CN104790397B - A kind of damaged stake of sleeve method processes construction method and its constructing device - Google Patents

A kind of damaged stake of sleeve method processes construction method and its constructing device Download PDF

Info

Publication number
CN104790397B
CN104790397B CN201510223843.2A CN201510223843A CN104790397B CN 104790397 B CN104790397 B CN 104790397B CN 201510223843 A CN201510223843 A CN 201510223843A CN 104790397 B CN104790397 B CN 104790397B
Authority
CN
China
Prior art keywords
stake
sleeve
steel pipe
damaged
pipe sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510223843.2A
Other languages
Chinese (zh)
Other versions
CN104790397A (en
Inventor
张继红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Solid Earth Rock Engineering Co., Ltd.
Original Assignee
张继红
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 张继红 filed Critical 张继红
Priority to CN201510223843.2A priority Critical patent/CN104790397B/en
Publication of CN104790397A publication Critical patent/CN104790397A/en
Application granted granted Critical
Publication of CN104790397B publication Critical patent/CN104790397B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The present invention relates to and the raked pile in field of civil engineering, broken pile or residual stake process engineering field in the damaged stake of sleeve method process construction method extremely constructing device, this pile extracting method using steel pipe sleeve (2), pending stake (6) is enclosed within steel pipe sleeve (2) and is rectified a deviation or extracted process, processing speed is fast, low cost, treatment effect is good, and after process, surrounding enviroment is affected little.

Description

A kind of damaged stake of sleeve method processes construction method and its constructing device
Technical field
The present invention relates to raked pile in field of civil engineering, broken pile or residual stake process engineering field.
Background technology
In current excavation of foundation pit with Other Engineering field, it is frequently encountered by soil body displacement and leads to stake to damage problem, also can The stake running in the soil body residual needs the problem of extracting, and existing damage stake is high with residual stake processing cost and difficult quality guarantee, It is sufficiently expensive that operating expenses is extracted in residual stake.
Content of the invention
First purpose of the present invention is to provide the first damaged stake of sleeve method to process construction method, and this construction method can The quick stake righting that will tilt, and can ensure that the secondary damage not leading to pile strength in righting process, speed of application is fast, cost Bottom.
This first damaged stake of sleeve method processes construction method and comprises the following steps:
A) positioning needs the stake of the inclination of righting of rectifying a deviation;
B) pile crown of raked pile is placed in steel pipe sleeve;
C) steel pipe sleeve is progressively inserted the soil body along the incline direction of raked pile;
D) by the tilting section righting of the stake together with the inclination in steel pipe sleeve for the steel pipe sleeve or stake;
E) hole that refilling step d) construction stays in the soil body.
Process in construction method in the first above-mentioned damaged stake of sleeve method, in above-mentioned step c), can be using vibration Steel pipe sleeve is inserted the soil body by method.
Process in construction method in above-mentioned the first damaged stake of sleeve method, in above-mentioned step d), will tilt After the tilting section righting of stake or stake, steel pipe sleeve is extracted recycling.
Process in construction method in above-mentioned the first damaged stake of sleeve method, in above-mentioned step d), will tilt After the tilting section righting of stake or stake, pile body is combined by the method using vibration, static pressure or heavy tamping from section position.
Process in construction method in above-mentioned the first damaged stake of sleeve method, in above-mentioned step d), will tilt Stake or stake tilting section righting after, for hollow shell pill, can by hollow part fill armored concrete to detachment at carry out Reinforce.
Second object of the present invention is to provide the damaged stake of second sleeve method to process construction method, and this construction method can Quickly the stake residuing in the soil body is extracted, speed of application is fast, cost bottom.
This damaged stake of second sleeve method processes construction method and comprises the following steps:
A) positioning needs the stake extracted;
B) pile crown of stake to be extracted is placed in steel pipe sleeve;
C) steel pipe sleeve is adopted vibratory drilling method to insert the soil body along the direction of stake;
D) steel pipe sleeve is extracted together with stake to be pulled out.
Process in construction method in the above-mentioned damaged stake of second sleeve method, in above-mentioned step b), can be in steel pipe socket The side wall of cylinder installs Grouting Pipe, in above-mentioned step d), while pile pulling, by one kind of cement mortar, mortar or sand or several Plant combination and inject pile pulling hole location in time.
Third object of the present invention is that providing the damaged stake that the damaged stake of sleeve method is processed used by construction method to process applies Frock is put, and this constructing device can smoothly realize the process to damaged stake, and equipment is simple, low cost, easy construction.
This constructing device includes pitching pile machine, steel pipe sleeve two parts, and wherein pitching pile machine includes crane, vibrating device, sleeve Fixture three part, vibrating device is lifted on crane, and wherein vibrating device is to provide setting of pitching pile or pile pulling power by vibration Standby, sleeve fixture is to be connected to the utensil can firmly clamp steel pipe sleeve on vibrating device, and steel pipe sleeve is will to treat Process damaged stake tubular device disposed within.
In above-mentioned constructing device, Grouting Pipe can be installed on the side wall of steel pipe sleeve.
Brief description
Fig. 1 is that first embodiment of the present invention processes construction method with the damaged stake of sleeve method used by second embodiment Constructing device structure organigram used.
Specific embodiment
As an as shown in Figure 1 embodiment of the present invention, main purpose is to introduce the first damaged stake of sleeve method The operation principle of process construction method and its constructing device used and implementation.First, the set of the present invention is introduced in conjunction with Fig. 1 The cylinder damaged stake of method processes constructing device structure construction and operation principle used by construction method.This constructing device includes pitching pile machine (1), steel pipe sleeve (2) two parts, wherein pitching pile machine (1) include crane (3), vibrating device (4), sleeve fixture (5) three part, Crane (3) therein is the equipment connecting vibrating device (4) and sleeve fixture (5) and having certain altitude, and vibrating device (4) is to carry For the equipment of pitching pile or pile pulling power, sleeve fixture (5) is to be connected on crane (3) and can firmly clamp steel pipe sleeve (2) Utensil, steel pipe sleeve (2) is can be by tubular device disposed within for pending damaged stake.Vibration dress in the present embodiment Putting (4) can be vibratory equipment such as vibration hammer, pneumatic vibrating equipment, hydraulic vibration equipment, also can be selected for hammering equipment (as driven piles Hammer), one or more of static press piling dynamicliquid pressure device combination replacement vibrating device (4).Crane (3) can be with vibration dress Put the equipment that (4) match, for example, when using vibration hammer as vibrating device (4), can be selected for crane (3) and carry out cooperation applying Work, it is also possible to be installed on vibrating device (4) on digging machine, is fabricated to mechanical hand.The following part of the present embodiment, introduces the first The damaged stake of sleeve method processes construction method.This first damaged stake of sleeve method process construction method main purpose be by tilt or Stake (6) correcting and then reinforcing of fracture is processed.This first damaged stake of sleeve method processes construction method and includes following five steps.First, Positioning needs the stake (6) of the inclination of righting of rectifying a deviation.Complete the first step, enter second step.In this step, using as shown in Figure 1 Steel pipe sleeve (2), the pile crown of the stake (6) tilting is placed in steel pipe sleeve (2).Complete second step, enter the 3rd step.At this In step, steel pipe sleeve (2) is progressively inserted the soil body along stake (6) incline direction tilting.The method of insertion can be using such as Pitching pile machine (1) shown in Fig. 1 is implemented, and when the angle of inclination of stake (6) is larger, can adjust steel pipe sleeve (2) by crane (3) Direction, makes the direction of insertion of steel pipe sleeve (2) consistent with the direction of stake (6).The insertion depth of steel pipe sleeve (2) can be according to stake (6) inclination segment length determines, can be basically identical with the inclination segment length of stake (6).Thus completing the 3rd step of the present embodiment, enter Enter the 4th step.In this step it is therefore an objective to by steel pipe sleeve (2) inclining together with the raked pile in steel pipe sleeve (2) or stake Tiltedly section righting.The method of righting, can in the top time horizontal force of steel pipe sleeve (2) by steel pipe sleeve (2) together with positioned at steel Stake (6) righting of pipe box cylinder (2), under the protection of steel pipe sleeve (2), stake (6) can avoid the occurrence of curved during by righting The secondary damage such as folding.In soil body squeeze side, Pile side soil body can also be removed before stake (6) righting, in order to righting construction.From And complete the 4th step of the present embodiment, enter the 5th step.In this step, the back of the body soil side during stake (6) righting can stay The space staying after pile body is mobile, for the ease of the use of stake after righting (6), can be using the filler such as sand, cement, mortar by the 4th The hole that step construction stays in the soil body, thus the first the damaged stake of sleeve method completing the present invention processes construction method, completes stake (6) correcting and then reinforcing.In the present embodiment, if stake (6) is the PHC pile tube of hollow, can be mixed with reinforcing bar in the hollow part of stake (6) Solidifying soil fills reinforcing.In the present embodiment, after by the righting of stake (6), sleeve can be extracted recycling.In the present embodiment, After by stake (6) righting, pile body detachment position is combined by the method using vibration, static pressure or heavy tamping.
As shown in Figure 1 second embodiment of the present invention, main purpose is to introduce second sleeve method damaged Stake processes construction method, and the main purpose of this processing method is to extract the waste and old stake (6) residuing in the soil body.The present embodiment Constructing device used is with first embodiment.The damaged stake of second sleeve method that the present embodiment is introduced processes construction method bag Include four steps, first three step therein is similar to first embodiment.In the 4th step of the present embodiment, with first embodiment Difference is together to extract together with the stake (6) in steel pipe sleeve (2) using steel pipe sleeve (2).Because typically residuing in soil In stake (6) mostly be reinforced concrete pile, the anti-pulling capacity of invar rib concrete pile is low, and pile side resistance is big in addition, typically very Stake (6) is directly extracted from the soil body by difficulty, and after steel pipe socket cylinder (2) is inserted in the outside of stake (6), pile pulling collateral resistance is mainly by steel pipe Sleeve (2) undertakes, and therefore greatly reduces pile pulling difficulty of construction, and can be by way of vibrating steel pipe sleeve (2), by pile pulling side Resistance is greatly lowered.After the completion of pile pulling, in order to avoid surface collapse, the space that easily filling pile pulling in time stays.Can be in steel Grouting Pipe installed by the side wall of pipe box cylinder (2), realizes the synchronous hole that carries out during pile pulling and backfills construction, and slip casting pressure can be utilized Masterpiece is a part for pile pulling power, can also complete micro-disturbance pile pulling construction with pore pressure counter-force pile-pulling construction method.Used by slip casting Serosity can be the materials such as cement mortar, mortar.
This patent includes but is not limited to other construction methods of the alternative use of professional person in the art.

Claims (5)

1. the damaged stake of a kind of sleeve method processes construction method, comprises the following steps:
A) positioning needs the stake (6) of the inclination of righting of rectifying a deviation;
B) pile crown of the stake (6) tilting is placed in steel pipe sleeve (2);
C) steel pipe sleeve (2) is progressively inserted the soil body along the incline direction of the stake (6) tilting;
D) by steel pipe sleeve (2) together with the inclination in steel pipe sleeve (2) stake (6) righting;
E) hole that refilling step d) construction stays in the soil body.
2. the damaged stake of a kind of sleeve method according to claim 1 processes construction method, it is characterized in that in above-mentioned step c) In, steel pipe sleeve (2) is inserted by the soil body using vibratory drilling method.
3. the damaged stake of a kind of sleeve method according to claim 1 processes construction method, it is characterized in that in above-mentioned step d) In, after stake (6) righting that will tilt, steel pipe sleeve (2) is extracted recycling.
4. the damaged stake of a kind of sleeve method according to claim 1 processes construction method, it is characterized in that in above-mentioned step d) In, after stake (6) righting that will tilt, pile body is combined by the method using vibration, static pressure or heavy tamping from section position.
5. the damaged stake of a kind of sleeve method according to claim 1 processes construction method, it is characterized in that in above-mentioned step d) In, after stake (6) righting that will tilt, for hollow shell pill, by hollow part fill armored concrete to detachment at enter Row is reinforced.
CN201510223843.2A 2015-05-05 2015-05-05 A kind of damaged stake of sleeve method processes construction method and its constructing device Active CN104790397B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510223843.2A CN104790397B (en) 2015-05-05 2015-05-05 A kind of damaged stake of sleeve method processes construction method and its constructing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510223843.2A CN104790397B (en) 2015-05-05 2015-05-05 A kind of damaged stake of sleeve method processes construction method and its constructing device

Publications (2)

Publication Number Publication Date
CN104790397A CN104790397A (en) 2015-07-22
CN104790397B true CN104790397B (en) 2017-03-01

Family

ID=53555552

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510223843.2A Active CN104790397B (en) 2015-05-05 2015-05-05 A kind of damaged stake of sleeve method processes construction method and its constructing device

Country Status (1)

Country Link
CN (1) CN104790397B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108894224A (en) * 2018-08-03 2018-11-27 中冶沈勘工程技术有限公司 A kind of method for pulling out of static pressure pipe pile
CN115959882A (en) * 2022-12-12 2023-04-14 哈尔滨师范大学 Charcoal powder slurry for permafrost, grouting method and grouting device

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10168879A (en) * 1996-12-10 1998-06-23 Taisei Corp Pulling method for steel sheet pile
CN103243747B (en) * 2013-05-31 2014-11-05 中建七局(上海)有限公司 Deviation rectifying method of prestressed concrete pipe pile foundation
CN203270577U (en) * 2013-06-05 2013-11-06 中铁四局集团有限公司 Underground pile removing apparatus with door plate clamp
CN103410182B (en) * 2013-08-22 2015-07-22 天津大学 Unilateral pile foundation unloading horizontal top-level pull deviation rectifying and broken pile reinforcement construction method
CN204298820U (en) * 2014-11-17 2015-04-29 天津市勘察院 A kind of single sleeve pile pulling device
CN204570695U (en) * 2015-05-05 2015-08-19 张继红 The construction equipment that a kind of sleeve method damaged stake process construction method is used

Also Published As

Publication number Publication date
CN104790397A (en) 2015-07-22

Similar Documents

Publication Publication Date Title
CN104947654B (en) Complicated water area inclined rock face large-diameter cast-in-place pile construction method
US10513831B2 (en) Open-end extensible shells and related methods for constructing a support pier
CN104420486B (en) A kind of extending shallow foundation and be additionally arranged at the bottom of method and the structure of steel-pipe pile
CN206495682U (en) A kind of stand quickly handled for Tunnel Landslide
CN103696784A (en) Large-diameter long pipe curtain construction method for shallowly-buried large-span under-tunnel-passing architectural structure
CN208088288U (en) The big areas grain size shiver stone Gao Tian pile foundation fast pore-creating structure
CN104790397B (en) A kind of damaged stake of sleeve method processes construction method and its constructing device
CN102561329B (en) Construction method of underwater concrete cast-in-place pipe pile
KR101236765B1 (en) Method for placing adhesive filling into the expanded drill hole to increase bearing capacity of piles and tention members and apparatus therefor
CN110016911A (en) A kind of depth casing mechanical hole building bore forming technique
CN109208594A (en) Processing method, steel pile casting structure and the drilled pile of sinking steel protecting canister chance boulder
CN107740419A (en) Foundation pit supporting method and raked pile
CN204570695U (en) The construction equipment that a kind of sleeve method damaged stake process construction method is used
CN110273413A (en) A kind of efficient construction method of prefabricated pile
CN112030961B (en) Vibration pipe following construction process for long spiral cast-in-place pile
CN111485616B (en) Construction method for newly adding municipal inspection well to water-rich sand-pressed pebble layer
CN107620309A (en) Foundation pit supporting method
CN107574825A (en) Foundation pit supporting method and raked pile
CN107366290A (en) Foundation pit supporting method and raked pile
CN104294817B (en) The construction method of concrete-pile
CN210163888U (en) Quick construction structure of major diameter socketed pile
JP6319942B2 (en) Steel pipe sheet pile press-in method and pipes
CN108239985A (en) Artificial digging pile per-fore pouring liquid with small pipe pre-reinforcing construction method
CN109577458A (en) The method for embedding of pipeline aerial crossing sandy soils stream section
CN206396758U (en) A kind of taper pile construction equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20181105

Address after: 200086 502, room 4, Lane 306, Helen Road, Hongkou District, Shanghai.

Patentee after: Shanghai Solid Earth Rock Engineering Co., Ltd.

Address before: 200086 502, room 4, Lane 306, Helen Road, Hongkou District, Shanghai.

Patentee before: Zhang Jihong

TR01 Transfer of patent right