A kind of supply and drain water system of plumbing integration module and building
Technical field
The invention belongs to building field, the supply and drain water system of specially a kind of plumbing integration module and building.
Background technology
The installation method of the water supply and sewerage pipeline of traditional architecture is:The hole needed for preserved pipeline well on floor, by plumbing
Each part, such as elbow, threeway, trap, transverse tube and standpipe assemble at the scene, afterwards because the requirements such as sound insulation, fire prevention need by
Hole is closed, and is closed in construction using hanging module and cast-in-situ.Exist site tissue accessory is more, assembly working amount is big, formwork is complicated, leakage
Slurry, mould can not be removed, sealing is poor, noise pollution, change it is difficult the problems such as.
The drainage pipeline of traditional architecture is because using gradual impeded drainage, silting up, because drainage pipeline access hole is in lower floor's smallpox
At plate, maintenance needs to lower floor to carry out, and damages lower floor's decorative cover, the problems such as pollution lower floor be present.
In traditional Water And Drainage System Design, pipeline is mostly PVC material, the service life of PVC, can be reached in theory
50 years, but it is influenceed by factors, it is difficult to reach life expectancy.And major structure of construction, including floor, equipment raise,
Design life behind equipment raise hole at pouring concrete is more on 50 years.Therefore need to change during the use of building
The pipeline of aging.Traditional method by pipeline it is cast-in-place with hole together with formed overall, replacing necessarily destroys floor, recovery project amount
Greatly and wet trade is needed, easily generate building waste, and cause indoor pollution.
In addition, traditional water supply and sewerage pipeline takes caisson type toilet or different layer draining, the ponding of toilet bottom to pass through
Floor drain discharge, and also be difficult in time, comprehensively discharge ponding.
The content of the invention
The technical problem to be solved in the present invention is:A kind of plumbing integration module is provided, convenient, processing that it is installed and changed
Simply, and the ponding of toilet bottom can be effectively discharged out.
Another technical problem to be solved by the present invention is that:A kind of supply and drain water system of building is provided, it is installed and replacing side
Just, processing is simple, and can be effectively discharged out the ponding of toilet bottom.
What the solution of the present invention was realized in:Plumbing integration module includes module body and preset pipeline, institute
State preset pipeline and preset and be fixed in the module body, at least one leakproof deodorization apparatus is provided with the preset pipeline.
In this programme, plumbing integration module is integrated together the various pipes in building are prefabricated and are arranged on same module
In body, material is thus formed a prefabricated integral module, and at least one leakproof deodorization apparatus is provided with preset pipeline,
The ponding of toilet bottom can be effectively discharged out.In this way, in construction, it is only necessary to which plumbing integration module is installed on often
In the reserved opening (such as equipment well head) of floor, the standpipe installation between floor up and down is then carried out, so completes building
The installation connection work of middle vertical duct, for pipeline above and below traditional floor is laid, installation rate is very fast, environment
Pollute small, site tissue accessory is few, and assembly working amount is small;In addition, after pipeline or plumbing integration module aging, can also be very
It is convenient to change, it is not necessary to destroy floor.
Another technical scheme of the present invention is that on above-mentioned basis the module body includes at least one side wall,
Side wall, which encloses, forms tubular framework, and the preset pipeline is arranged in the tubular framework, the preset pipeline and the tubular
Packing material is provided between framework.In this programme, plumbing integration module is prefabricated integrated by the various pipes in building
To together and being arranged in same tubular framework, packing material is then filled and presented between pipeline and framework again.Relative to tradition
Floor up and down pipeline lay for, because plumbing integration module has been filled with sealing in itself, reserved opening does not need cast-in-place envelope
It is stifled, that is, live formwork, cast-in-place concrete, form removal and maintenance are not needed, plumbing integration module is directly fixed on reserved opening
, and installation rate is very fast.
The present invention another technical scheme be it is above-mentioned basis on, the module body concrete or cement production systD
Sizing fixing device, the preset pipe built-in is in the module body.In this programme, module body concrete or cement
Manufactured sizing fixing device, the preset pipe built-in are prefabricated whole material is thus formed one in the module body
Module, in this way, in construction, it is only necessary to which plumbing integration module is installed on to reserved opening (such as equipment of every floor
Well head) in, the standpipe installation between floor up and down is then carried out, so completes the installation connection work of pipeline in building,
Installation rate is very fast.
Another technical scheme of the present invention is that on above-mentioned basis the module body is integral by being connected with each other
The framework of hack lever composition is formed, and the preset pipe built-in is in the module body, the preset pipeline and the framework
Between be cast with concrete or cement slurry.In this programme, frame that module body is formed by being connected with each other integral hack lever
Frame is formed, and the preset pipe built-in is cast with mixed in the module body between the preset pipeline and the framework
Solidifying soil or cement slurry, material is thus formed a prefabricated integral module, in this way, in construction, it is only necessary to by discharge
Water integration module is installed in the reserved opening (such as equipment well head) of every floor, then carries out the standpipe peace between floor up and down
Dress, so completes the installation connection work of pipeline in building, and installation rate is very fast.
Another technical scheme of the present invention is that on above-mentioned basis the module body is hollow box body structure, institute
Preset pipeline is stated to be fixed in the module body by bolt, the collar, bearing or welding manner.In this programme, module sheet
Body is hollow box body structure, and the preset pipeline is fixed on the module body by bolt, the collar, bearing or welding manner
In, material is thus formed a prefabricated integral module, in this way, in construction, it is only necessary to which plumbing integration module is pacified
In reserved opening (such as equipment well head) loaded on every floor, the standpipe installation between floor up and down is then carried out, is so completed
The installation connection work of pipeline, installation rate are very fast in building.
Another technical scheme of the present invention is that on above-mentioned basis the module body is cast or welded by metal material
Body structure is connected into, packing material is provided between the preset pipeline and the module body.In this programme, module body
Cast by metal material or be welded into body structure, packing material is provided between the preset pipeline and the module body.
For pipeline above and below traditional floor is laid, because plumbing integration module has been filled with sealing in itself, reserved opening is not
Cast-in-place closure is needed, that is, does not need live formwork, cast-in-place concrete, form removal and maintenance, directly fixes plumbing integration module
In reserved opening, and installation rate is very fast.
Another technical scheme of the present invention is that on above-mentioned basis the leakproof deodorization apparatus is and the present tube
The drainage tube that the side wall in road is connected, the drainage tube are U-tube, are provided with seepage mouth in the side wall of the preset pipeline, institute
The first end for stating drainage tube is connected with the seepage mouth, and the second end of the drainage tube is water inlet, described in the vertical direction
The position of water inlet is higher than the position of the seepage mouth.So when bathroom bottom ponding, can in time by drainage tube draining,
Because the lower end that drainage tube is U-tube or drainage tube is U-shaped structure, when ponding flows into drainage tube from the water inlet of drainage tube
Afterwards, water seal is formed in the lower end of drainage tube, when the water in drainage tube gradually increases, the water level of water seal exceedes the infiltration of preset pipeline
During mouth, ponding is to be drained into from the seepage mouth of preset pipeline in preset pipeline, so as in time by the ponding on the outside of preset pipeline
Discharge in time.
Another technical scheme of the present invention is on above-mentioned basis, and waterstop port, limit are additionally provided with the drainage tube
Position device and ball float, the diameter of the waterstop port are less than the aperture of the drainage tube, and the stopping means is arranged on the sealing
The lower section of mouth, the ball float are arranged between the stopping means and waterstop port, and the diameter of the ball float is more than the waterstop port
Diameter and less than the drainage tube aperture.Ball float mechanism is provided with drainage tube, when preset pipeline occurs to block or overflows
During water, the water being back to from preset pipeline in drainage tube can make ball float float, and when ball float floats to waterstop port, ball float is in buoyancy
Waterstop port is blocked under effect, so as to prevent water to be back to from preset pipeline by drainage tube in bathing room.
Another technical scheme of the present invention is that on above-mentioned basis the stopping means is filter screen or gag lever post or limit
Position projection.When no water is back to drainage tube from preset pipeline, stopping means plays support, position-limiting action to ball float, prevents from working as
Ponding from the water inlet of drainage tube flow into drainage tube when, drive ball float to move and block preset to the seepage mouth direction of preset pipeline
The seepage mouth of pipeline.
The present invention another technical scheme be it is above-mentioned basis on, the preset pipeline and the drainage tube integrated injection
It is moulded into type.When preset pipeline and the drainage tube integral molded plastic are molded, there is no gap between preset pipeline and drainage tube entirety,
Can be with one-shot forming, moreover, the production technology efficiency high being molded using integral molded plastic, steady quality is reliable, and production cost is relative
It is relatively low, be advantageous to large-scale promotion application.
Another technical scheme of the present invention is that on above-mentioned basis the preset pipeline and the drainage tube are detachable
Connection.When preset pipeline and the drainage tube are detachably connected, preset pipeline separately facilitates with drainage tube, be easy to maintenance and more
Change, so as to reduce cost.
Another technical scheme of the present invention is that on above-mentioned basis the leakproof deodorization apparatus is described pre- to be arranged on
The deodorization case outside pipe side wall is put, isolation tongue is provided with the deodorization case, seepage mouth is provided with the preset pipe side wall,
The tongue position for isolating tongue described in the vertical direction is less than the position of the seepage mouth.Deodorization is set outside preset pipe side wall
Case, so when bathroom bottom ponding, can in time by deodorization case draining, due to being provided with isolation tongue in the deodorization case,
Seepage mouth is provided with the preset pipe side wall, the tongue position that tongue is isolated described in the vertical direction is less than the seepage mouth
Position, after ponding flows into deodorization case from the water inlet of deodorization case, the shape between the isolation tongue and preset pipe side wall of deodorization case
Into water seal, when the water in deodorization case gradually increases, and water level exceedes the seepage mouth of preset pipeline, ponding is oozing from preset pipeline
The mouth of a river is drained into preset pipeline, so as in time discharge the ponding on the outside of preset pipeline in time.
Another technical scheme of the present invention is that on above-mentioned basis the isolation tongue and the preset pipeline are detachable
Connection;Or the isolation tongue and the preset pipeline integral molded plastic shaping.When preset pipeline and it is described isolation tongue integral molded plastic into
, can be with one-shot forming during type, moreover, the production technology efficiency high being molded using integral molded plastic, steady quality is reliable, production cost
It is relatively low, be advantageous to large-scale promotion application.When preset pipeline and it is described isolation tongue be detachably connected when, preset pipeline with every
Separately facilitate from tongue, be easy to repair and change, so as to reduce cost.And difficulty of processing can be reduced with separate machined and die sinking.
Another technical scheme of the present invention is that on above-mentioned basis the deodorization case and the preset pipeline are detachable
Connection;Or the deodorization case and the preset pipeline integral molded plastic shaping.When preset pipeline and the deodorization case integral molded plastic into
, can be with one-shot forming during type, moreover, the production technology efficiency high being molded using integral molded plastic, steady quality is reliable, production cost
It is relatively low, be advantageous to large-scale promotion application.When preset pipeline and the deodorization case are detachably connected, preset pipeline with every
Separately facilitate from tongue, be easy to repair and change, so as to reduce cost.And difficulty of processing can be reduced with separate machined and die sinking.
Another technical scheme of the present invention is on above-mentioned basis, and the dress that is connected is provided with the module body
Put.It is provided with and is connected after device in module body, in plumbing integration module installation process, will need to be only connected
Device is fixedly connected with the periphery of reserved opening, and efficiency of construction is greatly improved.
Another technical scheme of the present invention is on above-mentioned basis, described to be connected device to be arranged on the mould
Block body top and/or the annular toss of sidepiece;Or the device that is connected is to be arranged on the module body outer wall
Outer convex module;Or the device that is connected is the concave inward structure for being arranged on the module body outer wall.In this way, when connection
Fixing device be when being arranged on the annular toss of the module body top and/or sidepiece be advantageous to plumbing integration module with
Slab surfaces are connected, and further can set rubbery toroidal ring in annular toss bottom, can be by plumbing integration module
Thoroughly sealed with reserved opening, can prevent bathroom from seeping water to next layer;When the device that is connected is to be arranged on the module
When outer the convex module or concave inward structure of body outer wall, correspondingly, the reserving hole relevant position on floor is arranged to indent
Hole or outer projection, after the installation of plumbing integration module, on the outer convex module or concave inward structure and floor of module body outer wall
The inside recess that sets of reserving hole relevant position or outer projection match, so as to by plumbing integration module and floor tenon
Set connection positioning, improve the load ability of plumbing integration module so that pipeline also will not in the case where blocking the load of product full water
Displacement up and down occurs to destroy.
Another technical scheme of the present invention is that on above-mentioned basis the module body outer wall is provided with water stopping trough.
After the module body outer wall of draining integration module is provided with water stopping trough, caused ponding will not be from use for bathroom
The reserved opening down seepage of plumbing integration module installation.
Another technical scheme of the present invention is on above-mentioned basis, is chosen on the water stopping trough outside notch.In draining collection
After module body outer wall into module is provided with water stopping trough, and notch is chosen outside on water stopping trough, bathroom is produced in use
Ponding infiltration will not can be converged from the reserved opening down seepage that plumbing integration module is installed because being chosen outside notch on water stopping trough
Collection, prevent it from penetrating into next floor.
Another technical scheme of the present invention is on above-mentioned basis, and collector pipe is additionally provided with the module body,
Described collector pipe one end connects water stopping trough, and the other end connects preset pipeline.When being additionally provided with collector pipe, the collection in module body
Water pipe one end connects water stopping trough, and when the other end connects preset pipeline, the ponding that water stopping trough collects can be discharged into down by collector pipe
In waterpipe, prevent that its product is full excessive, thoroughly solve the problems, such as bathroom ponding.
Another technical scheme of the present invention is that on above-mentioned basis the module body outer wall is matte or spiral lamination
Road.When module body outer wall is matte or spiral thread, after the plumbing integration module is installed in floor reserved opening, then use
During the waterproof bonding material filleting such as cement mortar, matte or spiral thread can be such that plumbing integration module is closely tied with adhesives
Close, be not easy to seep water and improve the frictional force between plumbing integration module and floor, improve the load energy of plumbing integration module
Power.
Another technical scheme of the present invention is that on above-mentioned basis the side wall material is metal or organic material
Material.When side wall material is metal or organic material, the simple production process of plumbing integration module, punching press or weldering are molded
Connect, be advantageous to high-volume low cost production.
Another technical scheme of the present invention is that on above-mentioned basis the packing material is foam concrete, expansion
Pearlite concrete or haydite concrete.Using foam concrete, expanded perlite concrete or haydite concrete conduct
Packing material so that plumbing integration module from heavy and light, be easily portable and install, meanwhile, also help and chisel packing material
Its interior conduit is repaired and changed.In addition, when with foam concrete, the effect of interlayer fireproof can be not only played, moreover it is possible to
Play the good soundproof effect of strike note to current.
Another technical scheme of the present invention is that on above-mentioned basis the preset pipeline includes drainpipe and feedwater
Pipe, or, the preset pipeline includes the sleeve pipe and drainpipe of feed pipe.By default drainpipe and feed pipe, will can give
After drainage pipeline and feed pipe are integrated together, be advantageous to the I&M of pipeline, and improve Pipe installing efficiency and letter
Change work progress.Or by presetting the sleeve pipe and drainpipe of feed pipe, feed pipe can be installed in the sleeve pipe of feed pipe,
And be integrated together with drainpipe, be advantageous to the I&M of pipeline.Can certainly by preset feed pipe sleeve pipe and
Drain bushing, feed pipe and drainpipe are respectively arranged in the sleeve pipe and drain bushing of feed pipe, so as to incite somebody to action
Water supply and sewerage pipeline and feed pipe are integrated together, and are improved Pipe installing and the convenience safeguarded, are simplified work progress.
Another technical scheme of the present invention is on above-mentioned basis, is additionally provided with the module body with bathroom
The connected trap of leakage.After the trap being connected with bathroom floor drain is additionally provided with module body, trap can be by under
Foul smell in waterpipe is separated, and prevents it from entering along pipeline in bathing room.Meanwhile trap is arranged at plumbing
In integration module, and it is connected by pipeline with bathroom floor drain, so the floor below bathing room can not be carried out to drop plate processing,
I.e. bathing room can be not provided with caisson, and the ponding during use in bathing room is flowed into by pipeline from bathroom floor drain to be arranged on
In trap in plumbing integration module, then it is drained into drainpipe, so as to simplify building structure and work progress, carries
High efficiency of construction.
The present invention another technical scheme be it is above-mentioned basis on, the preset pipeline also include breather pipe and/or
Hot-water line;Or the preset pipeline also includes the sleeve pipe and/or breather pipe of hot-water line.More pipelines are integrated together,
It is more beneficial for the I&M of pipeline;In addition, installation breather pipe more meets the requirement of skyscraper, ensure drainpipe draining
Patency, reduce the possibility of drainpipe plugging;The installation of the sleeve pipe of hot-water line or hot-water line, is more suitable for Hotel Buildings, is easy to collect
Middle hot-water supply.
Another technical scheme of the present invention is that on above-mentioned basis at the top of the drainpipe or bottom is also associated with becoming
Footpath device.After diameter changing device is set, pair of standpipe and the preset pipeline in plumbing integration module between convenient floor up and down
Connect;In addition, being such as provided that big opening reducer pipe, then high flow rate pass can be formed in plumbing integration module so that dirty
Stain, which is not easy to deposit in plumbing integration module, to be blocked.Small opening reducer pipe can certainly be set, then can be in plumbing
Multiple entrances are set in integration module, facilitate multiple position ponding to be discharged into same sewer pipe.
Another technical scheme of the present invention is that on above-mentioned basis the top or bottom of the diameter changing device are connected with
Pipeline eccentric.When the top of diameter changing device or bottom are connected with pipeline eccentric, can solve upper and lower pipeline and not exist
Installation question on same axis, it is only necessary to which adjusting eccentric smooth can dock, and reduce Pipe installing difficulty.
Another technical scheme of the present invention is that on above-mentioned basis the drainpipe includes the first horizontal tube connector,
The dewatering horizontal tube of the first horizontal tube connector connection closestool and/or washbowl.First horizontal tube connector connects closestool and/or washbowl
Dewatering horizontal tube after, caused sewage during its use can be imported in the drainage pipeline in plumbing integration module.
Another technical scheme of the present invention is that on above-mentioned basis the drainpipe also includes the second transverse tube and connect
Head, second horizontal tube connector are connected with one end of the trap, the other end of the trap and the floor drain
Drainpipe is connected.So, the second horizontal tube connector is connected with one end of trap, the other end of trap and the floor drain
Drainpipe be connected after, the surface area water on bathroom ground can be entered in drainpipe by floor drain.
Another technical scheme of the present invention is that on above-mentioned basis the floor drain is side wall floor drain.When floor drain is side
During wall floor drain, all water supply and sewerage pipelines can solve needs and set pipeline below bathroom bottom plate by being laid in wall
Complicated construction problem.Meanwhile be arranged at reference to by trap in plumbing integration module, further can not be to bathroom
Floor below room carries out dropping plate processing, i.e., bathing room can be not provided with caisson, and the ponding during use in bathing room passes through
Side wall floor drain is flowed into the trap being arranged in plumbing integration module, then is drained into drainpipe.So as to simplify
Work progress, improve efficiency of construction.
Another technical scheme of the present invention is on above-mentioned basis, and expansion ring is additionally provided with the drainpipe.
After being provided with expansion ring on drainpipe, in the case of pipe built-in, expansion ring can solve the problems, such as that pipeline is short on a small quantity, is not required to
Changing pipeline can connect, meanwhile, expansion ring can also do and offset the mouth of pipe by a small margin, make the pipeline that it is docked not in same axle
It can also be connected on line;Existing drainpipe uses pvc pipe more, micro-strain can be produced under temperature change, be built for high level
For building, small deformation will form larger deflection after the accumulation of multilayer, it is most likely that make the broken of twin conduit
It is bad, by setting expansion ring on drainpipe, the deformation with regard to interlayer can be eliminated, prevent that deformation is cumulative.
Another technical scheme of the present invention is on above-mentioned basis, and fire trapping ring or anti-is provided with the preset pipeline
Fire bed.After fire trapping ring or fireprotection layer are provided with preset pipeline, when bathroom meets with fire, fire trapping ring or fireprotection layer can be with
Burning things which may cause a fire disaster is blocked to spread up and down.
Another technical scheme of the present invention is that on above-mentioned basis the module body is additionally provided with top cover or bottom
Lid.When module body is provided with top cover or bottom, top cover sets rubber seal with module body junction, while in top cover
Or after bottom is also provided with rubber seal with pipeline connection, it can prevent that bathroom excess surface water is past by plumbing integration module
Next layer of infiltration.
Another technical scheme of the present invention is on above-mentioned basis, the side wall of the module body be provided with rib or
Reinforcement.After the side wall of module body is provided with rib or reinforcement, the wall thickness of module body can be reduced further, together
When, the rigidity of module body in itself is higher, make its in application process will not deformed damaged, particularly in rib or reinforcement
After crisscross formation grid, the shock resistance damage capability and weight capacity of module body is greatly improved.
The present invention another technical scheme be it is above-mentioned basis on, the module body and preset pipeline integral molded plastic
Shaping.When module body and preset pipeline integral molded plastic are molded, do not have between the fixed component of module body and preset pipeline
Gap, moreover, the production technology efficiency high being molded using integral molded plastic, steady quality is reliable, and production cost is relatively low, favorably
In large-scale promotion application.
Another technical scheme of the present invention is that on above-mentioned basis the module body and preset pipeline are beaten using 3D
Print is integrally formed.When module body and preset pipeline planform complexity, when production and construction and installation are extremely inconvenient, beaten using 3D
Print is integrally formed, and is advantageous to manufacturing for plumbing integration module.So, can due to screens of the reserved opening to preset pipeline
To play a part of pre-determined bit to preset pipeline, moreover, when packing material is clogged, eliminate in the lower end of module body
The operation of face formwork, has not only saved manufacture craft, and bottom surface can also play certain supporting role to packing material.
Another technical scheme of the present invention is that on above-mentioned basis the bottom of the module body is provided with bottom surface, institute
State bottom surface and be provided with the reserved opening that preset pipeline passes through.Due to screens of the reserved opening to preset pipeline, preset pipeline can be risen
To the effect of pre-determined bit, moreover, when packing material is clogged, the operation in the lower surface formwork of module body is eliminated,
Manufacture craft is not only saved, bottom surface can also play certain supporting role to packing material.
What another solution of the present invention was realized in:A kind of supply and drain water system of bathing room is provided, including
Soil stack and water supply riser, in addition to the plumbing integration module, the soil stack and water supply riser with it is described pre-
Pipeline is put to be connected.So, in the supply and drain water system of bathing room, soil stack and water supply riser are connected with the preset pipeline
Afterwards, the bathing room water supply and sewerage pipeline in the whole same vertical axis of building and horizontal pipeline are combined into complete discharge water system
System, after being especially provided with plumbing integration module, plumbing integration module is integrated into the various pipes in building are preset
Together and it is arranged in the same module to occupy little space, for pipeline above and below traditional floor is laid, because of discharge
Water integration module has been filled with sealing in itself, and reserved opening does not need cast-in-place closure, that is, does not need live formwork, cast-in-place coagulation
Soil, form removal and maintenance, are directly fixed on reserved opening, and installation rate is very fast, environment by plumbing integration module
Pollute small, site tissue accessory is few, and assembly working amount is small;In addition, after pipeline or plumbing integration module aging, can also be very
It is convenient to change, it is not necessary to destroy floor.
Brief description of the drawings
Fig. 1 is the structure chart for representing the plumbing integration module involved by a kind of embodiment of this technology;
Fig. 2 is the structure chart for representing the plumbing integration module involved by this technology another embodiment;
Fig. 3 is the sectional view for representing the plumbing integration module involved by this technology another embodiment;
Fig. 4 is the top view for representing the plumbing integration module involved by this technology another embodiment;
Fig. 5-Figure 10 is several structure charts of the device that is connected of plumbing integration module shown in Fig. 1;
Figure 11 is the structure chart of the preset pipeline of plumbing integration module shown in Fig. 1;
Figure 12 is the sectional view of the another embodiment of the preset pipeline of plumbing integration module shown in Fig. 1;
Figure 13 is the structure chart for representing the plumbing integration module involved by this technology another embodiment;
Figure 14 is the installation diagram for representing the plumbing integration module involved by a kind of embodiment of this technology;
Figure 15 is the knot for the leakproof deodorization apparatus for representing the plumbing integration module involved by a kind of embodiment of this technology
Composition;
Figure 16 is the leakproof deodorization apparatus for representing the plumbing integration module involved by this technology another embodiment
Structure chart;
Figure 17 and Figure 18 is the sectional view of the aqueduct of leakproof deodorization apparatus described in Figure 16;
Figure 19 is the leakproof deodorization apparatus for representing the plumbing integration module involved by this technology another embodiment
Structure chart;
Figure 20 is the structure chart for representing the plumbing integration module involved by this technology another embodiment;
Figure 21 is the structure chart for representing the plumbing integration module involved by this technology another embodiment;
Figure 22 is the installation diagram for representing the integral bathroom involved by this technology another embodiment.
In figure:
110 module body, the 111 annular concave inward structure of 112 edge projection of toss 113
The collector pipe of 114 1211 water stopping trough of outer 121 drainpipe of convex module 1212
The hot-water line of 1213 first horizontal tube connector, 1214 expansion ring, 1215 fire trapping ring 122
The trap of 123 cold water feed pipe, 124 breather pipe, 125 ground leaking drainage pipe 1251
The packing material of 1252 1,253 90 degree of one eighth bend elbow, 1,254 second horizontal tube connector 130
The seepage mouth of 141 drainage tube, 1411 bootstrap block, 1412 guiding bar 142
The ball float of 143 water inlet, 144 waterstop port, 145 stopping means 146
The cross bar of 147 deodorization casees 148 isolation tongue, 1481 tongue 1101
The bathing room of 1102 vertical pole, 1103 vertical rod, 10 floor drain 200
The pipeline eccentric of 400 floor, 430 caisson, 1216 diameter changing device 1217
Embodiment
The present invention will be described in detail below in conjunction with the accompanying drawings, and the description of this part is only exemplary and explanatory, should not
There is any restriction effect to protection scope of the present invention.In addition, description of the those skilled in the art according to this document, can be right
Feature in this document in embodiment and in different embodiments carries out respective combination.
The embodiment of the present invention is as follows, refers to Fig. 1, what solution of the invention was realized in:Plumbing integrates mould
Block includes module body 110 and preset pipeline, and the preset pipeline is default to be fixed in the module body 110, described preset
A leakproof deodorization apparatus is provided with pipeline.The module body 110 includes at least one side wall, and side wall encloses composition tubular
Framework, the preset pipeline are arranged in the tubular framework, are provided with and are filled out between the preset pipeline and the tubular framework
Fill material 130.It should be noted that above-mentioned " tubular " does not form the restriction to plumbing integration module shape, the tubular
The cross section of framework can be the planforms such as polygon (as shown in Figure 1) or circle.The preset pipeline is fixed on described
In module body 110, the packing material 130 is preferably refractory material.In this programme, plumbing integration module is by building
In various pipes it is prefabricated be integrated together and be arranged in same tubular framework, then filled and presented again between pipeline and framework
Packing material, material is thus formed a prefabricated integral module, in this way, in construction, it is only necessary to which plumbing is integrated
Module is installed in the reserved opening (such as equipment well head) of every floor, then carries out the standpipe installation between floor up and down, so
The installation connection work of pipeline in building is completed, packing material can also play closing reserved opening, sound insulation, fireproof work
With;For pipeline above and below traditional floor is laid, because plumbing integration module has been filled with sealing in itself, reserved opening
Cast-in-place closure is not needed, that is, does not need live formwork, cast-in-place concrete, form removal and maintenance, directly consolidates plumbing integration module
Reserved opening is scheduled on, and installation rate is very fast, and environmental pollution is small, and site tissue accessory is few, and assembly working amount is small;Separately
Outside, after pipeline or plumbing integration module aging, can also very easily change, it is not necessary to destroy floor.Certainly, according to need
Will, two or more leakproof deodorization apparatus can also be set on the preset pipeline.
On the basis of above-described embodiment, in another embodiment of the present invention, Fig. 2, the module body concrete are referred to
Or the sizing fixing device of cement production systD, the preset pipe built-in is in the module body.In another embodiment of the present invention,
Figure 20 is referred to, the module body is formed by being connected with each other the framework that integral hack lever forms, and the hack lever includes cross bar
1101st, vertical pole 1102 and vertical rod 1103, the hack lever are interconnected to form three-dimensional frame structure.By some cross bars 1101,
Vertical pole 1102 and the various combination of vertical rod 1103 are assembled, can assemble the three-dimensional framework of different sizes and shapes as needed
The module body of structure.The preset pipe built-in is in the module body 110, between the preset pipeline and the framework
It is cast with concrete or cement slurry.In another embodiment of the present invention, Figure 21 is referred to, the module body is hollow box body knot
Structure, the preset pipeline are fixed in the module body 110 by bolt, the collar, bearing or welding manner.The present invention is another
In embodiment, the module body casts or is welded into body structure, the preset pipeline and the module sheet by metal material
Packing material is provided between body.In the above-described embodiment, plumbing integration module is prefabricated by the various pipes in building
It is integrated together and is arranged in same module body, then fills and presents packing material between pipeline and framework again, thus
A prefabricated integral module is formd, in this way, in construction, it is only necessary to which plumbing integration module is installed on every floor
Reserved opening (such as equipment well head) in, then carry out the standpipe installation up and down between floor, be so to complete building middle pipe
The installation connection work in road, packing material can also play closing reserved opening, sound insulation, fireproof effect;Relative to traditional building
Layer is up and down for pipeline laying, and because plumbing integration module has been filled with sealing in itself, reserved opening does not need cast-in-place closure, i.e.,
Live formwork, cast-in-place concrete, form removal and maintenance are not needed, plumbing integration module is directly fixed on reserved opening,
And installation rate is very fast, environmental pollution is small, and site tissue accessory is few, and assembly working amount is small;In addition, pipeline or plumbing
After integration module aging, can also very easily it change, it is not necessary to destroy floor.
On the basis of above-described embodiment, in another embodiment of the present invention, Figure 15 is referred to, the leakproof deodorization apparatus can
Think the drainage tube 141 being connected with the side wall of drainpipe 121, the drainage tube 141 can be under U-tube or drainage tube 141
Portion is provided with U-shaped structure or arcuate structure, is provided with seepage mouth 142 in the side wall of the drainpipe 121, and the of drainage tube 141
One end is connected with the seepage mouth 142, and the second end of the drainage tube is water inlet 143, and water inlet 143 is with being arranged on bathing room
It is typically more lower slightly than bathroom room floor on face or metope.The position of water inlet 143 described in the vertical direction is higher than the seepage mouth
142 position., can be in time by the draining of drainage tube 141, because drainage tube 141 is U-shaped so when bathing room bottom ponding
The lower end of pipe or drainage tube 141 is U-shaped structure, after ponding flows into drainage tube 141 from the water inlet 143 of drainage tube, is being drawn
The lower end of flow tube 141 forms water seal, and when the water in drainage tube 141 gradually increases, water level exceedes the seepage mouth 142 of drainpipe 121
When, ponding is to be drained into from the seepage mouth 142 of drainpipe 121 in drainpipe 121, so as in time by the outside of drainpipe 121
Ponding is discharged in time.Certain leakproof deodorization apparatus can also be arranged on the outside of other preset pipelines, will not be repeated here.
On the basis of above-described embodiment, in another embodiment of the present invention, Figure 16 is referred to, is gone back in the drainage tube 141
Waterstop port 144, stopping means 145 and ball float 146 are provided with, the diameter of the waterstop port 144 is less than the hole of the drainage tube 141
Footpath, the stopping means 145 are arranged on the lower section of the waterstop port 144, and the ball float 146 is arranged on the stopping means 145
Between waterstop port 144, the diameter of the ball float 146 is more than the diameter of the waterstop port 144 and less than the drainage tube 141
Aperture.Ball float 146 is provided with drainage tube 141, when blocking or spilling water occur for drainpipe 121, is back to from drainpipe 121
Water in drainage tube 141 can make ball float 146 float, and when ball float 146 floats to waterstop port 144, ball float 146 is under buoyancy
Waterstop port 144 is blocked, so as to prevent water to be back to from drainpipe 121 by drainage tube 141 in bathing room.The waterstop port 144,
The collar or chuck that can be provided in the pipe of drainage tube 141.The ball float 146 also differ be set to it is spherical, as long as with it is described only
Mouth of a river form fit, hermetic seal can be formed at waterstop port under buoyancy.
On the basis of above-described embodiment, in another embodiment of the present invention, the stopping means 145 can be filter screen or limit
Position bar or spacing block set.When no water is back to drainage tube 141 from drainpipe 121, stopping means 145 plays branch to ball float 146
Support, position-limiting action, prevent from, when ponding flows into drainage tube 141 from the water inlet 143 of drainage tube, driving ball float 146 to drainpipe
Move and block the seepage mouth 142 of drainpipe 121 in 121 direction of seepage mouth 142.It is furthermore preferred that Figure 17 and Figure 18 are referred to,
The inwall of drainage tube 141 can set bootstrap block 1411 or guiding bar 1412, and the guiding bar 1412 can set 3 or 3
More than individual, the motion path of ball float 146 can be so limited, prevents the beat in the drainage tube 141 of ball float 146.
On the basis of above-described embodiment, in another embodiment of the present invention, the drainpipe 121 and the drainage tube 141
Integral molded plastic is molded.When drainpipe 121 and the integral molded plastic of the drainage tube 141 are molded, drainpipe 121 and drainage tube 141 are whole
There is no gap between body, can be with one-shot forming, moreover, the production technology efficiency high being molded using integral molded plastic, steady quality can
Lean on, production cost is relatively low, is advantageous to large-scale promotion application.
On the basis of above-described embodiment, in another embodiment of the present invention, the drainpipe 121 and the drainage tube 141
It is detachably connected.When drainpipe 121 and the drainage tube 141 are detachably connected, drainpipe 121 and the side of separating of drainage tube 141
Just, it is easy to repair and change, so as to reduce cost.
On the basis of above-described embodiment, in another embodiment of the present invention, Figure 19 is referred to, the leakproof deodorization apparatus is
The deodorization case 147 being arranged on outside the side wall of drainpipe 121, isolation tongue 148, the draining are provided with the deodorization case 147
Seepage mouth 142 is provided with the side wall of pipe 121, the position of tongue 1481 that tongue is isolated described in the vertical direction is less than the seepage mouth
142 position.The both sides of isolation tongue 148 are tightly connected with the deodorization case 147.Deodorization case is set outside the side wall of drainpipe 121
147, can be in time by the draining of deodorization case 147, due to being provided with the deodorization case 147 so when bathroom bottom ponding
Isolate tongue 148, seepage mouth 142 is provided with the side wall of drainpipe 121, the tongue 1481 of tongue is isolated described in the vertical direction
Position is less than the position of the seepage mouth 142, after ponding flows into deodorization case 147 from the water inlet of deodorization case 147, in deodorization case
Water seal is formed between 147 isolation tongue 148 and the side wall of drainpipe 121, when the water in deodorization case 147 gradually increases, water level exceedes row
During the seepage mouth 142 of water pipe 121, ponding is to be drained into from the seepage mouth 142 of drainpipe 121 in drainpipe 121, so as to timely
The ponding in the outside of drainpipe 121 is discharged in time.
On the basis of above-described embodiment, in another embodiment of the present invention, the isolation tongue 148 and the drainpipe 121
It is detachably connected;Or the isolation tongue 148 and the shaping of the integral molded plastic of the drainpipe 121.When drainpipe 121 and the isolation tongue
, can be with one-shot forming, moreover, the production technology efficiency high being molded using integral molded plastic, steady quality when 148 integral molded plastics are molded
Reliably, production cost is relatively low, is advantageous to large-scale promotion application.When drainpipe 121 and the isolation tongue 148 detachably connect
When connecing, drainpipe 121 separately facilitates with isolating tongue 148, is easy to repair and change, so as to reduce cost.And can be with separate machined
With die sinking, difficulty of processing is reduced.
On the basis of above-described embodiment, in another embodiment of the present invention, the deodorization case 147 and the drainpipe 121
It is detachably connected;Or the deodorization case 147 and the shaping of the integral molded plastic of the drainpipe 121.When drainpipe 121 and the deodorization case
, can be with one-shot forming, moreover, the production technology efficiency high being molded using integral molded plastic, steady quality when 147 integral molded plastics are molded
Reliably, production cost is relatively low, is advantageous to large-scale promotion application.When drainpipe 121 and the deodorization case 147 detachably connect
When connecing, drainpipe 121 separately facilitates with isolating tongue 148, is easy to repair and change, so as to reduce cost.And can be with separate machined
With die sinking, difficulty of processing is reduced.
On the basis of above-described embodiment, in another embodiment of the present invention, it can also be set in the lower end of module body 110
Bottom surface, the reserved opening passed through for preset pipeline is provided with bottom surface, so, can be with due to screens of the reserved opening to preset pipeline
Pre-determined bit is played a part of to preset pipeline, moreover, when packing material is clogged, eliminated under module body 110
The operation of end face formwork, has not only saved manufacture craft, and bottom surface can also play certain supporting role to packing material.
On the basis of above-described embodiment, in another embodiment of the present invention, Fig. 1, Fig. 2, Fig. 5 are referred to Figure 10, in institute
The device that is connected can be provided with by stating in module body, in plumbing integration module installation process, will need to be only connected
Device is overlapped on the periphery of reserved opening, or the device that will be connected is joined with bolts at reserved opening, significantly
Degree improves efficiency of construction, of course for waterproof or further fixed, and will can also be connected device and building at reserved opening
The gap of the connecting portion of plate carries out filleting or cast-in-place.Specifically, the device that is connected can be to be arranged on the cylinder
Shape framework top and/or the annular toss 111 (as illustrated in fig. 1 and 2) of sidepiece, the annular toss 111 can outwards choose 40-
50mm;Or the device that is connected can also be arranged on the tubular framework outer wall outer convex module 114 (such as Fig. 5,
Shown in Fig. 7, Fig. 8 and Figure 10), outer convex module 114 can be the edge projection for being arranged on the tubular framework outer wall lower edges
112 or the middle projection that is arranged in the middle part of the tubular framework outer wall;Or the device that is connected can also
To be arranged on the concave inward structure 113 of the tubular framework outer wall (as shown in Fig. 6 and Fig. 9), the outer convex module or concave inward structure
Size and number can set as needed.In this way, when be connected device for be arranged on the module body top and/or
During the annular toss of sidepiece, be advantageous to plumbing integration module and be connected with slab surfaces, further under annular toss
Portion can set rubbery toroidal ring, can thoroughly seal plumbing integration module and reserved opening, can prevent bathroom from seeping water
To next layer;When the device that is connected is to be arranged on the outer convex module or concave inward structure of the module body outer wall, accordingly
Ground, the reserving hole relevant position on floor is arranged to inside recess or outer projection, after the installation of plumbing integration module, module
The outer convex module of body outer wall inside recess or evagination that either concave inward structure is set with the reserving hole relevant position on floor
Block matches, and so as to which plumbing integration module and the set connection of floor tenon are positioned, improves the load of plumbing integration module
Ability so that displacement up and down will not also occur in the case where blocking the load of product full water for pipeline destroys.Integrated simultaneously using the plumbing
Module can greatly reduce the workload of field pipes installation.Further, since plumbing integration module is sealed in itself, on floor
Preformed hole hole be also not required to, in cast-in-place closure, reduce the processes such as formwork, casting concrete, form removal and maintenance.
On the basis of above-described embodiment, in another embodiment of the present invention, Fig. 3 and Fig. 4 are referred to, in the module body
Be also provided with water stopping trough 1211 on outer wall, the water stopping trough 1211 can be along the annular groove around module body outer wall,
How much the size of water stopping trough can set according to water.The module body outer wall of draining integration module is provided with water stopping trough
Afterwards, caused ponding will not be from the reserved opening down seepage that plumbing integration module is installed in use for bathroom.
On the basis of above-described embodiment, in another embodiment of the present invention, Fig. 3 and Fig. 4, the water stopping trough 1211 are referred to
Chosen outside upper notch.The module body outer wall of draining integration module is provided with water stopping trough 1211, and after being chosen on water stopping trough outside notch,
Caused ponding will not be from the reserved opening down seepage that plumbing integration module is installed, because of water stopping trough in use for bathroom
Choose and infiltration can be collected outside upper notch, prevent it from penetrating into next floor.
On the basis of above-described embodiment, in another embodiment of the present invention, Fig. 3 and Fig. 4 are referred to, in the module body
Collector pipe 1212 is also provided with, described one end of collector pipe 1212 connects water stopping trough 1211, and the other end connects preset pipeline.This
The ponding that sample water stopping trough 1211 collects can be discharged into sewer pipe by collector pipe 1212, prevent that its product is full excessive, thoroughly solution
Determine bathroom ponding problem.
On the basis of above-described embodiment, in another embodiment of the present invention, the module body outer wall can be matte or
Spiral thread.When module body outer wall is matte or spiral thread, the plumbing integration module is installed in floor reserved opening
Afterwards, during then with the waterproof bonding material filleting such as cement mortar, matte or spiral thread can make plumbing integration module and Nian Jie material
Material is combined closely, and is not easy to seep water and is improved the frictional force between plumbing integration module and floor.
On the basis of above-described embodiment, in another embodiment of the present invention, the side wall material can be metal or have
Machine material.When side wall material is metal or organic material, the simple production process of plumbing integration module, mold punching press or
Person welds, and is advantageous to high-volume low cost production.
On the basis of above-described embodiment, in another embodiment of the present invention, the packing material 130 can be foam coagulation
The fire proofing materials such as soil, expanded perlite concrete or haydite concrete., can if shown plumbing integration module blocks
Shown packing material 130 is excavated, dredges, change preset pipeline, therefore the bottom plate that need not excavate whole bathroom is overhauled.
Using foam concrete, expanded perlite concrete or haydite concrete as packing material so that plumbing integration module
From heavy and light, be easily portable and install, meanwhile, also help to chisel packing material and repair its interior conduit and change.Used in addition, working as
When foam concrete, the effect of interlayer fireproof can be not only played, moreover it is possible to play the good sound insulation of strike note to current
Effect.
On the basis of above-described embodiment, in another embodiment of the present invention, Figure 13 is referred to, the preset pipeline can wrap
Drainpipe 121 and cold water feed pipe 123 are included, or, the preset pipeline can include the sleeve pipe and drainpipe of cold water feed pipe,
This plumbing integration module can be utilized in low multilayer residential architecture, because floor is low, sewage discharge will not cause draining
Air compression in pipe, without setting breather pipe etc..The preset pipeline can also include ground leaking drainage pipe 125.By default
Drainpipe 121 and cold water feed pipe 123, after water supply and sewerage pipeline 121 and cold water feed pipe 123 being integrated together, favorably
In the I&M of pipeline, and improve Pipe installing efficiency and simplify work progress.Or by presetting cold water feed pipe
Sleeve pipe and drainpipe, cold water feed pipe can be installed in the sleeve pipe of cold water feed pipe, and be integrated together with drainpipe,
Be advantageous to the I&M of pipeline.Can certainly be by the sleeve pipe and drain bushing of default cold water feed pipe, by cold water
Feed pipe and drainpipe are respectively arranged in the sleeve pipe and drain bushing of cold water feed pipe, so that can also be by water supply and sewerage pipeline
It is integrated together with cold water feed pipe, improves Pipe installing and the convenience safeguarded, simplify work progress.
On the basis of above-described embodiment, in another embodiment of the present invention, Fig. 3 and Figure 11, the module body are referred to
Inside it is additionally provided with the trap 1251 being connected with bathroom floor drain.The water being connected with bathroom floor drain is additionally provided with module body
After elbow, trap 1251 can separate the foul smell in sewer pipe, prevent it from entering along pipeline in bathing room.Together
When, trap 1251 is arranged in plumbing integration module, and be connected by pipeline with bathroom floor drain, so can not be right
Floor below bathing room carries out dropping plate processing, i.e., bathing room can be not provided with caisson, the ponding during use in bathing room
It is flowed into the trap being arranged in plumbing integration module, then is drained into drainpipe from bathroom floor drain by pipeline.
So as to simplify work progress, improve efficiency of construction.
On the basis of above-described embodiment, in another embodiment of the present invention, Fig. 1 and Fig. 2 are referred to, the preset pipeline is also
Breather pipe 124 and/or hot-water line 122 can be included;Or the preset pipeline can also include hot-water line sleeve pipe and/or
Breather pipe, pipeline of the breather pipe 124 with drainpipe 121 between floors are connected, specifically, the breather pipe 124 and draining
Pipe 121 forms H type pipes, and the air in drainpipe 121 can be avoided to arrange and do not go out and cause to have in pipeline pressure, influence sewage
Discharge.More pipelines are integrated together, are more beneficial for the I&M of pipeline;In addition, installation breather pipe more meets height
The requirement of layer building, ensure the patency of drainpipe draining, reduce the possibility of drainpipe plugging;The sleeve pipe of hot-water line or hot-water line
Installation, be more suitable for the public buildings such as hotel, be easy to centralizedly supply hot water.
On the basis of above-described embodiment, in another embodiment of the present invention, Figure 11, the top of drainpipe 121 are referred to
Or bottom can also be connected with diameter changing device 1216.The diameter changing device 1216 is preferably provided at the plumbing integration module
Top side, naturally it is also possible to be arranged on the bottom side of the plumbing integration module.After diameter changing device 1216 is set, convenient floor up and down
Between standpipe and the preset pipeline in plumbing integration module dock;In addition, being such as provided that big opening reducer pipe, then may be used
To form high flow rate pass in plumbing integration module so that spot, which is not easy to deposit in plumbing integration module, to be blocked,
And small opening reducer pipe is set, then multiple entrances can be set in plumbing integration module, facilitate multiple position ponding to be discharged into
In same sewer pipe.
On the basis of above-described embodiment, in another embodiment of the present invention, Figure 11 is referred to, the diameter changing device 1216
Top or bottom can also be connected with pipeline eccentric 1217.The pipeline eccentric 1217 is preferably provided at the discharge
The top side of water integration module, naturally it is also possible to be arranged on the bottom side of the plumbing integration module.When the top of diameter changing device 1216
When portion or bottom are connected with pipeline eccentric 1217, can solve the installation question of upper and lower pipeline not on the same axis, only
Need adjustment eccentric smooth can dock, reduce Pipe installing difficulty.
On the basis of above-described embodiment, in another embodiment of the present invention, Figure 11 is referred to, the drainpipe 121 may be used also
To include the first horizontal tube connector 1213, first horizontal tube connector 1213 connects the dewatering horizontal tube of closestool and/or washbowl.The
After one horizontal tube connector connects the dewatering horizontal tube of closestool and/or washbowl, caused sewage during its use can be imported discharge
In drainage pipeline in water integration module.
On the basis of above-described embodiment, in another embodiment of the present invention, Figure 11 is referred to, the drainpipe 121 may be used also
To include the second horizontal tube connector 1254, second horizontal tube connector 1254 is connected with one end of the trap 1251, institute
The other end for stating trap 1251 is connected with described ground leaking drainage pipe 125.Specifically, described ground leaking drainage pipe 125 can lead to
Cross 90 degree of elbows 1253 with the trap 1251 to be connected, trap 1251 passes through one eighth bend 1252 and described second again
Horizontal tube connector 1254 is connected.So, the second horizontal tube connector 1254 is connected with one end of trap 1251, trap
After 1251 other end is connected with the drainpipe 125 of the floor drain, the surface area water on integral bathroom ground can be leaked into by ground
Enter in drainpipe 121.
On the basis of above-described embodiment, in another embodiment of the present invention, Figure 14, the installation of plumbing integration module are referred to
At the equipment raise of bathing room side, the floor drain 10 is side wall floor drain.Connection ground leaking drainage pipe 125, side in constructing at the scene
Wall floor drain, ensure that trap 1251 be less than discharge outlet 200-300mm, can so utilize gravity and impulsive force draining, clearly
Except dirt.Bathing room 200 can coordinate simultaneously, and the horizontal plane of its bottom plate set into the gradient, and the lower of the gradient is toward the side of draining
Wall leak tilt.In addition, when floor drain is side wall floor drain, all water supply and sewerage pipelines can solve by being laid in wall
Need to set the complicated construction problem of pipelines below bathroom bottom plate.Meanwhile it is arranged at plumbing collection with reference to by trap
Into in module, further the floor below bathing room can not be carried out to drop plate processing, i.e., bathing room can be not provided with caisson,
Ponding during use in bathing room is flowed into by side wall floor drain in the trap being arranged in plumbing integration module,
It is drained into again in drainpipe.So as to simplify work progress, improve efficiency of construction.
On the basis of above-described embodiment, in another embodiment of the present invention, Figure 22 is referred to, bathing room is provided with caisson
430, the caisson 430 is arranged on below bottom plate 2;The supply and drain water system includes soil stack, water supply riser, trap
1251 and plumbing integration module;The plumbing integration module includes module body 110, preset pipeline, the preset pipeline
It is preset to be integrated in the module body 110;The trap 1251 is located in the caisson 430, the trap
1251st, soil stack and water supply riser are connected with the preset pipeline.Wherein, the caisson 430 is by entering to floor 400
Row drop plate processing forms.Connection ground leaking drainage pipe 125, floor drain, ensure that trap 1251 is less than draining in constructing at the scene
Mouth 200-300mm, it can so utilize gravity and impulsive force draining, remove dirt.Integral bathroom 200 can coordinate simultaneously,
The horizontal plane of its bottom plate is set into the gradient, the lower of the gradient tilts toward the ground leak of draining.
On the basis of above-described embodiment, in another embodiment of the present invention, Figure 12 is referred to, is gone back on the drainpipe 121
Expansion ring 1214 can be provided with.Existing drainpipe is all pvc pipe, and pvc pipe can produce micro-strain under temperature change, right
For skyscraper, small deformation will form larger deflection, thus very likely after the accumulation of multilayer
The destruction of twin conduit is made, by setting expansion ring 1214 on drainpipe 121, the deformation with regard to interlayer can be eliminated, prevents from deforming
It is cumulative;In addition, when progress soil stack docks with the preset pipeline in plumbing integration module, due to constructing or processing mistake
Difference, causes the length of standpipe to have deviation, and after setting expansion ring 1214, the deviation of riser length can be made up by expansion ring, be made
The installation effectiveness for obtaining pipeline improves.
On the basis of above-described embodiment, in another embodiment of the present invention, Figure 12 is referred to, it is (special on the preset pipeline
It is not on drainpipe 121 and breather pipe 124) fire trapping ring 1215 or fireprotection layer are installed.Fire trapping ring is installed on preset pipeline
1215 or fireprotection layer after, when bathroom meets with fire, fire trapping ring or fireprotection layer can block burning things which may cause a fire disaster to spread up and down.
On the basis of above-described embodiment, in another embodiment of the present invention, the module body is additionally provided with top cover.In mould
When block body is provided with top cover, top cover sets rubber seal with module body junction, while in top cover and pipeline connection
After being also provided with rubber seal, it can prevent bathroom excess surface water from being seeped water by plumbing integration module toward next layer.
On the basis of above-described embodiment, in another embodiment of the present invention, the side wall of the module body is provided with rib
Or reinforcement.After the side wall of module body is provided with rib or reinforcement, the wall thickness of module body can be reduced further, together
When, the rigidity of module body in itself is higher, make its in application process will not deformed damaged, particularly in rib or reinforcement
After crisscross formation grid, the shock resistance damage capability and weight capacity of module body is greatly improved.
On the basis of above-described embodiment, in another embodiment of the present invention, the module body and preset pipeline integrated injection
It is moulded into type.When module body and preset pipeline integral molded plastic are molded, there is no gap between module body and preset pipeline, and
And the production technology efficiency high being molded using integral molded plastic, steady quality is reliable, and production cost is relatively low, is advantageous to advise greatly
Mould popularization and application.
On the basis of above-described embodiment, in another embodiment of the present invention, the module body and preset pipeline use 3D
Printing integrated shaping.When module body and preset pipeline planform complexity, when production and construction and installation are extremely inconvenient, using 3D
Printing integrated shaping, be advantageous to manufacturing for plumbing integration module.
Plumbing integration module in all embodiments of the invention, you can for traditional common bathing room, can also use
In integral bathroom.
On the basis of above-described embodiment, in another embodiment of the present invention, a kind of discharge water system of bathing room is additionally provided
System, including soil stack and water supply riser, in addition to the plumbing integration module, the soil stack and water supply riser with
The preset pipeline is connected.So, in the supply and drain water system of bathing room, soil stack and water supply riser with the preset pipeline
After being connected, bathing room water supply and sewerage pipeline and horizontal pipeline in the whole same vertical axis of building are combined into complete plumbing
System, after being especially provided with plumbing integration module, plumbing integration module is preset integrated by the various pipes in building
To together and being arranged in the same module to occupy little space, for pipeline above and below traditional floor is laid, because giving
Draining integration module has been filled with sealing in itself, and reserved opening does not need cast-in-place closure, that is, does not need live formwork, cast-in-place coagulation
Soil, form removal and maintenance, are directly fixed on reserved opening, and installation rate is very fast, environment by plumbing integration module
Pollute small, site tissue accessory is few, and assembly working amount is small;In addition, after pipeline or plumbing integration module aging, can also be very
It is convenient to change, it is not necessary to destroy floor.
Described above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should
It is considered as protection scope of the present invention.