CN104727551B - Ring beam screw thread core pulling embedded steel bar construction method - Google Patents

Ring beam screw thread core pulling embedded steel bar construction method Download PDF

Info

Publication number
CN104727551B
CN104727551B CN201510138345.8A CN201510138345A CN104727551B CN 104727551 B CN104727551 B CN 104727551B CN 201510138345 A CN201510138345 A CN 201510138345A CN 104727551 B CN104727551 B CN 104727551B
Authority
CN
China
Prior art keywords
collar tie
bar planting
tie beam
concrete
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510138345.8A
Other languages
Chinese (zh)
Other versions
CN104727551A (en
Inventor
李湘泉
邓星星
黄敏茹
朱艾艾
朱红庚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG DIANBAI CONSTRUCTION GROUP CO Ltd
Original Assignee
GUANGDONG DIANBAI CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG DIANBAI CONSTRUCTION GROUP CO Ltd filed Critical GUANGDONG DIANBAI CONSTRUCTION GROUP CO Ltd
Priority to CN201510138345.8A priority Critical patent/CN104727551B/en
Publication of CN104727551A publication Critical patent/CN104727551A/en
Application granted granted Critical
Publication of CN104727551B publication Critical patent/CN104727551B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention discloses a ring beam screw thread core pulling embedded steel bar construction method. The method comprises the steps that a hole is mechanically drilled in a template, a threaded bolt is adopted to be embedded into the template, the threaded bolt is screwed repeatedly at the position of a nut after initial setting is performed on a cast concrete column, the threaded bolt forms a threaded structure inside concrete, the threaded bolt can be directly pulled out conveniently before form removal, and no concrete mechanical drilling is adopted, so that damage to concrete is avoided; the threaded structure is formed inside the concrete, so that the contact area between embedded steel bar glue and the inner surface of the concrete is increased, the bonding acting force and anti-uplift strength of the embedded steel glue and the concrete are enhanced, the construction period is shortened, and the labor intensity is lowered; during steel bar embedment, a long steel bar and a short steel bar are adopted to be in staggered and overlapped connection, the steel bar use amount is saved, the number of overlapped joints is decreased, the structural strength is improved, and the cost is lowered.

Description

Collar tie beam screw thread core pulling pore reinforced construction method
Technical field
The present invention relates to tendon-planted craft, be specifically related to collar tie beam screw thread core pulling pore reinforced construction method.
Background technology
The bar planting construction of beams of concrete in correlation technique, is employing power auger bar planting hole on the beams of concrete poured into a mould, then Bar planting hole is cleaned, then injecting glue bar planting.
Inventor finds, the beams of concrete poured into a mould can be caused certain infringement by machine drilling, and the intensity simultaneously constructed is big; The bar planting hole being drilled is not easily cleaned totally, and the cohesive force between bar planting structure glue and concrete can be made to decline.
Summary of the invention
Therefore for the problems referred to above, the problem to be solved in the present invention is to provide the pore reinforced construction method of beams of concrete, i.e. need not Carrying out machine drilling on the beams of concrete poured into a mould, the beams of concrete poured into a mould is not caused damage, the intensity of construction is little;Bar planting Hole easy to clean is clean.
For solve above-mentioned technical problem, the technical solution used in the present invention is, collar tie beam screw thread core pulling pore reinforced construction method, including with Lower step:
(1) snap the line location on bar planting side template, marks the position implanting reinforcing bar, wherein, for pouring into a mould two side forms of collar tie beam In plate, the template needing the side of boring is bar planting side template, it is not necessary to the template of the opposite side of boring is non-bar planting side form Plate;
(2) it is drilled preformed hole in described position, then installs described bar planting side template;
(3) by an end of screw bolt through described preformed hole, to the inner surface of described non-bar planting side template, its another end It is positioned at the outside of described bar planting side template;
(4) fixing another end described of nut is used;
(5) colligation bar planting side template and non-bar planting side template, the mixed earth of cast;
(6) concrete is after initial set before final set, and dynamics the most repeatedly turns the screw bolt at described nut, to turning Fluent sense during screw bolt;
(7) after concrete reaches final setting time, nut is backed out, screw bolt of back-outing, form bar planting hole;
(8) after bar planting hole is formed, clear up bar planting hole, inject anchoring adhesive, implant reinforcing bar.
Non-bar planting side template has first been installed before installing bar planting side template, and in the good bar planting side template of colligation and non-bar planting side template Stirrup.
After the inner surface of a described end extremely described non-bar planting side template, described screw bolt is fixed with stirrup colligation;If described spiral shell When residing for stricture of vagina bolt, plan-position is without stirrup, in stirrup, main muscle diagonally opposed is set up with stirrup with the reinforcing bar of diameter, and colligation Fixing described screw bolt.
When concrete is implanted into reinforcing bar, implant at the two ends in described bar planting hole that length is different respectively according to the length of collar tie beam two Reinforcing bar;Curing conservation carries out pullout tests and forms collar tie beam concrete column after completing.
When two collar tie beam concrete columns connect, reinforcing bar longer in a collar tie beam concrete column is shorter with another collar tie beam concrete column Bar splicing, mutually staggers in the position of bar splicing.
As preferably, described preformed hole uses the bit bore of machinery to be formed, the diameter of described bit diameter more described implantation reinforcing bar Big 4mm~8mm.
The method have the benefit that the present invention uses the preformed hole boring bar planting on bar planting side template, it is to avoid at the coagulation poured into a mould Tu Liang upper brill bar planting hole, does not cause damage to the beams of concrete poured into a mould;Spiral shell is the most repeatedly turned after the concrete initial set poured Stricture of vagina bolt, makes screw bolt be internally formed screw thread at beams of concrete, it is simple to form removal rear thread bolt can need not be taken out by machinery Going out, bar planting hole is prone to cleaning, reduces construction intensity, shortens the engineering time;Because concrete two is internally formed helicitic texture, Increase anchoring adhesive and the contact area within beams of concrete, increase anchoring adhesive strong with the cementation power of beams of concrete and resistance to plucking Degree;Two reinforcing bars that use in mixed earth beam that one is long and the other is short, use overlapping mode, decrease lap joint, save between collar tie beam Amount of reinforcement, reduces construction cost.
Accompanying drawing explanation
Schematic diagram buried in advance underground by Fig. 1 threaded rod of loosing core
Wherein, bar planting side template 1, screw-thread steel bolt 2
Fig. 2 bar planting pore-forming schematic diagram
Wherein, bar planting hole 3, collar tie beam concrete column 4
Fig. 3 bar planting and connection diagram
Detailed description of the invention
In conjunction with accompanying drawing, the invention will be further described.
Collar tie beam screw thread core pulling pore reinforced construction method, comprises the following steps:
(1) before installing bar planting side template 1, non-bar planting side template has been installed, and the good bar planting side template 1 of colligation and non-bar planting side Stirrup in template, wherein, in two side templates pouring into a mould collar tie beam, the template needing the side of boring is to plant Muscle side template, it is not necessary to the template of the opposite side of boring is non-bar planting side template;
(2) snap the line location on bar planting side template 1, marks the position implanting reinforcing bar;
(3) it is drilled preformed hole in described position, then installs described bar planting side template 1;Wherein the diameter ratio of drill bit to be planted Enter big 4mm~8mm of diameter of reinforcing bar;
(4) by an end of screw-thread steel bolt 2 through described preformed hole, to the inner surface of described non-bar planting side template, it is another One end is positioned at the outside of described bar planting side template 1;
(5) a described end is fixed with stirrup colligation to the inner surface of described non-bar planting side template;
(6) fixing another end described of nut is used;
(7) colligation bar planting side template 1 and non-bar planting side template, pour into a mould concrete;
(8) concrete is when initial set, the most repeatedly turns described spiral shell by the most inverse rear suitable order uniformly by die nut dynamics Screw-thread steel bolt 2 at cap, to when turning screw-thread steel bolt without significantly blocking sense;
(9) after concrete reaches final setting time, back out nut, counterclockwise turn screw-thread steel bolt 2, take out screw thread Steel bolt 2, forms bar planting hole 3;
(10), after bar planting hole 3 is formed, bar planting hole 3 is cleared up;
(11) anchoring adhesive is injected;Wherein implant reinforcing bar intensity depend mainly on the size of between reinforcing bar and anchoring adhesive, concrete And the cohesive force between anchoring adhesive: described cohesive force one is bond, frictional force between bar planting reinforcing bar and anchoring adhesive With mechanical snap effect;Two is frictional force, bond and the locking key effect between concrete and anchoring adhesive;So The full of injecting glue must be noted during injecting glue;
(12) at bar planting hole 3, reinforcing bar is implanted.
Further, when concrete is implanted into reinforcing bar, implant length respectively not according to the length of collar tie beam at the two ends in its bar planting hole Two same reinforcing bars;Forbid in completing after bar planting 24 hours by any disturbance, to ensure the normal cure of anchoring adhesive.
Further, the mixed earth after curing conservation carries out non-destructive pullout tests, obtains required collar tie beam and mix after pass the test Solidifying earth pillar 4.
Further, reinforcing bar longer in a collar tie beam concrete column 4 and another collar tie beam coagulation are used between two collar tie beam concrete columns 4 Bar splicing shorter in earth pillar 4, mutually staggers in bar splicing position.
Further, the position of described bar splicing is that it is with shorter with the distance of the collar tie beam concrete column 4 at longer reinforcing bar place 2 times of distance of collar tie beam concrete column 4 at reinforcing bar place.
Further, the diameter in described bar planting hole 3 is as shown in table 1 with the optimum matching point implanting bar diameter.
Implant bar diameter (mm) Bar planting bore dia (mm)
8 12
10 14
12 16
14 18
16 22
18 25
Table 1
Last it is noted that above example is only in order to illustrate technical scheme, it is not intended to limit;Although With reference to previous embodiment, the present invention is described in detail, it will be understood by those within the art that: it is still Technical scheme described in foregoing embodiments can be modified, or wherein portion of techniques feature is carried out equivalent replace Change;And these amendments or replacement, do not make the essence of appropriate technical solution depart from various embodiments of the present invention technical scheme Spirit and scope.

Claims (9)

1. collar tie beam screw thread core pulling pore reinforced construction method, is characterized in that, comprises the following steps:
(1) snap the line location on bar planting side template, marks the position implanting reinforcing bar, wherein, is used for pouring into a mould collar tie beam Two side templates in, the template of side needing boring is bar planting side template, it is not necessary to the mould of the opposite side of boring Plate is non-bar planting side template;
(2) on described position, it is drilled preformed hole, then installs described bar planting side template;
(3) by an end of screw bolt through described preformed hole, to the inner surface of described non-bar planting side template, its Another end is positioned at the outside of described bar planting side template;
(4) fixing another end described of nut is used;
(5) colligation bar planting side template and non-bar planting side template, pours into a mould concrete;
(6) concrete is when initial set, and dynamics the most repeatedly turns the screw bolt at described nut, to twisting Fluent sense during dynamic described screw bolt;
(7) after concrete reaches final setting time, nut is backed out, screw bolt of back-outing, form bar planting hole;
(8) after bar planting hole is formed, clear up bar planting hole, inject anchoring adhesive, implant reinforcing bar.
Collar tie beam screw thread core pulling pore reinforced construction method the most according to claim 1, is characterized in that, plant installing Non-bar planting side template has been installed before muscle side template, and the stirrup in the good bar planting side template of colligation and non-bar planting side template.
Collar tie beam screw thread core pulling pore reinforced construction method the most according to claim 2, is characterized in that, a described end After the inner surface of end extremely described non-bar planting side template, described screw bolt is fixed with described stirrup colligation.
Collar tie beam screw thread core pulling pore reinforced construction method the most according to claim 1, is characterized in that, in step (6) Screw bolt is turned by the most inverse rear suitable direction;In step (7), screw bolt is back-outed counterclockwise.
Collar tie beam screw thread core pulling pore reinforced construction method the most according to claim 1, is characterized in that, at concrete When being implanted into reinforcing bar, respectively implant the reinforcing bar that length is different at the two ends in described bar planting hole;Curing conservation completes After carry out pullout tests formed collar tie beam concrete column.
Collar tie beam screw thread core pulling pore reinforced construction method the most according to claim 5, is characterized in that, described bar planting The length of the reinforcing bar that hole is implanted into determines according to the length of collar tie beam.
Collar tie beam screw thread core pulling pore reinforced construction method the most according to claim 5, is characterized in that, at two collar tie beams When concrete column connects, the steel that reinforcing bar longer in a collar tie beam concrete column is shorter with another collar tie beam concrete column Muscle overlaps, and mutually staggers in the position of bar splicing.
Collar tie beam screw thread core pulling pore reinforced construction method the most according to claim 5, is characterized in that, described reinforcing bar The position of overlap joint is itself and shorter reinforcing bar place with the distance of the collar tie beam concrete column at longer reinforcing bar place 2 times of the distance of collar tie beam concrete column.
Collar tie beam screw thread core pulling pore reinforced construction method the most according to claim 1, is characterized in that, described reserved Hole uses the bit bore of machinery to be formed, the big 4mm of diameter of described bit diameter more described implantation reinforcing bar~ 8mm。
CN201510138345.8A 2015-03-26 2015-03-26 Ring beam screw thread core pulling embedded steel bar construction method Active CN104727551B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510138345.8A CN104727551B (en) 2015-03-26 2015-03-26 Ring beam screw thread core pulling embedded steel bar construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510138345.8A CN104727551B (en) 2015-03-26 2015-03-26 Ring beam screw thread core pulling embedded steel bar construction method

Publications (2)

Publication Number Publication Date
CN104727551A CN104727551A (en) 2015-06-24
CN104727551B true CN104727551B (en) 2017-01-11

Family

ID=53451904

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510138345.8A Active CN104727551B (en) 2015-03-26 2015-03-26 Ring beam screw thread core pulling embedded steel bar construction method

Country Status (1)

Country Link
CN (1) CN104727551B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109291239A (en) * 2018-09-30 2019-02-01 上海宝冶集团有限公司 Electrical spool buries production method and fabricated construction beam in fabricated construction beam
CN114704094A (en) * 2022-04-29 2022-07-05 山西三建集团有限公司 Method for presetting secondary structure constructional column bar planting holes in primary structure beam pouring system

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0819770B2 (en) * 1989-01-20 1996-02-28 宇部興産株式会社 Fixture with formwork support nut
CN1198036C (en) * 2002-06-03 2005-04-20 刘宣传 Method for mounting anchor tendon penetrated mechanically
CN101457570A (en) * 2007-12-14 2009-06-17 卢锡雷 Internal thread type reinforced bar adding method
JP2010138614A (en) * 2008-12-12 2010-06-24 Funaki Shoji Kk Panel used as form, and construction structure and construction method of concrete wall using the same
CN101748899B (en) * 2010-01-14 2011-03-30 中天建设集团有限公司 Method for pore forming by embedding assistant bonded rebar in reinforced concrete structure

Also Published As

Publication number Publication date
CN104727551A (en) 2015-06-24

Similar Documents

Publication Publication Date Title
CN109057840B (en) Self-adaptive grouting reinforcement anchor rod under high stress and anchoring construction method thereof
CN104775428B (en) Compound-type pre-stvessed anchor cable structure and construction method thereof
CN104018518B (en) The method of prefabricated diaphragm wall and construction outer wall of basement and floor
CN203756203U (en) Self-drilling type full-thread bolt grouting anchor rod
CN107044177A (en) A kind of assembly concrete shear wall fractionation, assembled attachment structure and connection method
CN202391019U (en) End part thickened grouting connector of steel bar
CN103452332A (en) Method for repairing construction engineering floor slab crack
CN103075013A (en) Building construction steel bar connection structure and connection method
CN106284655A (en) Precast concrete beam stud connects node and method of attachment in succession
CN206174195U (en) Assembled concrete shear force wall split, assemble connection structure
CN107119682A (en) A kind of soil nail wall and its construction method
CN104727551B (en) Ring beam screw thread core pulling embedded steel bar construction method
CN104295112A (en) Reinforced concrete column upper-connected concrete filled steel tube column connecting structure and construction method thereof
CN204435906U (en) Planting reinforced bar into concrete device
CN108708768A (en) Slip casting tube head, grouting device and its construction method
CN205954675U (en) Prefabricated pipeline concrete buttress
CN109024622B (en) Use method of slope reinforcement rod piece
CN103615049A (en) Anchoring joint of newly added frame rebar and original structure and construction method of anchoring joint
CN204174955U (en) Reinforced concrete post connects steel core concrete column syndeton
CN102912928A (en) Structural member for restraining grouting anchoring connection by using two ends of steel bar and connection method
CN101663441B (en) Grouting apparatus and grouting method
CN206571493U (en) Orifice tube anchor structure and orifice tube
CN204827500U (en) Pinniform wedge body stock
CN103352568A (en) Method for building constructional column on foundation pad
CN207378395U (en) A kind of two-part hoist engine basis pre embedded bolt

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant