CN204510742U - A kind of plumbing integration module, supply and drain water system and bathing room - Google Patents

A kind of plumbing integration module, supply and drain water system and bathing room Download PDF

Info

Publication number
CN204510742U
CN204510742U CN201520191304.0U CN201520191304U CN204510742U CN 204510742 U CN204510742 U CN 204510742U CN 201520191304 U CN201520191304 U CN 201520191304U CN 204510742 U CN204510742 U CN 204510742U
Authority
CN
China
Prior art keywords
plumbing integration
module body
pipeline
preset pipeline
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520191304.0U
Other languages
Chinese (zh)
Inventor
彭海辉
陈定球
谢俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Minsheng Zhuyou Co Ltd
Original Assignee
China Minsheng Zhuyou Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Minsheng Zhuyou Co Ltd filed Critical China Minsheng Zhuyou Co Ltd
Priority to CN201520191304.0U priority Critical patent/CN204510742U/en
Application granted granted Critical
Publication of CN204510742U publication Critical patent/CN204510742U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of plumbing integration module that the utility model provides comprises module body and preset pipeline, and described preset pipeline is preset and is fixed in described module body, described preset pipeline is provided with at least one infiltration back-flow preventer.Preset pipeline is provided with at least one infiltration back-flow preventer, effectively can discharges the ponding bottom bathing room, and when blocking occurs drainage pipe, water can be back to bathing room through floor drain from drainage pipe; In building operations, only need plumbing integration module to be installed in the reserved opening (as equipment well head) of every floor, then the standpipe carried out between upper and lower floor is installed, so namely, complete the installation connection work of vertical duct in building, for the upper and lower pipeline of traditional floor is laid, installation rate quickly.

Description

A kind of plumbing integration module, supply and drain water system and bathing room
Technical field
The utility model belongs to building field, is specially a kind of plumbing integration module, supply and drain water system and bathing room.
Background technology
The water supply and sewerage pipeline of traditional architecture takes caisson type bathing room or different layer draining, by the elbow of wash basin, toilet, floor drain and install pipeline in bathing room sinking position or lower one deck ceiling place.The complex structural designs of caisson type bathing room, backfilling working amount is large simultaneously, and back filled region load is higher than other floor plates, and waterproofing process difficulty, construction is inconvenient.Different layer draining causes the waste of lower layer space local, visually unsightly, must carry out furred ceiling process, once leak, directly will pollute lower layer space.
The mounting method of the water supply and sewerage pipeline of traditional architecture is hole needed for preserved pipeline well on floor, by each for plumbing parts, as elbow, threeway, trap, transverse tube and standpipe etc. are assembled at the scene, afterwards because sound insulation, fire prevention etc. require to need hole to close, hanging module and cast-in-situ in construction, is adopted to close.There is the problems such as site tissue accessory is many, assembly working amount is large, formwork is complicated, spillage, mould cannot be removed, sealing is poor, noise pollution, replacing difficulty.
The drainage pipe of traditional architecture because of use gradually impeded drainage, silt up, because drainage pipe access hole is at ceiling place of lower floor, maintenance needs to carry out to lower floor, and damages lower floor's decorative cover, there is problems such as polluting lower floor.
In traditional Water And Drainage System Design, pipeline mostly is PVC material, the service life of PVC, can reach 50 years in theory, but it is subject to the impact of factors, is difficult to reach life expectancy.And major structure of construction, comprise the design life at pouring concrete place behind floor, equipment raise, equipment raise hole many on 50 years.Therefore need to change aging pipeline in the use procedure of building.Form entirety together with traditional method is cast-in-place with hole by pipeline, replacing must destroy floor, and reinstatement works amount is large and need wet trade, easily generates building waste, and causes indoor pollution.
In addition, traditional water supply and sewerage pipeline takes caisson type bathing room or different layer draining, and the ponding bottom bathing room is discharged by floor drain, and general being difficult to discharges ponding in time, all sidedly.And when blocking occurs drainage pipe, water can be back to bathing room through floor drain from drainage pipe, can not meet safety and sanitary condition.
Summary of the invention
The technical problems to be solved in the utility model is: provide a kind of plumbing integration module, and it is installed and change conveniently, processing is simple, and effectively can discharge the ponding bottom bathing room, and can prevent drainage pipe water from refluxing.
Another technical problem to be solved in the utility model is: the supply and drain water system providing a kind of building, and that its plumbing integration module is installed and changed is convenient, processing is simple, and the ponding can effectively discharged bottom bathing room and can prevent drainage pipe water from refluxing.
Another technical problem to be solved in the utility model is: provide a kind of bathing room, and that its plumbing integration module is installed and changed is convenient, processing is simple, and the ponding can effectively discharged bottom bathing room and can prevent drainage pipe water from refluxing.
Solution of the present utility model is achieved in that plumbing integration module comprises module body and preset pipeline, and described preset pipeline is preset and is fixed in described module body, described preset pipeline is provided with at least one infiltration back-flow preventer.In this programme, plumbing integration module is integrated together prefabricated for the various pipes in building and be arranged in same module body, material is thus formed a prefabricated integral module, preset pipeline is provided with at least one infiltration back-flow preventer, effectively can discharge the ponding bottom bathing room, and when blocking occurs drainage pipe, water can be back to bathing room through floor drain from drainage pipe.So, in building operations, only need to be installed on by plumbing integration module in the reserved opening (as equipment well head) of every floor, the standpipe then carried out between upper and lower floor is installed, and so namely completes the installation connection work of vertical duct in building; For the upper and lower pipeline of traditional floor is laid, quickly, environment pollution is little for installation rate, and site tissue accessory is few, and assembly working amount is little; In addition, pipeline or plumbing integration module aging after, also can change very easily, do not need destroy floor.
Another technical scheme of the present utility model is on above-mentioned basis, described module body comprises at least one sidewall, sidewall encloses and forms tubular framework, and described preset pipeline is arranged in described tubular framework, is provided with packing material between described preset pipeline and described tubular framework.In this programme, plumbing integration module is integrated together prefabricated for the various pipes in building and be arranged in same tubular framework, and then fills and presents packing material between pipeline and framework.For the upper and lower pipeline of traditional floor is laid, because plumbing integration module itself is filled with a sealing, reserved opening does not need cast-in-place shutoff, namely on-the-spot formwork, cast-in-situ concrete, form removal and maintenance is not needed, directly plumbing integration module is fixed on reserved opening, and installation rate quickly.
Another technical scheme of the present utility model is on above-mentioned basis, the sizing fastening devices of described module body concrete or cement production systD, and described preset pipe built-in is in described module body.In this programme, the sizing fastening devices of module body concrete or cement production systD, described preset pipe built-in is in described module body, material is thus formed a prefabricated integral module, so, in building operations, only need plumbing integration module to be installed in the reserved opening (as equipment well head) of every floor, then the standpipe carried out between upper and lower floor is installed, and so namely complete the installation connection work of pipeline in building, installation rate quickly.
Another technical scheme of the present utility model is on above-mentioned basis, the framework that described module body is made up of the hack lever be interconnected integrally is formed, described preset pipe built-in, in described module body, is cast with concrete or cement slurry between described preset pipeline and described framework.In this programme, the framework that module body is made up of the hack lever be interconnected integrally is formed, described preset pipe built-in is in described module body, concrete or cement slurry is cast with between described preset pipeline and described framework, material is thus formed a prefabricated integral module, so, in building operations, only need plumbing integration module to be installed in the reserved opening (as equipment well head) of every floor, then the standpipe carried out between upper and lower floor is installed, so namely, complete the installation connection work of pipeline in building, installation rate quickly.
Another technical scheme of the present utility model is on above-mentioned basis, and described module body is hollow box body structure, and described preset pipeline is fixed in described module body by bolt, the collar, bearing or welding manner.In this programme, module body is hollow box body structure, described preset pipeline is fixed in described module body by bolt, the collar, bearing or welding manner, material is thus formed a prefabricated integral module, so, in building operations, only need plumbing integration module to be installed in the reserved opening (as equipment well head) of every floor, then the standpipe carried out between upper and lower floor is installed, and so namely complete the installation connection work of pipeline in building, installation rate quickly.
Another technical scheme of the present utility model is on above-mentioned basis, and described module body is cast by metal material or is welded into body structure, is provided with packing material between described preset pipeline and described module body.In this programme, module body is cast by metal material or is welded into body structure, is provided with packing material between described preset pipeline and described module body.For the upper and lower pipeline of traditional floor is laid, because plumbing integration module itself is filled with a sealing, reserved opening does not need cast-in-place shutoff, namely on-the-spot formwork, cast-in-situ concrete, form removal and maintenance is not needed, directly plumbing integration module is fixed on reserved opening, and installation rate quickly.
Another technical scheme of the present utility model is on above-mentioned basis, described infiltration back-flow preventer is the drainage tube be connected with the sidewall of described preset pipeline, waterstop port, stopping means and ball float is also provided with in described drainage tube, the diameter of described waterstop port is less than the aperture of described drainage tube, described stopping means is arranged on the below of described waterstop port, described ball float is arranged between described stopping means and waterstop port, and the diameter of described ball float is greater than the diameter of described waterstop port and is less than the aperture of described drainage tube.Ball float mechanism is provided with in drainage tube, when there is blocking or spilling water in preset pipeline, the water be back to drainage tube from preset pipeline can make ball float float, when ball float floats to waterstop port, ball float blocks waterstop port under buoyancy, thus anti-sealing is back to bathing room from preset pipeline by drainage tube.
Another technical scheme of the present utility model is on above-mentioned basis, and described stopping means is filter screen or gag lever post or spacing block set.When not having water to be back to drainage tube from preset pipeline, stopping means plays support, position-limiting action to ball float, prevent when ponding flows into drainage tube from the water inlet of drainage tube, drive ball float to block the seepage mouth of preset pipeline to the seepage mouth direction motion of preset pipeline.
Another technical scheme of the present utility model is on above-mentioned basis, described preset pipeline and described drainage tube integral molded plastic shaping.When preset pipeline and described drainage tube integral molded plastic shaping time, there is no gap between preset pipeline and drainage tube entirety, can one-shot forming, and the production technology efficiency adopting integral molded plastic shaping is high, and steady quality is reliable, cost of production is relatively low, is conducive to large-scale promotion application.
Another technical scheme of the present utility model is on above-mentioned basis, and described preset pipeline and described drainage tube removably connect.When preset pipeline and described drainage tube removably connect, preset pipeline and drainage tube separate convenient, are convenient to maintenance and change, thus reducing costs.
Another technical scheme of the present utility model is on above-mentioned basis, and described module body top is provided with and is connected and fixed device.After module body top is provided with and is connected and fixed device, in plumbing integration module installation process, only need be fixedly connected with being connected and fixed device with the periphery of reserved opening, having increased substantially efficiency of construction.
Another technical scheme of the present utility model is on above-mentioned basis, described in be connected and fixed device be the annular toss being arranged on described module body top and/or sidepiece; Or, described in be connected and fixed device be the outer convex module being arranged on described module body outer wall; Or, described in be connected and fixed device be the concave inward structure being arranged on described module body outer wall.So, when being connected and fixed device and being the annular toss being arranged on described module body top and/or sidepiece, be conducive to plumbing integration module and slab surfaces is connected and fixed, further in annular toss bottom, can rubbery toroidal ring be set, plumbing integration module and reserved opening thoroughly can be sealed, can prevent bathroom from seeping water to lower one deck, when being connected and fixed device and being outer convex module or the concave inward structure being arranged on described module body outer wall, correspondingly, reserving hole relevant position on floor is set to inside recess or outer projection, after plumbing integration module is installed, the inside recess that reserving hole relevant position on the outer convex module of module body outer wall or concave inward structure and floor is arranged or outer projection match, thus plumbing integration module and floor tenon can be overlapped to be connected and locate, improve the load ability of plumbing integration module, make pipeline also the destruction that is shifted up and down can not occur under the load of the long-pending full water of blocking.
Another technical scheme of the present utility model is on above-mentioned basis, and described module body outer wall is provided with water stopping trough.After the module body outer wall of draining integration module is provided with water stopping trough, the reserved opening down seepage that the ponding that bathroom is in use produced can not be installed from plumbing integration module.
Another technical scheme of the present utility model is, on above-mentioned basis, described water stopping trough to be chosen outside notch.The module body outer wall of draining integration module is provided with water stopping trough, and after water stopping trough is chosen outside notch, the reserved opening down seepage that the ponding that bathroom is in use produced can not be installed from plumbing integration module, infiltration can be collected because choosing outside notch on water stopping trough, preventing it from infiltrating next floor.
Another technical scheme of the present utility model is, on above-mentioned basis, to be also provided with header in described module body, and described header one end is communicated with water stopping trough, and the other end is communicated with preset pipeline.When being also provided with header in module body, described header one end is communicated with water stopping trough, and when the other end is communicated with preset pipeline, the ponding that water stopping trough collects can enter in sewer pipe by header, prevents it long-pending full excessive, thoroughly solves bathroom ponding problem.
Another technical scheme of the present utility model is on above-mentioned basis, and described module body outer wall is exasperate or spiral lines.When module body outer wall is exasperate or spiral lines, described plumbing integration module is installed to after in floor reserved opening, time again with waterproof bonding material filletings such as cement pastes, exasperate or spiral lines can make plumbing integration module and adhesives combine closely, not easily seep water and improve the frictional force between plumbing integration module and floor, improve the load ability of plumbing integration module.
Another technical scheme of the present utility model is on above-mentioned basis, and described sidewall material is metal or organic material.When sidewall material be metal or organic material time, the production technology of plumbing integration module is simple, die sinking punching press or weld, and is conducive to low-cost production in enormous quantities.
Another technical scheme of the present utility model is on above-mentioned basis, and described packing material is foam concrete, expanded perlite concrete or haydite concrete.Adopt foam concrete, expanded perlite concrete or haydite concrete as packing material, make plumbing integration module from heavy and light, be easy to carrying with install, meanwhile, also help and chisel packing material to its interior conduit maintain and replace.In addition, in time using foam concrete, not only can play the effect of interlayer fireproof, can also play the good soundproof effect of the impact sound of current.
Another technical scheme of the present utility model is on above-mentioned basis, and described preset pipeline comprises gutter and water service pipe, or described preset pipeline comprises sleeve pipe and the gutter of water service pipe.By default gutter and water service pipe, after water supply and sewerage pipeline and water service pipe can being integrated together, be conducive to the I&M of pipeline, and improve Pipe installing efficiency and simplify work progress.Or by sleeve pipe and the gutter of default water service pipe, water service pipe can be installed in the sleeve pipe of water service pipe, and be integrated together with gutter, be conducive to the I&M of pipeline.Can certainly by presetting sleeve pipe and the drain bushing of water service pipe, in the sleeve pipe that water service pipe and gutter are installed on water service pipe respectively and drain bushing, thus also water supply and sewerage pipeline and water service pipe can be integrated together, improve the convenience of Pipe installing and maintenance, simplify work progress.
Another technical scheme of the present utility model is on above-mentioned basis, is also provided with the trap be connected with bathroom floor drain in described module body.After being also provided with the trap be connected with bathroom floor drain in module body, the foul smell in sewer pipe can be separated by trap, prevents it from entering in bathing room along pipeline.Simultaneously, trap is arranged in plumbing integration module, and be connected with bathroom floor drain by pipeline, plate process can not be fallen like this to the floor below bathing room, namely bathing room can not arrange caisson, and the ponding in use procedure in bathing room is flow in the trap be arranged on plumbing integration module from bathroom floor drain by pipeline, then is drained in gutter, thus simplify building structure and work progress, improve efficiency of construction.
Another technical scheme of the present utility model is on above-mentioned basis, and described preset pipeline also comprises ventilating pipe and/or hot-water line; Or described preset pipeline also comprises sleeve pipe and/or the ventilating pipe of hot-water line.More pipeline is integrated together, is more conducive to the I&M of pipeline; In addition, the requirement that ventilating pipe more meets highrise building is installed, ensures the patency of stack draining, reduce the possibility of gutter plugging; The installation of the sleeve pipe of hot-water line or hot-water line, is more suitable for Hotel Buildings, is convenient to centralizedly supply hot water.
Another technical scheme of the present utility model is on above-mentioned basis, and described gutter top or bottom are also connected with diameter changing device.After diameter changing device is set, expediently descend docking of the standpipe between floor and the preset pipeline in plumbing integration module; In addition, be big uncork reducer pipe as what arrange, then can form high flow rate pass in plumbing integration module, make spot be not easy deposition blocking in plumbing integration module.Little opening reducer pipe can certainly be set, then multiple entrance can be set in plumbing integration module, facilitate multiple positions ponding to enter in same sewer pipe.
Another technical scheme of the present utility model is that, on above-mentioned basis, the top of described diameter changing device or bottom are connected with pipeline eccentric.When the top of diameter changing device or bottom are connected with pipeline eccentric, upper and lower pipeline not installation question on the same axis can be solved, only need adjustment eccentric can smooth and easy docking, reduce Pipe installing difficulty.
Another technical scheme of the present utility model is that, on above-mentioned basis, described gutter includes the first horizontal tube connector, and described first horizontal tube connector connects the dewatering horizontal tube of toilet and/or wash basin.After first horizontal tube connector connects the dewatering horizontal tube of toilet and/or wash basin, the sewage produced can be imported in the drainage pipe in plumbing integration module in its use procedure.
Another technical scheme of the present utility model is that, on above-mentioned basis, described gutter also includes the second horizontal tube connector, and described second horizontal tube connector is connected with one end of described trap, and the other end of described trap is connected with the gutter of described floor drain.Like this, be connected by the second horizontal tube connector with one end of trap, after the other end of trap is connected with the gutter of described floor drain, the surface area water on bathroom ground enters in gutter by floor drain.
Another technical scheme of the present utility model is on above-mentioned basis, and described floor drain is side wall floor drain.When floor drain is side wall floor drain, all water supply and sewerage pipelines by laying in body of wall, can solve the complicated construction problem needing to arrange pipeline below bathroom base plate.Simultaneously, in conjunction with trap being arranged in plumbing integration module, plate process can not be fallen further to the floor below bathing room, namely bathing room can not arrange caisson, ponding in use procedure in bathing room is flow into by side wall floor drain in the trap be arranged in plumbing integration module, then is drained in gutter.Thus, simplify work progress, improve efficiency of construction.
Another technical scheme of the present utility model is, on above-mentioned basis, described gutter to be also provided with expansion ring.After gutter is provided with expansion ring, when pipe built-in, expansion ring can solve the problem of a small amount of shortage of pipeline, do not need to change pipeline can connect, meanwhile, expansion ring can also do and offset the mouth of pipe by a small margin, and the pipeline making it dock also can not connect on the same axis.
Another technical scheme of the present utility model is on above-mentioned basis, and described preset pipeline is provided with fire trapping ring or fireprotection layer.After preset pipeline is provided with fire trapping ring or fireprotection layer, when bathroom meets with fire, fire trapping ring or fireprotection layer can block burning things which may cause a fire disaster and spread up and down.
Another technical scheme of the present utility model is that, on above-mentioned basis, described module body is also provided with top cover or bottom.When module body is provided with top cover or bottom, top cover and module body junction arrange rubber seal, simultaneously after top cover or bottom also arrange rubber seal with pipeline connection, can prevent bathroom excess surface water by plumbing integration module down one deck seep water.
Another technical scheme of the present utility model is on above-mentioned basis, and the sidewall of described module body is provided with rib or reinforcing rib.After the sidewall of module body is provided with rib or reinforcing rib, the wall thickness of module body can reduce further, simultaneously, the rigidity of module body itself is higher, make it can not deformed damaged in application process, particularly after rib or the crisscross formation grid of reinforcing rib, shock resistance damage capability and the weight capacity of module body are increased substantially.
Another technical scheme of the present utility model is on above-mentioned basis, described module body and preset pipeline integral molded plastic shaping.When module body and preset pipeline integral molded plastic shaping time, there is no gap between the fixed part of module body and preset pipeline, and, the production technology efficiency adopting integral molded plastic shaping is high, steady quality is reliable, and cost of production is relatively low, is conducive to large-scale promotion application.
Another technical scheme of the present utility model is on above-mentioned basis, and described module body and preset pipeline adopt 3D printing integrated shaping.When module body and preset pipeline planform complexity, when production and construction and installation are very inconvenient, adopt 3D printing integrated shaping, be conducive to manufacturing of plumbing integration module.Like this, because reserved opening is to the screens of preset pipeline, the effect of pre-determined bit can be played to preset pipeline, and, when filling packing material, eliminate the operation of the lower surface formwork in module body, not only saved manufacture craft, certain supporting role can also be played to packing material in bottom surface.
Another technical scheme of the present utility model is that, on above-mentioned basis, the bottom of described module body is provided with bottom surface, and described bottom surface is provided with the reserved opening that preset pipeline passes.
Another one solution of the present utility model is achieved in that the supply and drain water system providing a kind of bathing room, comprise soil stack and water supply riser, also comprise described plumbing integration module, described soil stack and water supply riser are all connected with described preset pipeline.Like this, in the supply and drain water system of bathing room, after soil stack and water supply riser are all connected with described preset pipeline, bathing room water supply and sewerage pipeline in whole the same vertical axis of building and horizontal pipeline are combined into complete supply and drain water system, after being particularly provided with plumbing integration module, plumbing integration module by preset for the various pipes in building be integrated together and be arranged on samely take up room in little module, for the upper and lower pipeline of traditional floor is laid, because plumbing integration module itself is filled with a sealing, reserved opening does not need cast-in-place shutoff, namely on-the-spot formwork is not needed, cast-in-situ concrete, form removal and maintenance, directly plumbing integration module is fixed on reserved opening, and installation rate quickly, environment pollution is little, site tissue accessory is few, assembly working amount is little, in addition, pipeline or plumbing integration module aging after, also can change very easily, do not need destroy floor.
Another one solution of the present utility model is achieved in that and provides a kind of bathing room, comprise base plate and bathing room supply and drain water system, plumbing integration module and the described base plate of described bathing room supply and drain water system are fixed, and the entrance of described infiltration back-flow preventer is lower than the face at described base plate place.Like this, if when bathing room base plate has ponding, will by the entrance of described infiltration back-flow preventer, be drained in preset pipeline, soil stack again through being connected with described preset pipeline is discharged, and when blocking or spilling water occur soil stack, described infiltration back-flow preventer can be back in bathing room by anti-sealing.
Accompanying drawing explanation
Fig. 1 is for representing the structure chart of the plumbing integration module involved by a kind of embodiment of this technology;
Fig. 2 is for representing the structure chart of the plumbing integration module involved by the another kind of embodiment of this technology;
Fig. 3 is for representing the sectional view of the plumbing integration module involved by the another kind of embodiment of this technology;
Fig. 4 is for representing the top view of the plumbing integration module involved by the another kind of embodiment of this technology;
Several structure charts being connected and fixed device that Fig. 5-Figure 10 is the integration module of plumbing shown in Fig. 1;
Figure 11 is the structure chart of the preset pipeline of the integration module of plumbing shown in Fig. 1;
Figure 12 is the structure chart of the another kind of embodiment of the preset pipeline of the integration module of plumbing shown in Fig. 1;
Figure 13 is for representing the structure chart of the plumbing integration module involved by the another kind of embodiment of this technology;
Figure 14 is for representing the installation drawing of the plumbing integration module involved by a kind of embodiment of this technology;
Figure 15 is for representing the structure chart of the infiltration back-flow preventer of the plumbing integration module involved by a kind of embodiment of this technology;
Figure 16 is for representing the structure chart of the infiltration back-flow preventer of the plumbing integration module involved by the another kind of embodiment of this technology;
Figure 17 and Figure 18 is the sectional view of the aqueduct of the back-flow preventer that seeps water described in Figure 16;
Figure 19 is for representing the structure chart of the infiltration back-flow preventer of the plumbing integration module involved by the another kind of embodiment of this technology;
Figure 20 is for representing the structure chart of the plumbing integration module involved by the another kind of embodiment of this technology;
Figure 21 is for representing the structure chart of the plumbing integration module involved by the another kind of embodiment of this technology;
Figure 22 is for representing the installation drawing of the integral bathroom involved by the another kind of embodiment of this technology.
In figure:
110 module body 111 annular toss 112 edge projection 113 concave inward structure
114 outer convex module 121 gutter 1211 water stopping trough 1212 headers
1213 first horizontal tube connector 1214 expansion ring 1215 fire trapping ring 122 hot-water lines
123 cold water water service pipe 124 ventilating pipe 125 ground leaking drainage pipe 1251 traps
1252 one eighth bend 1,253 90 degree elbow 1,254 second horizontal tube connector 130 packing materials
141 drainage tube 1411 bootstrap block 1412 guide rod 142 seepage mouths
143 water inlet 144 waterstop port 145 stopping means 146 ball floats
Tongue 1481 tongue 1101 cross bar isolated by 147 deodorization casees 148
1102 vertical pole 1103 vertical rod 10 floor drain 200 bathing rooms
400 floor 430 caissons
Detailed description of the invention
Be described in detail the utility model below in conjunction with accompanying drawing, the description of this part is only exemplary and explanatory, should not have any restriction to protection domain of the present utility model.In addition, those skilled in the art, according to the description of presents, can carry out respective combination to the feature in embodiment in presents and in different embodiment.
The utility model embodiment is as follows, refer to Fig. 1, solution of the present utility model is achieved in that plumbing integration module comprises module body 110 and preset pipeline, described preset pipeline is preset and is fixed in described module body 110, described preset pipeline is provided with an infiltration back-flow preventer.Described module body 110 comprises at least one sidewall, and sidewall encloses and forms tubular framework, and described preset pipeline is arranged in described tubular framework, is provided with packing material 130 between described preset pipeline and described tubular framework.Preset pipeline is provided with at least one infiltration back-flow preventer, effectively can discharges the ponding bottom bathing room, and when blocking occurs drainage pipe, water can be back to bathing room through floor drain from drainage pipe.It should be noted that, above-mentioned " tubular " does not form the restriction to plumbing integration module shape, and the cross section of described tubular framework can be the planform such as polygon (as shown in Figure 1) or circle.Described preset pipeline is fixed in described module body 110, and described packing material 130 is preferably refractory material.In this programme, plumbing integration module is integrated together prefabricated for the various pipes in building and be arranged in same tubular framework, and then packing material is filled and presented between pipeline and framework, material is thus formed a prefabricated integral module, so, in building operations, only need plumbing integration module to be installed in the reserved opening (as equipment well head) of every floor, then the standpipe carried out between upper and lower floor is installed, so namely, complete the installation connection work of pipeline in building, packing material can also play closed reserved opening, sound insulation, fireproof effect, for the upper and lower pipeline of traditional floor is laid, because plumbing integration module itself is filled with a sealing, reserved opening does not need cast-in-place shutoff, namely on-the-spot formwork, cast-in-situ concrete, form removal and maintenance is not needed, directly plumbing integration module is fixed on reserved opening, and installation rate quickly, environment pollution is little, site tissue accessory is few, and assembly working amount is little, in addition, pipeline or plumbing integration module aging after, also can change very easily, do not need destroy floor.Certainly, also on described preset pipeline, two or more infiltration back-flow preventer is provided with as required.
On the basis of above-described embodiment, in another embodiment of the utility model, refer to Fig. 2, the sizing fastening devices of described module body concrete or cement production systD, described preset pipe built-in is in described module body.In another embodiment of the utility model, refer to Figure 20, the framework that described module body is made up of the hack lever be interconnected integrally is formed, and described hack lever comprises cross bar 1101, vertical pole 1102 and vertical rod 1103, and described hack lever is interconnected to form three-dimensional frame construction.Assembled by the various combination of some cross bars 1101, vertical pole 1102 and vertical rod 1103, can as required assembled go out the module body of three-dimensional frame construction of different size and shape.Described preset pipe built-in, in described module body 110, is cast with concrete or cement slurry between described preset pipeline and described framework.In another embodiment of the utility model, refer to Figure 21, described module body is hollow box body structure, and described preset pipeline is fixed in described module body 110 by bolt, the collar, bearing or welding manner.In another embodiment of the utility model, described module body is cast by metal material or is welded into body structure, is provided with packing material between described preset pipeline and described module body.In the above-described embodiment, plumbing integration module is integrated together prefabricated for the various pipes in building and be arranged in same module body, and then packing material is filled and presented between pipeline and framework, material is thus formed a prefabricated integral module, so, in building operations, only need plumbing integration module to be installed in the reserved opening (as equipment well head) of every floor, then the standpipe carried out between upper and lower floor is installed, so namely, complete the installation connection work of pipeline in building, packing material can also play closed reserved opening, sound insulation, fireproof effect, for the upper and lower pipeline of traditional floor is laid, because plumbing integration module itself is filled with a sealing, reserved opening does not need cast-in-place shutoff, namely on-the-spot formwork, cast-in-situ concrete, form removal and maintenance is not needed, directly plumbing integration module is fixed on reserved opening, and installation rate quickly, environment pollution is little, site tissue accessory is few, and assembly working amount is little, in addition, pipeline or plumbing integration module aging after, also can change very easily, do not need destroy floor.
On the basis of above-described embodiment, in another embodiment of the utility model, refer to Figure 15, described infiltration back-flow preventer can for the drainage tube 141 be connected with the sidewall of gutter 121, described drainage tube 141 can be provided with U-shaped structure or arcuate structure for U-shaped pipe or drainage tube 141 bottom, waterstop port 144 and ball float 146 is also provided with in drainage tube 141, the sidewall of described gutter 121 is provided with seepage mouth 142, the first end of drainage tube 141 is connected with described seepage mouth 142, second end of described drainage tube is water inlet 143, water inlet 143 is arranged on bathing room ground or metope, general more lower slightly than bathing room ground.The position of water inlet 143 described in the vertical direction is higher than the position of described seepage mouth 142.Like this bottom bathing room during ponding, drainage tube 141 draining can be passed through in time, the lower end being U-shaped pipe or drainage tube due to drainage tube is U-shaped structure, after ponding flows into drainage tube 141 from the water inlet 143 of drainage tube, water seal is formed in the lower end of drainage tube 141, when the water in drainage tube 141 increases gradually, when water level exceedes the seepage mouth 142 of gutter 121, namely ponding be drained into gutter 121 from the seepage mouth 142 of gutter 121, thus can be discharged in time by the ponding outside gutter 121 in time.Between the U-shaped structure that described ball float 146 is arranged on described drainage tube 141 and waterstop port 144, the diameter of described ball float 146 is greater than the diameter of described waterstop port 144 and is less than the aperture of described drainage tube 141.Ball float 146 is provided with in drainage tube 141, when there is blocking or spilling water in gutter 121, the water be back to drainage tube 141 from gutter 121 can make ball float 146 float, when ball float 146 floats to waterstop port 144, ball float 146 blocks waterstop port 144 under buoyancy, thus anti-sealing is back to bathing room from gutter 121 by drainage tube 141.Described waterstop port 144 can be arranged on the collar in drainage tube 141 pipe or chuck.Described ball float 146 also differ be decided to be spherical, as long as with described waterstop port form fit, can under buoyancy waterstop port place formed hermetic seal.Certain described infiltration back-flow preventer also can be arranged on the outside of other preset pipelines, does not repeat them here.
On the basis of above-described embodiment, in another embodiment of the utility model, refer to Figure 16, waterstop port 144, stopping means 145 and ball float 146 is also provided with in described drainage tube 141, the diameter of described waterstop port 144 is less than the aperture of described drainage tube 141, described stopping means 145 is arranged on the below of described waterstop port 144, described ball float 146 is arranged between described stopping means 145 and waterstop port 144, and the diameter of described ball float 146 is greater than the diameter of described waterstop port 144 and is less than the aperture of described drainage tube 141.Ball float 146 is provided with in drainage tube 141, when there is blocking or spilling water in gutter 121, the water be back to drainage tube 141 from gutter 121 can make ball float 146 float, when ball float 146 floats to waterstop port 144, ball float 146 blocks waterstop port 144 under buoyancy, thus anti-sealing is back to bathing room from gutter 121 by drainage tube 141.Described waterstop port 144 can be arranged on the collar in drainage tube 141 pipe or chuck.Described ball float 146 also differ be decided to be spherical, as long as with described waterstop port form fit, can under buoyancy waterstop port place formed hermetic seal.
On the basis of above-described embodiment, in another embodiment of the utility model, described stopping means 145 can be filter screen or gag lever post or spacing block set.When not having water to be back to drainage tube 141 from gutter 121,146 supports of stopping means 145 pairs of ball floats, position-limiting action, prevent when ponding flows into drainage tube 141 from the water inlet 143 of drainage tube 141, drive ball float 146 to block the seepage mouth 142 of gutter 121 to the seepage mouth 142 direction motion of gutter 121.Preferred, refer to Figure 17 and Figure 18, can arrange bootstrap block 1411 or guide rod 1412 at described drainage tube 141 inwall, described guide rod 1412 can arrange more than 3 or 3, the motion path of ball float 146 can be limited like this, prevent ball float 146 beat in described drainage tube 141.
On the basis of above-described embodiment, in another embodiment of the utility model, described gutter 121 and described drainage tube 141 integral molded plastic shaping.When gutter 121 and described drainage tube 141 integral molded plastic shaping time, gap is not had between gutter 121 and drainage tube 141 entirety, can one-shot forming, and, the production technology efficiency adopting integral molded plastic shaping is high, steady quality is reliable, and cost of production is relatively low, is conducive to large-scale promotion application.
On the basis of above-described embodiment, in another embodiment of the utility model, described gutter 121 and described drainage tube 141 removably connect.When gutter 121 and described drainage tube 141 removably connect, gutter 121 and drainage tube 141 separate convenient, are convenient to maintenance and change, thus reducing costs.
On the basis of above-described embodiment, in another embodiment of the utility model, refer to Figure 19, described infiltration back-flow preventer is be arranged on the deodorization case 147 outside described gutter 121 sidewall, isolation tongue 148 is provided with in described deodorization case 147, described gutter 121 sidewall is provided with seepage mouth 142, described in the vertical direction, isolates the position of tongue 1481 position lower than described seepage mouth 142 of tongue.Both sides and the described deodorization case 147 of isolation tongue 148 are tightly connected.Outside gutter 121 sidewall, deodorization case 147 is set, like this bottom bathroom during ponding, deodorization case 147 draining can be passed through in time, owing to being provided with isolation tongue 148 in described deodorization case 147, described gutter 121 sidewall is provided with seepage mouth 142, the position of tongue 1481 position lower than described seepage mouth 142 of tongue is isolated described in the vertical direction, after ponding flows into deodorization case 147 from the water inlet of deodorization case 147, water seal is formed between the isolation tongue 148 and gutter 121 sidewall of deodorization case 147, when the water in deodorization case 147 increases gradually, when water level exceedes the seepage mouth 142 of gutter 121, namely ponding be drained into gutter 121 from the seepage mouth 142 of gutter 121, thus can in time the ponding outside gutter 121 be discharged in time.Waterstop port 144, stopping means 145 and ball float 146 is also provided with in described deodorization case 147, the diameter of described waterstop port 144 is less than the distance between the water inlet side sidewall of described deodorization case 147 and isolation tongue 148, described stopping means 145 is arranged on the below of described waterstop port 144, described ball float 146 is arranged between described stopping means 145 and waterstop port 144, and the diameter of described ball float 146 is greater than the diameter of described waterstop port 144 and the distance be less than between the water inlet side sidewall of described deodorization case 147 and isolation tongue 148.Ball float 146 is provided with in deodorization case 147, when there is blocking or spilling water in gutter 121, the water be back to deodorization case 147 from gutter 121 can make ball float 146 float, when ball float 146 floats to waterstop port 144, ball float 146 blocks waterstop port 144 under buoyancy, thus anti-sealing is back to bathing room from gutter 121 by deodorization case 147.Described waterstop port 144 can be arranged on the collar in deodorization case 147 pipe or chuck.Described ball float 146 also differ be decided to be spherical, as long as with described waterstop port form fit, can under buoyancy waterstop port place formed hermetic seal.
On the basis of above-described embodiment, in another embodiment of the utility model, described isolation tongue 148 and described gutter 121 removably connect; Or described isolation tongue 148 and described gutter 121 integral molded plastic shaping.When gutter 121 and described isolation tongue 148 integral molded plastic shaping time, can one-shot forming, and the production technology efficiency adopting integral molded plastic shaping is high, and steady quality is reliable, and cost of production is relatively low, is conducive to large-scale promotion application.When gutter 121 and described isolation tongue 148 removably connect, it is convenient that gutter 121 and isolation tongue 148 separate, and is convenient to maintenance and changes, thus reducing costs.And can separate machined and die sinking, reduce difficulty of processing.
On the basis of above-described embodiment, in another embodiment of the utility model, described deodorization case 147 and described gutter 121 removably connect; Or described deodorization case 147 and described gutter 121 integral molded plastic shaping.When gutter 121 and described deodorization case 147 integral molded plastic shaping time, can one-shot forming, and the production technology efficiency adopting integral molded plastic shaping is high, and steady quality is reliable, and cost of production is relatively low, is conducive to large-scale promotion application.When gutter 121 and described deodorization case 147 removably connect, it is convenient that gutter 121 and isolation tongue 148 separate, and is convenient to maintenance and changes, thus reducing costs.And can separate machined and die sinking, reduce difficulty of processing.
On the basis of above-described embodiment, in another embodiment of the utility model, bottom surface can also be set in the lower end of module body 110, bottom surface have the reserved opening of passing for preset pipeline, like this, because reserved opening is to the screens of preset pipeline, the effect of pre-determined bit can be played to preset pipeline, and, when filling packing material, eliminate the operation of the lower surface formwork in module body 110, not only saved manufacture craft, certain supporting role can also be played to packing material in bottom surface.
On the basis of above-described embodiment, in another embodiment of the utility model, refer to Fig. 1, Fig. 2, Fig. 5 to Figure 10, described module body can be provided with and be connected and fixed device, in plumbing integration module installation process, only need be connected and fixed device and be overlapped on the periphery of reserved opening, maybe will be connected and fixed device is joined with bolts at reserved opening place, increase substantially efficiency of construction, certainly in order to waterproof or fix further, the gap of the connecting portion being connected and fixed device and reserved opening place floor can also be carried out filleting or cast-in-place.Concrete, described in be connected and fixed device can for being arranged on the annular toss 111 (as illustrated in fig. 1 and 2) of described tubular framework top and/or sidepiece, described annular toss 111 outwards can choose 40-50mm; Or, described be connected and fixed device also can for being arranged on the outer convex module 114 (as shown in Fig. 5, Fig. 7, Fig. 8 and Figure 10) of described tubular framework outer wall, outer convex module 114 can, for being arranged on the edge projection 112 of described tubular framework outer wall lower edges, also can be arranged on the middle projection in the middle part of described tubular framework outer wall; Or, described in be connected and fixed device also can for being arranged on the concave inward structure 113 (as shown in Fig. 6 and Fig. 9) of described tubular framework outer wall, the size and number of described outer convex module or concave inward structure can set as required.So, when being connected and fixed device and being the annular toss being arranged on described module body top and/or sidepiece, be conducive to plumbing integration module and slab surfaces is connected and fixed, further in annular toss bottom, can rubbery toroidal ring be set, plumbing integration module and reserved opening thoroughly can be sealed, can prevent bathroom from seeping water to lower one deck, when being connected and fixed device and being outer convex module or the concave inward structure being arranged on described module body outer wall, correspondingly, reserving hole relevant position on floor is set to inside recess or outer projection, after plumbing integration module is installed, the inside recess that reserving hole relevant position on the outer convex module of module body outer wall or concave inward structure and floor is arranged or outer projection match, thus plumbing integration module and floor tenon can be overlapped to be connected and locate, improve the load ability of plumbing integration module, make pipeline also the destruction that is shifted up and down can not occur under the load of the long-pending full water of blocking.Adopt this plumbing integration module can greatly reduce the workload of field pipes installation simultaneously.In addition, because plumbing integration module seals itself, the preformed hole hole on floor also in cast-in-place shutoff, need not decrease the operations such as formwork, concreting, form removal and maintenance.
On the basis of above-described embodiment, in another embodiment of the utility model, refer to Fig. 3 and Fig. 4, described module body outer wall can also be provided with water stopping trough 1211, described water stopping trough 1211 can be along the cannelure around module body outer wall, and how many sizes of water stopping trough can set according to the water yield.After the module body outer wall of draining integration module is provided with water stopping trough, the reserved opening down seepage that the ponding that bathroom is in use produced can not be installed from plumbing integration module.
On the basis of above-described embodiment, in another embodiment of the utility model, refer to Fig. 3 and Fig. 4, described water stopping trough 1211 is chosen outside notch.The module body outer wall of draining integration module is provided with water stopping trough 1211, and after water stopping trough is chosen outside notch, the reserved opening down seepage that the ponding that bathroom is in use produced can not be installed from plumbing integration module, infiltration can be collected because choosing outside notch on water stopping trough, preventing it from infiltrating next floor.
On the basis of above-described embodiment, in another embodiment of the utility model, refer to Fig. 3 and Fig. 4, can also be provided with header 1212 in described module body, described header 1212 one end is communicated with water stopping trough 1211, and the other end is communicated with preset pipeline.The ponding that such water stopping trough 1211 collects can enter in sewer pipe by header 1212, prevents it long-pending full excessive, thoroughly solves bathroom ponding problem.
On the basis of above-described embodiment, in another embodiment of the utility model, described module body outer wall can be exasperate or spiral lines.When module body outer wall is exasperate or spiral lines, described plumbing integration module is installed to after in floor reserved opening, time again with waterproof bonding material filletings such as cement pastes, exasperate or spiral lines can make plumbing integration module and adhesives combine closely, and not easily seep water and improve the frictional force between plumbing integration module and floor.
On the basis of above-described embodiment, in another embodiment of the utility model, described sidewall material can be metal or organic material.When sidewall material be metal or organic material time, the production technology of plumbing integration module is simple, die sinking punching press or weld, and is conducive to low-cost production in enormous quantities.
On the basis of above-described embodiment, in another embodiment of the utility model, described packing material 130 can be the fire proofing materials such as foam concrete, expanded perlite concrete or haydite concrete.If when blocking occurs shown plumbing integration module, shown packing material 130 can be excavated, dredge, change preset pipeline, therefore overhaul without the need to the base plate excavated between whole bathroom.Adopt foam concrete, expanded perlite concrete or haydite concrete as packing material, make plumbing integration module from heavy and light, be easy to carrying with install, meanwhile, also help and chisel packing material to its interior conduit maintain and replace.In addition, in time using foam concrete, not only can play the effect of interlayer fireproof, can also play the good soundproof effect of the impact sound of current.
On the basis of above-described embodiment, in another embodiment of the utility model, refer to Figure 13, described preset pipeline can comprise gutter 121 and cold water water service pipe 123, or described preset pipeline can comprise sleeve pipe and the gutter of cold water water service pipe, this plumbing integration module can utilize in low multilayer residential building, because floor is low, effluent discharge can not cause the air compressing in gutter, without the need to arranging ventilating pipe etc.Described preset pipeline can also comprise ground leaking drainage pipe 125.By default gutter 121 and cold water water service pipe 123, after water supply and sewerage pipeline 121 and cold water water service pipe 123 can being integrated together, be conducive to the I&M of pipeline, and improve Pipe installing efficiency and simplify work progress.Or by sleeve pipe and the gutter of default cold water water service pipe, cold water water service pipe can be installed in the sleeve pipe of cold water water service pipe, and be integrated together with gutter, be conducive to the I&M of pipeline.Can certainly by presetting sleeve pipe and the drain bushing of cold water water service pipe, in the sleeve pipe that cold water water service pipe and gutter are installed on cold water water service pipe respectively and drain bushing, thus also water supply and sewerage pipeline and cold water water service pipe can be integrated together, improve the convenience of Pipe installing and maintenance, simplify work progress.
On the basis of above-described embodiment, in another embodiment of the utility model, refer to Fig. 3 and Figure 11, in described module body, be also provided with the trap 1251 be connected with bathroom floor drain.After being also provided with the trap be connected with bathroom floor drain in module body, the foul smell in sewer pipe can be separated by trap 1251, prevents it from entering in bathing room along pipeline.Simultaneously, trap 1251 is arranged in plumbing integration module, and be connected with bathroom floor drain by pipeline, plate process can not be fallen like this to the floor below bathing room, namely bathing room can not arrange caisson, ponding in use procedure in bathing room is flow in the trap be arranged on plumbing integration module from bathroom floor drain by pipeline, then is drained in gutter.Thus, simplify work progress, improve efficiency of construction.
On the basis of above-described embodiment, in another embodiment of the utility model, refer to Fig. 1 and Fig. 2, described preset pipeline can also comprise ventilating pipe 124 and/or hot-water line 122; Or, described preset pipeline can also comprise sleeve pipe and/or the ventilating pipe of hot-water line, ventilating pipe 124 is connected with gutter 121 pipeline between floors, particularly, described ventilating pipe 124 forms H type pipe with gutter 121, the air in gutter 121 can be avoided to arrange do not go out and cause in pipeline and have pressure, affect the discharge of sewage.More pipeline is integrated together, is more conducive to the I&M of pipeline; In addition, the requirement that ventilating pipe more meets highrise building is installed, ensures the patency of stack draining, reduce the possibility of gutter plugging; The installation of the sleeve pipe of hot-water line or hot-water line, is more suitable for the public buildings such as hotel, is convenient to centralizedly supply hot water.
On the basis of above-described embodiment, in another embodiment of the utility model, refer to Figure 11, described gutter 121 top or bottom can also be connected with diameter changing device 1211.Described diameter changing device 1211 is preferably arranged on the top side of described plumbing integration module, can certainly be arranged on the bottom side of described plumbing integration module.After diameter changing device 1211 is set, expediently descend docking of the standpipe between floor and the preset pipeline in plumbing integration module; In addition, as setting is big uncork reducer pipe, then can form high flow rate pass in plumbing integration module, spot is made to be not easy deposition blocking in plumbing integration module, and little opening reducer pipe is set, then multiple entrance can be set in plumbing integration module, facilitate multiple positions ponding to enter in same sewer pipe.
On the basis of above-described embodiment, in another embodiment of the utility model, refer to Figure 11, top or the bottom of described diameter changing device 1211 can also be connected with pipeline eccentric 1212.Described pipeline eccentric 1212 is preferably arranged on the top side of described plumbing integration module, can certainly be arranged on the bottom side of described plumbing integration module.When the top of diameter changing device 1211 or bottom are connected with pipeline eccentric 1212, upper and lower pipeline not installation question on the same axis can be solved, only need adjustment eccentric can smooth and easy docking, reduce Pipe installing difficulty.
On the basis of above-described embodiment, in another embodiment of the utility model, refer to Figure 11, described gutter 121 can also include the first horizontal tube connector 1213, and described first horizontal tube connector 1213 connects the dewatering horizontal tube of toilet and/or wash basin.After first horizontal tube connector connects the dewatering horizontal tube of toilet and/or wash basin, the sewage produced can be imported in the drainage pipe in plumbing integration module in its use procedure.
On the basis of above-described embodiment, in another embodiment of the utility model, refer to Figure 11, described gutter 121 can also include the second horizontal tube connector 1254, described second horizontal tube connector 1254 is connected with one end of described trap 1251, and the other end of described trap 1251 is connected with described ground leaking drainage pipe 125.Particularly, described ground leaking drainage pipe 125 can be connected with described trap 1251 by 90 degree of elbows 1253, and trap 1251 is connected with described second horizontal tube connector 1254 by one eighth bend 1252 again.Like this, be connected by the second horizontal tube connector 1254 with one end of trap 1251, after the other end of trap 1251 is connected with the gutter 125 of described floor drain, the surface area water on integral bathroom ground enters in gutter 121 by floor drain.
On the basis of above-described embodiment, in another embodiment of the utility model, refer to Figure 14, plumbing integration module is installed on the equipment raise place of bathing room side, and described floor drain 10 is side wall floor drain.Connect ground leaking drainage pipe 125, side wall floor drain in construction at the scene, ensure that trap 1251 is lower than outfall 200-300mm, gravity and impulsive force draining can be utilized like this, remove dirt.Simultaneously bathing room 200 can coordinate, and the horizontal plane of its base plate is arranged the gradient, and the lower of the gradient tilts toward the side wall floor drain place of draining.In addition, when floor drain is side wall floor drain, all water supply and sewerage pipelines by laying in body of wall, can solve the complicated construction problem needing to arrange pipeline below bathroom base plate.Simultaneously, in conjunction with trap being arranged in plumbing integration module, plate process can not be fallen further to the floor below bathing room, namely bathing room can not arrange caisson, ponding in use procedure in bathing room is flow into by side wall floor drain in the trap be arranged in plumbing integration module, then is drained in gutter.Thus, simplify work progress, improve efficiency of construction.
On the basis of above-described embodiment, in another embodiment of the utility model, refer to Figure 22, bathing room is provided with caisson 430, and described caisson 430 is arranged on below base plate 2; Described supply and drain water system comprises soil stack, water supply riser, trap 1251 and plumbing integration module; Described plumbing integration module comprises module body 110, preset pipeline, and described preset pipeline is preset to be integrated in described module body 110; Described trap 1251 is located in described caisson 430, and described trap 1251, soil stack and water supply riser are all connected with described preset pipeline.Wherein, described caisson 430 forms by falling plate process to floor 400.Connect ground leaking drainage pipe 125, floor drain in construction at the scene, ensure that trap 1251 is lower than outfall 200-300mm, gravity and impulsive force draining can be utilized like this, remove dirt.Simultaneously integral bathroom 200 can coordinate, and the horizontal plane of its base plate is arranged the gradient, and the lower of the gradient tilts toward the ground leak of draining.
On the basis of above-described embodiment, in another embodiment of the utility model, refer to Figure 12, described gutter 121 can also be provided with expansion ring 1214.Existing gutter is all pvc pipe, pvc pipe can produce micro-strain under variations in temperature, for highrise building, small distortion is after the accumulation of multilayer, larger deflection will being formed, so just very likely making the destruction of twin conduit, by arranging expansion ring 1214 on gutter 121, distortion just between energy eliminating layer, prevents distortion cumulative; In addition, when carrying out soil stack and docking with the preset pipeline in plumbing integration module, due to construction or mismachining tolerance, the length of standpipe is caused to have deviation, after arranging expansion ring 1214, the deviation of riser length can be made up by expansion ring, and the installation effectiveness of pipeline is improved.
On the basis of above-described embodiment, in another embodiment of the utility model, refer to Figure 12, on described preset pipeline (particularly gutter 121 and ventilating pipe 124 on) fire trapping ring 1215 or fireprotection layer are installed.After preset pipeline is provided with fire trapping ring 1215 or fireprotection layer, when bathroom meets with fire, fire trapping ring or fireprotection layer can block burning things which may cause a fire disaster and spread up and down.
On the basis of above-described embodiment, in another embodiment of the utility model, described module body is also provided with top cover.When module body is provided with top cover, top cover and module body junction arrange rubber seal, simultaneously after top cover and pipeline connection also arrange rubber seal, bathroom excess surface water can be prevented by the down one deck infiltration of plumbing integration module.
On the basis of above-described embodiment, in another embodiment of the utility model, the sidewall of described module body is provided with rib or reinforcing rib.After the sidewall of module body is provided with rib or reinforcing rib, the wall thickness of module body can reduce further, simultaneously, the rigidity of module body itself is higher, make it can not deformed damaged in application process, particularly after rib or the crisscross formation grid of reinforcing rib, shock resistance damage capability and the weight capacity of module body are increased substantially.
On the basis of above-described embodiment, in another embodiment of the utility model, described module body and preset pipeline integral molded plastic shaping.When module body and preset pipeline integral molded plastic shaping time, there is no gap between module body and preset pipeline, and adopt the shaping production technology efficiency of integral molded plastic high, steady quality is reliable, and cost of production is relatively low, is conducive to large-scale promotion application.
On the basis of above-described embodiment, in another embodiment of the utility model, described module body and preset pipeline adopt 3D printing integrated shaping.When module body and preset pipeline planform complexity, when production and construction and installation are very inconvenient, adopt 3D printing integrated shaping, be conducive to manufacturing of plumbing integration module.
Plumbing integration module in all embodiments of the utility model, namely can be used for traditional common bathing room, also may be used for integral bathroom.
On the basis of above-described embodiment, in another embodiment of the utility model, additionally provide a kind of supply and drain water system of bathing room, comprise soil stack and water supply riser, also comprise described plumbing integration module, described soil stack and water supply riser are all connected with described preset pipeline.Like this, in the supply and drain water system of bathing room, after soil stack and water supply riser are all connected with described preset pipeline, bathing room water supply and sewerage pipeline in whole the same vertical axis of building and horizontal pipeline are combined into complete supply and drain water system, after being particularly provided with plumbing integration module, plumbing integration module by preset for the various pipes in building be integrated together and be arranged on samely take up room in little module, for the upper and lower pipeline of traditional floor is laid, because plumbing integration module itself is filled with a sealing, reserved opening does not need cast-in-place shutoff, namely on-the-spot formwork is not needed, cast-in-situ concrete, form removal and maintenance, directly plumbing integration module is fixed on reserved opening, and installation rate quickly, environment pollution is little, site tissue accessory is few, assembly working amount is little, in addition, pipeline or plumbing integration module aging after, also can change very easily, do not need destroy floor.
On the basis of above-described embodiment, in another embodiment of the utility model, additionally provide a kind of bathing room, it comprises base plate and bathing room supply and drain water system, plumbing integration module and the described base plate of described bathing room supply and drain water system are fixed, and the entrance of described infiltration back-flow preventer is lower than the face at described base plate place.Like this, if when bathing room base plate has ponding, will by the entrance of described infiltration back-flow preventer, be drained in preset pipeline, soil stack again through being connected with described preset pipeline is discharged, and when blocking or spilling water occur soil stack, described infiltration back-flow preventer can be back in bathing room by anti-sealing.
The above is only preferred embodiment of the present utility model; it should be pointed out that for those skilled in the art, under the prerequisite not departing from the utility model principle; can also make some improvements and modifications, these improvements and modifications also should be considered as protection domain of the present utility model.

Claims (31)

1. a plumbing integration module, is characterized in that, comprises module body and preset pipeline, and described preset pipeline is preset and is fixed in described module body, described preset pipeline is provided with at least one infiltration back-flow preventer.
2. a kind of plumbing integration module according to claim 1, it is characterized in that, described module body comprises at least one sidewall, sidewall encloses and forms tubular framework, described preset pipeline is arranged in described tubular framework, is provided with packing material between described preset pipeline and described tubular framework.
3. a kind of plumbing integration module according to claim 1, is characterized in that, described module body is the sizing fastening devices of concrete or cement production systD, and described preset pipe built-in is in described module body.
4. a kind of plumbing integration module according to claim 1, it is characterized in that, the framework that described module body is made up of the hack lever be interconnected integrally is formed, described preset pipe built-in, in described module body, is provided with concrete and/or cement fixture between described preset pipeline and described framework.
5. a kind of plumbing integration module according to claim 1, is characterized in that, described module body is hollow box body structure, and described preset pipeline is fixed in described module body by bolt, the collar, bearing or welding manner.
6. a kind of plumbing integration module according to claim 1, is characterized in that, described module body is cast by metal material or is welded into body structure, is provided with packing material between described preset pipeline and described module body.
7. a kind of plumbing integration module according to claim 1, it is characterized in that, described infiltration back-flow preventer is the drainage tube be connected with the sidewall of described preset pipeline, the sidewall of described preset pipeline is provided with seepage mouth, one end of described drainage tube is connected with described seepage mouth, waterstop port is provided with in described drainage tube, stopping means and ball float, the diameter of described waterstop port is less than the aperture of described drainage tube, described stopping means is arranged on the below of described waterstop port, described ball float is arranged between described stopping means and waterstop port, the diameter of described ball float is greater than the diameter of described waterstop port and is less than the aperture of described drainage tube.
8. a kind of plumbing integration module according to claim 7, is characterized in that, described stopping means is filter screen or gag lever post or spacing block set.
9. a kind of plumbing integration module according to claim 7, is characterized in that, described preset pipeline and described drainage tube integral molded plastic shaping.
10. a kind of plumbing integration module according to claim 7, is characterized in that, described preset pipeline and described drainage tube removably connect.
11. a kind of plumbing integration modules according to claim 1, is characterized in that, described module body is provided with and is connected and fixed device, described in be connected and fixed device be the annular toss being arranged on described module body top and/or sidepiece; Or, described in be connected and fixed device be the outer convex module being arranged on described module body outer wall; Or, described in be connected and fixed device be the concave inward structure being arranged on described module body outer wall.
12. a kind of plumbing integration modules according to claim 1, it is characterized in that, described module body outer wall is provided with water stopping trough.
13. a kind of plumbing integration modules according to claim 8, is characterized in that, choose under described water stopping trough outside notch.
14. a kind of plumbing integration modules according to claim 8, is characterized in that, be also provided with header in described module body, and described header one end is communicated with water stopping trough, and the other end is communicated with preset pipeline.
15. a kind of plumbing integration modules according to claim 2 or 6, it is characterized in that, described packing material is foam concrete, expanded perlite concrete or haydite concrete.
16. a kind of plumbing integration modules according to claim arbitrary in claim 1 to 14, it is characterized in that, described preset pipeline comprises gutter and water service pipe, or comprises sleeve pipe and the gutter of water service pipe.
17. a kind of plumbing integration modules according to claim 16, is characterized in that, be also provided with the trap be connected with bathroom floor drain in described module body.
18. a kind of plumbing integration modules according to claim 17, it is characterized in that, described preset pipeline also comprises ventilating pipe and/or hot-water line; Or described preset pipeline also comprises sleeve pipe and/or the ventilating pipe of hot-water line.
19. a kind of plumbing integration modules according to claim 18, it is characterized in that, top or the bottom of described gutter and/or ventilating pipe are also connected with diameter changing device.
20. a kind of plumbing integration modules according to claim 19, it is characterized in that, the top of described diameter changing device or bottom are connected with pipeline eccentric.
21. a kind of plumbing integration modules according to claim 16, it is characterized in that, described gutter includes the first horizontal tube connector, and described first horizontal tube connector connects the dewatering horizontal tube of toilet and/or wash basin.
22. a kind of plumbing integration modules according to claim 21, it is characterized in that, described gutter also includes the second horizontal tube connector, and described second horizontal tube connector is connected with one end of the trap of floor drain, and the other end of described trap is connected with described floor drain.
23. a kind of plumbing integration modules according to claim arbitrary in claim 1 to 14, is characterized in that, described preset pipeline is provided with fire trapping ring or fireprotection layer.
24. a kind of plumbing integration modules according to claim 16, is characterized in that, described gutter is also provided with expansion ring.
25. a kind of plumbing integration modules according to claim arbitrary in claim 1 to 14, it is characterized in that, described module body is also provided with top cover or bottom.
26. a kind of plumbing integration modules according to claim arbitrary in claim 1 to 14, it is characterized in that, the sidewall of described module body is provided with rib or reinforcing rib.
27. a kind of plumbing integration modules according to claim 1 and 2, is characterized in that, described module body and preset pipeline integral molded plastic shaping.
28. a kind of plumbing integration modules according to claim 27, is characterized in that, described module body and preset pipeline adopt 3D printing integrated shaping.
29. a kind of plumbing integration modules according to claim arbitrary in claim 1 to 14, it is characterized in that, the bottom of described module body is provided with bottom surface, and described bottom surface is provided with the reserved opening that preset pipeline passes.
The supply and drain water system of 30. 1 kinds of buildings, comprise soil stack and water supply riser, characterized by further comprising the plumbing integration module in claim 1 to 29 described in arbitrary claim, described soil stack and water supply riser are all connected with described preset pipeline.
31. 1 kinds of bathing rooms, comprise base plate, it is characterized in that, also comprise the supply and drain water system of the bathing room described in claim 29, and described plumbing integration module and described base plate are fixed, and the entrance of described infiltration back-flow preventer is lower than the face at described base plate place.
CN201520191304.0U 2015-03-31 2015-03-31 A kind of plumbing integration module, supply and drain water system and bathing room Expired - Fee Related CN204510742U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520191304.0U CN204510742U (en) 2015-03-31 2015-03-31 A kind of plumbing integration module, supply and drain water system and bathing room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520191304.0U CN204510742U (en) 2015-03-31 2015-03-31 A kind of plumbing integration module, supply and drain water system and bathing room

Publications (1)

Publication Number Publication Date
CN204510742U true CN204510742U (en) 2015-07-29

Family

ID=53708732

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520191304.0U Expired - Fee Related CN204510742U (en) 2015-03-31 2015-03-31 A kind of plumbing integration module, supply and drain water system and bathing room

Country Status (1)

Country Link
CN (1) CN204510742U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104727529A (en) * 2015-03-31 2015-06-24 中民筑友有限公司 Water supply and drainage integration module, water supply and drainage system and bathroom
CN112797616A (en) * 2020-12-15 2021-05-14 深圳市楚浩空调机电设备工程有限公司 Ventilation and water-stop equipment of air conditioner condensate pipe

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104727529A (en) * 2015-03-31 2015-06-24 中民筑友有限公司 Water supply and drainage integration module, water supply and drainage system and bathroom
CN112797616A (en) * 2020-12-15 2021-05-14 深圳市楚浩空调机电设备工程有限公司 Ventilation and water-stop equipment of air conditioner condensate pipe

Similar Documents

Publication Publication Date Title
CN204510742U (en) A kind of plumbing integration module, supply and drain water system and bathing room
CN104775484A (en) Water supply and drainage system of water supply and drainage integrated module and building
CN204645162U (en) A kind of installation node of plumbing integration module
CN104727529A (en) Water supply and drainage integration module, water supply and drainage system and bathroom
CN204626539U (en) The supply and drain water system of a kind of plumbing integration module and building
CN204626537U (en) The supply and drain water system of a kind of plumbing integration module and building
CN204645171U (en) The supply and drain water system of a kind of plumbing integration module and building
CN204552161U (en) A kind of bathing room
CN104746592A (en) Water supply and drainage integration module and water supply and drainage system for buildings
CN104727584A (en) Bathroom
CN204626541U (en) The supply and drain water system of a kind of plumbing integration module and building
CN204491738U (en) The supply and drain water system of a kind of plumbing integration module and building
CN204492255U (en) A kind of bathing room
CN204510901U (en) A kind of bathing room
CN204627036U (en) A kind of bathing room
CN104763023A (en) Water supplying and draining integrated module and water supplying and draining system of building
CN104727391A (en) Bathroom
CN204626559U (en) The supply and drain water system of a kind of plumbing integration module and building
CN204626536U (en) The supply and drain water system of a kind of plumbing integration module and building
CN204626560U (en) The supply and drain water system of a kind of plumbing integration module and building
CN204510903U (en) A kind of bathing room
CN104775485A (en) Water supply and drainage system of water supply and drainage integrated module and building
CN104746908A (en) Bathroom
CN204510910U (en) A kind of bathing room
CN204626545U (en) A kind of bathing room

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Zhongmin Zhuyou Technology Investment Co.,Ltd.

Assignor: Zhongmin Zhuyou Co.,Ltd.

Contract record no.: 2017430000027

Denomination of utility model: Water supply and drainage integration module, water supply and drainage system and bathroom

Granted publication date: 20150729

License type: Exclusive License

Record date: 20171222

EC01 Cancellation of recordation of patent licensing contract
EC01 Cancellation of recordation of patent licensing contract

Assignee: Zhongmin Zhuyou Technology Investment Co.,Ltd.

Assignor: Zhongmin Zhuyou Co.,Ltd.

Contract record no.: 2017430000027

Date of cancellation: 20180801

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150729