CN103075013A - Building construction steel bar connection structure and connection method - Google Patents

Building construction steel bar connection structure and connection method Download PDF

Info

Publication number
CN103075013A
CN103075013A CN2013100266369A CN201310026636A CN103075013A CN 103075013 A CN103075013 A CN 103075013A CN 2013100266369 A CN2013100266369 A CN 2013100266369A CN 201310026636 A CN201310026636 A CN 201310026636A CN 103075013 A CN103075013 A CN 103075013A
Authority
CN
China
Prior art keywords
longitudinal
longitudinal reinforcement
hole
reinforcement
longitudinal hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013100266369A
Other languages
Chinese (zh)
Other versions
CN103075013B (en
Inventor
刘文清
姜洪斌
闫红缨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Yuhui New Type Building Material Co., Ltd.
Original Assignee
HUBEI YUHUI NEW TYPE BUILDING MATERIAL CO Ltd
Heilongjiang Yuhui New Building Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUBEI YUHUI NEW TYPE BUILDING MATERIAL CO Ltd, Heilongjiang Yuhui New Building Materials Co Ltd filed Critical HUBEI YUHUI NEW TYPE BUILDING MATERIAL CO Ltd
Priority to CN201310026636.9A priority Critical patent/CN103075013B/en
Publication of CN103075013A publication Critical patent/CN103075013A/en
Application granted granted Critical
Publication of CN103075013B publication Critical patent/CN103075013B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention discloses a building construction steel bar connection structure and a connection method, and particularly discloses a plug-in type preformed hole grouting steel bar concentric restraining anchoring lap connection method. The structure comprises a prefabricated concrete shear wall component; a longitudinal steel bar is pre-cast in the component; a preformed hole is formed beside the bottom of the longitudinal steel bar; a grouting hole and a grout outlet hole which are communicated with a wall surface are formed above and below the preformed hole; and strengthening ribs are formed on peripheries of the hole and the longitudinal steel bar. The structure is used for the connection of longitudinal steel bars among prefabricated concrete structural components, and solves the problem that the existing connection construction of steel bars in building industry is complex.

Description

A kind of building operations steel bar connecting structure and method of attachment
Technical field
The present invention relates to a kind of building operations steel bar connecting structure and method of attachment, be specifically related to a kind of method of attachment housing industrialization, prefabricated concrete structure member longitudinal reinforcement and a kind of plug-in type preformed hole grouting reinforcing bar of being suitable for and retrain with one heart anchoring overlap joint syndeton.
Background technology
In cast-in-place concrete structure, the connection of reinforcing bar adopts overlap joint to connect, be welded to connect or the mechanical connection method such as compression sleeve more, wherein the overlap joint of reinforcing bar connects the simplest, be welded to connect or the construction of the mechanical connection such as compression sleeve comparatively complicated, but these traditional constructions must be finished the connection of reinforcing bar before fluid concrete, are not suitable for the fabricated construction engineering method of precast concrete.
Summary of the invention
The purpose of this invention is to provide a kind of building operations steel bar connecting structure and method of attachment, utilize the reserving hole on precast unit embedded bar next door to realize connection between the longitudinal reinforcement, simple to operate, dependable performance.
Above-mentioned purpose realizes by following technical scheme:
A kind of building operations connecting method for reinforcing bars, the method adopt the mode of anchoring overlap joint to realize the connection of reinforcing bar behind fluid concrete, comprise following several step:
(a) when precast concrete shear wall, nuzzle in advance the first longitudinal reinforcement and the second longitudinal reinforcement;
(b) at the precast concrete shear wall member some holes are set, form the first longitudinal hole with reservation mode, wherein the first longitudinal hole is positioned near the first longitudinal reinforcement bottom, is substantially parallel layout with the first longitudinal reinforcement, and the second longitudinal reinforcement is inserted in the first longitudinal hole;
(c) form the contraction slit perpendicular with the first longitudinal hole with reservation mode, around cement mortar sealing contraction slit;
(d) at the first longitudinal hole and the first longitudinal reinforcement and the second longitudinal reinforcement periphery reinforcing rib is set;
(e) adopt Churn drill have the pulp effect the first transverse holes get through operation, described the first transverse holes and the first longitudinal hole intercommunication are positioned at the apical position of the first longitudinal hole
(f) adopt Churn drill have the grouting effect the second transverse holes get through operation, described the second transverse holes and the first longitudinal hole intercommunication are positioned near the bottom of the first longitudinal hole;
(g) add the filling grouting material by the second transverse holes in the first longitudinal hole, treat that slurry in the first longitudinal hole reaches closely knit when flowing out the grouting material degree from the first transverse holes, shutoff the first transverse holes is finished connection by the grouting material setting and harden.
Preferably, in described step (b), described the second longitudinal reinforcement inserts in the first longitudinal hole indirectly to overlap with the first longitudinal reinforcement anchoring and is connected; Described the first longitudinal reinforcement bottom bends or connects at the inflection point place coaxial the 3rd longitudinal reinforcement of certain-length, makes member the first longitudinal reinforcement and the second longitudinal reinforcement axially concentric.
Preferably, the inwall of described the first longitudinal hole is zigzag, corrugated, shape of threads, and its inwall hole forming method is the built-in fitting of placing the given shape face in member, treats before the concrete final set built-in fitting to be extracted out; Or the smooth straight steel pipe of placement surface, at steel tube surface brushing retarding agent, it is inboard to extract rear water brush hole wall until steel pipe.
Preferably, described reinforcing rib is helical form or ring-type, and described reinforcing rib is strengthened the reinforcing bar bending part simultaneously, and its external diameter is greater than total external diameter of the first longitudinal reinforcement, the second longitudinal reinforcement and the first longitudinal hole.
The present invention also provides a kind of building operations steel bar connecting structure, and it comprises above-mentioned building operations connecting method for reinforcing bars, and described structure comprises: first longitudinal reinforcement of nuzzling in advance when precast concrete shear wall, the second longitudinal reinforcement; On the precast concrete shear wall member with reservation mode form the first longitudinal hole and with the perpendicular contraction slit of the first longitudinal hole; Reinforcing rib; The first transverse holes and the second transverse holes; Wherein the first longitudinal hole is positioned near the first longitudinal reinforcement bottom, is substantially parallel layout with the first longitudinal reinforcement, and the second longitudinal reinforcement is inserted in the first longitudinal hole, at the first longitudinal hole and the first longitudinal reinforcement and the second longitudinal reinforcement periphery reinforcing rib is set.
Further, described the second longitudinal reinforcement inserts in the first longitudinal hole indirectly to overlap with the first longitudinal reinforcement anchoring and is connected; Described the first longitudinal reinforcement bottom bends or connects at the inflection point place coaxial the 3rd longitudinal reinforcement of certain-length, makes member the first longitudinal reinforcement and the second longitudinal reinforcement axially concentric.
Further, the inwall of described the first longitudinal hole is zigzag, corrugated, shape of threads, and its inwall hole forming method is the built-in fitting of placing the given shape face in member, treats before the concrete final set built-in fitting to be extracted out; Or the smooth straight steel pipe of placement surface, at steel tube surface brushing retarding agent, it is inboard to extract rear water brush hole wall until steel pipe.
Further, described reinforcing rib is helical form or ring-type, and described reinforcing rib is strengthened the reinforcing bar bending part simultaneously, and its external diameter is greater than total external diameter of the first longitudinal reinforcement, the second longitudinal reinforcement and the first longitudinal hole.
Beneficial effect of the present invention is as follows:
1. the reinforcing bar attended operation that realizes of the present invention is simple, and work progress does not need complicated plant equipment and facility, does not need power consumption yet.The non-smooth-shaped of reserving hole inwall, hole and embedded bar periphery pre-buried reinforcing rib can further strengthen the connection effect, so switching performance is reliable, is suitable for again the construction characteristics of housing industrialization precast concrete.Construction quality of the present invention is easy to guarantee that the job site is to do operation substantially, has fully avoided all disadvantages of traditional reinforcing bar connected mode.
2. building course environmental protection and energy saving, reduction cost, saving construction fund.
The bending place connect axially with one heart during reinforcing bar, connecting reinforcement has been realized the stress transmission between reinforcing bar, makes the junction structure more reliable.
Description of drawings
Fig. 1 is structural representation of the present invention.
Fig. 2 is the horizontal sectional drawing of accompanying drawing 1.
Fig. 3 is the structural representation that the present invention connects coaxial reinforcing bar.
Wherein: 1 precast concrete shear wall member, 2 first longitudinal reinforcements, 3 first longitudinal holes, 4 second transverse holes, 5 first transverse holes, 6 reinforcing ribs, 7 shrink slit, 8 cement mortar, 9 axial the 3rd longitudinal reinforcements.
The specific embodiment
Below in conjunction with drawings and Examples principle of the present invention and advantage are further elaborated.
Embodiment 1
A kind of building operations connecting method for reinforcing bars, the method adopt the mode of anchoring overlap joint to realize the connection of reinforcing bar behind fluid concrete, comprise following several step:
(a) when precast concrete shear wall, nuzzle in advance the first longitudinal reinforcement and the second longitudinal reinforcement;
(b) at the precast concrete shear wall member some holes are set, form the first longitudinal hole with reservation mode, wherein the first longitudinal hole is positioned near the first longitudinal reinforcement bottom, is substantially parallel layout with the first longitudinal reinforcement, and the second longitudinal reinforcement is inserted in the first longitudinal hole;
(c) form the contraction slit perpendicular with the first longitudinal hole with reservation mode, around cement mortar sealing contraction slit;
(d) at the first longitudinal hole and the first longitudinal reinforcement and the second longitudinal reinforcement periphery reinforcing rib is set;
(e) adopt Churn drill have the pulp effect the first transverse holes get through operation, described the first transverse holes and the first longitudinal hole intercommunication are positioned at the apical position of the first longitudinal hole
(f) adopt Churn drill have the grouting effect the second transverse holes get through operation, described the second transverse holes and the first longitudinal hole intercommunication are positioned near the bottom of the first longitudinal hole;
(g) add the filling grouting material by the second transverse holes in the first longitudinal hole, treat that slurry in the first longitudinal hole reaches closely knit when flowing out the grouting material degree from the first transverse holes, shutoff the first transverse holes is finished connection by the grouting material setting and harden.
Embodiment 2
In another embodiment, other parts are all identical with embodiment 1, and difference is, in described step (b), described the second longitudinal reinforcement inserts in the first longitudinal hole indirectly to overlap with the first longitudinal reinforcement anchoring and is connected; Described the first longitudinal reinforcement bottom bends or connects at the inflection point place coaxial the 3rd longitudinal reinforcement of certain-length, makes member the first longitudinal reinforcement and the second longitudinal reinforcement axially concentric.
Embodiment 3
In another embodiment, other parts are all identical with embodiment 1, difference is, the inwall of described the first longitudinal hole is zigzag, corrugated, shape of threads, its inwall hole forming method is the built-in fitting of placing the given shape face in member, treat before the concrete final set built-in fitting to be extracted out; Or the smooth straight steel pipe of placement surface, at steel tube surface brushing retarding agent, it is inboard to extract rear water brush hole wall until steel pipe.
Embodiment 4
In another embodiment, other parts are all identical with embodiment 1, and difference is that described reinforcing rib is helical form or ring-type, described reinforcing rib is strengthened the reinforcing bar bending part simultaneously, and its external diameter is greater than total external diameter of the first longitudinal reinforcement, the second longitudinal reinforcement and the first longitudinal hole.
Embodiment 5
The present invention also provides a kind of building operations steel bar connecting structure, and it comprises above-mentioned building operations connecting method for reinforcing bars, and described structure comprises: first longitudinal reinforcement of nuzzling in advance when precast concrete shear wall, the second longitudinal reinforcement; On the precast concrete shear wall member with reservation mode form the first longitudinal hole and with the perpendicular contraction slit of the first longitudinal hole; Reinforcing rib; The first transverse holes and the second transverse holes; Wherein the first longitudinal hole is positioned near the first longitudinal reinforcement bottom, is substantially parallel layout with the first longitudinal reinforcement, and the second longitudinal reinforcement is inserted in the first longitudinal hole, at the first longitudinal hole and the first longitudinal reinforcement and the second longitudinal reinforcement periphery reinforcing rib is set.
Embodiment 6
In another one embodiment of the present invention, other parts are all identical with embodiment 5, and difference is, described the second longitudinal reinforcement inserts in the first longitudinal hole indirectly to overlap with the first longitudinal reinforcement anchoring and is connected; Described the first longitudinal reinforcement bottom bends or connects at the inflection point place coaxial the 3rd longitudinal reinforcement of certain-length, makes member the first longitudinal reinforcement and the second longitudinal reinforcement axially concentric.
Embodiment 7
In another one embodiment of the present invention, other parts are all identical with embodiment 5, difference is, the inwall of described the first longitudinal hole is zigzag, corrugated, shape of threads, its inwall hole forming method is the built-in fitting of placing the given shape face in member, treat before the concrete final set built-in fitting to be extracted out; Or the smooth straight steel pipe of placement surface, at steel tube surface brushing retarding agent, it is inboard to extract rear water brush hole wall until steel pipe.
Embodiment 8
In another one embodiment of the present invention, other parts are all identical with embodiment 5, difference is, described reinforcing rib is helical form or ring-type, described reinforcing rib is strengthened the reinforcing bar bending part simultaneously, and its external diameter is greater than total external diameter of the first longitudinal reinforcement, the second longitudinal reinforcement and the first longitudinal hole.
Beneficial effect:
1. the reinforcing bar attended operation that realizes of the present invention is simple, and work progress does not need complicated plant equipment and facility, does not need power consumption yet.The non-smooth-shaped of reserving hole inwall, hole and embedded bar periphery pre-buried reinforcing rib can further strengthen the connection effect, so switching performance is reliable, is suitable for again the construction characteristics of housing industrialization precast concrete.Construction quality of the present invention is easy to guarantee that the job site is to do operation substantially, has fully avoided all disadvantages of traditional reinforcing bar connected mode.
2. building course environmental protection and energy saving, reduction cost, saving construction fund.
The bending place connect axially with one heart during reinforcing bar, connecting reinforcement has been realized the stress transmission between reinforcing bar, makes the junction structure more reliable.
Need to prove that the preferred embodiments of the present invention comprise that the inventor is used to implement known optimal mode of the present invention.The change of preferred embodiment is apparent for those of ordinary skills after reading above-mentioned explanation.The inventor wishes the change that the those of ordinary skill rational Application is such, and the inventor thinks and offers some clarification on different application at this and also can realize the present invention.Therefore, the present invention includes all modifications and the equivalents of the purport of quoting in the claim, this allows in applicable law.In addition, any combination of all possible change of above-mentioned key element is also comprised by the present invention, unless point out in addition or obvious contradiction in context at this.

Claims (8)

1. a building operations connecting method for reinforcing bars is characterized in that, the method adopts the mode of anchoring overlap joint to realize the connection of reinforcing bar behind fluid concrete, comprising:
(a) when precast concrete shear wall, nuzzle in advance the first longitudinal reinforcement and the second longitudinal reinforcement;
(b) at the precast concrete shear wall member some holes are set, form the first longitudinal hole with reservation mode, wherein the first longitudinal hole is positioned near the first longitudinal reinforcement bottom, is substantially parallel layout with the first longitudinal reinforcement, and the second longitudinal reinforcement is inserted in the first longitudinal hole;
(c) form the contraction slit perpendicular with the first longitudinal hole with reservation mode, around cement mortar sealing contraction slit;
(d) at the first longitudinal hole and the first longitudinal reinforcement and the second longitudinal reinforcement periphery reinforcing rib is set;
(e) adopt Churn drill have the pulp effect the first transverse holes get through operation, described the first transverse holes and the first longitudinal hole intercommunication are positioned at the apical position of the first longitudinal hole
(f) adopt Churn drill have the grouting effect the second transverse holes get through operation, described the second transverse holes and the first longitudinal hole intercommunication are positioned near the bottom of the first longitudinal hole;
(g) add the filling grouting material by the second transverse holes in the first longitudinal hole, treat that slurry in the first longitudinal hole reaches closely knit when flowing out the grouting material degree from the first transverse holes, shutoff the first transverse holes is finished connection by the grouting material setting and harden.
2. a kind of building operations connecting method for reinforcing bars according to claim 1 is characterized in that: in step (b), described the second longitudinal reinforcement inserts in the first longitudinal hole indirectly to overlap with the first longitudinal reinforcement anchoring and is connected; Described the first longitudinal reinforcement bottom bends or connects at the inflection point place coaxial the 3rd longitudinal reinforcement of certain-length, makes member the first longitudinal reinforcement and the second longitudinal reinforcement axially concentric.
3. a kind of building operations connecting method for reinforcing bars according to claim 1 and 2, it is characterized in that: the inwall of described the first longitudinal hole is zigzag, corrugated, shape of threads, its inwall hole forming method is the built-in fitting of placing the given shape face in member, treat before the concrete final set built-in fitting to be extracted out; Or the smooth straight steel pipe of placement surface, at steel tube surface brushing retarding agent, it is inboard to extract rear water brush hole wall until steel pipe.
4. a kind of building operations connecting method for reinforcing bars according to claim 1, it is characterized in that: described reinforcing rib is helical form or ring-type, described reinforcing rib is strengthened the reinforcing bar bending part simultaneously, and its external diameter is greater than total external diameter of the first longitudinal reinforcement, the second longitudinal reinforcement and the first longitudinal hole.
5. building operations steel bar connecting structure, it comprises each described building operations connecting method for reinforcing bars such as claim 1-4, it is characterized in that described structure comprises: first longitudinal reinforcement of when precast concrete shear wall, nuzzling in advance, the second longitudinal reinforcement; On the precast concrete shear wall member with reservation mode form the first longitudinal hole and with the perpendicular contraction slit of the first longitudinal hole; Reinforcing rib; The first transverse holes and the second transverse holes; Wherein the first longitudinal hole is positioned near the first longitudinal reinforcement bottom, is substantially parallel layout with the first longitudinal reinforcement, and the second longitudinal reinforcement is inserted in the first longitudinal hole, at the first longitudinal hole and the first longitudinal reinforcement and the second longitudinal reinforcement periphery reinforcing rib is set.
6. a kind of building operations steel bar connecting structure according to claim 5 is characterized in that: described the second longitudinal reinforcement inserts in the first longitudinal hole indirectly to overlap with the first longitudinal reinforcement anchoring and is connected; Described the first longitudinal reinforcement bottom bends or connects at the inflection point place coaxial the 3rd longitudinal reinforcement of certain-length, makes member the first longitudinal reinforcement and the second longitudinal reinforcement axially concentric.
7. according to claim 5 or 6 described a kind of building operations steel bar connecting structures, it is characterized in that: the inwall of described the first longitudinal hole is zigzag, corrugated, shape of threads, its inwall hole forming method is the built-in fitting of placing the given shape face in member, treat before the concrete final set built-in fitting to be extracted out; Or the smooth straight steel pipe of placement surface, at steel tube surface brushing retarding agent, it is inboard to extract rear water brush hole wall until steel pipe.
8. a kind of building operations steel bar connecting structure according to claim 5, it is characterized in that: described reinforcing rib is helical form or ring-type, described reinforcing rib is strengthened the reinforcing bar bending part simultaneously, and its external diameter is greater than total external diameter of the first longitudinal reinforcement, the second longitudinal reinforcement and the first longitudinal hole.
CN201310026636.9A 2013-01-21 2013-01-21 Building construction steel bar connection structure and connection method Active CN103075013B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310026636.9A CN103075013B (en) 2013-01-21 2013-01-21 Building construction steel bar connection structure and connection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310026636.9A CN103075013B (en) 2013-01-21 2013-01-21 Building construction steel bar connection structure and connection method

Publications (2)

Publication Number Publication Date
CN103075013A true CN103075013A (en) 2013-05-01
CN103075013B CN103075013B (en) 2015-06-03

Family

ID=48151699

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310026636.9A Active CN103075013B (en) 2013-01-21 2013-01-21 Building construction steel bar connection structure and connection method

Country Status (1)

Country Link
CN (1) CN103075013B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104153461A (en) * 2013-05-16 2014-11-19 叶新 Precast concrete structural member and method for building construction longitudinal connection between structural members
CN104594640A (en) * 2014-12-01 2015-05-06 中建七局第四建筑有限公司 High-rise building secondary structure foam concrete cast-in-situ bar planting technology and construction method thereof
CN105256922A (en) * 2014-07-16 2016-01-20 中铁建工集团有限公司 Mounting method of light-weight wall boards
CN106193329A (en) * 2016-08-29 2016-12-07 朱凤起 Concrete wall structure and construction method thereof
CN107542220A (en) * 2016-06-24 2018-01-05 中国二十冶集团有限公司 Large-scale variable cross-section concrete column upper strata vertical reinforcement construction method
CN109281397A (en) * 2017-07-19 2019-01-29 沈阳建筑大学 Boundling is in the milk entirely constrains slurry anchor connection method
CN109281398A (en) * 2017-07-19 2019-01-29 沈阳建筑大学 Boundling half, which is in the milk, constrains slurry anchor connection method
CN109881817A (en) * 2018-06-26 2019-06-14 清华大学 A kind of precast concrete shear wall horizontal joint box out overlapped forming hole method
CN110331787A (en) * 2019-07-09 2019-10-15 中铁十九局集团第二工程有限公司 The construction method that part concrete is connect with beam body concrete is poured after a kind of enhancing beam body sealing end
CN111851304A (en) * 2020-07-24 2020-10-30 南京林业大学 L-shaped slot-in type connection method of prefabricated bridge pier and bearing platform

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201217847Y (en) * 2008-06-05 2009-04-08 黑龙江宇辉新型建筑材料有限公司 Plug-in type preformed hole grouting reinforcement lapping connection component
JP2012255302A (en) * 2011-06-09 2012-12-27 D B S:Kk Reinforcement steel bar for reinforced concrete and steel bar construction method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201217847Y (en) * 2008-06-05 2009-04-08 黑龙江宇辉新型建筑材料有限公司 Plug-in type preformed hole grouting reinforcement lapping connection component
JP2012255302A (en) * 2011-06-09 2012-12-27 D B S:Kk Reinforcement steel bar for reinforced concrete and steel bar construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
姜洪斌等: "预制混凝土结构插入式预留孔灌浆钢筋锚固性能", 《哈尔滨工业大学学报》, vol. 43, no. 4, 30 April 2011 (2011-04-30) *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104153461A (en) * 2013-05-16 2014-11-19 叶新 Precast concrete structural member and method for building construction longitudinal connection between structural members
CN105256922A (en) * 2014-07-16 2016-01-20 中铁建工集团有限公司 Mounting method of light-weight wall boards
CN104594640A (en) * 2014-12-01 2015-05-06 中建七局第四建筑有限公司 High-rise building secondary structure foam concrete cast-in-situ bar planting technology and construction method thereof
CN107542220A (en) * 2016-06-24 2018-01-05 中国二十冶集团有限公司 Large-scale variable cross-section concrete column upper strata vertical reinforcement construction method
CN107542220B (en) * 2016-06-24 2019-09-13 中国二十冶集团有限公司 Large-scale variable cross-section concrete column upper layer vertical reinforcement construction method
CN106193329A (en) * 2016-08-29 2016-12-07 朱凤起 Concrete wall structure and construction method thereof
CN106193329B (en) * 2016-08-29 2019-03-15 朱凤起 Concrete wall structure and its construction method
CN109281397A (en) * 2017-07-19 2019-01-29 沈阳建筑大学 Boundling is in the milk entirely constrains slurry anchor connection method
CN109281398A (en) * 2017-07-19 2019-01-29 沈阳建筑大学 Boundling half, which is in the milk, constrains slurry anchor connection method
CN109881817A (en) * 2018-06-26 2019-06-14 清华大学 A kind of precast concrete shear wall horizontal joint box out overlapped forming hole method
CN110331787A (en) * 2019-07-09 2019-10-15 中铁十九局集团第二工程有限公司 The construction method that part concrete is connect with beam body concrete is poured after a kind of enhancing beam body sealing end
CN111851304A (en) * 2020-07-24 2020-10-30 南京林业大学 L-shaped slot-in type connection method of prefabricated bridge pier and bearing platform

Also Published As

Publication number Publication date
CN103075013B (en) 2015-06-03

Similar Documents

Publication Publication Date Title
CN103075013B (en) Building construction steel bar connection structure and connection method
CN201217847Y (en) Plug-in type preformed hole grouting reinforcement lapping connection component
CN102425310B (en) Assembly-type residential shear wall structural wall body vertical connection construction method
CN102433945B (en) Vertical mixed connection structure and method of prefabricated internal wallboards for assembling shear wall structure
CN104032856B (en) A kind of precast shear wall horizontal connecting node
CN102691365B (en) Connecting structure for assembly type concrete shear wall edge member
CN202391019U (en) End part thickened grouting connector of steel bar
CN203256730U (en) Prefabricated energy pile device for embedding heat transmission pipe
CN103334519B (en) Overlaid plate type concrete shear wall and longitudinally connected method
CN204826426U (en) Grout sleeve for steel bar connection
CN105064619A (en) Rebar sleeve grouting connection member for prefabricated assembled type concrete component and connection method
CN107355010A (en) Precast concrete shear wall shaped steel node connection structure
CN100370171C (en) Excavation-free integral restoration method of underground conduit and inspection well
CN105064625A (en) Grout sleeve for reinforcement connection and reinforcement connecting method
CN202611012U (en) Assembly type concrete shear wall edge member connection structure
CN103590493A (en) Overlaid plate type concrete shear wall and longitudinal connecting method
CN206052987U (en) Connecting structure with H type slotted wall structure precast shear walls
CN204826423U (en) Prefabricated assembled is reinforcing bar sleeve grout connecting piece for concrete member
CN105019606A (en) Precast concrete unit steel bar grouting connecting piece and connecting method
CN204826429U (en) Cast member reinforcing bar grout connecting piece
CN206328954U (en) Node pouring structure between prefabricated assembled post and post
CN205063961U (en) Push pipe tube coupling structure
CN102071775A (en) Insertion prepared hole venting reinforcing steel bar lap joint structure fabricated construction method
CN102912928B (en) Structural member for restraining grouting anchoring connection by using two ends of steel bar and connection method
CN207160270U (en) Precast concrete shear wall shaped steel node connection structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20171218

Address after: 432000 Hubei province Xiaogan city Xiaochang County Economic Development Zone

Patentee after: Hubei Yuhui New Type Building Material Co., Ltd.

Address before: 158100 east side of Beijing University of Li Min Development Zone, Harbin, Heilongjiang

Co-patentee before: Hubei Yuhui New Type Building Material Co., Ltd.

Patentee before: Heilongjiang Yuhui New Building Materials Co., Ltd.