CN104674830B - A kind of construction method of well-points dewatering - Google Patents

A kind of construction method of well-points dewatering Download PDF

Info

Publication number
CN104674830B
CN104674830B CN201510110304.8A CN201510110304A CN104674830B CN 104674830 B CN104674830 B CN 104674830B CN 201510110304 A CN201510110304 A CN 201510110304A CN 104674830 B CN104674830 B CN 104674830B
Authority
CN
China
Prior art keywords
well
wellhole
pipe
point
filter assemblies
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510110304.8A
Other languages
Chinese (zh)
Other versions
CN104674830A (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Han Chunlin
Original Assignee
Ningbo Jiangdongfeichuang Electronis Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Jiangdongfeichuang Electronis Technology Co ltd filed Critical Ningbo Jiangdongfeichuang Electronis Technology Co ltd
Priority to CN201610142966.8A priority Critical patent/CN105714840B/en
Priority to CN201510110304.8A priority patent/CN104674830B/en
Priority to CN201610140736.8A priority patent/CN105714839B/en
Priority to CN201610141389.0A priority patent/CN105804104B/en
Priority to CN201610142098.3A priority patent/CN105735330B/en
Publication of CN104674830A publication Critical patent/CN104674830A/en
Application granted granted Critical
Publication of CN104674830B publication Critical patent/CN104674830B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Paleontology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Filtering Materials (AREA)

Abstract

The invention provides the construction method of a kind of well-points dewatering, comprise the following steps: (1) according to the design drawing of well-points dewatering, surveying setting-out at the construction field (site), determine the drilling well position of well point, grooved position, horizontal elevation;(2) use drilling machinery in the drilling well position determined, get out the wellhole meeting projected depth;(3) groove of digging laying well point pipeline;(4) carrying out the pipe laying in wellhole, the well-point pipe that bottom is provided with deformable tubulose filter assemblies puts into wellhole, is fixed at projected depth the bottom of well-point pipe;(5) deformable tubulose filter assemblies is expanded, by deformable tubulose filter assemblies spreading so that it is be close on borehole wall, play support borehole wall and the effect of filtration;(6) installing suction pump, lay water delivery house steward, each well-point pipe is obtained water side and is connected with water delivery house steward, carry out construction of drawing water, the present invention is without hindrance discharging in construction by subsoil water, and sand and mud is blocked in wellhole.

Description

A kind of construction method of well-points dewatering
Technical field
The present invention relates to the construction method of the support & protection of foundation pit for precipitation used in a kind of architecture construction, the construction of a kind of well-points dewatering Method.
Background technology
Along with the development of modern society, the use function of building is constantly expanded, and particularly in big city, newly-built building is for ground The utilization in lower space is more and more extensive, if the basement of building the most all reaches dried layer, foundation depth even from tens meters to several Ten meters.Therefore, to the method for foundation pit construction it is also proposed that new requirement.
A kind of well-point dewatering construction technique of the prior art, the most first uses general geology rig after mud off drilling and forming hole, pacifies Dress filter tube forms pipe well, then uses high-pressure water jet to rinse in filter tube, destroys slurry coat method structure sheaf, and makes filter tube pipe week Self-forming filter course, the outlet pipe that then front end is provided with immersible pump is arranged in filter tube, finally starts immersible pump and realizes well-points dewatering. But this kind of construction method complex operation in practice of construction, the blocking and filter tube the most easily deposits, causing well point to block becomes dried-up well. Make precipitation unsuccessful, it is easy to cause great engineering accident, as all relevant with this in the domestic foundation pit collapse accident appeared in the newspapers repeatly.
In existing construction method, also have use filling back-up sand hardcore in the borehole as the construction method of filter course, but this kind of method There is defect that construction is loaded down with trivial details equally, and cannot be avoided alluvial blocking too, cause well point to block the defect becoming dried-up well.
Summary of the invention
The present invention relates to the construction method of a kind of well-points dewatering, be effectively simplified the operation of construction so that practice of construction is easy and simple to handle, and And it is avoided that the situation that well point blocks.
The invention provides the construction method of a kind of well-points dewatering, comprise the following steps:
(1) according to the design drawing of well-points dewatering, surveying setting-out at the construction field (site), determine the drilling well position of well point, grooved position, Horizontal elevation;
(2) use drilling machinery in the drilling well position determined, get out the wellhole meeting projected depth;
(3) groove of digging laying well point pipeline;
(4) carrying out the pipe laying in wellhole, the well-point pipe that bottom is provided with deformable tubulose filter assemblies puts into wellhole, will The bottom of well-point pipe is fixed at projected depth;
(5) deformable tubulose filter assemblies is expanded, by deformable tubulose filter assemblies spreading so that it is be close on borehole wall, Play support borehole wall and the effect of filtration;
(6) suction pump is installed, lays water delivery house steward, each well-point pipe is obtained water side and is connected with water delivery house steward, carry out construction of drawing water;
Wherein, deformable tubulose filter assemblies includes:
Base tube, it is tubular part, and on base tube wall, bearing of trend along pipe is provided with the crack of some row strips, and in adjacent column Mutually stagger in strip crack;
Filter course, covers base tube and is shaped generally as tubulose;
Sleeve, covers the direction extended along pipe on the outside of the filter course of tubulose, the wall of sleeve and arranges the hole of some row rhombuses, and Diamond hole in adjacent column mutually staggers.
The deformable tubulose filter assemblies that the present invention uses in construction is after expansion construction completes, radial through deformable tubular filter group The water of part is through the filtration of each layer, and without hindrance discharges subsoil water, and sand and mud is blocked in wellhole.So, after expansion The internal diameter that deformable tubulose filter assemblies obtains after making sand control is maximum, adds the drainage area in wellhole, simultaneously deformable tubulose mistake Filter assembly has supporting role for borehole wall, the beneficially discharge of subsoil water, common owing to space exists in being avoided that again wellhole The annular plug of generation, the phenomenon of borehole wall erosion.
Accompanying drawing explanation
Accompanying drawing 1 is deformable tubulose filter assemblies and expands schematic diagram.
Accompanying drawing 2 is the structural representation of deformable tubulose filter assemblies.
Detailed description of the invention
The construction method of certain engineering Deep Foundation Pit Well-Point Dewatering: include
(1) according to the design drawing of well-points dewatering, surveying setting-out at the construction field (site), determine the drilling well position of well point, grooved position, Horizontal elevation;
(2) use drilling machinery in the drilling well position determined, get out the wellhole meeting projected depth;
(3) groove of digging laying well point pipeline;
(4) pipe laying in wellhole is carried out;It is specially and the drill bit of drilling machinery is withdrawn wellhole, bottom is provided with deformable tube The well-point pipe of shape filter assemblies puts into wellhole, is fixed at projected depth the bottom of well-point pipe;
(5) deformable tubulose filter assemblies is expanded;By deformable tubulose filter assemblies spreading so that it is be close on borehole wall, Play support borehole wall and the effect of filtration;
(6) suction pump is installed, lays water delivery house steward, each well-point pipe is obtained water side and is connected with water delivery house steward, carry out construction of drawing water.
As shown in Figure 2, deformable tubulose filter assemblies includes: base tube 1, and it is tubular part, along the extension side of pipe on base tube wall To being provided with the crack of some row strips, and mutually stagger in the strip crack in adjacent column;Filter course 2, covers base tube and is formed as Generally tubular;Sleeve 3, covers the direction extended along pipe on the outside of the filter course of tubulose, the wall of sleeve and arranges some row rhombuses Diamond hole in hole, and adjacent column mutually staggers.
Filter course 2 between base tube 1 and sleeve 3, when base tube 1 expanded radially, due to the expansion between base tube 1 and sleeve 3 Difference, filter course 2 is necessary to ensure that the two will not interfere.Filter course 2 preferably comprises three layer filtration material: outer layer is relatively crude Rough metal material braid, can use overlapped sheet metal braiding to form, be connected with each other, form monoblock type knot between sheet metal Structure, and be connected with the internal surface of sleeve pipe covered outside;Intermediate layer is that thread material continuous winding is formed, and this thread material is preferably Stainless steel silk or synthetic fibres;Internal layer is stainless steel cloth or synthetic fiber cloth.
As shown in Figure 1, deformable tubulose filter assemblies can utilize multiple method to form dilatancy radially.Preferably mode is: The expansion vertebra 4 that can pass through is put into so that expansion vertebra 4 is under the effect of mechanical force or hydraulic coupling, through base tube in well-point pipe Inside, so that deformable tubulose filter assemblies is expanded;Another kind of preferably mode is: directly apply hydraulic coupling to deformable The inside of tubular filter assembly so that it is expand.
Further preferred construction method is:
Including: step (7), in well-point pipe bottom and deformable tubulose filter assemblies junction, arranges level sensor and flow-velocity sensing Device, is connected sensor with control centre, when after well-points dewatering construction operation a period of time, if a sensor senses that level of ground water does not has There is arrival predetermined design water level, and flow velocity signal is abnormal, then judge that alluvial occurs in this wellhole, closes the company of this well-point pipe and water delivery house steward Connecing valve, extracted by this well-point pipe, the deformable tubulose filter assemblies cleaning end reinstalls well-point pipe or the deformable tubulose more renewed After filter assemblies, distending again.

Claims (1)

1. a construction method for well-points dewatering, comprises the following steps:
(1) according to the design drawing of well-points dewatering, surveying setting-out at the construction field (site), determine the drilling well position of well point, grooved position, Horizontal elevation;
(2) use drilling machinery in the drilling well position determined, get out the wellhole meeting projected depth;
(3) groove of digging laying well point pipeline;
(4) carrying out the pipe laying in wellhole, the well-point pipe that bottom is provided with deformable tubulose filter assemblies puts into wellhole, will The bottom of well-point pipe is fixed at projected depth;
(5) deformable tubulose filter assemblies is expanded, by deformable tubulose filter assemblies spreading so that it is be close on borehole wall, Play support borehole wall and the effect of filtration;
(6) suction pump is installed, lays water delivery house steward, each well-point pipe is obtained water side and is connected with water delivery house steward, carry out construction of drawing water;
Wherein, deformable tubulose filter assemblies includes:
Base tube, it is tubular part, and on base tube wall, bearing of trend along pipe is provided with the crack of some row strips, and in adjacent column Mutually stagger in strip crack;
Filter course, covers base tube and is shaped generally as tubulose;
Sleeve, covers the direction extended along pipe on the outside of the filter course of tubulose, the wall of sleeve and arranges the hole of some row rhombuses, and Diamond hole in adjacent column mutually staggers.
CN201510110304.8A 2015-03-13 2015-03-13 A kind of construction method of well-points dewatering Expired - Fee Related CN104674830B (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
CN201610142966.8A CN105714840B (en) 2015-03-13 2015-03-13 A kind of construction method of well-points dewatering
CN201510110304.8A CN104674830B (en) 2015-03-13 2015-03-13 A kind of construction method of well-points dewatering
CN201610140736.8A CN105714839B (en) 2015-03-13 2015-03-13 A kind of construction method of well-points dewatering
CN201610141389.0A CN105804104B (en) 2015-03-13 2015-03-13 A kind of construction method of well-points dewatering
CN201610142098.3A CN105735330B (en) 2015-03-13 2015-03-13 A kind of construction method of well-points dewatering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510110304.8A CN104674830B (en) 2015-03-13 2015-03-13 A kind of construction method of well-points dewatering

Related Child Applications (4)

Application Number Title Priority Date Filing Date
CN201610142098.3A Division CN105735330B (en) 2015-03-13 2015-03-13 A kind of construction method of well-points dewatering
CN201610142966.8A Division CN105714840B (en) 2015-03-13 2015-03-13 A kind of construction method of well-points dewatering
CN201610140736.8A Division CN105714839B (en) 2015-03-13 2015-03-13 A kind of construction method of well-points dewatering
CN201610141389.0A Division CN105804104B (en) 2015-03-13 2015-03-13 A kind of construction method of well-points dewatering

Publications (2)

Publication Number Publication Date
CN104674830A CN104674830A (en) 2015-06-03
CN104674830B true CN104674830B (en) 2016-08-17

Family

ID=53310377

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201510110304.8A Expired - Fee Related CN104674830B (en) 2015-03-13 2015-03-13 A kind of construction method of well-points dewatering
CN201610141389.0A Active CN105804104B (en) 2015-03-13 2015-03-13 A kind of construction method of well-points dewatering

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201610141389.0A Active CN105804104B (en) 2015-03-13 2015-03-13 A kind of construction method of well-points dewatering

Country Status (1)

Country Link
CN (2) CN104674830B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106337427B (en) * 2016-09-26 2018-06-22 湖南科技大学 A kind of deformation control method in the pre- dewatering construction of foundation pit

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61211415A (en) * 1985-03-18 1986-09-19 Takenaka Komuten Co Ltd Reduction well construction method
SU1317065A1 (en) * 1985-06-17 1987-06-15 Всесоюзный Научно-Исследовательский,Конструкторско-Технологический И Проектно-Изыскательский Институт По Осушению Месторождений Полезных Ископаемых,Специальным Горным Работам,Рудничной Геологии И Маркшейдерскому Делу Method of constructing water intake well
DE3703534A1 (en) * 1987-02-06 1988-08-25 Bilfinger Berger Bau Method for producing a well
CN2563191Y (en) * 2002-08-12 2003-07-30 李景新 Water dropping machine for well point
CN100429356C (en) * 2006-03-01 2008-10-29 冯克俊 Vacuum foundation-pit deep-well precipitation apparatus
CN102002959B (en) * 2010-12-21 2015-09-09 上海广联建设发展有限公司 Underground structure substrate water draw-off and distribution method thereof
CN202194686U (en) * 2011-08-03 2012-04-18 中铁十二局集团第四工程有限公司 Well-point dewatering device at bottom of tunnel
CN102383437B (en) * 2011-08-08 2015-05-20 河南理工大学 Well point positioned pumping tubular well and well point positioned pumping method
CN202644552U (en) * 2012-05-08 2013-01-02 上海市水利工程集团有限公司 Light well-point dewatering device for cofferdam foundation pit
CN103526780B (en) * 2013-10-23 2015-06-24 天津大学 Water plugging seepage-proofing method for recharge well

Also Published As

Publication number Publication date
CN105804104A (en) 2016-07-27
CN105804104B (en) 2017-08-15
CN104674830A (en) 2015-06-03

Similar Documents

Publication Publication Date Title
CN106437798B (en) A kind of preprocess method of the anchor cable group across shield driving section
CN104314090A (en) Deep foundation pit bedrock drainage culvert and drainage system and drainage construction method thereof
CN110029680B (en) Deep foundation pit dewatering construction method
CN104929136A (en) Urban complex underground obstacle working condition occlusive pile enclosure construction method
CN105625445A (en) Foundation pit dewatering method in coastal sandy soil region
CN105257908A (en) Jacking-pushing drilling construction device and method of underground pipeline
CN114635697A (en) Pre-grouting treatment method for water damage of shaft well construction
CN107152294A (en) High hydraulic pressure big flow Karst Tunnel underground water seal blocking method
CN104674830B (en) A kind of construction method of well-points dewatering
CN105672336B (en) A kind of deformable filter assemblies of well-points dewatering
CN107386283A (en) A kind of anchor rod construction method suitable for mud burning into sand layer
CN104674829B (en) A kind of deformable filter assemblies of well-points dewatering
CN102536144A (en) Coal bed gas double-channel well washing valve
CN105714839B (en) A kind of construction method of well-points dewatering
CN105735330B (en) A kind of construction method of well-points dewatering
CN105714840B (en) A kind of construction method of well-points dewatering
CN112554215B (en) Double-sleeve artesian deep well precipitation construction method and structure for muddy silty clay with silty soil geology
CN105064384B (en) Vacuum tube well precipitation system
CN105649643B (en) Met in a kind of push-bench and construction into the not smooth processing method of soil
CN111622249B (en) Miniature pumping device for underground water of narrow foundation pit and construction method thereof
CN114045850A (en) Construction method for replacing waterproof curtain by combination of light well point and pneumatic dewatering
CN108005440A (en) A kind of vertical shaft type garage arrangement form and hanging scaffold
CN108561082B (en) Method for modifying limestone aquifer by mutually-embedded jet grouting
CN113756831A (en) Construction method for sand blowing and filling between main pipeline and sleeve
JP2018009298A (en) Ground water level lowering system and method of constructing the same

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: The inventor has waived the right to be mentioned

Inventor before: Chen Zhuojie

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20160719

Address after: 017, 315000, 128 Exhibition Road, Jiangdong District, Zhejiang, Ningbo

Applicant after: NINGBO JIANGDONGFEICHUANG ELECTRONIS TECHNOLOGY CO.,LTD.

Address before: The 11 group Wang Xie village Beilun Daxie Development Zone 315812 area in Zhejiang city of Ningbo Province

Applicant before: Chen Zhuojie

C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Han Chunlin

Inventor before: The inventor has waived the right to be mentioned

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170811

Address after: 5, 158100 Permanent Committee of Mt. Hengshan District, Heilongjiang, Jixi

Patentee after: Han Chunlin

Address before: 017, 315000, 128 Exhibition Road, Jiangdong District, Zhejiang, Ningbo

Patentee before: NINGBO JIANGDONGFEICHUANG ELECTRONIS TECHNOLOGY CO.,LTD.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160817

Termination date: 20180313