CN204431470U - 一种混凝土管桩张拉系统 - Google Patents
一种混凝土管桩张拉系统 Download PDFInfo
- Publication number
- CN204431470U CN204431470U CN201520040865.0U CN201520040865U CN204431470U CN 204431470 U CN204431470 U CN 204431470U CN 201520040865 U CN201520040865 U CN 201520040865U CN 204431470 U CN204431470 U CN 204431470U
- Authority
- CN
- China
- Prior art keywords
- pipe pile
- stretch
- stretch board
- end plate
- connecting plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
Abstract
本实用新型涉及一种混凝土管桩张拉系统,包括管桩模具、钢丝笼及张拉板;所述管桩模具内设有钢丝笼,在管桩模具的首端固定有封口板,管桩模具的尾端固定有尾板,所述钢丝笼的两端分别安装有首端头板及尾端头板,首端头板与张拉板相连接,所述张拉板中心固定有一锁紧丝杆,所述锁紧丝杆向外伸出封口板后与锁紧螺母螺纹锁紧,所述张拉板与首端头板之间设置有连接板,所述连接板通过卡箍与张拉板之间进行联动。本实用新型的优点在于:同时利用连接板与张拉板对钢丝笼进行张拉,由原先的中心张拉转变为外张拉,避免了钢丝笼张拉筋的受力不均。
Description
技术领域
本实用新型涉及建筑技术领域,特别涉及一种混凝土管桩张拉系统。
背景技术
随着混凝土技术的发展,混凝土管桩的技术也日趋成熟,除应用于工业、民用建筑外,还广泛应用于桥梁、港口、铁路或水利工程等各领域。
在进行混凝土管桩的生产时,需要对管桩模具内的钢丝笼进行预应力张拉,目前的张拉系统中采用中心张拉的方式,张拉板直接与预应力筋相连,在张拉时,张拉板不能与所有的预应力筋完全连接,最终会导致张拉不均;现有张拉板整体的重量约为200kg,在搬运时,重量比较重,搬运不方便。
发明内容
本实用新型要解决的技术问题是提供一种张拉效果好的混凝土管桩张拉系统。
为了解决上述技术问题,本实用新型的技术方案为:一种混凝土管桩张拉系统,其创新点在于:包括管桩模具、钢丝笼及张拉板;
所述管桩模具内设有钢丝笼,在管桩模具的首端固定有封口板,管桩模具的尾端固定有尾板,所述尾板沿圆周方向逐渐向外延伸形成延伸部,所述延伸部与管桩模具之间有容尾板卡板嵌入的间隙;
所述钢丝笼的两端分别安装有首端头板及尾端头板,首端头板与张拉板相连接,所述张拉板中心固定有一锁紧丝杆,所述锁紧丝杆向外伸出封口板后与锁紧螺母螺纹锁紧,尾端头板与尾板之间通过螺栓进行固定;
所述张拉板与首端头板之间设置有连接板,连接板通过锁紧螺母与首端头板相固定,所述连接板通过卡箍与张拉板之间进行联动,具体连接为:所述张拉板与连接板的外端均设有一圆环状延伸部,卡箍的外壁贴着管桩模具的内壁,卡箍的内壁开有与张拉板及连接板的延伸部相配的凹槽。
进一步的,所述卡箍由两个对开设置的半圆环状小卡箍拼接而成。
本实用新型的优点在于:同时利用连接板与张拉板对钢丝笼进行张拉,由原先的中心张拉转变为外张拉,避免了钢丝笼张拉筋的受力不均;张拉系统由张拉板、抱箍及连接板三部分组成,整体重量降到90kg左右,并且可以分体,分体后单件的重量在20kg左右,从而方便工作人员搬运,降低了劳动强度。
附图说明
图1为本实用新型的混凝土管桩张拉系统的示意图。
图2为图1中的A部放大图。
具体实施方式
如图1所示的示意图可知,本实用新型的混凝土管桩张拉系统包括管桩模具9、钢丝笼及张拉板4。
管桩模具9内设有钢丝笼,在管桩模具9的首端固定有封口板3,管桩模具9的尾端固定有尾板7,尾板7沿圆周方向逐渐向外延伸形成延伸部,尾板7的延伸部与管桩模具9之间有容尾板卡板6嵌入的间隙。
钢丝笼的两端分别安装有首端头板10及尾端头板11,首端头板10与张拉板4相连接,在张拉板4中心处固定有一锁紧丝杆1,锁紧丝杆1向外伸出封口板3后与锁紧螺母2螺纹锁紧,尾端头板11与尾板7之间通过螺栓进行固定。
在张拉板4与首端头板10之间还设置有一连接板8,连接板8通过锁紧螺母与首端头板10相固定,连接板8通过卡箍5与张拉板4之间进行联动,具体连接为:在张拉板4与连接板8的外端均设有一圆环状延伸部,卡箍5的外壁贴着管桩模具9的内壁,卡箍5的内壁开有与张拉板4及连接板8的延伸部相配的凹槽,卡箍5由两个对开设置的半圆环状小卡箍拼接而成。
以上显示和描述了本实用新型的基本原理和主要特征和本实用新型的优点。本行业的技术人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的只是说明本实用新型的原理,在不脱离本实用新型精神和范围的前提下,本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型范围内。本实用新型要求保护范围由所附的权利要求书及其等效物界定。
Claims (2)
1.一种混凝土管桩张拉系统,其特征在于:包括管桩模具、钢丝笼及张拉板;
所述管桩模具内设有钢丝笼,在管桩模具的首端固定有封口板,管桩模具的尾端固定有尾板,所述尾板沿圆周方向逐渐向外延伸形成延伸部,所述延伸部与管桩模具之间有容尾板卡板嵌入的间隙;
所述钢丝笼的两端分别安装有首端头板及尾端头板,首端头板与张拉板相连接,所述张拉板中心固定有一锁紧丝杆,所述锁紧丝杆向外伸出封口板后与锁紧螺母螺纹锁紧,尾端头板与尾板之间通过螺栓进行固定;
所述张拉板与首端头板之间设置有连接板,连接板通过锁紧螺母与首端头板相固定,所述连接板通过卡箍与张拉板之间进行联动,具体连接为:所述张拉板与连接板的外端均设有一圆环状延伸部,卡箍的外壁贴着管桩模具的内壁,卡箍的内壁开有与张拉板及连接板的延伸部相配的凹槽。
2. 根据权利要求1所述的混凝土管桩张拉系统,其特征在于:所述卡箍由两个对开设置的半圆环状小卡箍拼接而成。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520040865.0U CN204431470U (zh) | 2015-01-21 | 2015-01-21 | 一种混凝土管桩张拉系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520040865.0U CN204431470U (zh) | 2015-01-21 | 2015-01-21 | 一种混凝土管桩张拉系统 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204431470U true CN204431470U (zh) | 2015-07-01 |
Family
ID=53599383
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520040865.0U Expired - Fee Related CN204431470U (zh) | 2015-01-21 | 2015-01-21 | 一种混凝土管桩张拉系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204431470U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105563636A (zh) * | 2016-02-29 | 2016-05-11 | 周兆弟 | 钢筋笼预应力张拉机构 |
CN106426543A (zh) * | 2016-11-30 | 2017-02-22 | 如皋市中正机械有限公司 | 轻型张拉装置 |
CN108189219A (zh) * | 2017-12-13 | 2018-06-22 | 泰州市春为强通用机械有限公司 | 一种特殊的电杆管桩张拉装置 |
-
2015
- 2015-01-21 CN CN201520040865.0U patent/CN204431470U/zh not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105563636A (zh) * | 2016-02-29 | 2016-05-11 | 周兆弟 | 钢筋笼预应力张拉机构 |
CN105563636B (zh) * | 2016-02-29 | 2018-01-09 | 周兆弟 | 钢筋笼预应力张拉机构 |
CN106426543A (zh) * | 2016-11-30 | 2017-02-22 | 如皋市中正机械有限公司 | 轻型张拉装置 |
CN108189219A (zh) * | 2017-12-13 | 2018-06-22 | 泰州市春为强通用机械有限公司 | 一种特殊的电杆管桩张拉装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204431470U (zh) | 一种混凝土管桩张拉系统 | |
CN103114722A (zh) | 一种地下室外墙用三段式止水螺杆 | |
CN102366971A (zh) | 混凝土管桩张拉系统 | |
CN104314589B (zh) | 隧道边墙基础的纵向止水带安装方法 | |
CN101745983A (zh) | 一种管桩预应力张拉装置 | |
CN204960953U (zh) | 隧道中埋式纵向止水带拉直装置 | |
CN206052767U (zh) | 可周转使用的施工电梯基础 | |
CN202241581U (zh) | 混凝土管桩张拉系统 | |
CN103882840B (zh) | 一种调压井现浇砼可装配式模板支架及其安装方法 | |
CN104196023A (zh) | 一种带机械连接装置的混凝土预制管桩桩尖及其使用方法 | |
CN203626237U (zh) | 建筑施工中支撑钢筋混凝土构件成型用的钢木枋 | |
CN207714747U (zh) | 一种钢筋混凝土柱模板加固夹具 | |
CN203624808U (zh) | 一种可拆卸的钢结构吊具 | |
CN102672821A (zh) | 同时制造多根预应力混凝土管桩的张拉工具 | |
CN106948339B (zh) | 钢筋笼穿管引导器和钢筋笼穿管方法 | |
CN202899626U (zh) | 外箍式拉索张拉工装装置 | |
CN201972271U (zh) | 新型预制钢筋混凝土剪力墙 | |
CN202899173U (zh) | 一种管桩抗拔试验装置 | |
CN204079226U (zh) | 一种能增加管桁架吊装时刚度的活动式张弦梁吊装装置 | |
CN204040316U (zh) | 钢筋连接装置 | |
CN203755661U (zh) | 大截面劲性钢骨柱柱箍搭设结构 | |
CN104831921B (zh) | 用于固定混凝土方形柱模板不需对拉杆的环形箍 | |
CN209585295U (zh) | 一种塔吊附墙预埋件 | |
CN105387279A (zh) | 一种管道附墙固定装置及方法 | |
CN205591545U (zh) | 一种圆木模板加固工具 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150701 Termination date: 20160121 |
|
EXPY | Termination of patent right or utility model |