CN104727391B - A kind of bathing room - Google Patents

A kind of bathing room Download PDF

Info

Publication number
CN104727391B
CN104727391B CN201510148962.6A CN201510148962A CN104727391B CN 104727391 B CN104727391 B CN 104727391B CN 201510148962 A CN201510148962 A CN 201510148962A CN 104727391 B CN104727391 B CN 104727391B
Authority
CN
China
Prior art keywords
pipeline
preset pipeline
pipe
module body
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510148962.6A
Other languages
Chinese (zh)
Other versions
CN104727391A (en
Inventor
陈定球
彭海辉
谢俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuyou Zhizao Technology Investment Co., Ltd
Original Assignee
China Minsheng Zhuyou Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Minsheng Zhuyou Co Ltd filed Critical China Minsheng Zhuyou Co Ltd
Priority to CN201510148962.6A priority Critical patent/CN104727391B/en
Publication of CN104727391A publication Critical patent/CN104727391A/en
Application granted granted Critical
Publication of CN104727391B publication Critical patent/CN104727391B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03CDOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
    • E03C1/00Domestic plumbing installations for fresh water or waste water; Sinks
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03CDOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
    • E03C1/00Domestic plumbing installations for fresh water or waste water; Sinks
    • E03C1/12Plumbing installations for waste water; Basins or fountains connected thereto; Sinks
    • E03C1/122Pipe-line systems for waste water in building
    • E03C1/1222Arrangements of devices in domestic waste water pipe-line systems
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C1/00Building elements of block or other shape for the construction of parts of buildings
    • E04C1/39Building elements of block or other shape for the construction of parts of buildings characterised by special adaptations, e.g. serving for locating conduits, for forming soffits, cornices, or shelves, for fixing wall-plates or door-frames, for claustra
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • E04H1/125Small buildings, arranged in other buildings
    • E04H1/1266Cubicles for dressing; Toilets

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Environmental & Geological Engineering (AREA)
  • Sink And Installation For Waste Water (AREA)

Abstract

The present invention provides a kind of bathing room, and including supply and drain water system, caisson, described supply and drain water system includes soil stack, water supply riser, floor drain trap and plumbing integration module;Described plumbing integration module includes module body, preset pipeline, and described preset pipeline is preset to be integrated in described module body;Described floor drain trap is located in described caisson, and described floor drain trap, soil stack are all connected with described preset pipeline with water supply riser.In this programme, meanwhile, use plumbing integration module, be integrated together prefabricated for the various pipes in building, in construction, have only to be installed on by plumbing integration module in the reserved opening (such as equipment well head) of every floor, then carry out the standpipe between upper and lower floor and install, the most i.e. complete the installation connection work of pipeline in building, installation rate is the fastest, environmental pollution is little, and site tissue accessory is few, and assembly working amount is little.

Description

A kind of bathing room
Technical field
The invention belongs to building field, be specially a kind of bathing room.
Background technology
The installation method of the water supply and sewerage pipeline of traditional architecture: hole needed for preserved pipeline well on floor, plumbing is each Parts, assemble at the scene such as elbow, threeway, trap etc., require to need to close hole because of sound insulation, fire prevention etc. afterwards, construction Middle employing hanging module and cast-in-situ is closed.Have that site tissue accessory is many, assembly working amount is big, formwork is complicated, spillage, mould cannot be torn open Remove, sealing is poor, noise pollution, replacing difficulty etc. problem.
In the Water And Drainage System Design of traditional architecture, pipeline mostly is PVC material, and the service life of PVC is the most permissible Reach 50 years, but it is affected by factors, it is difficult to reach life expectancy.And major structure of construction, including floor, equipment Behind well, equipment raise hole, the design life at pouring concrete is many on 50 years.Therefore need during the use of building Change aging pipeline.Traditional method forms entirety together with cast-in-place with hole for pipeline, changes and necessarily destroys floor, repairs work Journey amount is big and needs wet trade, easily generates building waste, and causes indoor pollution.
Summary of the invention
The technical problem to be solved in the present invention is: provide a kind of bathing room, the water supply and sewerage pipeline of this bathing room install simple, Efficiency is few compared with high and on-the-spot pollution.
The solution of the present invention is achieved in that a kind of bathing room, including supply and drain water system, caisson, described discharge Water system includes soil stack, water supply riser, floor drain trap and plumbing integration module;Described plumbing integration module bag Including module body, preset pipeline, described preset pipeline is preset to be integrated in described module body;Described floor drain trap is located at In described caisson, described floor drain trap, soil stack are all connected with described preset pipeline with water supply riser.In this programme, Meanwhile, use plumbing integration module, be integrated together prefabricated for the various pipes in building, in construction, only need Plumbing integration module is installed in the reserved opening (such as equipment well head) of every floor, then carry out between upper and lower floor Standpipe is installed, and the most i.e. completes the installation connection work of pipeline in building, and installation rate is very fast, and environmental pollution is little, on-the-spot Tissue accessory is few, and assembly working amount is little;It addition, pipeline or plumbing integration module aging after, it is also possible to change very easily, Need not destroy floor.
Another technical scheme of the present invention is on above-mentioned basis, and described preset pipeline includes drain pipe and feedwater Pipe, described drain pipe and feed pipe are respectively connected with soil stack and water supply riser respectively;Or, including feed pipe sleeve pipe and Drain pipe, water supply riser is arranged in described sleeve pipe, and described drain pipe is connected with soil stack.By default drain pipe and feedwater Pipe, after water supply and sewerage pipeline and feed pipe can being integrated together, the beneficially I&M of pipeline, and improve pipeline peace Dress efficiency and simplification work progress.Or by sleeve pipe and the drain pipe of default feed pipe, feed pipe can be installed on feedwater In the sleeve pipe of pipe, and it is integrated together with drain pipe, the beneficially I&M of pipeline.Can certainly be by presetting feedwater The sleeve pipe of pipe and drain bushing, be respectively arranged in feed pipe and drain pipe in sleeve pipe and the drain bushing of feed pipe, from And water supply and sewerage pipeline and feed pipe can also be integrated together, improve the convenience of Pipe installing and maintenance, simplify construction Process.
Another technical scheme of the present invention is on above-mentioned basis, described preset pipeline also include hot-water line and/or The breather being connected with described soil stack;Or, described preset pipeline also include the sleeve pipe for arranging hot-water line and/or The breather being connected with described soil stack.More pipeline is integrated together, is more beneficial for the I&M of pipeline; It addition, install breather more meet the requirement of skyscraper, it is ensured that the patency of drain pipe draining, reduce drain pipe plugging can Energy;The installation of the sleeve pipe of hot-water line or hot-water line, is more suitable for Hotel Buildings, it is simple to centralizedly supply hot water.
Another technical scheme of the present invention is on above-mentioned basis, described drain pipe and/or the top of breather or Bottom is also associated with diameter changing device.After diameter changing device is set, facilitate in the standpipe between upper and lower floor and plumbing integration module The docking of preset pipeline;It addition, be such as provided that big opening reducer pipe, then can form high stream in plumbing integration module Speed pass so that spot is not easy in plumbing integration module deposition blocking, and arranges little opening reducer pipe, then can give Draining integration module arranges multiple entrance, facilitates multiple positions hydrops to enter in same sewer pipe.
Another technical scheme of the present invention is on above-mentioned basis, and the top of described diameter changing device or bottom connect to be had Pipeline eccentric.When the top of diameter changing device or bottom connect and have pipeline eccentric, upper and lower pipeline can be solved and do not exist Installation question on same axis, it is only necessary to adjust eccentric and get final product smooth and easy docking, reduce Pipe installing difficulty.
Another technical scheme of the present invention is, on above-mentioned basis, described drain pipe to be provided with expansion ring.Row After being provided with expansion ring on water pipe, in the case of pipe built-in, the problem that expansion ring can solve pipeline shortage on a small quantity, it is not necessary to Changing pipeline can connect, meanwhile, expansion ring can also do and offset the mouth of pipe by a small margin so that it is the pipeline of docking is not at same axis On can also connect.
Another technical scheme of the present invention is that, on above-mentioned basis, described drain pipe includes the first horizontal tube connector, Described first horizontal tube connector connects toilet and/or the dewatering horizontal tube of wash basin.First horizontal tube connector connects toilet and/or wash basin Dewatering horizontal tube after, the sewage that can produce during being used imports in the drainage pipeline in plumbing integration module.
Another technical scheme of the present invention is on above-mentioned basis, and described drain pipe also includes the second transverse tube and connects Head, described second horizontal tube connector is connected with floor drain trap.So, by one end phase of the second horizontal tube connector with trap Even, after the other end of trap is connected with the drain pipe of described floor drain, the surface area water on bathing room ground can leak into passing through Enter in drain pipe.
Another technical scheme of the present invention is that, on above-mentioned basis, described module body includes at least one side Wall, sidewall encloses composition tubular framework, and preset pipeline is arranged in tubular framework, is provided with between preset pipeline and tubular framework Packing material.
Another technical scheme of the present invention is on above-mentioned basis, and described tubular framework is additionally provided with top cover or the end Lid.When tubular framework is provided with top cover or bottom, top cover or bottom arrange rubber seal, simultaneously with tubular framework junction After top cover or bottom are also provided with rubber seal with pipeline connection, it is possible to prevent bathing room excess surface water by plumbing collection Module is become to seep water toward next layer.It addition, the bottom of tubular framework is provided with bottom, it is reserved that bottom is provided with that preset pipeline passes Mouthful.So, due to the reserved opening screens to preset pipeline, preset pipeline can be played the effect of pre-determined bit, and, in filling The when of packing material, eliminating the operation of lower surface formwork in module body, not only saved processing technology, bottom can also Packing material is played certain supporting role
Another technical scheme of the present invention is on above-mentioned basis, the sidewall of described tubular framework be provided with rib or Reinforcement.After the sidewall of tubular framework is provided with rib or reinforcement, the wall thickness of tubular framework can reduce further, with Time, the rigidity of tubular framework itself is higher so that it is in application process will not deformed damaged, particularly at rib or reinforcement After crisscross formation grid, shock resistance damage capability and the weight capacity of tubular framework is greatly improved.
Another technical scheme of the present invention is on above-mentioned basis, described module body and preset pipeline integral molded plastic Molding.When module body and preset pipeline integral molded plastic molding, between module body and preset pipeline, there is no gap, and, The production technology efficiency using integral molded plastic molding is high, and steady quality is reliable, and production cost is relatively low, is conducive to pushing away on a large scale Wide application.
Another technical scheme of the present invention is on above-mentioned basis, and described connection fixing device is for being arranged on described cylinder Shape framework top and/or the annular toss of sidepiece;Or, described connection fixing device is to be arranged on described tubular framework outer wall Outer convex module;Or, described connection fixing device is to be arranged on the concave inward structure of described tubular framework outer wall.When connecting fixing dress When being set to outer convex module, correspondingly, the reserving hole relevant position on floor is set to concave inward structure, plumbing integration module After installation, the concave inward structure that outer convex module is arranged with the reserving hole relevant position on floor matches, thus can be by plumbing Integration module is connected location with floor tenon set, improves the load ability of plumbing integration module so that pipeline is long-pending full in blocking Also will not occur under the load of water to shift destruction up and down.
Another technical scheme of the present invention is on above-mentioned basis, and described sidewall material is steel or organic material Material.When sidewall material is steel or organic material, the production technology of plumbing integration module is simple, die sinking punching press or weldering Connect, be conducive to high-volume low-cost production.
Another technical scheme of the present invention is on above-mentioned basis, and described packing material is foam concrete, expansion Pearlite concrete or haydite concrete.Use foam concrete, expanded perlite concrete or haydite concrete conduct Packing material so that plumbing integration module from heavy and light, it is easy to carry and install, meanwhile, also help and chisel packing material The maintenance of its interior conduit is changed.It addition, when using foam concrete when, interlayer fireproof effect not only can be played, moreover it is possible to Play the good soundproof effect of the strike note to current.
Another technical scheme of the present invention is on above-mentioned basis, and described module body is concrete or cement production systD Sizing fixing device, described preset pipe built-in is in described module body.So, use concrete or cement as discharge The making material of water integration module body, advantageously reduces the material cost of plumbing integration module, and because of concrete or water Mud is mouldable shaped material, is conducive to the production and processing of special-shaped plumbing integration module, additionally, because plumbing integration module is mixed Solidifying soil or cement material, material own with floor is consistent, and therefore the two is treated as entirety more easily by filleting.
Another technical scheme of the present invention is that, on above-mentioned basis, described module body is integral by being connected with each other The framework of hack lever composition is constituted, described preset pipe built-in in described module body, described preset pipeline and described framework it Between poured concrete or cement slurry.Use such scheme to make plumbing integration module, can first will be interconnected mutually by hack lever It is connected into entirety, more preset pipeline is integrally disposed in hack lever framework, poured close with concrete or cement mortar the most again Real closure;It addition, after the hole side of floor preformed hole arranges fast-easy closing-up net, it is possible to by floor and plumbing integration module It is combined into entirety, prevents its seepage further.
Another technical scheme of the present invention is on above-mentioned basis, and described module body is hollow box body structure, institute State preset pipeline to be fixed in described module body by bolt, the collar, bearing or welding manner.Module body is hollow box body Structure, when preset pipeline is fixed in described module body by bolt, the collar, bearing or welding manner, integrated in plumbing Module installs before beginning to use, after tubing upper and lower to floor carries out the situation that test confirms not have seepage, then will Hollow box body fills full heat-barrier material or the foam concrete of lightweight, and preset pipeline is by bolt, the collar, bearing or welding Mode is fixed in described module body, then can effectively prevent preset pipeline in casting concrete or the process of cement mortar In be moved, beneficially construction is accurately positioned.
Another technical scheme of the present invention is that, on above-mentioned basis, described module body is cast by metal material or welds It is connected into body structure, between described preset pipeline and described module body, is provided with packing material.When module body is by metal material When material casts or is welded into body structure, the production technology of plumbing integration module is simple, uses die casting or welding i.e. Can, be conducive to high-volume low-cost production, meanwhile, between preset pipeline and described module body, be provided with packing material, then Preset pipeline can be fixed on design attitude, prevent it from loosening skew.
Another technical scheme of the present invention is that, on above-mentioned basis, described supply and drain water system is additionally provided with discharge pipe line Anti-block apparatus.So can solve the problem that drain pipe occurs blocking.
Another technical scheme of the present invention is on above-mentioned basis, described discharge pipe line anti-block apparatus be drainage screen or Screen plate, described drainage screen or screen plate are arranged on the porch of discharge pipe line.Arranged by the porch at discharge pipe line Filter screen or screen plate, can effectively intercept the larger object in drain pipe, thus prevent drain pipe blockage phenomenon.
Another technical scheme of the present invention is on above-mentioned basis, and described discharge pipe line anti-block apparatus is high-pressure hydraulic pump Or high-pressure pump, described high-pressure hydraulic pump or high pressure gas delivery side of pump access in discharge pipe line.High pressure it is provided with in discharge pipe line Water pump or high-pressure pump, when discharge pipe line occurs blocking, can start described high-pressure hydraulic pump or high-pressure pump, pass through water under high pressure Stream or air-flow carry out the tamper in flush discharge pipe, thus solve the blockage problem of drain pipe.
Another technical scheme of the present invention is on above-mentioned basis, and described discharge pipe line anti-block apparatus is reducing mechanism Or agitating device, described reducing mechanism or agitating device are arranged on discharge pipe line.On discharge pipe line install reducing mechanism or Agitating device, when discharge pipe line occurs blocking, can start described reducing mechanism or agitating device, by reducing mechanism or stir Mix device and smash the object being blocked in drain pipe, then discharged by drain pipe, thus solve the blockage problem of drain pipe.
Another technical scheme of the present invention is on above-mentioned basis, and described module body outer wall is provided with water stopping trough. After the module body outer wall of draining integration module is provided with water stopping trough, in use produced hydrops will not for bathing room The reserved opening down seepage installed from plumbing integration module.
Another technical scheme of the present invention is, on above-mentioned basis, described water stopping trough to be chosen outside notch.At draining collection The module body outer wall becoming module is provided with after choosing outside notch on water stopping trough, and water stopping trough, and bathing room is in use produced The reserved opening down seepage that raw hydrops will not be installed from plumbing integration module, can converge infiltration because choosing outside notch on water stopping trough Collection, prevents it from penetrating into next floor.
Another technical scheme of the present invention is, on above-mentioned basis, to be additionally provided with collector pipe in described module body, Described collector pipe one end connection water stopping trough, the other end connects preset pipeline.When being additionally provided with collector pipe in module body, described collection Water pipe one end connection water stopping trough, when the other end connects preset pipeline, the hydrops that water stopping trough collects can be entered down by collector pipe In waterpipe, prevent it long-pending full excessive, thoroughly solve bathing room hydrops problem.
Another technical scheme of the present invention is on above-mentioned basis, and described preset pipeline is also provided with leakproof Deodorization apparatus, described leakproof deodorization apparatus is the drainage tube that the sidewall with described preset pipeline is connected, and described drainage tube is U-shaped Pipe, the sidewall of described preset pipeline is provided with seepage mouth, the first end of described drainage tube is connected with described seepage mouth, described in draw Second end of flow tube is water inlet, and the position of water inlet described in the vertical direction is higher than the position of described seepage mouth.So when Bottom bathroom during hydrops, drainage tube draining can be passed through in time, owing to the lower end that drainage tube is U-tube or drainage tube is U-shaped Structure, when hydrops is after the water inlet of drainage tube flows into drainage tube, forms water seal, when the water in drainage tube in the lower end of drainage tube Gradually increasing, when the water level of water seal exceedes the seepage mouth of preset pipeline, hydrops is i.e. drained into preset from the seepage mouth of preset pipeline In pipeline, it is thus possible in time the hydrops outside preset pipeline is discharged in time.
Another technical scheme of the present invention is, on above-mentioned basis, to be additionally provided with waterstop port, limit in described drainage tube Position device and ball float, the diameter of described waterstop port is less than the aperture of described drainage tube, and described stopping means is arranged on described sealing The lower section of mouth, described ball float is arranged between described stopping means and waterstop port, and the diameter of described ball float is more than described waterstop port Diameter and less than the aperture of described drainage tube.Ball float mechanism it is provided with, when preset pipeline occurs blocking or overflows in drainage tube During water, the water being back to drainage tube from preset pipeline can make ball float float, and when ball float floats to waterstop port, ball float is at buoyancy Block waterstop port under effect, thus prevent water to be back to bathing room by drainage tube from preset pipeline.
Another technical scheme of the present invention is on above-mentioned basis, and described stopping means is filter screen or gag lever post or limit Position projection.When not having water to be back to drainage tube from preset pipeline, ball float is played support, position-limiting action by stopping means, prevents from working as Hydrops, when the water inlet of drainage tube flows into drainage tube, drives ball float to block preset to the motion of the seepage mouth direction of preset pipeline The seepage mouth of pipeline.
Another technical scheme of the present invention is on above-mentioned basis, described preset pipeline and described drainage tube integrated injection Molded.When preset pipeline and described drainage tube integral molded plastic molding, between preset pipeline and drainage tube entirety, there is no gap, Can with one-shot forming, and, the production technology efficiency using integral molded plastic molding is high, and steady quality is reliable, and production cost is relative Relatively low, beneficially large-scale promotion application.
Another technical scheme of the present invention is on above-mentioned basis, and described preset pipeline and described drainage tube are detachable Connect.When preset pipeline and described drainage tube removably connect, it is convenient that preset pipeline and drainage tube separate, it is simple to maintenance and more Change, thus reduce cost.
Another technical scheme of the present invention is on above-mentioned basis, and described preset pipeline is also provided with leakproof Deodorization apparatus, described leakproof deodorization apparatus is the deodorant case being arranged on outside described preset pipe side wall, arranges in described deodorant case Having isolation tongue, described preset pipe side wall is provided with seepage mouth, the tongue position isolating tongue described in the vertical direction is less than The position of described seepage mouth.Deodorant case is set outside preset pipe side wall, so bottom bathroom during hydrops, can pass through in time Deodorant case draining, owing to being provided with isolation tongue in described deodorant case, described preset pipe side wall is provided with seepage mouth, vertically On direction, the tongue position of described isolation tongue is less than the position of described seepage mouth, when hydrops flows into deodorant from the water inlet of deodorant case After case, between the isolation tongue and preset pipe side wall of deodorant case, form water seal, when the water in deodorant case gradually increases, and water level exceedes During the seepage mouth of preset pipeline, hydrops is i.e. drained into preset pipeline from the seepage mouth of preset pipeline, it is thus possible in time by preset Hydrops outside pipeline is discharged in time.
Another technical scheme of the present invention is on above-mentioned basis, and described isolation tongue and described preset pipeline are detachable Connect;Or described isolation tongue and described preset pipeline integral molded plastic molding.When preset pipeline and described isolation tongue integrated injection are moulded During type, can with one-shot forming, and, the production technology efficiency using integral molded plastic molding is high, and steady quality is reliable, production cost Relatively low, beneficially large-scale promotion application.When preset pipeline and described isolation tongue removably connect, preset pipeline with every The most convenient from tongue, it is simple to keep in repair and change, thus reduce cost.And difficulty of processing can be reduced with separate machined and die sinking.
Another technical scheme of the present invention is on above-mentioned basis, and described deodorant case and described preset pipeline are detachable Connect;Or described deodorant case and described preset pipeline integral molded plastic molding.When preset pipeline and described deodorant case integrated injection are moulded During type, can with one-shot forming, and, the production technology efficiency using integral molded plastic molding is high, and steady quality is reliable, production cost Relatively low, beneficially large-scale promotion application.When preset pipeline and described deodorant case removably connect, preset pipeline with every The most convenient from tongue, it is simple to keep in repair and change, thus reduce cost.And difficulty of processing can be reduced with separate machined and die sinking.
Another technical scheme of the present invention is on above-mentioned basis, and described preset pipeline is provided with fire trapping ring or anti- Fire bed.After being provided with fire trapping ring or fireprotection layer on preset pipeline, when bathing room meets with fire, fire trapping ring or fireprotection layer can Spread up and down with blocking-up burning things which may cause a fire disaster.
Another technical scheme of the present invention is on above-mentioned basis, and described module body and preset pipeline use 3D to beat Print one-body molded.When module body and preset pipeline planform are complicated, during production and construction and installation extremely inconvenience, 3D is used to beat Print one-body molded, beneficially the manufacturing of plumbing integration module.
Accompanying drawing explanation
Fig. 1 is the structure chart of the plumbing integration module representing the bathing room involved by a kind of embodiment of this technology;
Fig. 2 is the structure chart of the plumbing integration module representing the bathing room involved by this technology another embodiment;
Fig. 3 is the sectional view of the plumbing integration module representing the bathing room involved by this technology another embodiment;
Fig. 4 is the top view of the plumbing integration module representing the bathing room involved by this technology another embodiment;
Fig. 5-Figure 10 is several structure charts of the connection fixing device of plumbing integration module shown in Fig. 1;
Figure 11 is the structure chart of the drain pipe of plumbing integration module shown in Fig. 1;
Figure 12 is the structure chart of the another embodiment of the drain pipe of plumbing integration module shown in Fig. 1;
Figure 13 is the structure chart of the plumbing integration module representing the bathing room involved by this technology another embodiment;
Figure 14 is the structure chart representing the bathing room involved by a kind of embodiment of this technology;
Figure 15 is the leakproof deodorant of the plumbing integration module representing the bathing room involved by a kind of embodiment of this technology
The structure chart of device;
Figure 16 is that the leakproof of the plumbing integration module representing the bathing room involved by this technology another embodiment is prevented
The structure chart of smelly device;
Figure 17 and Figure 18 is the sectional view of the aqueduct of leakproof deodorization apparatus described in Figure 16;
Figure 19 is that the leakproof of the plumbing integration module representing the bathing room involved by this technology another embodiment is prevented
The structure chart of smelly device;
Figure 20 is the structure chart of the plumbing integration module representing the bathing room involved by this technology another embodiment;
Figure 21 is the structure chart of the plumbing integration module representing the bathing room involved by this technology another embodiment.
In figure:
110 module body 111 annular toss 112 edge projection 113 concave inward structures
114 outer convex module 121 drain pipe 1211 water stopping trough 1212 collector pipes
1213 first horizontal tube connector 1214 expansion ring 1215 fire trapping ring 122 hot-water lines
123 cold water feed pipe 124 breather 125 ground leaking drainage pipe 1251 floor drain traps
1252 one eighth bend 1,253 90 degree elbow 1,254 second horizontal tube connector 3 bodies of wall
130 packing material 10 floor drain 200 bathing rooms
141 drainage tube 1411 bootstrap blocks 1412 guide bar 142 seepage mouth
143 water inlet 144 waterstop port 145 stopping means 146 ball floats
Tongue 1481 tongue 1101 cross bar isolated by 147 deodorant casees 148
1102 vertical pole 1103 vertical rod 400 floor 430 caissons
Detailed description of the invention
Describing the present invention below in conjunction with the accompanying drawings, the description of this part is only exemplary and explanatory, should not Protection scope of the present invention is had any restriction effect.Additionally, those skilled in the art are according to the description of presents, can be right In presents, the feature in embodiment and in different embodiment carries out respective combination.
The embodiment of the present invention is as follows, refers to Figure 14, a kind of bathing room, and described bathing room 200 includes supply and drain water system, sinks Case 430, described supply and drain water system includes soil stack, water supply riser, floor drain trap 1251 and plumbing integration module;Institute Stating plumbing integration module and include module body 110, preset pipeline, described preset pipeline is preset is integrated in described module body In 110;Described floor drain trap 1251 is located in described caisson 430, described floor drain trap 1251, soil stack and give Water standpipe is all connected with described preset pipeline.Use plumbing integration module, be integrated into prefabricated for the various pipes in building Together, in construction, it is only necessary to plumbing integration module is installed in the reserved opening (such as equipment well head) of every floor, Then carry out the standpipe between upper and lower floor to install, the most i.e. complete the installation connection work of pipeline in building, installation rate Very fast, environmental pollution is little, and site tissue accessory is few, and assembly working amount is little;It addition, pipeline or plumbing integration module are aging After, it is also possible to change very easily, it is not necessary to destroy floor.Foul smell in sewer pipe can be separated by floor drain trap 1251 Come, prevent it from entering in bathing room along pipeline.Wherein, described caisson 430 be by floor 400 is carried out drop plate process and Become.Construction connects ground leaking drainage pipe 125, floor drain 10 at the scene, it is ensured that floor drain trap 1251 is less than discharge outlet 200- 300mm, so can utilize gravity and impulsive force draining, remove dirt.Bathing room 200 can coordinate simultaneously, by its base plate Horizontal plane the gradient is set, the lower of the gradient tilts toward at the floor drain 10 of draining.
On the basis of above-described embodiment, in another embodiment of the present invention, referring to Figure 13, described preset pipeline can wrap Include drain pipe 121 and feed pipe.In figure, feed pipe is cold water feed pipe 123, or, described preset pipeline can include cold water to The sleeve pipe of water pipe and drain pipe, this plumbing integration module can utilize in low multilamellar residential architecture, because floor is low, dirty Water discharge will not cause the air compression in drain pipe, it is not necessary to arranges breather etc..Described preset pipeline can also include floor drain Drain pipe 125.By default drain pipe 121 and cold water feed pipe 123, can be by water supply and sewerage pipeline 121 and cold water feed pipe 123 After being integrated together, the beneficially I&M of pipeline, and improve Pipe installing efficiency and simplify work progress.Or it is logical Cross sleeve pipe and the drain pipe presetting cold water feed pipe, cold water feed pipe can be installed in the sleeve pipe of cold water feed pipe, and and Drain pipe is integrated together, beneficially the I&M of pipeline.Can certainly by the sleeve pipe of default cold water feed pipe and Drain bushing, is respectively arranged in cold water feed pipe and drain pipe in sleeve pipe and the drain bushing of cold water feed pipe, thus Water supply and sewerage pipeline and cold water feed pipe can also be integrated together, improve the convenience of Pipe installing and maintenance, simplify and execute Work process.
On the basis of above-described embodiment, in another embodiment of the present invention, referring to Fig. 1 and Fig. 2, described preset pipeline is also Breather 124 and/or hot-water line 122 can be included;Or, described preset pipeline can also include hot-water line sleeve pipe and/or Breather, breather 124 is connected with drain pipe 121 pipeline between floors, specifically, described breather 124 and draining Pipe 121 forms H type pipe, the row of the air in drain pipe 121 can be avoided not go out and have pressure in causing pipeline, affect sewage Discharge.More pipeline is integrated together, is more beneficial for the I&M of pipeline;It addition, install breather more meet height The requirement of layer building, it is ensured that the patency of drain pipe draining, reduces the possibility of drain pipe plugging;Hot-water line or the sleeve pipe of hot-water line Installation, be more suitable for Hotel Buildings, it is simple to centralizedly supply hot water.
On the basis of above-described embodiment, in another embodiment of the present invention, refer to Figure 11, described drain pipe 121 top Or bottom can also connect and has diameter changing device 1211.Described diameter changing device 1211 is preferably provided at described plumbing integration module Top side, naturally it is also possible to be arranged on the bottom side of described plumbing integration module.After diameter changing device 1211 is set, facilitate upper and lower floor Between the docking of standpipe and the preset pipeline in plumbing integration module;It addition, be such as provided that big opening reducer pipe, then may be used To form high flow rate pass in plumbing integration module so that spot is not easy in plumbing integration module deposition blocking, And little opening reducer pipe is set, then multiple entrance can be set in plumbing integration module, facilitate multiple positions hydrops to enter In same sewer pipe.
On the basis of above-described embodiment, in another embodiment of the present invention, refer to Figure 11, described diameter changing device 1211 Top or bottom can also connect pipeline eccentric 1212.Described pipeline eccentric 1212 is preferably provided at described discharge The top side of water integration module, naturally it is also possible to be arranged on the bottom side of described plumbing integration module.Top when diameter changing device 1211 When portion or bottom connection have pipeline eccentric 1212, upper and lower pipeline installation question the most on the same axis can be solved, only Need to adjust eccentric and get final product smooth and easy docking, reduce Pipe installing difficulty.
On the basis of above-described embodiment, in another embodiment of the present invention, refer to Figure 12, on described drain pipe 121 also Expansion ring 1214 can be provided with.Existing drain pipe is all pvc pipe, and pvc pipe can produce micro-strain under variations in temperature, right For skyscraper, small deformation, after the accumulation of multilamellar, will form bigger deflection, the most very likely Make the destruction of twin conduit, by arranging expansion ring 1214 on drain pipe 121, just can eliminate the deformation of interlayer, prevent deformation Cumulative;It addition, when carrying out soil stack and docking with the preset pipeline in plumbing integration module, due to construction or processing by mistake Difference, causes the length of standpipe to have deviation, and after arranging expansion ring 1214, the deviation of riser length can be made up by expansion ring, makes The installation effectiveness obtaining pipeline improves.
On the basis of above-described embodiment, in another embodiment of the present invention, referring to Figure 11, described drain pipe 121 also may be used To include the first horizontal tube connector 1213, described first horizontal tube connector 1213 connects the dewatering horizontal tube of toilet and/or wash basin.The After one horizontal tube connector connects the dewatering horizontal tube of toilet and/or wash basin, the sewage that can produce during being used imports discharge In drainage pipeline in water integration module.
On the basis of above-described embodiment, in another embodiment of the present invention, referring to Figure 11, described drain pipe 121 also may be used To include the second horizontal tube connector 1254, the connection end of described second horizontal tube connector 1254 is arranged on described plumbing integration module Outward, or described second horizontal tube connector 1254 is by connecting tube and one end phase of the floor drain trap 1251 being arranged in caisson Even, the other end of described floor drain trap 1251 is connected with described ground leaking drainage pipe 125.Specifically, described ground leaking drainage pipe 125 can be connected with described floor drain trap 1251 by 90 degree of elbows 1253, and floor drain trap 1251 is again by 45 degree Elbow 1252 is connected with described second horizontal tube connector 1254.So, by the second horizontal tube connector 1254 and floor drain trap 1251 One end be connected, after the other end of floor drain trap 1251 is connected with the drain pipe 125 of described floor drain, integral bathroom ground The surface area water in face can be entered in drain pipe 121 by floor drain.
On the basis of above-described embodiment, in another embodiment of the present invention, referring to Fig. 1, described module body 110 includes At least one sidewall, sidewall encloses composition tubular framework, and described preset pipeline is arranged in described tubular framework, described present tube It is provided with packing material 130 between road and described tubular framework.It should be noted that above-mentioned " tubular " is not constituted plumbing The restriction of integration module shape, the cross section of described tubular framework can be the structures such as polygon (as shown in Figure 1) or circle Shape.Described preset pipeline is fixed in described module body 110, and described packing material 130 is preferably refractory material.We In case, plumbing integration module is integrated together and is arranged on same tubular framework by prefabricated for the various pipes in building In, between pipeline and framework, fill and present packing material the most again, material is thus formed a prefabricated integral module, so, In construction, it is only necessary to plumbing integration module is installed in the reserved opening (such as equipment well head) of every floor, then enters Standpipe between the upper and lower floor of row is installed, and the most i.e. completes the installation connection work of pipeline in building, and packing material can also rise To closing reserved opening, sound insulation, fireproof effect;For traditional upper and lower pipeline of floor is laid, because plumbing is integrated Module itself has been filled with sealing, and reserved opening need not cast-in-place closure, i.e. need not on-the-spot formwork, cast-in-place concrete, form removal And maintenance, directly plumbing integration module being fixed on reserved opening, and installation rate is very fast, environmental pollution is little, Site tissue accessory is few, and assembly working amount is little;It addition, pipeline or plumbing integration module aging after, it is also possible to very easily Change, it is not necessary to destroy floor.
On the basis of above-described embodiment, in another embodiment of the present invention, referring to Fig. 2, described module body is coagulation Soil or the sizing fixing device of cement production systD, described preset pipe built-in is in described module body.So, use concrete or Cement, as the making material of plumbing integration module body, advantageously reduces the material cost of plumbing integration module, and because of Concrete or cement are mouldable shaped material, are conducive to the production and processing of special-shaped plumbing integration module, additionally, because of plumbing Integration module is concrete or cement material, and material own with floor is consistent, and therefore the two is processed into more easily by filleting For entirety.
On the basis of above-described embodiment, in another embodiment of the present invention, referring to Figure 20, described module body is by mutually The framework of the hack lever composition connecting into entirety is constituted, and described hack lever includes cross bar 1101, vertical pole 1102 and vertical rod 1103, described frame Bar is interconnected to form three-dimensional frame structure.Spelled by the various combination of some cross bars 1101, vertical pole 1102 and vertical rod 1103 Dress, can assemble the module body of the three-dimensional frame structure of different size and shape as required.Described preset pipeline is pre- It is embedded in described module body 110, between described preset pipeline and described framework, is cast with concrete or cement slurry.In employing Scheme of stating, can be first integral by being connected with each other by hack lever to make plumbing integration module, more preset pipeline is arranged on hack lever In framework, poured closely knit closure with concrete or cement mortar the most again;Additionally the hole side at floor preformed hole sets After putting fast-easy closing-up net, it is possible to floor and plumbing integration module are combined into entirety, prevent its seepage further.
On the basis of above-described embodiment, in another embodiment of the present invention, referring to Figure 21, described module body is hollow Body structure, described preset pipeline is fixed in described module body 110 by bolt, the collar, bearing or welding manner.Module Body is hollow box body structure, and preset pipeline is fixed in described module body by bolt, the collar, bearing or welding manner Time, before plumbing integration module installs and begins to use, carry out test in tubing upper and lower to floor and confirm not ooze After the situation of leakage, then hollow box body is filled full heat preserving and insulating material or the foam concrete of lightweight, and preset pipeline passes through Bolt, the collar, bearing or welding manner are fixed in described module body, then can effectively prevent preset pipeline pour mixed Being moved during solidifying soil or cement mortar, beneficially construction is accurately positioned.
On the basis of above-described embodiment, in another embodiment of the present invention, described module body cast by metal material or It is welded into body structure, between described preset pipeline and described module body, is provided with packing material, when module body is by metal Cast or when being welded into body structure, the production technology of plumbing integration module is simple, uses die casting or welding , be conducive to high-volume low-cost production, meanwhile, between preset pipeline and described module body, be provided with packing material, Then preset pipeline can be fixed on design attitude, prevent it from loosening skew.
On the basis of above-described embodiment, in another embodiment of the present invention, refer to Fig. 1, Fig. 2, Fig. 5 to Figure 10, in institute State and connection fixing device in module body, can be provided with, in plumbing integration module installation process, only need to be fixing by connecting Device is overlapped on the periphery of reserved opening, is maybe joined with bolts at reserved opening by connection fixing device, significantly Degree improves efficiency of construction, of course for waterproof or fix further, it is also possible to will connect building at fixing device and reserved opening The gap of the connecting portion of plate carries out filleting or cast-in-place.Concrete, described connection fixing device can be to be arranged on described cylinder The annular toss 111 (as illustrated in fig. 1 and 2) of shape framework top and/or sidepiece, 40-can be outwards chosen in the toss 111 of described annular 50mm;Or, described connection fixing device can also be arranged on described tubular framework outer wall outer convex module 114 (as Fig. 5, Shown in Fig. 7, Fig. 8 and Figure 10), outer convex module 114 can be the edge projection being arranged on described tubular framework outer wall lower edges 112, it is also possible to be provided in the middle projection in the middle part of described tubular framework outer wall;Or, described connection fixing device can also For being arranged on the concave inward structure 113 (as shown in Fig. 6 and Fig. 9) of described tubular framework outer wall, described outer convex module or concave inward structure Size and number can set as required.So, when connect fixing device for be arranged on described module body top and/or During the annular toss of sidepiece, beneficially plumbing integration module is connected fixing with slab surfaces, further under annular toss Portion can arrange rubbery toroidal ring, can thoroughly be sealed with reserved opening by plumbing integration module, can prevent bathing room from oozing Water is to next layer;When connecting fixing device and being outer convex module or the concave inward structure being arranged on described module body outer wall, phase Ying Di, the reserving hole relevant position on floor is set to inside recess or outer projection, after plumbing integration module is installed, mould Inside recess that the outer convex module of block body outer wall or concave inward structure are arranged with the reserving hole relevant position on floor or outer Projection matches, thus with floor tenon set, plumbing integration module can be connected location, improves holding of plumbing integration module Power ability so that pipeline also will not occur to shift destruction up and down under the load of the long-pending full water of blocking.Use this plumbing collection simultaneously Become module can greatly reduce the workload that field pipes is installed.Further, since plumbing integration module itself is the most sealed, floor On preformed hole hole be also not required to, in cast-in-place closure, decrease the operations such as formwork, casting concrete, form removal and maintenance.
On the basis of above-described embodiment, in another embodiment of the present invention, described floor is provided with and described outer punch The interior female die block of Block-matching;Or it is provided with the outer male structure mated with described concave inward structure, described plumbing on described floor Integration module is by the coupling of described outer convex module and the coupling of interior female die block or concave inward structure and outer male structure and described floor Fixing connection.After plumbing integration module is installed, outer convex module matches with interior female die block, thus can be by plumbing integration module It is connected location with floor tenon set, improves the load ability of plumbing integration module so that pipeline is at the load of the long-pending full water of blocking Under also will not occur to shift destruction up and down.
On the basis of above-described embodiment, in another embodiment of the present invention, refer to Fig. 3 and Fig. 4, in described module body Being also provided with water stopping trough 1211 on outer wall, described water stopping trough 1211 can be along the cannelure around module body outer wall, How many sizes of water stopping trough can set according to the water yield.Module body outer wall at draining integration module is provided with water stopping trough After, the bathing room reserved opening down seepage that in use produced hydrops will not be installed from plumbing integration module.
On the basis of above-described embodiment, in another embodiment of the present invention, refer to Fig. 3 and Fig. 4, described water stopping trough 1211 Choose outside upper notch.Module body outer wall at draining integration module is provided with water stopping trough 1211, and after choosing outside notch on water stopping trough, The bathing room reserved opening down seepage that in use produced hydrops will not be installed from plumbing integration module, because of sealing Choose outside notch on groove and infiltration can be collected, prevent it from penetrating into next floor.
On the basis of above-described embodiment, in another embodiment of the present invention, refer to Fig. 3 and Fig. 4, in described module body Being also provided with collector pipe 1212, described collector pipe 1212 one end connection water stopping trough 1211, the other end connects preset pipeline.This The hydrops that sample water stopping trough 1211 collects can enter in sewer pipe by collector pipe 1212, prevents it long-pending full excessive, thoroughly solves Determine bathing room hydrops problem.
On the basis of above-described embodiment, in another embodiment of the present invention, described module body outer wall can be matte or Spiral lines.When module body outer wall is matte or spiral lines, and described plumbing integration module is installed in floor reserved opening After, then during with waterproof bonding material filletings such as cement mortars, matte or spiral lines can make plumbing integration module and bonding material Material is combined closely, and is difficult to infiltration and improves the frictional force between plumbing integration module and floor.
On the basis of above-described embodiment, in another embodiment of the present invention, described packing material 130 can be foam coagulation The fire proofing materials such as soil, expanded perlite concrete or haydite concrete.If there is blocking in shown plumbing integration module, can Shown packing material 130 is excavated, dredges, change preset pipeline, therefore overhaul without excavating the base plate between whole bathroom. Use foam concrete, expanded perlite concrete or haydite concrete as packing material so that plumbing integration module From heavy and light, it is easy to carry and install, meanwhile, also help chisel packing material to its interior conduit maintenance change.It addition, when using The when of foam concrete, not only can play interlayer fireproof effect, moreover it is possible to play the good sound insulation of the strike note to current Effect.
On the basis of above-described embodiment, in another embodiment of the present invention, refer to Figure 12, (special on described preset pipeline It is not on drain pipe 121 and breather 124) fire trapping ring 1215 or fireprotection layer are installed.Preset pipeline is provided with fire trapping ring 1215 or fireprotection layer after, when bathing room meet with fire time, fire trapping ring or fireprotection layer can block burning things which may cause a fire disaster and spread up and down.
On the basis of above-described embodiment, in another embodiment of the present invention, described module body is additionally provided with top cover.At mould When block body is provided with top cover, top cover and module body junction arrange rubber seal, simultaneously at top cover and pipeline connection After being also provided with rubber seal, it is possible to prevent bathing room excess surface water by plumbing integration module toward next layer of infiltration.
On the basis of above-described embodiment, in another embodiment of the present invention, the sidewall of described module body is provided with rib Or reinforcement.After the sidewall of module body is provided with rib or reinforcement, the wall thickness of module body can reduce further, with Time, the rigidity of module body itself is higher so that it is in application process will not deformed damaged, particularly at rib or reinforcement After crisscross formation grid, shock resistance damage capability and the weight capacity of module body is greatly improved.
On the basis of above-described embodiment, in another embodiment of the present invention, described module body and preset pipeline integrated injection Molded.When module body and preset pipeline integral molded plastic molding, between module body and preset pipeline, there is no gap, and And, the production technology efficiency using integral molded plastic molding is high, and steady quality is reliable, and production cost is relatively low, is conducive to big rule Mould popularization and application.
On the basis of above-described embodiment, in another embodiment of the present invention, described module body and preset pipeline use 3D Printing integrated molding.When module body and preset pipeline planform are complicated, during production and construction and installation extremely inconvenience, use 3D Manufacturing of printing integrated molding, beneficially plumbing integration module.
On the basis of above-described embodiment, in another embodiment of the present invention, refer to Figure 15, described preset pipeline also may be used To be provided with leakproof deodorization apparatus, described leakproof deodorization apparatus can be the drainage tube that the sidewall with drain pipe 121 is connected 141, described drainage tube 141 can be U-tube or drainage tube 141 bottom is provided with U-shaped structure or arcuate structure, described drain pipe Being provided with seepage mouth 142 on the sidewall of 121, the first end of drainage tube 141 is connected with described seepage mouth 142, described drainage tube Second end is water inlet 143, and water inlet 143 is arranged on bathing room ground or metope, typically lower than bathing room ground.Perpendicular The position of the most described water inlet of Nogata 143 is higher than the position of described seepage mouth 142.So bottom bathing room during hydrops, can With in time by drainage tube draining, owing to the lower end that drainage tube is U-tube or drainage tube is U-shaped structure, when hydrops is from drain After the water inlet 143 of pipe flows into drainage tube 141, the lower end of drainage tube 141 formed water seal, when the water in drainage tube 141 gradually Increasing, when water level exceedes the seepage mouth 142 of drain pipe 121, hydrops is i.e. drained into drain pipe from the seepage mouth 142 of drain pipe 121 In 121, it is thus possible in time the hydrops outside drain pipe 121 is discharged in time.Certain described leakproof deodorization apparatus can also be arranged In the outside of other preset pipelines, again repeat no more.
On the basis of above-described embodiment, in another embodiment of the present invention, refer to Figure 16, in described drainage tube 141 also Being provided with waterstop port 144, stopping means 145 and ball float 146, the diameter of described waterstop port 144 is less than the hole of described drainage tube 141 Footpath, described stopping means 145 is arranged on the lower section of described waterstop port 144, and described ball float 146 is arranged on described stopping means 145 With between waterstop port 144, the diameter of described ball float 146 is more than the diameter of described waterstop port 144 and less than described drainage tube 141 Aperture.In drainage tube 141, it is provided with ball float 146, when drain pipe 121 occurs blocking or spilling water, is back to from drain pipe 121 Water in drainage tube 141 can make ball float 146 float, and when ball float 146 floats to waterstop port 144, ball float 146 is under buoyancy Block waterstop port 144, thus prevent water to be back to bathing room by drainage tube 141 from drain pipe 121.Described waterstop port 144, The collar in drainage tube 141 pipe or chuck can be provided in.Described ball float 146 also differ be set to spherical, as long as with described only Mouth of a river form fit, can form hermetic seal under buoyancy at waterstop port.
On the basis of above-described embodiment, in another embodiment of the present invention, described stopping means 145 can be filter screen or limit Position bar or spacing block set.When not having water to be back to drainage tube 141 from drain pipe 121, stopping means 145 is to ball float 146 Support, position-limiting action, prevent from, when hydrops flows into drainage tube 141 from the water inlet of drainage tube 141, driving ball float 146 to drain pipe Move and block the seepage mouth 142 of drain pipe 121 in seepage mouth 142 direction of 121.It is furthermore preferred that refer to Figure 17 and Figure 18, Described drainage tube 141 inwall can arrange bootstrap block 1411 or guide bar 1412, and described guiding bar 1412 can arrange 3 or 3 More than individual, so can limit the motion path of ball float 146, prevent ball float 146 beat in described drainage tube 141.
On the basis of above-described embodiment, in another embodiment of the present invention, described drain pipe 121 and described drainage tube 141 Integral molded plastic molding.When drain pipe 121 and described drainage tube 141 integral molded plastic molding, drain pipe 121 is whole with drainage tube 141 There is no gap between body, can with one-shot forming, and, the production technology efficiency using integral molded plastic molding is high, and steady quality can Leaning on, production cost is relatively low, beneficially large-scale promotion application.
On the basis of above-described embodiment, in another embodiment of the present invention, described drain pipe 121 and described drainage tube 141 Removably connect.When drain pipe 121 and described drainage tube 141 removably connect, drain pipe 121 and drainage tube 141 side of separating Just, it is simple to keep in repair and change, thus reduce cost.
On the basis of above-described embodiment, in another embodiment of the present invention, refer to Figure 19, described preset pipeline also may be used To be provided with leakproof deodorization apparatus, described leakproof deodorization apparatus is the deodorant case 147 being arranged on outside described drain pipe 121 sidewall, It is provided with isolation tongue 148 in described deodorant case 147, described drain pipe 121 sidewall is provided with seepage mouth 142, at vertical direction Tongue 1481 position of upper described isolation tongue is less than the position of described seepage mouth 142.The both sides of isolation tongue 148 and described deodorant case 147 are tightly connected.Deodorant case 147 is set outside drain pipe 121 sidewall, so bottom bathroom during hydrops, can pass through in time Deodorant case 147 draining, owing to being provided with isolation tongue 148 in described deodorant case 147, described drain pipe 121 sidewall is provided with and oozes The mouth of a river 142, isolates the position less than described seepage mouth 142, tongue 1481 position of tongue described in the vertical direction, when hydrops from After the water inlet of deodorant case 147 flows into deodorant case 147, formed between the isolation tongue 148 and drain pipe 121 sidewall of deodorant case 147 Water seal, when the water in deodorant case 147 gradually increases, and water level exceedes the seepage mouth 142 of drain pipe 121, hydrops is i.e. from drain pipe The seepage mouth 142 of 121 is drained in drain pipe 121, it is thus possible to discharged in time by the hydrops outside drain pipe 121 in time.
On the basis of above-described embodiment, in another embodiment of the present invention, described isolation tongue 148 and described drain pipe 121 Removably connect;Or described isolation tongue 148 and described drain pipe 121 integral molded plastic molding.When drain pipe 121 and described isolation tongue During 148 integral molded plastic molding, can with one-shot forming, and, the production technology efficiency using integral molded plastic molding is high, steady quality Reliably, production cost is relatively low, beneficially large-scale promotion application.When drain pipe 121 and described isolation tongue 148 detachably connect When connecing, it is convenient that drain pipe 121 and isolation tongue 148 separate, it is simple to keeps in repair and changes, thus reduces cost.And can be with separate machined With die sinking, reduce difficulty of processing.
On the basis of above-described embodiment, in another embodiment of the present invention, described deodorant case 147 and described drain pipe 121 Removably connect;Or described deodorant case 147 and described drain pipe 121 integral molded plastic molding.When drain pipe 121 and described deodorant case During 147 integral molded plastic molding, can with one-shot forming, and, the production technology efficiency using integral molded plastic molding is high, steady quality Reliably, production cost is relatively low, beneficially large-scale promotion application.When drain pipe 121 and described deodorant case 147 detachably connect When connecing, it is convenient that drain pipe 121 and isolation tongue 148 separate, it is simple to keeps in repair and changes, thus reduces cost.And can be with separate machined With die sinking, reduce difficulty of processing.
On the basis of above-described embodiment, in another embodiment of the present invention, for the module body of tubular cabinet structure 110, it is also possible in the lower end of module body 110, bottom surface is set, bottom surface has the reserved opening passed for preset pipeline, this Sample, due to the reserved opening screens to preset pipeline, can play the effect of pre-determined bit to preset pipeline, and, fill in filling The when of material, eliminating the operation of lower surface formwork in module body 110, not only saved processing technology, bottom surface can also Packing material is played certain supporting role.
On the basis of above-described embodiment, in another embodiment of the present invention, described supply and drain water system is additionally provided with drain pipe Road anti-block apparatus.So can solve the problem that drain pipe occurs blocking.
On the basis of above-described embodiment, in another embodiment of the present invention, described discharge pipe line anti-block apparatus is drainage screen Or screen plate, described drainage screen or screen plate are arranged on the porch of discharge pipe line.By arranging in the porch of discharge pipe line Drainage screen or screen plate, can effectively intercept the larger object in drain pipe, thus prevent drain pipe blockage phenomenon.
On the basis of above-described embodiment, in another embodiment of the present invention, described discharge pipe line anti-block apparatus is water under high pressure Pump or high-pressure pump, described high-pressure hydraulic pump or high pressure gas delivery side of pump access in discharge pipe line.Height it is provided with in discharge pipe line Water pump or high-pressure pump, when discharge pipe line occurs blocking, can start described high-pressure hydraulic pump or high-pressure pump, pass through high pressure Current or air-flow carry out the tamper in flush discharge pipe, thus solve the blockage problem of drain pipe.
On the basis of above-described embodiment, in another embodiment of the present invention, described discharge pipe line anti-block apparatus is for pulverizing dress Putting or agitating device, described reducing mechanism or agitating device are arranged on discharge pipe line.Discharge pipe line is installed reducing mechanism Or agitating device, when discharge pipe line occurs blocking, described reducing mechanism or agitating device can be started, by reducing mechanism or The object being blocked in drain pipe smashed by agitating device, is then discharged by drain pipe, thus the blocking solving drain pipe is asked Topic.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For Yuan, under the premise without departing from the principles of the invention, it is also possible to make some improvements and modifications, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (23)

1. a bathing room, it is characterised in that
Described bathing room includes that supply and drain water system, caisson, described supply and drain water system include that soil stack, water supply riser, floor drain are deposited Water elbow and plumbing integration module;
Described plumbing integration module includes module body, preset pipeline, and described preset pipeline is preset is integrated in described module originally In body;
Described floor drain trap is located in described caisson, and described floor drain trap, soil stack and water supply riser are all and institute State preset pipeline to be connected;
Being additionally provided with leakproof deodorization apparatus on described preset pipeline, described leakproof deodorization apparatus is and the sidewall of described preset pipeline The drainage tube being connected, described drainage tube is U-tube, and the sidewall of described preset pipeline is provided with seepage mouth, described drainage tube The first end be connected with described seepage mouth, the second end of described drainage tube is water inlet, water inlet described in the vertical direction Position is higher than the position of described seepage mouth.
A kind of bathing room the most according to claim 1, it is characterised in that described preset pipeline includes drain pipe and feedwater Pipe, described drain pipe and feed pipe are respectively connected with soil stack and water supply riser respectively;Or, including feed pipe sleeve pipe and Drain pipe, water supply riser is arranged in described sleeve pipe, and described drain pipe is connected with soil stack.
A kind of bathing room the most according to claim 2, it is characterised in that described preset pipeline also include hot-water line and/or The breather being connected with described soil stack;Or, described preset pipeline also include the sleeve pipe for arranging hot-water line and/or The breather being connected with described soil stack.
A kind of bathing room the most according to claim 3, it is characterised in that described drain pipe and/or the top of breather or Bottom is also associated with diameter changing device.
A kind of bathing room the most according to claim 4, it is characterised in that the top of described diameter changing device or bottom connect to be had Pipeline eccentric.
A kind of bathing room the most according to claim 2, it is characterised in that be provided with expansion ring on described drain pipe.
A kind of bathing room the most according to claim 2, it is characterised in that described drain pipe includes the first horizontal tube connector, Described first horizontal tube connector connects toilet and/or the dewatering horizontal tube of wash basin.
A kind of bathing room the most according to claim 7, it is characterised in that described drain pipe also includes the second transverse tube and connects Head, described second horizontal tube connector is connected with floor drain trap.
9. according to a kind of bathing room described in any one of claim 1 to 8, it is characterised in that described module body include to A few sidewall, sidewall encloses composition tubular framework, and preset pipeline is arranged in tubular framework, preset pipeline and tubular framework it Between be provided with packing material.
A kind of bathing room the most according to claim 9, it is characterised in that described tubular framework is additionally provided with top cover or the end Lid.
11. a kind of bathing rooms according to claim 9, it is characterised in that the sidewall of described tubular framework is provided with rib Or reinforcement.
12. a kind of bathing rooms according to claim 9, it is characterised in that described module body and preset pipeline integrated injection Molded, or use 3D printing shaping.
13. a kind of bathing rooms according to claim 9, it is characterised in that be provided with connection in described module body solid Determining device, described connection fixing device is to be arranged on the annular toss of described tubular framework top and/or sidepiece;Or, described Connecting fixing device is to be arranged on the outer convex module of described tubular framework outer wall;Or, described connection fixing device is for being arranged on The concave inward structure of described tubular framework outer wall.
14. a kind of bathing rooms according to claim 9, it is characterised in that described sidewall material is steel or organic material Material.
15. a kind of bathing rooms according to claim 9, it is characterised in that described packing material is foam concrete, expansion Pearlite concrete or haydite concrete.
16. according to a kind of bathing room described in any one of claim 1 to 8, it is characterised in that described module body is concrete Or the sizing fixing device of cement production systD, described preset pipe built-in is in described module body.
17. according to a kind of bathing room described in any one of claim 1 to 8, it is characterised in that described module body is by interconnecting mutually Be connected into entirety hack lever composition framework constitute, described preset pipe built-in in described module body, described preset pipeline with Concrete and/or cement fixture it is provided with between described framework.
18. according to a kind of bathing room described in any one of claim 1 to 8, it is characterised in that described module body is hollow box Body structure, described preset pipeline is fixed in described module body by bolt, the collar, bearing or welding manner.
19. according to a kind of bathing room described in any one of claim 1 to 8, it is characterised in that described module body is by metal material Material casts or is welded into body structure, is provided with packing material between described preset pipeline and described module body.
20. according to a kind of bathing room described in any claim in claim 1 to 8, it is characterised in that described discharge water system System is additionally provided with discharge pipe line anti-block apparatus.
21. a kind of bathing rooms according to claim 20, it is characterised in that described discharge pipe line anti-block apparatus is drainage screen Or screen plate, described drainage screen or screen plate are arranged on the porch of discharge pipe line.
22. a kind of bathing rooms according to claim 20, it is characterised in that described discharge pipe line anti-block apparatus is water under high pressure Pump or high-pressure pump, described high-pressure hydraulic pump or high pressure gas delivery side of pump access in discharge pipe line.
23. a kind of bathing rooms according to claim 20, it is characterised in that described discharge pipe line anti-block apparatus is for pulverizing dress Putting or agitating device, described reducing mechanism or agitating device are arranged on discharge pipe line.
CN201510148962.6A 2015-03-31 2015-03-31 A kind of bathing room Active CN104727391B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510148962.6A CN104727391B (en) 2015-03-31 2015-03-31 A kind of bathing room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510148962.6A CN104727391B (en) 2015-03-31 2015-03-31 A kind of bathing room

Publications (2)

Publication Number Publication Date
CN104727391A CN104727391A (en) 2015-06-24
CN104727391B true CN104727391B (en) 2016-11-30

Family

ID=53451749

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510148962.6A Active CN104727391B (en) 2015-03-31 2015-03-31 A kind of bathing room

Country Status (1)

Country Link
CN (1) CN104727391B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208744A (en) * 2018-11-13 2019-01-15 浙江老铁匠实业有限公司 Drainage arrangement for toilet

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008095355A (en) * 2006-10-11 2008-04-24 Inax Corp Soil conveying system
CN201050093Y (en) * 2007-06-08 2008-04-23 王凤蕊 Kitchen-toilet modularization same floor side water draining device
CN201074349Y (en) * 2007-06-08 2008-06-18 王凤蕊 Kitchen-toilet modularization same floor water feeding and draining device
JP2010057300A (en) * 2008-08-29 2010-03-11 Nippon Densan Corp Motor and fan
KR101293641B1 (en) * 2012-05-02 2013-08-13 김회민 Popup valve module
CN204001084U (en) * 2014-06-26 2014-12-10 北京中建圣大环境科技发展有限公司 A kind of Homofloor drainage system
CN204552161U (en) * 2015-03-31 2015-08-12 中民筑友有限公司 A kind of bathing room

Also Published As

Publication number Publication date
CN104727391A (en) 2015-06-24

Similar Documents

Publication Publication Date Title
CN204491758U (en) A kind of drainage system of bathing room and bathing room
CN104727391B (en) A kind of bathing room
CN204645162U (en) A kind of installation node of plumbing integration module
CN204510742U (en) A kind of plumbing integration module, supply and drain water system and bathing room
CN104746589B (en) A kind of installation node of plumbing integration module
CN104763023B (en) A kind of supply and drain water system of plumbing integration module and building
CN204552161U (en) A kind of bathing room
CN104727529A (en) Water supply and drainage integration module, water supply and drainage system and bathroom
CN204626539U (en) The supply and drain water system of a kind of plumbing integration module and building
CN204627036U (en) A kind of bathing room
CN204492255U (en) A kind of bathing room
CN104727584A (en) Bathroom
CN104746592A (en) Water supply and drainage integration module and water supply and drainage system for buildings
CN204626537U (en) The supply and drain water system of a kind of plumbing integration module and building
CN204510901U (en) A kind of bathing room
CN204491738U (en) The supply and drain water system of a kind of plumbing integration module and building
CN204645171U (en) The supply and drain water system of a kind of plumbing integration module and building
CN204626541U (en) The supply and drain water system of a kind of plumbing integration module and building
CN204510903U (en) A kind of bathing room
CN104727530B (en) A kind of supply and drain water system of plumbing integration module and building
CN204626543U (en) A kind of bathing room
CN104727396A (en) Bathroom
CN204510900U (en) A kind of bathing room
CN204626545U (en) A kind of bathing room
CN204510910U (en) A kind of bathing room

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170524

Address after: 410205 Hunan province Changsha Kaifu District Jinxia Economic Development Zone, Road No. 9

Patentee after: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD.

Address before: 410205 Hunan province Changsha Kaifu District, No. 30 Xingang Road, Changsha Jinxia bonded logistics summary new building room 3005

Patentee before: Zhong Minzhuyou Co., Ltd

EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20150624

Assignee: China Civil Architecture Friends Technology (Jiaozhou) Co., Ltd.

Assignor: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD.

Contract record no.: 2018430000023

Denomination of invention: Bathroom

Granted publication date: 20161130

License type: Common License

Record date: 20190102

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20150624

Assignee: Nanning Zhongmin zhuyou Intelligent Manufacturing Technology Co., Ltd

Assignor: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD.

Contract record no.: X2019430000004

Denomination of invention: Bathroom

Granted publication date: 20161130

License type: Common License

Record date: 20191105

EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20150624

Assignee: Xiangxi Zhongmin zhuyou Technology Co., Ltd

Assignor: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD.

Contract record no.: X2020430000002

Denomination of invention: Bathroom

Granted publication date: 20161130

License type: Common License

Record date: 20200305

EE01 Entry into force of recordation of patent licensing contract
CP03 Change of name, title or address

Address after: 5 / F, office building 2, Zhongmin zhuyou Co., Ltd., No. 10, Zhongshi Road, shaping street, Kaifu District, Changsha City, Hunan Province, 410000

Patentee after: Zhuyou Zhizao Technology Investment Co., Ltd

Address before: 410205 Hunan province Changsha Kaifu District Jinxia Economic Development Zone, Road No. 9

Patentee before: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT Ltd.

CP03 Change of name, title or address
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20150624

Assignee: Nantong Zhongmin zhuyou Zhizao Technology Co., Ltd

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2020980007488

Denomination of invention: A bathroom

Granted publication date: 20161130

License type: Common License

Record date: 20201105

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20150624

Assignee: Hunan Yuanfeng Construction Engineering Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980000884

Denomination of invention: A bathroom

Granted publication date: 20161130

License type: Common License

Record date: 20210203

EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20150624

Assignee: Hunan Hailong Construction Engineering Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980001039

Denomination of invention: A bathroom

Granted publication date: 20161130

License type: Common License

Record date: 20210207

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20150624

Assignee: Henan YingYuan Construction Service Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980001160

Denomination of invention: A bathroom

Granted publication date: 20161130

License type: Common License

Record date: 20210218

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20150624

Assignee: Henan guochi Construction Service Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980001282

Denomination of invention: A bathroom

Granted publication date: 20161130

License type: Common License

Record date: 20210225

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20150624

Assignee: Linzhou Hongen Construction Service Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980001340

Denomination of invention: A bathroom

Granted publication date: 20161130

License type: Common License

Record date: 20210302

EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20150624

Assignee: Henan fengque Construction Engineering Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980010621

Denomination of invention: A bathroom

Granted publication date: 20161130

License type: Common License

Record date: 20211019

EE01 Entry into force of recordation of patent licensing contract