CN108894224A - A kind of method for pulling out of static pressure pipe pile - Google Patents

A kind of method for pulling out of static pressure pipe pile Download PDF

Info

Publication number
CN108894224A
CN108894224A CN201810879002.0A CN201810879002A CN108894224A CN 108894224 A CN108894224 A CN 108894224A CN 201810879002 A CN201810879002 A CN 201810879002A CN 108894224 A CN108894224 A CN 108894224A
Authority
CN
China
Prior art keywords
pressure pipe
static pressure
pipe pile
extracted
pulling out
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810879002.0A
Other languages
Chinese (zh)
Inventor
张大伟
于忠泽
冯伟
杨俊岭
辛全伟
姜宏
张立丰
何经纬
魏可峰
张国杰
张欢
李博
李沈吉
田大鹏
田振林
高文彬
王金良
聂启博
于跃
敖然
岳玉梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHONGYE SHENKAN ENGINEERING TECHNOLOGY Co Ltd
Original Assignee
ZHONGYE SHENKAN ENGINEERING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONGYE SHENKAN ENGINEERING TECHNOLOGY Co Ltd filed Critical ZHONGYE SHENKAN ENGINEERING TECHNOLOGY Co Ltd
Priority to CN201810879002.0A priority Critical patent/CN108894224A/en
Publication of CN108894224A publication Critical patent/CN108894224A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D9/00Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
    • E02D9/02Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof by withdrawing

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

A kind of method for pulling out of static pressure pipe pile first removes the surflaes in static pressure pipe pile;Then reinforcing bar is inserted into static pressure pipe pile;Micro-expansion cement mortar or grouting material are injected into static pressure pipe pile again, after intensity reaches requirement, takes shake drawing to go out technique and carries out drawing, whole static pressure pipe pile is extracted;When static pressure pipe pile length is longer, partial cut can will be extracted, then proceed to extract remainder;Static pressure pipe pile fills and leads up the empty hole left after all extracting.This method is simple and effective, transfers to tubular pole convenient and efficient, and success rate is high;And recyclable static pressure pipe pile recycles.

Description

A kind of method for pulling out of static pressure pipe pile
Technical field
It is especially a kind of useless to what is left in the soft layer of city during subway work the present invention relates to subway work Abandon the method that static pressure pipe pile is extracted.
Background technique
We often use pre-tensioning system technique to make prestressed high-strength coagulation at the industrial pile foundation with civil buildings in house at present Native tubular pole (i.e. PHC) and prestressed concrete pipe pile (i.e. PC), such tubular pole are referred to as static pressure pipe pile.
During Urban Metro Construction, it is relatively common that shield machine passes through the case where old town encounters engineering pile.Shield machine Once encountering waste and old pile body, drilling head can be caused to scrap accident, lost very serious.For the generation for avoiding such accident, it is necessary to The discarded tubular pole for being embedded in underground is handled before construction.
Currently, usually discarded stake is smashed to pieces with Wu Kesi drilling machine to the method that discarded static pressure pipe pile is handled.This Kind processing method, cannot not only recycle tubular pole, but also in soft stratum, because the reasons such as pile body inclination, removing make part by steel Muscle or the tubular pole of steel building can not be smashed to pieces, and the subsequent construction of Suporting structure is still influenced.
To discarded tubular pole using the means of filling out are changed, although largely effective, the redistribution of entire stratum load, structure can be caused Building object internal force need to recalculate, and operating expenses will increase.
Summary of the invention
In view of the above-mentioned problems existing in the prior art, the object of the present invention is to provide it is a kind of it is simple and effective, can quickly pull out The method of static pressure pipe pile out.
The method for pulling out of static pressure pipe pile provided by the invention is first to remove the surflaes in static pressure pipe pile;Then reinforcing bar is inserted Enter in static pressure pipe pile;Micro-expansion cement mortar is injected into static pressure pipe pile again or grouting material takes shake after intensity reaches requirement Drawing goes out technique and carries out drawing, and whole static pressure pipe pile is extracted;When static pressure pipe pile length is longer, partial cut can will be extracted, It then proceedes to extract remainder;Static pressure pipe pile fills and leads up the empty hole left after all extracting.
The method of the present invention is simple and effective, transfers to static pressure pipe pile convenient and efficient, and success rate is high;And it is sharp again that static pressure pipe pile can be recycled With.
Specific embodiment
Embodiment
The present embodiment is to extract in certain Urban Metro Construction to static pressure pipe pile is discarded existing for shield machine construction region Method.
The interior of the discarded static pressure pipe pile of this area is 200mm.
Specifically extracting construction method is:Method is first manually dug out with Luoyang Spade or 30 prospecting drilling machines dig out method and remove static pressure Surflaes in tubular pole;Then the level Four screw-thread steel with ribbing of diameter 40 is inserted into the inner hole of tubular pole;Microdilatancy is injected into tubular pole again Cement mortar takes shake drawing to go out technique and carries out drawing, every dial-out 6m or so is used after intensity reaches M40 with hydraulic tube drawing bench Toothless saw will extract partial cut, then proceed to extract remainder;Static pressure pipe pile fills and leads up the empty hole left after all extracting.

Claims (1)

1. a kind of method for pulling out of static pressure pipe pile, characterized in that first remove the surflaes in static pressure pipe pile;Then reinforcing bar is inserted into quiet In pressure pipe stake;Micro-expansion cement mortar is injected into static pressure pipe pile again or grouting material takes shake drawing after intensity reaches requirement Technique carries out drawing out, and whole static pressure pipe pile is extracted;When static pressure pipe pile length is longer, partial cut can will be extracted, then Continue to extract remainder;Static pressure pipe pile fills and leads up the empty hole left after all extracting.
CN201810879002.0A 2018-08-03 2018-08-03 A kind of method for pulling out of static pressure pipe pile Pending CN108894224A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810879002.0A CN108894224A (en) 2018-08-03 2018-08-03 A kind of method for pulling out of static pressure pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810879002.0A CN108894224A (en) 2018-08-03 2018-08-03 A kind of method for pulling out of static pressure pipe pile

Publications (1)

Publication Number Publication Date
CN108894224A true CN108894224A (en) 2018-11-27

Family

ID=64353244

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810879002.0A Pending CN108894224A (en) 2018-08-03 2018-08-03 A kind of method for pulling out of static pressure pipe pile

Country Status (1)

Country Link
CN (1) CN108894224A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10168879A (en) * 1996-12-10 1998-06-23 Taisei Corp Pulling method for steel sheet pile
CN101736746A (en) * 2009-12-04 2010-06-16 上海智平基础工程有限公司 Construction method for vibrator pipe sinking high-pressure grouting underpinning pile extracting
CN104790397A (en) * 2015-05-05 2015-07-22 张继红 Sleeve method damaged pile treatment and construction method and construction device using same
CN106968252A (en) * 2017-04-01 2017-07-21 南京瑞迪建设科技有限公司 Pile pulling recharge method and pile pulling recharge system
CN107254876A (en) * 2017-06-27 2017-10-17 广东工业大学 The pile pulling device and method of a kind of armored concrete pile for prestressed pipe

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10168879A (en) * 1996-12-10 1998-06-23 Taisei Corp Pulling method for steel sheet pile
CN101736746A (en) * 2009-12-04 2010-06-16 上海智平基础工程有限公司 Construction method for vibrator pipe sinking high-pressure grouting underpinning pile extracting
CN104790397A (en) * 2015-05-05 2015-07-22 张继红 Sleeve method damaged pile treatment and construction method and construction device using same
CN106968252A (en) * 2017-04-01 2017-07-21 南京瑞迪建设科技有限公司 Pile pulling recharge method and pile pulling recharge system
CN107254876A (en) * 2017-06-27 2017-10-17 广东工业大学 The pile pulling device and method of a kind of armored concrete pile for prestressed pipe

Similar Documents

Publication Publication Date Title
CN105735251B (en) Cutting type full-casing follow-up pile-forming construction method and system of bridge pile foundation rotary drilling rig
CN101603431B (en) Method for reinforcing outburst-prone coal seam cross-cut coal uncovering
KR101410471B1 (en) Method for buttom-up removal of underground retaining wall by using h-piles remained in earth retaining work of existed building
CN104389628B (en) Landslide location tunnel reinforcement device and reinforced construction method
CN101608448B (en) Pile-forming method for cement paste spraying multi-directional core entraining mixing pile
CN101929163B (en) Support construction process of lotus root-shaped segmental expanded soil anchor rod
CN105780763A (en) Construction method of medium-hole vibrating casing wall protection type long spiral cast-in-situ bored pile
CN105442605B (en) Extract PHC and be reused in deep foundation pit supporting construction method
CN103321244A (en) Construction method for additionally arranged basement in existing building on sand foundation
EA031926B1 (en) Method for forming a pillar part and reinforcing adjacently constructed parallel tunnels with reinforcing rods
WO2000032906A1 (en) Sardine-bone construction method for large-section tunnel
CN1963044A (en) Construction method for withdrawal of waste pile
JP2019019633A (en) Construction method of continuous underground wall and steel pipe pile
JP3927842B2 (en) Construction method of double pipe digging small diameter pile
CN105862862B (en) A kind of large diameter pile buries hammer Refloatation method
CN101666091A (en) Filling core reinforcement method for fractured tubular piles
KR102333978B1 (en) Pileless-up wall demolition method
CN108222012A (en) A kind of foundation pit anchor cable excision and the construction method that supporting pile is carried out using anchor cable excision system
US1164085A (en) Method or process of anchoring steel piles.
CN112523202A (en) Broken pile treatment construction method for cast-in-situ bored pile
KR101620789B1 (en) Small bore drain pipe burial method of soft ground condition
CN108894224A (en) A kind of method for pulling out of static pressure pipe pile
CN109403326B (en) Method for taking out reinforcement cage based on serious hole collapse of drilled pile
Mangushev et al. Modern technologies of foundation building in the conditions of weak soils of St. Petersburg
JP2005120622A (en) Construction method of underground structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181127