CN204491758U - A kind of drainage system of bathing room and bathing room - Google Patents

A kind of drainage system of bathing room and bathing room Download PDF

Info

Publication number
CN204491758U
CN204491758U CN201520189316.XU CN201520189316U CN204491758U CN 204491758 U CN204491758 U CN 204491758U CN 201520189316 U CN201520189316 U CN 201520189316U CN 204491758 U CN204491758 U CN 204491758U
Authority
CN
China
Prior art keywords
drainage
module
bathing room
bathing
gutter
Prior art date
Application number
CN201520189316.XU
Other languages
Chinese (zh)
Inventor
陈定球
彭海辉
谢俊
Original Assignee
中民筑友有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 中民筑友有限公司 filed Critical 中民筑友有限公司
Priority to CN201520189316.XU priority Critical patent/CN204491758U/en
Application granted granted Critical
Publication of CN204491758U publication Critical patent/CN204491758U/en

Links

Abstract

The drainage system of a kind of bathing room that the utility model provides, comprises leader, also comprises: rear drainage type toilet, and its toilet gutter is arranged on the rear side of toilet; Side wall floor drain, is arranged on the body of wall bottom of described bathing room; Described toilet gutter is all connected with described leader with the gutter of side wall floor drain.In institute's this programme, toilet gutter is arranged on the rear side of toilet, then the drainage pipe of toilet can wear and arrive in water main pipeline in body of wall, so arranges and can not need to arrange caisset; Side wall floor drain is arranged on the body of wall bottom of described bathing room, described toilet gutter is all connected with described leader with the gutter of side wall floor drain, floor drain drainage pipe can be laid in body of wall, solve the complicated construction problem needing to arrange pipeline below bathing room base plate.

Description

A kind of drainage system of bathing room and bathing room

Technical field

The utility model belongs to building field, is specially a kind of drainage system and bathing room of bathing room.

Background technology

The drainage system of the bathing room of traditional architecture is taked to be with the co-layer draining of caisson or different layer draining usually, by the elbow of wash basin, toilet, floor drain and install pipeline in bathing room sinking position or lower one deck ceiling place.Bathing room will arrange caisson, will fall plate process, but also additionally will arrange secondary beam to floor, complex structural designs, the backfilling working amount simultaneously after the installation of caisson interior conduit is large, and the load of back filled region is higher than other position of floor, in addition, waterproofing process is also very difficult, construction inconvenience.Different layer draining causes the waste of lower layer space local, visually unsightly, must carry out furred ceiling process, once leak, directly will pollute lower layer space.

The mounting method of the drainage system of the bathing room of traditional architecture is on floor hole needed for reserved equipment raise, by each for drainage system parts, as elbow, threeway, standpipe, transverse tube and trap etc. are assembled at the scene, afterwards because sound insulation, fire prevention etc. require to need hole to close, hanging module and cast-in-situ in construction, is adopted to close.There is the problems such as site tissue accessory is many, assembly working amount is large, formwork is complicated, spillage, mould cannot be removed, sealing is poor, noise pollution, replacing difficulty.

After drainage system service time of traditional bathing room is long, gutter gradually impeded drainage, silt up, because drainage pipe access hole is at ceiling place of lower floor, maintenance needs to carry out to lower floor, and damages lower floor's decorative cover, there is problems such as polluting lower floor.

Summary of the invention

The technical problems to be solved in the utility model is: the drainage system providing a kind of bathing room, which solves bathing room because needing to arrange the construction inconvenience that caisson brings, the problem that maintenance is difficult.

Another technical problem to be solved in the utility model is: provide a kind of bathing room, which solves bathing room because needing to arrange the construction inconvenience that caisson brings, the problem that maintenance is difficult.

Solution of the present utility model is achieved in that a kind of drainage system of bathing room, comprises leader, also comprises: rear drainage type toilet, and its toilet gutter is arranged on the rear side of toilet; Side wall floor drain, is arranged on the body of wall bottom of described bathing room; Described toilet gutter is all connected with described leader with the gutter of side wall floor drain.In institute's this programme, toilet gutter is arranged on the rear side of toilet, then the drainage pipe of toilet can wear and arrive in water main pipeline in body of wall, so arranges and can not need to arrange caisset; Side wall floor drain, is arranged on the body of wall bottom of described bathing room; Described toilet gutter is all connected with described leader with the gutter of side wall floor drain, and floor drain is side wall floor drain, and floor drain drainage pipe can be laid in body of wall, solves the complicated construction problem needing to arrange pipeline below bathing room base plate.Simultaneously, if also trap is arranged at outside bathing room, plate process can not be fallen further to the floor below bathing room, namely bathing room can not arrange caisson, ponding in use procedure in bathing room flow in leader by side wall floor drain, thus, simplify work progress, improve efficiency of construction.

Another technical scheme of the present utility model is on above-mentioned basis, and the gutter of described toilet gutter and side wall floor drain is arranged on the outside of described body of wall.The gutter of toilet gutter and side wall floor drain is arranged on the outside of described body of wall, the gutter of such toilet gutter and side wall floor drain can not take the space of bathing room inside, be conducive to the space efficiency utilization improving bathing room, also make bathing room cleaner and tidier, attractive in appearance in addition.

Another technical scheme of the present utility model is that, on above-mentioned basis, described leader is arranged in equipment raise.Being arranged by leader is arranged in equipment raise, can make full use of the space of equipment raise, improves building usable floor area further.

Another technical scheme of the present utility model is that, on above-mentioned basis, the gutter of described side wall floor drain also comprises trap, and described trap is also arranged in equipment raise.Trap is arranged in equipment raise, can not plate process be fallen the floor below bathing room, namely bathing room can not arrange caisson, ponding in use procedure in bathing room flow in trap by side wall floor drain, be drained into again in leader, thus simplify work progress, improve efficiency of construction.In addition, also can make full use of the space of equipment raise, improve building usable floor area further.

Another technical scheme of the present utility model is, on above-mentioned basis, to it is characterized in that, described drainage system is also provided with discharge pipe line anti-block apparatus.The problem that blocking occurs gutter can be solved like this.

Another technical scheme of the present utility model is on above-mentioned basis, and described discharge pipe line anti-block apparatus is screen pack or filter, and described screen pack or filter are arranged on the entrance of discharge pipe line.By arranging screen pack or filter in the entrance of discharge pipe line, effectively can tackle the larger object in gutter, thus preventing gutter blockage phenomenon.

Another technical scheme of the present utility model is on above-mentioned basis, and described discharge pipe line anti-block apparatus is high-pressure hydraulic pump or high-pressure pump, and described high-pressure hydraulic pump or high pressure gas delivery side of pump access in discharge pipe line.In discharge pipe line, be provided with high-pressure hydraulic pump or high-pressure pump, when blocking occurs discharge pipe line, described high-pressure hydraulic pump or high-pressure pump can be started, carry out the obstruction in flush discharge pipe by High-Pressure Water or air-flow, thus solve the blockage problem of gutter.

Another technical scheme of the present utility model is on above-mentioned basis, and described discharge pipe line anti-block apparatus is reducing mechanism or mixing plant, and described reducing mechanism or mixing plant are arranged on discharge pipe line.Discharge pipe line is installed reducing mechanism or mixing plant, when there is blocking in discharge pipe line, described reducing mechanism or mixing plant can be started, the object be blocked in gutter is smashed by reducing mechanism or mixing plant, then discharged by gutter, thus solve the blockage problem of gutter.

Another technical scheme of the present utility model is on above-mentioned basis, bathing room is at least divided into dry district and wet district, and the position adjacent with wet district, described dry district is provided with rhone, is provided with water-proof strip in described rhone.Bathing room is divided into dry district and wet district, the position adjacent with wet district, described dry district is provided with rhone, after being provided with water-proof strip in described rhone, by arranging water-proof strip, Ke Jiangshi district and dry differentiation separate, in the use procedure of bathing room, the water in wet district is pooled in rhone and enters sewerage, prevents the wet and slippery and ponding in Gan Qu ground; In addition, also at the position, non-dry zoning of bathing room ground and metope intersection, also water-proof strip can be set, water can be blocked and infiltrate in body of wall.

Another technical scheme of the present utility model is on above-mentioned basis, and described wet district is provided with the default gradient, and the described gradient tilts to the direction being provided with rhone.After wet district is provided with the default gradient, the ponding that bathing room in use produces can be concentrated in rhone along the default gradient and then enter sewerage, can prevent bathing room excess surface water.

Another technical scheme of the present utility model is on above-mentioned basis, and the body of wall periphery in described wet district is provided with rhone, is provided with water-proof strip in described rhone.The body of wall periphery in wet district is provided with rhone, and after being provided with water-proof strip in described rhone, in the use procedure of bathing room, the water in wet district is pooled in rhone and enters sewerage, prevents the wet and slippery and ponding in Gan Qu ground; Meanwhile, because being also provided with water-proof strip in rhone, water can being blocked and infiltrate in the body of wall of bathing room, prevent infiltration from corroding skeleton.

Another technical scheme of the present utility model is on above-mentioned basis, the drainage system of described bathing room also comprises plumbing integration module, described plumbing integration module comprises module body and preset pipeline, and described preset pipeline is preset and is fixed in described module body.In this programme, plumbing integration module is integrated together prefabricated for the various pipes in building and be arranged in same module body, material is thus formed a prefabricated integral module.So, in building operations, only need plumbing integration module to be installed in the reserved opening (as equipment well head) of every floor, then the standpipe carried out between upper and lower floor installs (as leader, water service pipe, hot-water line or stack), so namely completes the installation connection work of vertical duct in building; For the upper and lower pipeline of traditional floor is laid, quickly, environment pollution is little for installation rate, and site tissue accessory is few, and assembly working amount is little; In addition, pipeline or plumbing integration module aging after, also can change very easily, do not need destroy floor.

Another technical scheme of the present utility model is on above-mentioned basis, described module body comprises at least one sidewall, sidewall encloses and forms tubular framework, and described preset pipeline is arranged in described tubular framework, is provided with packing material between described preset pipeline and described tubular framework.In this programme, plumbing integration module is integrated together prefabricated for the various pipes in building and be arranged in same tubular framework, and then fills and presents packing material between pipeline and framework.For the upper and lower pipeline of traditional floor is laid, because plumbing integration module itself is filled with a sealing, reserved opening does not need cast-in-place shutoff, namely on-the-spot formwork, cast-in-situ concrete, form removal and maintenance is not needed, directly plumbing integration module is fixed on reserved opening, and installation rate quickly.

Another technical scheme of the present utility model is on above-mentioned basis, the sizing fastening devices of described module body concrete or cement production systD, and described preset pipe built-in is in described module body.In this programme, the sizing fastening devices of module body concrete or cement production systD, described preset pipe built-in is in described module body, material is thus formed a prefabricated integral module, so, in building operations, only need plumbing integration module to be installed in the reserved opening (as equipment well head) of every floor, then the standpipe carried out between upper and lower floor is installed, and so namely complete the installation connection work of pipeline in building, installation rate quickly.

Another technical scheme of the present utility model is on above-mentioned basis, the framework that described module body is made up of the hack lever be interconnected integrally is formed, described preset pipe built-in, in described module body, is cast with concrete or cement slurry between described preset pipeline and described framework.In this programme, the framework that module body is made up of the hack lever be interconnected integrally is formed, described preset pipe built-in is in described module body, concrete or cement slurry is cast with between described preset pipeline and described framework, material is thus formed a prefabricated integral module, so, in building operations, only need plumbing integration module to be installed in the reserved opening (as equipment well head) of every floor, then the standpipe carried out between upper and lower floor is installed, so namely, complete the installation connection work of pipeline in building, installation rate quickly.

Another technical scheme of the present utility model is on above-mentioned basis, and described module body is hollow box body structure, and described preset pipeline is fixed in described module body by bolt, the collar, bearing or welding manner.In this programme, module body is hollow box body structure, described preset pipeline is fixed in described module body by bolt, the collar, bearing or welding manner, material is thus formed a prefabricated integral module, so, in building operations, only need plumbing integration module to be installed in the reserved opening (as equipment well head) of every floor, then the standpipe carried out between upper and lower floor is installed, and so namely complete the installation connection work of pipeline in building, installation rate quickly.

Another technical scheme of the present utility model is on above-mentioned basis, and described module body is cast by metal material or is welded into body structure, is provided with packing material between described preset pipeline and described module body.In this programme, module body is cast by metal material or is welded into body structure, is provided with packing material between described preset pipeline and described module body.For the upper and lower pipeline of traditional floor is laid, because plumbing integration module itself is filled with a sealing, reserved opening does not need cast-in-place shutoff, namely on-the-spot formwork, cast-in-situ concrete, form removal and maintenance is not needed, directly plumbing integration module is fixed on reserved opening, and installation rate quickly.

Another one solution of the present utility model is achieved in that and provides a kind of bathing room, comprises top board, base plate and body of wall, and described top board is connected with body of wall with base plate, and described bathing room is also provided with above-mentioned drainage system.Because bathing room is provided with above-mentioned drainage system, therefore also there is function and the advantage of above-mentioned drainage system, do not repeat them here.

Accompanying drawing explanation

Fig. 1 is for representing the structure chart of the drainage system of the bathing room involved by a kind of embodiment of this technology;

The rhone partial view that Fig. 2 is the drainage system of bathing room shown in Fig. 1;

Fig. 3 is the enlarged drawing of the water-proof strip of rhone shown in Fig. 2;

The structure chart of the plumbing integration module that Fig. 4 is the drainage system of bathing room shown in Fig. 1;

The other several embodiment of the plumbing integration module that Fig. 5-Fig. 7 is the drainage system of bathing room shown in Fig. 1

Structure chart.

In figure:

110 module body 111 annular toss 121 gutter 122 hot-water line

123 cold water water service pipe 124 ventilating pipe 125 ground leaking drainage pipe 130 packing materials

1101 cross bar 1102 vertical pole 1103 vertical rod 3 bodies of wall

Drainage type toilet 11 equipment raise 8 rhone after 310 side wall floor drains 320

9 rhone lids

Detailed description of the invention

Be described in detail the utility model below in conjunction with accompanying drawing, the description of this part is only exemplary and explanatory, should not have any restriction to protection domain of the present utility model.In addition, those skilled in the art, according to the description of presents, can carry out respective combination to the feature in embodiment in presents and in different embodiment.

The utility model embodiment is as follows, refers to Fig. 1, and for representing the structure chart of the drainage system of the bathing room involved by present embodiment, the drainage system of this bathing room, comprises leader, rear drainage type toilet 320, side wall floor drain 310; The described rear gutter of drainage type toilet 320 is all connected with leader with the gutter of side wall floor drain.In present embodiment, toilet gutter is arranged on the rear side of toilet, then the drainage pipe of toilet can wear and be connected to lower water main pipeline in body of wall, so arranges and can not need to arrange caisset; Side wall floor drain, is arranged on the body of wall bottom of described bathing room; Described toilet gutter is all connected with described leader with the gutter of side wall floor drain, adopts side wall floor drain, makes floor drain drainage pipe by laying in body of wall 3, can solve the complicated construction problem needing to arrange pipeline below bathing room base plate.Simultaneously, if can also trap be arranged at outside bathing room, plate process can not be fallen further to the floor below bathing room, namely bathing room can not arrange caisson, ponding in use procedure in bathing room flows in leader by side wall floor drain, thus, simplify work progress, improve efficiency of construction.

On the basis of above-described embodiment, in another embodiment of the utility model, the gutter of described toilet gutter and side wall floor drain is arranged on the outside of described body of wall 3.The gutter of toilet gutter and side wall floor drain is arranged on the outside of described body of wall 3, the gutter of such toilet gutter and side wall floor drain can not take the space of bathing room inside, be conducive to the space efficiency utilization improving bathing room, also make bathing room cleaner and tidier, attractive in appearance in addition.

On the basis of above-described embodiment, in another embodiment of the utility model, described leader is arranged in equipment raise 11.Being arranged by leader is arranged in equipment raise 11, can make full use of the space of equipment raise, improves building usable floor area further.

On the basis of above-described embodiment, in another embodiment of the utility model, the gutter of described side wall floor drain also comprises trap, and described trap is also arranged in equipment raise 11.Trap is arranged in equipment raise, can not plate process be fallen the floor below bathing room, namely bathing room can not arrange caisson, ponding in use procedure in bathing room flow in the trap be arranged in plumbing integration module by side wall floor drain, be drained into again in gutter, thus simplify work progress, improve efficiency of construction.In addition, also can make full use of the space of equipment raise, improve building usable floor area further.

On the basis of above-described embodiment, in another embodiment of the utility model, described drainage system is also provided with discharge pipe line anti-block apparatus.The problem that blocking occurs gutter can be solved like this.

On the basis of above-described embodiment, in another embodiment of the utility model, described discharge pipe line anti-block apparatus is screen pack or filter, and described screen pack or filter are arranged on the entrance of discharge pipe line.By arranging screen pack or filter in the entrance of discharge pipe line, effectively can tackle the larger object in gutter, thus preventing gutter blockage phenomenon.

On the basis of above-described embodiment, in another embodiment of the utility model, described discharge pipe line anti-block apparatus is high-pressure hydraulic pump or high-pressure pump, and described high-pressure hydraulic pump or high pressure gas delivery side of pump access in discharge pipe line.In discharge pipe line, be provided with high-pressure hydraulic pump or high-pressure pump, when blocking occurs discharge pipe line, described high-pressure hydraulic pump or high-pressure pump can be started, carry out the obstruction in flush discharge pipe by High-Pressure Water or air-flow, thus solve the blockage problem of gutter.

On the basis of above-described embodiment, in another embodiment of the utility model, described discharge pipe line anti-block apparatus is reducing mechanism or mixing plant, and described reducing mechanism or mixing plant are arranged on discharge pipe line.Discharge pipe line is installed reducing mechanism or mixing plant, when there is blocking in discharge pipe line, described reducing mechanism or mixing plant can be started, the object be blocked in gutter is smashed by reducing mechanism or mixing plant, then discharged by gutter, thus solve the blockage problem of gutter.

On the basis of above-described embodiment, in another embodiment of the utility model, refer to Fig. 2 and Fig. 3, bathing room is at least divided into dry district and wet district, the position adjacent with wet district, described dry district is provided with rhone 8, be provided with rhone lid 9 in described rhone 8, described rhone lid 9 lid is placed on rhone 8, and rhone lid 9 is also provided with through hole.Bathing room is divided into dry district (such as, washroom) and wet district (such as, shower cubicle).The wet earth material of district's base plate of bathing room can adopt ceramic tile, to play the effect of decoration and water-proof skid-proof; The earth material in dry district can adopt pvc homogeneous penetrating coiled material, has resistance to depression, resistance to delineation, the feature such as antibacterial, easy to clean.Certainly, can all be provided with rhone 8 at the body of wall periphery in wet district, and be all provided with rhone lid 9 in described rhone 8.Described rhone 8 and rhone lid 9 can have stainless steel material to make, and described the interior of rhone 8 is also provided with water-proof strip, and water-proof strip can be set as into U-shaped or L shape, to mate with described rhone 8.Bathing room is divided into dry district and wet district, the position adjacent with wet district, described dry district is provided with rhone 8, after being provided with water-proof strip in described rhone 8, by arranging water-proof strip, Ke Jiangshi district and dry differentiation separate, in the use procedure of bathing room, the water in wet district is pooled in rhone 8 and enters sewerage, prevents the wet and slippery and ponding in Gan Qu ground; In addition, also at the position, non-dry zoning of bathing room ground and metope intersection, also water-proof strip can be set, water can be blocked and infiltrate in body of wall.

On the basis of above-described embodiment, in another embodiment of the utility model, described wet district is provided with the default gradient, and the described gradient tilts to the direction being provided with rhone 8.The scope of the described default gradient can between 0.5%-3%.After wet district is provided with the default gradient, the ponding that bathing room in use produces can be concentrated in rhone 8 along the default gradient and then enter sewerage, can prevent bathing room excess surface water.

Refer to Fig. 4, the drainage system of described bathing room also comprises plumbing integration module, and described plumbing integration module comprises module body 110 and preset pipeline, and described preset pipeline is preset and is fixed in described module body 110.Described module body 110 comprises at least one sidewall, and sidewall encloses and forms tubular framework, and described preset pipeline is arranged in described tubular framework, is provided with packing material 130 between described preset pipeline and described tubular framework.It should be noted that, above-mentioned " tubular " does not form the restriction to plumbing integration module shape, and the cross section of described tubular framework can be the planform such as polygon (as shown in Figure 1) or circle.Described preset pipeline is fixed in described module body 110, and described packing material 130 is preferably refractory material.In this programme, plumbing integration module is integrated together prefabricated for the various pipes in building and be arranged in same tubular framework, and then packing material is filled and presented between pipeline and framework, material is thus formed a prefabricated integral module, so, in building operations, only need plumbing integration module to be installed in the reserved opening (as equipment well head) of every floor, then the standpipe carried out between upper and lower floor is installed, so namely, complete the installation connection work of pipeline in building, packing material can also play closed reserved opening, sound insulation, fireproof effect, for the upper and lower pipeline of traditional floor is laid, because plumbing integration module itself is filled with a sealing, reserved opening does not need cast-in-place shutoff, namely on-the-spot formwork, cast-in-situ concrete, form removal and maintenance is not needed, directly plumbing integration module is fixed on reserved opening, and installation rate quickly, environment pollution is little, site tissue accessory is few, and assembly working amount is little, in addition, pipeline or plumbing integration module aging after, also can change very easily, do not need destroy floor.

On the basis of above-described embodiment, in another embodiment of the utility model, refer to Fig. 5, described module body is the sizing fastening devices of concrete or cement production systD, and described preset pipe built-in is in described module body.In another embodiment of the utility model, refer to Fig. 6, the framework that described module body is made up of the hack lever be interconnected integrally is formed, and described hack lever comprises cross bar 1101, vertical pole 1102 and vertical rod 1103, and described hack lever is interconnected to form three-dimensional frame construction.Assembled by the various combination of some cross bars 1101, vertical pole 1102 and vertical rod 1103, can as required assembled go out the module body of three-dimensional frame construction of different size and shape.Described preset pipe built-in, in described module body 110, is cast with concrete or cement slurry between described preset pipeline and described framework.In another embodiment of the utility model, refer to Fig. 7, described module body is hollow box body structure, and described preset pipeline is fixed in described module body 110 by bolt, the collar, bearing or welding manner.In another embodiment of the utility model, described module body is cast by metal material or is welded into body structure, is provided with packing material between described preset pipeline and described module body.In the above-described embodiment, plumbing integration module is integrated together prefabricated for the various pipes in building and be arranged in same module body, and then packing material is filled and presented between pipeline and framework, material is thus formed a prefabricated integral module, so, in building operations, only need plumbing integration module to be installed in the reserved opening (as equipment well head) of every floor, then the standpipe carried out between upper and lower floor is installed, so namely, complete the installation connection work of pipeline in building, packing material can also play closed reserved opening, sound insulation, fireproof effect, for the upper and lower pipeline of traditional floor is laid, because plumbing integration module itself is filled with a sealing, reserved opening does not need cast-in-place shutoff, namely on-the-spot formwork, cast-in-situ concrete, form removal and maintenance is not needed, directly plumbing integration module is fixed on reserved opening, and installation rate quickly, environment pollution is little, site tissue accessory is few, and assembly working amount is little, in addition, pipeline or plumbing integration module aging after, also can change very easily, do not need destroy floor.

On the basis of above-described embodiment, in another embodiment of the utility model, a kind of bathing room, comprises top board, base plate and body of wall, and described top board is connected with body of wall with base plate, and described bathing room is also provided with above-mentioned drainage system.Because bathing room is provided with above-mentioned drainage system, therefore also there is function and the advantage of above-mentioned drainage system, do not repeat them here.

The above is only preferred embodiment of the present utility model; it should be pointed out that for those skilled in the art, under the prerequisite not departing from the utility model principle; can also make some improvements and modifications, these improvements and modifications also should be considered as protection domain of the present utility model.

Claims (18)

1. a drainage system for bathing room, comprises leader, it is characterized in that, also comprises:
Rear drainage type toilet, its toilet gutter is arranged on the rear side of toilet;
Side wall floor drain, is arranged on the body of wall bottom of described bathing room;
Described toilet gutter is all connected with described leader with the gutter of side wall floor drain.
2. the drainage system of a kind of bathing room according to claim 1, is characterized in that, the gutter of described toilet gutter and side wall floor drain is arranged on the outside of described body of wall.
3. the drainage system of a kind of bathing room according to claim 2, is characterized in that, described leader is arranged in equipment raise.
4. the drainage system of a kind of bathing room according to claim 3, is characterized in that, the gutter of described side wall floor drain also comprises trap, and described trap is also arranged in equipment raise.
5. according to the drainage system of a kind of bathing room in claim 1,2,3 or 4 described in arbitrary claim, it is characterized in that, described drainage system is also provided with discharge pipe line anti-block apparatus.
6. the drainage system of a kind of bathing room according to claim 5, is characterized in that, described discharge pipe line anti-block apparatus is screen pack or filter, and described screen pack or filter are arranged on the entrance of discharge pipe line.
7. the drainage system of a kind of bathing room according to claim 5, is characterized in that, described discharge pipe line anti-block apparatus is high-pressure hydraulic pump or high-pressure pump, and described high-pressure hydraulic pump or high pressure gas delivery side of pump access in discharge pipe line.
8. the drainage system of a kind of bathing room according to claim 5, is characterized in that, described discharge pipe line anti-block apparatus is reducing mechanism or mixing plant, and described reducing mechanism or mixing plant are arranged on discharge pipe line.
9. according to the drainage system of a kind of bathing room in claim 1,2,3 or 4 described in arbitrary claim, it is characterized in that, bathing room is at least divided into dry district and wet district, the position adjacent with wet district, described dry district is provided with rhone, is provided with water-proof strip in described rhone.
10. the drainage system of a kind of bathing room according to claim 9, is characterized in that, described wet district is provided with the default gradient, and the described gradient tilts to the direction being provided with rhone.
The drainage system of 11. a kind of bathing rooms according to claim 9, is characterized in that, the body of wall periphery in described wet district is provided with rhone, is provided with water-proof strip in described rhone.
12. according to the drainage system of a kind of bathing room in claim 1,2,3 or 4 described in arbitrary claim, it is characterized in that, also comprise plumbing integration module, described draining integration module comprises module body and preset pipeline, and described preset pipeline is preset and is fixed in described module body.
The drainage system of 13. a kind of bathing rooms according to claim 12, it is characterized in that, described module body comprises at least one sidewall, sidewall encloses and forms tubular framework, described preset pipeline is arranged in described tubular framework, is provided with packing material between described preset pipeline and described tubular framework.
The drainage system of 14. a kind of bathing rooms according to claim 12, is characterized in that, described module body is the sizing fastening devices of concrete or cement production systD, and described preset pipe built-in is in described module body.
The drainage system of 15. a kind of bathing rooms according to claim 12, it is characterized in that, the framework that described module body is made up of the hack lever be interconnected integrally is formed, described preset pipe built-in, in described module body, is provided with concrete fixture or cement fixture between described preset pipeline and described framework.
The drainage system of 16. a kind of bathing rooms according to claim 12, it is characterized in that, described module body is hollow box body structure, described preset pipeline is fixed in described module body by bolt, the collar, bearing or welding manner.
The drainage system of 17. a kind of bathing rooms according to claim 12, is characterized in that, described module body is cast by metal material or is welded into body structure, is provided with packing material between described preset pipeline and described module body.
18. 1 kinds of bathing rooms, comprise top board, base plate and body of wall, and described top board is connected with body of wall with base plate, it is characterized in that, described bathing room is also provided with the drainage system according to any one of claim 1 to 17.
CN201520189316.XU 2015-03-31 2015-03-31 A kind of drainage system of bathing room and bathing room CN204491758U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520189316.XU CN204491758U (en) 2015-03-31 2015-03-31 A kind of drainage system of bathing room and bathing room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520189316.XU CN204491758U (en) 2015-03-31 2015-03-31 A kind of drainage system of bathing room and bathing room

Publications (1)

Publication Number Publication Date
CN204491758U true CN204491758U (en) 2015-07-22

Family

ID=53571063

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520189316.XU CN204491758U (en) 2015-03-31 2015-03-31 A kind of drainage system of bathing room and bathing room

Country Status (1)

Country Link
CN (1) CN204491758U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106320750A (en) * 2016-09-29 2017-01-11 中民筑友科技投资有限公司 Bathroom
CN106320749A (en) * 2016-09-29 2017-01-11 中民筑友科技投资有限公司 Bathroom
CN106351471A (en) * 2016-09-29 2017-01-25 中民筑友科技投资有限公司 Bathroom
CN106351470A (en) * 2016-09-29 2017-01-25 中民筑友科技投资有限公司 Bathroom

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106320750A (en) * 2016-09-29 2017-01-11 中民筑友科技投资有限公司 Bathroom
CN106320749A (en) * 2016-09-29 2017-01-11 中民筑友科技投资有限公司 Bathroom
CN106351471A (en) * 2016-09-29 2017-01-25 中民筑友科技投资有限公司 Bathroom
CN106351470A (en) * 2016-09-29 2017-01-25 中民筑友科技投资有限公司 Bathroom

Similar Documents

Publication Publication Date Title
CN201050093Y (en) Kitchen-toilet modularization same floor side water draining device
US5239794A (en) Habitable structure with water catachment, storage and distribution
DE202007019020U1 (en) Sanitary facility with a floor drain
KR100846420B1 (en) Backflow prevention device for manhole of sewer pipe
CN204530732U (en) A kind of structure of the precipitation based on basement elevator shaft plash
CN201358494Y (en) Leak-proof automatic drainage system for toilet
CN102767218B (en) Frame for bathroom caisson, bathroom caisson and construction method
US20100050330A1 (en) Fixed location, ultra-low flush, sewage-holding vessel restroom system
KR20120121494A (en) Structure of prefabricated bathroom
WO2018157846A1 (en) Vertical reclaimed water storage, treatment and reuse system for water closet
CN2797460Y (en) Complementary pipe network end water storing device
KR20110075701A (en) A prefabricated bathroom
KR20110137931A (en) Drain tray for bathroom floor coupled with drain pipe system laid on floor
CN209457166U (en) A kind of subsided rest room caisson entirety overhead type waterproof construction
CN106638919B (en) A kind of urban road rainwater recycling system and construction method
CN104358305B (en) A kind of cyclone, water drainage riser connecting piece of caisson type washroom
CN200992726Y (en) Same floor wastewater discharge system
CN100485144C (en) Co-layer drainage system
Antoniou et al. Latrines and wastewater sanitation technologies in ancient Greece
CN206529795U (en) A kind of municipal comprehensive pipeline passage of assembled
CN202745335U (en) Sunken type toilet water-resistant deodorization settling basin structure
US3212105A (en) Submergible swimming pool change room
CN102127980A (en) Combined type pump house of drainage pump station
CN101105068A (en) Siphon type rainwater discharging system construction technique
CN205296314U (en) Water drainage system on same floor

Legal Events

Date Code Title Description
GR01 Patent grant
C14 Grant of patent or utility model
CB03 Change of inventor or designer information

Inventor after: Su Zhanao

Inventor before: Chen Dingqiu

Inventor before: Peng Haihui

Inventor before: Xie Jun

CB03 Change of inventor or designer information
EE01 Entry into force of recordation of patent licensing contract

Assignee: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD.

Assignor: Zhong Minzhuyou Co., Ltd

Contract record no.: 2017430000027

Denomination of utility model: Drainage system used in bathroom and bathroom

Granted publication date: 20150722

License type: Exclusive License

Record date: 20171222

EE01 Entry into force of recordation of patent licensing contract
EC01 Cancellation of recordation of patent licensing contract

Assignee: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD.

Assignor: Zhong Minzhuyou Co., Ltd

Contract record no.: 2017430000027

Date of cancellation: 20180801

EC01 Cancellation of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: China Civil Architecture Friends Technology (Jiaozhou) Co., Ltd.

Assignor: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD.

Contract record no.: 2018430000023

Denomination of utility model: Drainage system used in bathroom and bathroom

Granted publication date: 20150722

License type: Common License

Record date: 20190102

EE01 Entry into force of recordation of patent licensing contract