CN2563191Y - Water dropping machine for well point - Google Patents

Water dropping machine for well point Download PDF

Info

Publication number
CN2563191Y
CN2563191Y CN 02245673 CN02245673U CN2563191Y CN 2563191 Y CN2563191 Y CN 2563191Y CN 02245673 CN02245673 CN 02245673 CN 02245673 U CN02245673 U CN 02245673U CN 2563191 Y CN2563191 Y CN 2563191Y
Authority
CN
China
Prior art keywords
communicated
well
ejector
water
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 02245673
Other languages
Chinese (zh)
Inventor
李景新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 02245673 priority Critical patent/CN2563191Y/en
Application granted granted Critical
Publication of CN2563191Y publication Critical patent/CN2563191Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a water dropping machine for well point which belongs to the construction dewatering installation. A motor (1) drives to a centrifugal pump (2) which is communicated with a circulating water tank (3) through a T joint, the circulating water tank (3) is communicated with an L-shaped standpipe (13), an ejector (4) inserts into the circulating water tank (3), and a suction hose (5) is communicated with the ejector (4); a plurality of well bore are drilled around a construction foundation area, each well bore is deep enough to go through the depth of foundation into an aquifer (11), a sieve tube (6) with sieve (10) is inserted into each well bore, and a collector pipe (7) on the ground (8) is communicated with each sieve tube (6) and then is communicated with the hose (5). A line pipe (9) arranged inside the funnel-shaped ejector (4) is wide on the upper part and narrow on the lower part. When the water dropping machine for well point is used during construction, ground water is pumped out and consequently the ground water level is lowered. Thus no water can bleed out in the construction area and no water can accumulate, thereby putting an end to collapse accidents. During operation, as the circulating water centrifugal pump can run normally and continuously, the motor can not be damaged.

Description

The well-points dewatering machine
(1) technical field:
The utility model belongs to the well-points dewatering machine that reduction face of land water level is convenient to foundation construction.
(2) background technology:
In the building operations of low-lying location, underground construction often relates to the underground water of going up, and causes workman's work under bad environment, and constructional difficulties is such as ponding, landslide.Prior art is to extract clear water out with submersible pump, with slush pump water and mud is extracted out in the lump.Because water shortage can make submersible pump and slush pump idle running or change in midair so that frequent burn-out motor causes damage.Underground water is osmosis type gradually in the aquifer, and the water that penetrates continuously can cause landslide, and will to increase labor strength like this influence construction quality and duration.
(3) utility model content:
Technical problem to be solved in the utility model is at the problem of depositing in the background technology, reduces the well-points dewatering machine that face of land water level is convenient to foundation construction and provide.
The invention for solving the technical problem can reach by following technical solution: the driven by motor centrifugal pump inserts cyclic water tank by threeway communication loop water tank, connection " L type " standpipe, ejector, is communicated with ejector with soft suction hose; The drilling well eye is some around the base area construction, and every well is crossed foundation depth deeply and entered the aquifer, and every well is lowered to the screen casing of band filter screen, on ground with header be communicated with each screen casing again with soft pipe connection.
In such scheme, as like bushing pipe being arranged in the ejector of funnel, it is upper coarse and lower fine.
The utility model is compared with background technology has following beneficial effect: the well-points dewatering machine uses in construction, and underground water is drawn out of, groundwater table reduces, and construction area is anhydrous to ooze out, and does not also just have seeping phenomenon, thereby also just can not produce landslide.In the course of the work, owing to there is the cyclic water tank centrifugal pump to run well continuously, motor can scaling loss yet.
(4) description of drawings:
Accompanying drawing 1 is that the well-points dewatering machine operation is installed schematic diagram; Accompanying drawing 2 is Fig. 1 UEJE 4 structure complete section figure.
(5) specific embodiment: below in conjunction with the drawings and specific embodiments will the utility model is described in further detail:
In conjunction with shown in Figure 2, motor 1 drives centrifugal pump 2 and inserts cyclic water tanks 3 by threeway 12 communication loop water tanks 3, connection " L type " standpipe 13, ejector 4, is communicated with ejectors 4 with soft suction hose 5 by Fig. 1; The drilling well eye is some around the base area construction, and every well is crossed foundation depth deeply and entered aquifer 11, and every well is lowered to the screen casing 6 of band filter screen 10, is communicated with each screen casing 6 with header 7 and is communicated with flexible pipe 5 on ground 8.In such scheme, 4 li bushing pipe 9 is being arranged as ejector like funnel, it is upper coarse and lower fine.Above-mentioned motor 1 centrifugal pump 2, water tank 3 are mounted on the basis 8.

Claims (2)

1, a kind of well-points dewatering machine that relates to, the soft suction hose (5) that contains motor (1) and the pump (2) that drives and be communicated with is characterized in that:
A, motor (1) drive centrifugal pump (2) and insert cyclic water tank (3) by threeway (12) communication loop water tank (3), connection " L " type standpipe (13), ejector (4), are communicated with ejector (4) with soft suction hose (5);
B, the drilling well eye is some around base area construction, every well is crossed foundation depth deeply and is entered aquifer (11), every well is lowered to the screen casing (6) of band filter screen (10), is communicated with each screen casing (6) with header (7) and is communicated with flexible pipe (5) on ground (8).
2, well-points dewatering machine according to claim 1 is characterized in that: as ejector (4) lining like funnel bushing pipe (9) is being arranged, it is upper coarse and lower fine.
CN 02245673 2002-08-12 2002-08-12 Water dropping machine for well point Expired - Fee Related CN2563191Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 02245673 CN2563191Y (en) 2002-08-12 2002-08-12 Water dropping machine for well point

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 02245673 CN2563191Y (en) 2002-08-12 2002-08-12 Water dropping machine for well point

Publications (1)

Publication Number Publication Date
CN2563191Y true CN2563191Y (en) 2003-07-30

Family

ID=33717205

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 02245673 Expired - Fee Related CN2563191Y (en) 2002-08-12 2002-08-12 Water dropping machine for well point

Country Status (1)

Country Link
CN (1) CN2563191Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104762982A (en) * 2015-03-06 2015-07-08 中建三局第一建设工程有限责任公司 Construction method of watery red sandstone geological underground water level control
CN105735330A (en) * 2015-03-13 2016-07-06 陈卓杰 Construction method for well-point dewatering
CN105804104A (en) * 2015-03-13 2016-07-27 陈卓杰 Construction method for well point dewatering

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104762982A (en) * 2015-03-06 2015-07-08 中建三局第一建设工程有限责任公司 Construction method of watery red sandstone geological underground water level control
CN105735330A (en) * 2015-03-13 2016-07-06 陈卓杰 Construction method for well-point dewatering
CN105804104A (en) * 2015-03-13 2016-07-27 陈卓杰 Construction method for well point dewatering
CN105804104B (en) * 2015-03-13 2017-08-15 河北建设集团卓诚路桥工程有限公司 A kind of construction method of well-points dewatering
CN105735330B (en) * 2015-03-13 2017-11-14 苏建林 A kind of construction method of well-points dewatering

Similar Documents

Publication Publication Date Title
CN107401393B (en) Drainage and gas production integrated goaf gas extraction well body structure and construction method thereof
CN102704871B (en) The method of further well-flushing and well washing apparatus in water source heat pump system
CN100545545C (en) The recycling method of groundwater recharge
CN201412129Y (en) Pumping and drainage gas production device of gas production well
CN105625445A (en) Foundation pit dewatering method in coastal sandy soil region
CN211851719U (en) Bored pile pore-forming system
CN100491650C (en) Precipitation construction method for double-bushing vacuum deep well point
CN2563191Y (en) Water dropping machine for well point
CN104454001A (en) In-tunnel dewatering system and method for tunnel in low-permeability silty-fine sand stratum
CN103883291B (en) Throw gravel in Hydrology well casing and become well equipment and construction method
CN206721904U (en) A kind of integrated precipitation pumping system
CN206129244U (en) Colliery water resources regionalization is mining system in advance
CN103615014A (en) Water-lowering device of soft-soil foundation pit and using method of water-lowering device
CN216894349U (en) Coal bed gas mining system capable of being used for full life cycle
CN202596614U (en) Well flushing device for further flushing well in water source heat pump system
CN2231721Y (en) Jet well pump set
CN205348204U (en) Light well point precipitation system
CN211006723U (en) Drainage structures of precipitation well
CN112012789A (en) Shaft bottom collection drainage system of railway tunnel long and large inclined shaft
CN209179736U (en) A kind of coal bed gas ground vertical well is anti-to spit sand device
CN219060098U (en) Assembled recoverable precipitation device of deep basal pit
CN220394602U (en) Positive and negative pressure combined device for deep well precipitation
CN212177101U (en) Large overflow salt well snubbing serving system
CN108316971A (en) A kind of mine gas extraction system suction side automatic draining structure and method
CN218405510U (en) Water collecting port of downcomer well

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee