紧工作原理实现的),从而带动弧形架(9)及伸缩梁(1)对木方(5)形成初始压应力,当浇筑混凝土及振捣混凝土时,混凝土对模板(4)施加各个方向相等的压应力,又由于钢绞线(2)的圆形径向力作用,伸缩梁(1)对模板(4)施加的压应力与混凝土对模板(4)施加的压应力大小相等方向相反,这样就保证了模板不会变形;另外,伸缩梁(1)是两端悬臂中间铰支承受均布荷载的悬臂梁,其中间的铰支点理论上没有变形,正好弥补普通混凝土柱模板中间容易起鼓变形的弱点。当模板需拆模时,只需敲击张紧器(3)的滑动块(6)的上端,钢绞线(2)松开,拆除伸缩梁(1)及模板即可。
Claims (3)
1.用于固定混凝土方形柱模板不需对拉杆的环形箍,其特征是它主要由伸缩梁(1)、钢绞线(2)、张紧器(3)、弧形架(9)组成;伸缩梁(1)主要由主梁(11)、伸缩节(10)组成,主梁(11)有螺丝孔(12);张紧器(3)又由滑动块(6),杆(7),孔(8)组成;杆(7)穿过滑动块(6)的孔(8),滑动块(6)可以沿杆(7)滑动,钢绞线(2)一端与滑动块(6)的侧面固定,另一端与杆(7)固定;弧形架(9)有丝杆(13),其一端与弧形架固定。
2.根据权利要求1所述的用于固定混凝土方形柱模板不需对拉杆的环形箍,其特征是弧形架(9)外侧有固定钢绞线(2)的凹槽。
3.根据权利要求1所述的用于固定混凝土方形柱模板不需对拉杆的环形箍,其特征是所述的孔(8)的高度略大于杆(7)的高度。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510066147.5A CN104831921B (zh) | 2015-02-09 | 2015-02-09 | 用于固定混凝土方形柱模板不需对拉杆的环形箍 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510066147.5A CN104831921B (zh) | 2015-02-09 | 2015-02-09 | 用于固定混凝土方形柱模板不需对拉杆的环形箍 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104831921A CN104831921A (zh) | 2015-08-12 |
CN104831921B true CN104831921B (zh) | 2017-06-16 |
Family
ID=53810079
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510066147.5A Active CN104831921B (zh) | 2015-02-09 | 2015-02-09 | 用于固定混凝土方形柱模板不需对拉杆的环形箍 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104831921B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105178198A (zh) * | 2015-10-06 | 2015-12-23 | 中交第四公路工程局有限公司 | 一种桥梁变截面高墩可调式模板 |
CN107035142A (zh) * | 2017-04-11 | 2017-08-11 | 中国建筑第二工程局有限公司 | 一种框架柱模板柔性加固体系及其施工方法 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11303388A (ja) * | 1998-04-23 | 1999-11-02 | Fujita Corp | コンクリート構造体の施工方法およびそれに用いる型枠分割体 |
CN201495775U (zh) * | 2009-08-25 | 2010-06-02 | 中国第一冶金建设有限责任公司 | 桥梁柱钢模板 |
CN201943346U (zh) * | 2010-11-22 | 2011-08-24 | 中国十七冶集团有限公司 | 柱梁混凝土构件支模用模板加固卡具 |
CN201896450U (zh) * | 2010-11-23 | 2011-07-13 | 中国二十冶集团有限公司 | 柱基础和框架柱施工模板的快速支撑装置 |
CN202969923U (zh) * | 2012-12-29 | 2013-06-05 | 中建海峡建设发展有限公司 | 柱子模板加固组件 |
-
2015
- 2015-02-09 CN CN201510066147.5A patent/CN104831921B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN104831921A (zh) | 2015-08-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9783987B2 (en) | Pre-tensioned centrifugal concrete structure with steel strands | |
CN203441100U (zh) | 构造柱的支模结构 | |
CN104831921B (zh) | 用于固定混凝土方形柱模板不需对拉杆的环形箍 | |
CN104775629B (zh) | 自控式纤维布预应力张拉的方法和设备 | |
CN204311746U (zh) | 一种混凝土框架柱模板紧固装置 | |
CN204626961U (zh) | 一种燕尾形大型混凝土墩柱的钢模板桁架结构 | |
CN104533079B (zh) | 用于固定混凝土方形柱模板能快速装卸且不需对拉杆的环形箍 | |
CN207714747U (zh) | 一种钢筋混凝土柱模板加固夹具 | |
CN204431470U (zh) | 一种混凝土管桩张拉系统 | |
CN203626237U (zh) | 建筑施工中支撑钢筋混凝土构件成型用的钢木枋 | |
CN204112735U (zh) | 一种模板固定器 | |
CN206655469U (zh) | 伸缩缝处两侧剪刀墙的施工模板 | |
CN204299182U (zh) | 一种墙体模板整体进退模机构 | |
CN204475848U (zh) | 圆柱模板体系 | |
CN210888058U (zh) | 一种长度可调节式混凝土柱模板快速加固装置 | |
CN103104093A (zh) | 建筑梁底梁帮模板的专用加固卡具 | |
CN203441105U (zh) | 洞口模板支撑工具 | |
CN205400045U (zh) | 一种简易型砼模壳机器 | |
CN208280644U (zh) | 沉井及逆作内模支设装置 | |
CN204386168U (zh) | 一种型钢组装式柱模板夹具 | |
CN207757815U (zh) | 预制t梁的模板紧固结构 | |
CN201850700U (zh) | 波纹腹板h形钢楼面次梁及配套托杆 | |
CN206899477U (zh) | 筒形罗马柱用的成型装置 | |
CN202039862U (zh) | 混凝土曲面定型模板 | |
CN205591551U (zh) | 一种新型混凝土构件模板夹 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
CP02 | Change in the address of a patent holder |
Address after: 430000 Hubei province Wuhan City Jiang'an District liberation road No. 2111 building 19 floor theeight Patentee after: New Eight Construction Group Co., Ltd. Address before: 430030 Zhongshan Avenue in Hubei Province in Qiaokou District of Wuhan City No. 228 Han Hua Building 13 floor Patentee before: New Eight Construction Group Co., Ltd. |
|
CP02 | Change in the address of a patent holder |