CN105625445A - Foundation pit dewatering method in coastal sandy soil region - Google Patents

Foundation pit dewatering method in coastal sandy soil region Download PDF

Info

Publication number
CN105625445A
CN105625445A CN201410617295.7A CN201410617295A CN105625445A CN 105625445 A CN105625445 A CN 105625445A CN 201410617295 A CN201410617295 A CN 201410617295A CN 105625445 A CN105625445 A CN 105625445A
Authority
CN
China
Prior art keywords
pipe
well
dewatering
point
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410617295.7A
Other languages
Chinese (zh)
Other versions
CN105625445B (en
Inventor
王新虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201410617295.7A priority Critical patent/CN105625445B/en
Publication of CN105625445A publication Critical patent/CN105625445A/en
Application granted granted Critical
Publication of CN105625445B publication Critical patent/CN105625445B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a foundation pit dewatering method in a coastal sandy soil region. The method is characterized by comprising the steps of: (a) surveying, setting out and prefabrication of a dewatering well point pipe; (b) punching and installation of the well point pipe; (c) filling of rough sand filtrates; (d) installation of water pumping equipment; (e) trial water pumping; (f) formal water pumping; (g) foundation construction; and (h) evacuation of the well point. The foundation pit dewatering method in the coastal sandy soil region has the advantages of reasonable design of foundation pit dewatering steps, simple operation, simple method, convenience for construction, better dewatering effect, low construction cost and wide promotion value.

Description

A kind of Method on Dewatering of Foundation Pit of coastal sand soil area
Technical field
The present invention relates to a kind of Method on Dewatering of Foundation Pit, specifically, be the Method on Dewatering of Foundation Pit of a kind of coastal sand soil area.
Background technology
Adopt traditional construction method to tend not to meet expection dewatering effect in coastal area, and long construction period, precipitation cost are high, dewatering effect controllability is unstable, construction in later period quality, deep pit monitor, project progress are all had considerable influence, thus for coastal sand region need to develop as early as possible a set of simple to operate, dewatering effect is good, scheme is simple, the base pit dewatering new technology of cost.
Summary of the invention
The purpose of the present invention, is in that to propose the Method on Dewatering of Foundation Pit of the fairly obvious coastal sand soil area of a kind of easy construction, dewatering effect.
For achieving the above object, the technical solution of the present invention is:
The Method on Dewatering of Foundation Pit of a kind of coastal sand soil area, it is characterised in that comprise the following steps:
A, surveying setting-out and precast dewatering well point pipe
(1) surveying setting-out, lays well point, and the spacing of well point laying, quantity, the depth of burying are determined according to calculating and arrangement and method for construction;
(2) precast dewatering well point pipe
Precipitation well point pipe (3) adopts pvc pipe to make, and pvc pipe lower end is furnished with chimney filter (4), and chimney filter wall is drilled with the filter opening that diameter is �� 10mm in plum blossom-shaped; Filter opening area is the 15%-25% of chimney filter surface area, and chimney filter wall is double-baged filter screen, and internal layer adopts mesh to be 30-50 hole/cm2Nylon yarn cloth fie screen, outer layer adopt mesh be 3-10 hole/cm2Nylon yarn cloth coarse strainer, fasten with iron wire;
B, punching and installation well-point pipe
(1) well point position ground cleaning
Well point position ground 500mm boundary inner surface surface dust, assorted soil are excavated after laying by well point, form 500*500*500mm shallow hole shape, to facilitate well-point pipe to install;
(2) punching adopts 6 meters of long steel pipes and 8 meters long PVC water pipes, is inserted by PVC water pipe in steel pipe; PVC water pipe upper end connects with high-pressure pump, and lower end is pressed into flat mouth-shaped, and concordant with steel pipe lower end, the sleeve pipe of composition punching; During punching, sleeve pipe being perpendicular to well point position ground, first start high-pressure hydraulic pump, under the impulse force of hydraulic pressure, sand reaming sleeve pipe sinks, and operator adopt spanner to block in the middle part of sleeve pipe, and left-right rotation sleeve pipe, so that the quick punching of sleeve pipe is sunk;
(3) precipitation well point pipe is installed
After sleeve pipe sinks down into designed elevation, close high-pressure pump and extract PVC water pipe in sleeve pipe immediately, and rapidly precast dewatering well point pipe is inserted in steel pipe, then pull out steel pipe and make precipitation well point pipe be retained in sand, well-point pipe installation;
Coarse sand filtrate is filled out in c, filling
After well-point pipe is installed, coarse sand is adopted to fill in the space inserting well-point pipe and ground formation immediately, until concordant in ground;
D, installation pumping equipment
Water pump is installed routinely, notices that well-point pipe adopts flexible pipe with water pump linkage section;
E, examination are drawn water
Turn on pump examination is taken out, and water outlet rule is first big after small, first muddy rear clear;
F, formally draw water
Need during formally drawing water to arrange special messenger to be responsible for maintenance, the subsoil water of extraction is drained;
G, foundation construction
Construct by scheme practice processes;
H, withdraw well casing
When need to withdraw precipitation well point pipe, after removing water pump facility, well-point pipe standpipe cuts off by foundation elevation.
The Method on Dewatering of Foundation Pit of the coastal sand soil area of the present invention can also be further achieved by the following technical measures.
Aforesaid method, the diameter of wherein said precipitation well point pipe is 25mm.
Aforesaid method, the diameter of wherein said chimney filter is 32mm.
Aforesaid method, the long 500-1200mm of wherein said chimney filter.
Aforesaid method, the diameter >=48mm of wherein said steel pipe.
Aforesaid method, the diameter >=32mm of wherein said PVC water pipe, and can insert in steel pipe.
Aforesaid method, when wherein said well-point pipe is installed, well-point pipe exceeds 600mm than place ground, it is simple to install with pump equipment.
Aforesaid method, the subsoil water pvc pipe of wherein said extraction drains into specific drainage ditch or adopts the pvc pipe of caliber 150mm to drain into foundation ditch at a distance, to prevent water outlet from recharging or rainwater flows into foundation ditch and affects dewatering effect.
After adopting technique scheme, the Method on Dewatering of Foundation Pit of the coastal sand soil area of the present invention has the advantage that
1, base pit dewatering step is reasonable in design, simple to operate;
2, method is simple, easy construction, and dewatering effect is splendid;
3, operating expenses is cheap, has promotional value widely.
Accompanying drawing explanation
Fig. 1 is the precipitation well point tubular construction schematic diagram of the embodiment of the present invention;
Fig. 2 is the schematic diagram of the precipitation well point pipe installation process A-D of the embodiment of the present invention
In figure: 1 steel pipe, 2PVC water pipe, 3 precipitation well point pipes, 4 chimney filters.
Detailed description of the invention
Below in conjunction with embodiment and accompanying drawing thereof, the present invention is illustrated further.
Embodiment 1
The Method on Dewatering of Foundation Pit of the coastal sand soil area of the present invention, it is characterised in that comprise the following steps:
A, surveying setting-out and precast dewatering well point pipe
(1) surveying setting-out, lays well point, and the spacing of well point laying, quantity, the depth of burying are determined according to calculating and arrangement and method for construction;
(2) precast dewatering well point pipe
Referring now to the precipitation well point tubular construction schematic diagram that Fig. 1, Fig. 1 are the embodiment of the present invention. As it can be seen, described precipitation well point pipe 3 adopts pvc pipe to make, caliber 25mm, pvc pipe lower end is furnished with chimney filter 4, caliber 32mm, considers pipe range 800mm, chimney filter wall is drilled with the filter opening that diameter is �� 10mm in plum blossom-shaped; Filter opening area is the 15%-25% of chimney filter surface area, and chimney filter wall is double-baged filter screen, and internal layer adopts mesh to be 40 holes/cm2Nylon yarn cloth fie screen, outer layer adopt mesh be 8 holes/cm2Nylon yarn cloth coarse strainer, fasten with iron wire;
B, punching and installation well-point pipe
(1) well point position ground cleaning
Well point position ground 500mm boundary inner surface surface dust, assorted soil are excavated after laying by well point, form 500*500*500mm shallow hole shape, to facilitate well-point pipe to install;
(2) punching adopts 6 meters long �� 48mm steel pipes 1 and 8 meters long �� 32mmPVC water pipes 2, is inserted by PVC water pipe 2 in steel pipe 1; PVC water pipe upper end connects with high-pressure pump, and lower end is pressed into flat mouth-shaped, and concordant with steel pipe 1 lower end, the sleeve pipe of composition punching; During punching, sleeve pipe being perpendicular to well point position ground, first start high-pressure hydraulic pump, under the impulse force of hydraulic pressure, sand reaming sleeve pipe sinks, and operator adopt spanner to block in the middle part of sleeve pipe, and left-right rotation sleeve pipe, so that the quick punching of sleeve pipe is sunk;
(3) precipitation well point pipe is installed
Fig. 2 is the schematic diagram of the precipitation well point pipe installation process A-D of the embodiment of the present invention.
After sleeve pipe sinks down into designed elevation (place state A), close high-pressure pump and extract PVC water pipe 2(place state B in sleeve pipe immediately), and rapidly precast dewatering well point pipe 3 is inserted (place state C) in steel pipe 1, then pull out steel pipe 1 and make precipitation well point pipe 3(place state D) it is retained in sand, well-point pipe installation;
Coarse sand filtrate is filled out in c, filling
After well-point pipe is installed, coarse sand is adopted to fill in the space inserting well-point pipe 3 and ground formation immediately, until concordant in ground;
D, installation pumping equipment
Water pump is installed routinely, notices that well-point pipe adopts flexible pipe with water pump linkage section;
E, examination are drawn water
Turn on pump examination is taken out, and water outlet rule is first big after small, first muddy rear clear;
F, formally draw water
Need during formally drawing water to arrange special messenger to be responsible for maintenance; The subsoil water extracted need to adopt diameter 150mmPVC pipe to drain into the outer specified point (guaranteeing minimum 35 meters away from foundation ditch be) of foundation ditch in a organized way;
G, foundation construction
Construct by scheme practice processes;
H, withdraw well casing
When need to withdraw precipitation well point pipe, after removing water pump facility, well-point pipe standpipe cuts off by foundation elevation.
The present invention has substantive distinguishing features and significant technological progress, the Method on Dewatering of Foundation Pit of the coastal sand soil area of the present invention be a set of simple to operate, dewatering effect is good, scheme is simple, the base pit dewatering new technology of cost, there is method simple, easy construction, low cost, dewatering effect is splendid, the feature of low cost, and has promotional value widely.
The Method on Dewatering of Foundation Pit of the coastal sand soil area of the present invention is applied in Pingtan, Fujian Province comprehensive test region flowing water primary school, city, pool kindergarten, the multiple project of Cao Yu school, respond well ensure that project is implemented smoothly, effect is notable, obtains exploiting entity, supervisor and construction unit's abundant affirmation.
Above example is used for illustrative purposes only, but not limitation of the present invention, person skilled in the relevant technique, without departing from the spirit and scope of the present invention, it is also possible to make various conversion or change. Therefore, all equivalent technical schemes also should belong to scope of the invention, should be limited by each claim.

Claims (8)

1. the Method on Dewatering of Foundation Pit of a coastal sand soil area, it is characterised in that comprise the following steps:
A, surveying setting-out and precast dewatering well point pipe
(1) surveying setting-out, lays well point, and the spacing of well point laying, quantity, the depth of burying are determined according to calculating and arrangement and method for construction;
(2) precast dewatering well point pipe
Precipitation well point pipe (3) adopts pvc pipe to make, and pvc pipe lower end is furnished with chimney filter (4), and chimney filter wall is drilled with the filter opening that diameter is �� 10mm in plum blossom-shaped; Filter opening area is the 15%-25% of chimney filter surface area, and chimney filter wall is double-baged filter screen, and internal layer adopts mesh to be 30-50 hole/cm2Nylon yarn cloth fie screen, outer layer adopt mesh be 3-10 hole/cm2Nylon yarn cloth coarse strainer, fasten with iron wire;
B, punching and installation well-point pipe
(1) well point position ground cleaning
Well point position ground 500mm boundary inner surface surface dust, assorted soil are excavated after laying by well point, form 500*500*500mm shallow hole shape, to facilitate well-point pipe to install;
(2) punching adopts one 6 meters long steel pipes (1) and 8 meters long PVC water pipes (2), is inserted by PVC water pipe (2) in steel pipe (1); PVC water pipe upper end connects with high-pressure pump, and lower end is pressed into flat mouth-shaped, and concordant with steel pipe (1) lower end, the sleeve pipe of composition punching; During punching, sleeve pipe being perpendicular to well point position ground, first start high-pressure hydraulic pump, under the impulse force of hydraulic pressure, sand reaming sleeve pipe sinks, and operator adopt spanner to block in the middle part of sleeve pipe, and left-right rotation sleeve pipe, so that the quick punching of sleeve pipe is sunk;
(3) precipitation well point pipe is installed
After sleeve pipe sinks down into designed elevation, close high-pressure pump and extract PVC water pipe (2) in sleeve pipe immediately, and rapidly precast dewatering well point is managed in (3) insertion steel pipe (1), then pull out steel pipe (1) and make precipitation well point pipe (3) be retained in sand, well-point pipe installation;
Coarse sand filtrate is filled out in c, filling
After well-point pipe is installed, coarse sand is adopted to fill in the space inserting well-point pipe (3) and ground formation immediately, until concordant in ground;
D, installation pumping equipment
Water pump is installed routinely, notices that well-point pipe adopts flexible pipe with water pump linkage section;
E, examination are drawn water
Turn on pump examination is taken out, and water outlet rule is first big after small, first muddy rear clear;
F, formally draw water
Need during formally drawing water to arrange special messenger to be responsible for maintenance, the subsoil water of extraction is drained;
G, foundation construction
Construct by scheme practice processes;
H, withdraw well casing
When need to withdraw precipitation well point pipe, after removing water pump facility, well-point pipe standpipe cuts off by foundation elevation.
2. the Method on Dewatering of Foundation Pit of coastal sand soil area as claimed in claim 1, it is characterised in that the diameter of described precipitation well point pipe (3) is 25mm.
3. the Method on Dewatering of Foundation Pit of coastal sand soil area as claimed in claim 1, it is characterised in that the diameter of described chimney filter (4) is 32mm.
4. the Method on Dewatering of Foundation Pit of coastal sand soil area as claimed in claim 1, it is characterised in that described chimney filter (4) long 500-1200mm.
5. the Method on Dewatering of Foundation Pit of coastal sand soil area as claimed in claim 1, it is characterised in that the diameter >=48mm of described steel pipe (1).
6. the Method on Dewatering of Foundation Pit of coastal sand soil area as claimed in claim 1, it is characterised in that the diameter >=32mm of described PVC water pipe (2), and can insert in steel pipe (1).
7. the Method on Dewatering of Foundation Pit of coastal sand soil area as claimed in claim 1, it is characterised in that when described well-point pipe is installed, well-point pipe exceeds 600mm than place ground, it is simple to install with pump equipment.
8. the Method on Dewatering of Foundation Pit of coastal sand soil area as claimed in claim 1, it is characterized in that, the subsoil water pvc pipe of described extraction drains into specific drainage ditch or adopts the pvc pipe of caliber 150mm to drain into foundation ditch at a distance, to prevent water outlet from recharging or rainwater flows into foundation ditch and affects dewatering effect.
CN201410617295.7A 2014-11-06 2014-11-06 A kind of Method on Dewatering of Foundation Pit of coastal sand soil area Active CN105625445B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410617295.7A CN105625445B (en) 2014-11-06 2014-11-06 A kind of Method on Dewatering of Foundation Pit of coastal sand soil area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410617295.7A CN105625445B (en) 2014-11-06 2014-11-06 A kind of Method on Dewatering of Foundation Pit of coastal sand soil area

Publications (2)

Publication Number Publication Date
CN105625445A true CN105625445A (en) 2016-06-01
CN105625445B CN105625445B (en) 2017-11-28

Family

ID=56040755

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410617295.7A Active CN105625445B (en) 2014-11-06 2014-11-06 A kind of Method on Dewatering of Foundation Pit of coastal sand soil area

Country Status (1)

Country Link
CN (1) CN105625445B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106088123A (en) * 2016-08-16 2016-11-09 中国建筑第七工程局有限公司 A kind of sand geology steel tube well fall water level device and construction method thereof
CN106337427A (en) * 2016-09-26 2017-01-18 湖南科技大学 Deformation control method applied to foundation pit pre-dewatering construction
CN106544964A (en) * 2016-11-08 2017-03-29 中铁六局集团天津铁路建设有限公司 Road bed and lowering water level construction method during jacking box culvert
CN108049392A (en) * 2017-11-16 2018-05-18 中国三冶集团有限公司 A kind of steel plate pilework and water discharge method with drain function
CN109736340A (en) * 2019-02-22 2019-05-10 宁蔚蔚 A kind of sole plate reserves the dewatering device and method of dewatering well guarantee bed course integrality
CN109812223A (en) * 2019-03-25 2019-05-28 五冶集团上海有限公司 It is a kind of suitable for silt, the hole punched device of flour sand soil property and application method
CN111021508A (en) * 2019-12-16 2020-04-17 南通永泰建设工程有限公司 Underground drainage pipeline construction process
CN112609722A (en) * 2020-12-09 2021-04-06 中铁二十局集团第六工程有限公司 Drainage and water leakage plugging method for deep foundation pit in sea reclamation area

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2557592Y (en) * 2001-05-29 2003-06-25 韩晓迪 Pumping equipment for sink well
CN2869132Y (en) * 2006-03-01 2007-02-14 冯克俊 Intubation type vacuum base pit deep-well precipitation device
CN1952272A (en) * 2006-11-16 2007-04-25 上海隧道工程股份有限公司 Precipitation construction method for double-bushing vacuum deep well point
CN201031386Y (en) * 2007-05-23 2008-03-05 叶凝雯 Filtering packet type well point pipe system
CN102561372A (en) * 2011-12-23 2012-07-11 中国十七冶集团有限公司 Plugging method for downcomer for well-point dewatering of deep foundation pit

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2557592Y (en) * 2001-05-29 2003-06-25 韩晓迪 Pumping equipment for sink well
CN2869132Y (en) * 2006-03-01 2007-02-14 冯克俊 Intubation type vacuum base pit deep-well precipitation device
CN1952272A (en) * 2006-11-16 2007-04-25 上海隧道工程股份有限公司 Precipitation construction method for double-bushing vacuum deep well point
CN201031386Y (en) * 2007-05-23 2008-03-05 叶凝雯 Filtering packet type well point pipe system
CN102561372A (en) * 2011-12-23 2012-07-11 中国十七冶集团有限公司 Plugging method for downcomer for well-point dewatering of deep foundation pit

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
曹忠明等: "井点降水在砂性土路基施工中的应用", 《公路交通科技(应用技术版)》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106088123A (en) * 2016-08-16 2016-11-09 中国建筑第七工程局有限公司 A kind of sand geology steel tube well fall water level device and construction method thereof
CN106088123B (en) * 2016-08-16 2018-06-29 中国建筑第七工程局有限公司 A kind of sand geology steel tube well drop water level device and its construction method
CN106337427A (en) * 2016-09-26 2017-01-18 湖南科技大学 Deformation control method applied to foundation pit pre-dewatering construction
CN106544964A (en) * 2016-11-08 2017-03-29 中铁六局集团天津铁路建设有限公司 Road bed and lowering water level construction method during jacking box culvert
CN108049392A (en) * 2017-11-16 2018-05-18 中国三冶集团有限公司 A kind of steel plate pilework and water discharge method with drain function
CN109736340A (en) * 2019-02-22 2019-05-10 宁蔚蔚 A kind of sole plate reserves the dewatering device and method of dewatering well guarantee bed course integrality
CN109812223A (en) * 2019-03-25 2019-05-28 五冶集团上海有限公司 It is a kind of suitable for silt, the hole punched device of flour sand soil property and application method
CN111021508A (en) * 2019-12-16 2020-04-17 南通永泰建设工程有限公司 Underground drainage pipeline construction process
CN112609722A (en) * 2020-12-09 2021-04-06 中铁二十局集团第六工程有限公司 Drainage and water leakage plugging method for deep foundation pit in sea reclamation area

Also Published As

Publication number Publication date
CN105625445B (en) 2017-11-28

Similar Documents

Publication Publication Date Title
CN105625445B (en) A kind of Method on Dewatering of Foundation Pit of coastal sand soil area
CN100480475C (en) Controllable one-well lamina precipitation construction method
CN103967028A (en) Immersed tube drainage structure and method for handling suddenly-produced foundation pit water bursting and fountains through immersed tube drainage structure
CN102383437B (en) Well point positioned pumping tubular well and well point positioned pumping method
CN103866777B (en) Light well point dewatering construction method for shallow foundation pits of coastal areas
CN105401587A (en) Water descending system for foundation pits through deep wells and shallow wells for composite stratums of large-scale foundation pits and water descending method of water descending system
CN206721904U (en) A kind of integrated precipitation pumping system
CN105696611A (en) Foundation pit dewatering device for sand layer with high water permeability
CN205444216U (en) Depth well foundation pit dewatering system on compound stratum of large -scale foundation ditch
CN204418194U (en) For high water-permeability layer of sand foundation pit dewatering device
CN204899978U (en) Shaft excavation to interface water layer drainage system
CN205348204U (en) Light well point precipitation system
CN203022015U (en) Foundation raft bottom partial deep foundation pit dewatering device
CN205314117U (en) Foundation structure that draw water is carried out with centrifugal pump
CN206956917U (en) A kind of automatically cleaning pumping plant base for collecting sludge certainly
CN204326089U (en) A kind of structure for foundation ditch Yield rainfall relation
CN204098050U (en) A kind of control artesian water precipitation system
CN204551507U (en) A kind of rock foundation ductule local dewatering device
CN204139229U (en) A kind of Metro Deep Excavation dewatering well Accrete clearing device
CN104018488B (en) The servicing unit of plastic draining board is set based on liquid-plastic state Clayey Soil Ground
CN201406689Y (en) Bottom-sealing drainage structure of sunk well
CN203213129U (en) Controllable non-return drainer
CN203514331U (en) Large-aperture deep well point precipitation system arranged outside foundation pit
CN205917684U (en) Integral type well dotted calandria
CN109487886A (en) The siphon drainge system of underground garage

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant