CN104652445A CN201310591722.4A CN201310591722A CN104652445A CN 104652445 A CN104652445 A CN 104652445A CN 201310591722 A CN201310591722 A CN 201310591722A CN 104652445 A CN104652445 A CN 104652445A
Authority
CN
China
Prior art keywords
lattice column
steel lattice
casing
horizontal bar
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310591722.4A
Other languages
English (en)
Other versions
CN104652445B (zh
Inventor
张涛
岳齐贤
赵建立
梁建民
于青川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
CMTCC Shanghai Shisanye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CMTCC Shanghai Shisanye Construction Co Ltd filed Critical CMTCC Shanghai Shisanye Construction Co Ltd
Priority to CN201310591722.4A priority Critical patent/CN104652445B/zh
Publication of CN104652445A publication Critical patent/CN104652445A/zh
Application granted granted Critical
Publication of CN104652445B publication Critical patent/CN104652445B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

本发明涉及深基坑桩基工程领域,具体为一种深基坑一桩一柱钢格构柱定位装置;它包括靠尺,其特征是:还包括一个护筒,四个限位楔、两根吊筋、一对单杠、一对垫板、若干垫片;护筒垂直设置,四个限位楔垂直地固定于护筒内壁同一水平面上且限位楔两两成对并十字交叉设置;所述限位楔呈五边形,顶部自中点向两侧面倾斜形成两个倾斜面,底部为一平面,一侧倾斜面与格构柱侧面紧靠,底部与护筒内壁固定连接;垫板对称设于护筒外侧,单杠相互平行地搁置于两块垫板上;吊筋垂直设置,一端吊设于单杠,另一端与钢格构柱固定连接。本装置采用上述结构设计,其使用方法简单快速并且使用成本低,能有效保证钢格构柱的施工精度。

Description

深基坑一桩一柱钢格构柱定位装置及其施工方法
技术领域
本发明涉及深基坑桩基工程领域,具体为一种深基坑一桩一柱钢格构柱定位装置及其施工方法。
背景技术
    钢格构柱由于其装拆方便、力学性能稳定、材料可回收利用等优点,成为基坑竖向支撑的首选形式。
钢格构柱截面一般为方形,由角钢和缀板组成;钢格构柱大部分采取一桩一柱形式,与立柱桩同时施工,既缩短了施工周期,降低了工程造价,又提高了结构的整体性能。但是,在一桩一柱施工过程中,钢格构柱吊装、混凝土浇筑都会对钢格构柱的准确定位造成较大影响,进而影响竖向荷载的传递。
在2010年第01期《施工技术》的杂志中,《斯托克曼商业中心逆作施工格构柱安装定位技术》一文提出了逆作法一桩一柱施工用钢筋混凝土导墙代替校正架的方法,虽然较好地控制了钢格构柱的施工精度,但是由于要进行导墙砌筑,造成了工期和材料的浪费。 
发明内容
本发明的目的在于提出一种深基坑一桩一柱钢格构柱安装定位装置及期施工方法,具有构造简单、操作方便、占地面积小等优点。
为了达到上述目的,本发明是这样实现的:
一种深基坑一桩一柱钢格构柱定位装置,它包括靠尺,还包括一个护筒,四个限位楔、两根吊筋、一对单杠、一对垫板、若干垫片;护筒垂直设置,四个限位楔垂直地固定于护筒内壁同一水平面上且限位楔两两成对并十字交叉设置;所述限位楔呈五边形,顶部自中点向两侧面倾斜形成两个倾斜面,底部为一平面,一侧倾斜面与格构柱侧面紧靠,底部与护筒内壁固定连接;垫板对称设于护筒外侧,单杠相互平行地搁置于两块垫板上;吊筋垂直设置,一端吊设于单杠,另一端与钢格构柱固定连接。
所述的深基坑一桩一柱钢格构柱定位装置,吊筋为螺纹钢,吊筋一端设有吊环,其通过吊环穿于单杠上,吊环的内圈形状与单杠的截面形状相吻合。
所述的深基坑一桩一柱钢格构柱定位装置的使用方法,包括:
步骤1、施工桩孔;
步骤2、桩孔周边区域地面硬化处理;
步骤3、将护筒竖直放入桩孔内,护筒顶面高于硬化后地面10cm;
步骤4、向护筒内垂直吊装钢格构柱及其下方立柱桩钢筋笼,期间每隔5m用靠尺检查钢格构柱的垂直度;
步骤5、将下一段钢格构柱与护筒内钢格构柱的顶部固定连接,并调整下一段钢格构柱的方向及中心位置;
步骤6、重复步骤4~步骤5,直至钢格构柱达到设计标高与设计平面坐标;
步骤7、在护筒两侧地面对称铺设垫板,垫板顶高出护筒顶面5cm,垫板上放置单杠; 
步骤8、选择钢格构柱相对的两个侧面,在其顶端对称焊接吊筋,吊筋另一端设环形吊钩并吊设于单杠上;
步骤9、用靠尺检查单杠的水平度,若单杠不水平,逐块添加垫片直到单杠达到水平;
步骤10、在钢格构柱相互垂直的两个轴线方向上将四个限位楔分别沿护筒内壁垂直下放,各限位楔的一个倾斜面与钢格构柱的顶面紧贴,各限位楔的底部与护筒点焊;
步骤11、在桩孔内安装导管,浇筑钢格构柱下方立柱桩混凝土,浇筑完成后对钢格构柱范围桩孔进行回填并移除本定位装置。
本装置采用上述结构设计,其使用方法简单快速并且使用成本低,能有效保证钢格构柱的施工精度。
附图说明
图1为本发明的平面图。
图2为本发明的剖面图。
具体实施方式
如图1、图2所示,
一种深基坑一桩一柱钢格构柱定位装置,它包括靠尺,还包括一个护筒1,四个限位楔6、两根吊筋5、一对单杠4、一对垫板3、若干垫片;护筒1垂直设置,四个限位楔6垂直地固定于护筒1内壁同一水平面上且限位楔6两两成对并十字交叉设置;所述限位楔6呈五边形,顶部自中点向两侧面倾斜形成两个倾斜面,底部为一平面,一侧倾斜面与格构柱侧2面紧靠,底部与护筒1内壁固定连接;垫板3对称设于护筒1外侧,单杠4相互平行地搁置于两块垫板3上;吊筋5垂直设置,一端吊设于单杠4,另一端与钢格构柱固定连接。
所述的深基坑一桩一柱钢格构柱定位装置,吊筋5为螺纹钢,吊筋5一端设有吊环,其通过吊环穿于单杠4上,吊环的内圈形状与单杠4的截面形状相吻合。
如图1、图2所示,
所述的深基坑一桩一柱钢格构柱定位装置的使用方法,包括:
步骤1、施工桩孔;
步骤2、桩孔周边区域地面硬化处理;
步骤3、将护筒1竖直放入桩孔内,护筒1顶面高于硬化后地面10cm;
步骤4、向护筒1内垂直吊装钢格构柱2及其下方立柱桩钢筋笼,期间每隔5m用靠尺检查钢格构柱2的垂直度;
步骤5、将下一段钢格构柱2与护筒1内钢格构柱2的顶部固定连接,并调整下一段钢格构柱2的方向及中心位置;
步骤6、重复步骤4~步骤5,直至钢格构柱2达到设计标高与设计平面坐标;
步骤7、在护筒1两侧地面对称铺设垫板3,垫板3顶高出护筒1顶面5cm,垫板上放置单杠4; 
步骤8、选择钢格构柱2相对的两个侧面,在其顶端对称焊接吊筋5,吊筋5另一端设环形吊钩并吊设于单杠4上;
步骤9、用靠尺检查单杠4的水平度,若单杠4不水平,逐块添加垫片直到单杠4达到水平;
步骤10、在钢格构柱2相互垂直的两个轴线方向上将四个限位楔6分别沿护筒1内壁垂直下放,各限位楔6的一个倾斜面与钢格构柱2的顶面紧贴,各限位楔6的底部与护筒1点焊;
步骤11、在桩孔内安装导管,浇筑钢格构柱下方立柱桩混凝土,浇筑完成后对钢格构柱范围桩孔进行回填并移除本定位装置。
本装置采用上述结构设计,其使用方法简单快速并且使用成本低,能有效保证钢格构柱的施工精度。

Claims (3)

1. 一种深基坑一桩一柱钢格构柱定位装置,它包括靠尺,其特征是:还包括一个护筒,四个限位楔、两根吊筋、一对单杠、一对垫板、若干垫片;护筒垂直设置,四个限位楔垂直地固定于护筒内壁同一水平面上且限位楔两两成对并十字交叉设置;所述限位楔呈五边形,顶部自中点向两侧面倾斜形成两个倾斜面,底部为一平面,一侧倾斜面与格构柱侧面紧靠,底部与护筒内壁固定连接;垫板对称设于护筒外侧,单杠相互平行地搁置于两块垫板上;吊筋垂直设置,一端吊设于单杠,另一端与钢格构柱固定连接。
2.根据权利要求1所述的深基坑一桩一柱钢格构柱定位装置,其特征是:吊筋为螺纹钢,吊筋一端设有吊环,其通过吊环穿于单杠上,吊环的内圈形状与单杠的截面形状相吻合。
3.如权利要求1所述的深基坑一桩一柱钢格构柱定位装置的使用方法,其特征是:包括:
步骤1、施工桩孔;
步骤2、桩孔周边区域地面硬化处理;
步骤3、将护筒竖直放入桩孔内,护筒顶面高于硬化后地面10cm;
步骤4、向护筒内垂直吊装钢格构柱及其下方立柱桩钢筋笼,期间每隔5m用靠尺检查钢格构柱的垂直度;
步骤5、将下一段钢格构柱与护筒内钢格构柱的顶部固定连接,并调整下一段钢格构柱的方向及中心位置;
步骤6、重复步骤4~步骤5,直至钢格构柱达到设计标高与设计平面坐标;
步骤7、在护筒两侧地面对称铺设垫板,垫板顶高出护筒顶面5cm,垫板上放置单杠; 
步骤8、选择钢格构柱相对的两个侧面,在其顶端对称焊接吊筋,吊筋另一端设环形吊钩并吊设于单杠上;
步骤9、用靠尺检查单杠的水平度,若单杠不水平,逐块添加垫片直到单杠达到水平;
步骤10、在钢格构柱相互垂直的两个轴线方向上将四个限位楔分别沿护筒内壁垂直下放,各限位楔的一个倾斜面与钢格构柱的顶面紧贴,各限位楔的底部与护筒点焊;
步骤11、在桩孔内安装导管,浇筑钢格构柱下方立柱桩混凝土,浇筑完成后对钢格构柱范围桩孔进行回填并移除本定位装置。
CN201310591722.4A 2013-11-22 2013-11-22 深基坑一桩一柱钢格构柱定位装置及其施工方法 Active CN104652445B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310591722.4A CN104652445B (zh) 2013-11-22 2013-11-22 深基坑一桩一柱钢格构柱定位装置及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310591722.4A CN104652445B (zh) 2013-11-22 2013-11-22 深基坑一桩一柱钢格构柱定位装置及其施工方法

Publications (2)

Publication Number Publication Date
CN104652445A true CN104652445A (zh) 2015-05-27
CN104652445B CN104652445B (zh) 2016-08-17

Family

ID=53244039

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310591722.4A Active CN104652445B (zh) 2013-11-22 2013-11-22 深基坑一桩一柱钢格构柱定位装置及其施工方法

Country Status (1)

Country Link
CN (1) CN104652445B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105821887A (zh) * 2016-04-05 2016-08-03 东通岩土科技(杭州)有限公司 一种在卵石层中施工的立柱桩安装方法
CN107178079A (zh) * 2017-07-25 2017-09-19 中交二航局第四工程有限公司 一种适用于灌注桩钢筋笼及导管定位的工具平台

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05171636A (ja) * 1991-12-26 1993-07-09 Fujita Corp 深礎杭式土留擁壁の施工法
CN201071510Y (zh) * 2007-07-13 2008-06-11 中建三局第三建设工程有限责任公司 格构柱定位调垂导架装置
CN101509254A (zh) * 2009-03-09 2009-08-19 天津市建工工程总承包有限公司 钢筋混凝土灌注桩与水泥搅拌桩啮合式基坑支护施工方法
CN202577380U (zh) * 2012-05-29 2012-12-05 中国建筑第四工程局有限公司 立柱桩施工用的钢构件垂直度的校正装置
CN203393719U (zh) * 2013-08-02 2014-01-15 武汉地质勘察基础工程有限公司 钢格构柱定位架

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05171636A (ja) * 1991-12-26 1993-07-09 Fujita Corp 深礎杭式土留擁壁の施工法
JP2733722B2 (ja) * 1991-12-26 1998-03-30 株式会社フジタ 深礎杭式土留擁壁の施工法
CN201071510Y (zh) * 2007-07-13 2008-06-11 中建三局第三建设工程有限责任公司 格构柱定位调垂导架装置
CN101509254A (zh) * 2009-03-09 2009-08-19 天津市建工工程总承包有限公司 钢筋混凝土灌注桩与水泥搅拌桩啮合式基坑支护施工方法
CN202577380U (zh) * 2012-05-29 2012-12-05 中国建筑第四工程局有限公司 立柱桩施工用的钢构件垂直度的校正装置
CN203393719U (zh) * 2013-08-02 2014-01-15 武汉地质勘察基础工程有限公司 钢格构柱定位架

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105821887A (zh) * 2016-04-05 2016-08-03 东通岩土科技(杭州)有限公司 一种在卵石层中施工的立柱桩安装方法
CN107178079A (zh) * 2017-07-25 2017-09-19 中交二航局第四工程有限公司 一种适用于灌注桩钢筋笼及导管定位的工具平台

Also Published As

Publication number Publication date
CN104652445B (zh) 2016-08-17

Similar Documents

Publication Publication Date Title
CN104110035A (zh) 逆作法钢管混凝土柱垂直度校正装置及其施工方法
CN210766774U (zh) 一种钢筋笼及格构柱的定位装置
CN103966947B (zh) 一种基于桥梁梁体减震的防落梁装置
KR20120033683A (ko) 지하 구조물 구축장치 및 공법
CN110685277A (zh) 一种陆上大型桩基永久钢护筒的导向定位装置及其方法
CN103469732B (zh) 一种桥梁支座地脚螺栓预留孔的施工方法
CN104652445A (zh) 深基坑一桩一柱钢格构柱定位装置及其施工方法
CN203846390U (zh) 一种基于桥梁梁体减震的防落梁装置
CN109797753B (zh) 适用于高岩面场地基坑的立柱桩及格构柱的施工方法
CN103967332A (zh) 一种建筑工地围挡的施工方法
CN204662929U (zh) 一种跨线行走式防护操作装置
CN203546618U (zh) 一种桥梁现浇混凝土模板八字支撑架
CN216586578U (zh) 一种地基内支撑结构
CN210946864U (zh) 松软地层景观构筑物基础
CN102995560A (zh) 薄壁空心墩提模架及使用方法
CN108571014A (zh) 一种固定格构柱的地下室逆作法施工方法
CN212175798U (zh) 一种深基坑整体支撑装置
CN209855288U (zh) 一种土木工程用组合式支撑桩
CN213297204U (zh) 钢立柱定位板结构
CN213296356U (zh) 定位精确的钢立柱结构
JP2013040538A (ja) 擁壁ブロック、擁壁ブロック用支柱及び擁壁ブロックの固定方法
JP3208100U (ja) 地中構造物構築用の足場装置
CN209799419U (zh) 一种结构柱的定位、调垂装置
CN110374221A (zh) 基础工程隔振结构及其施工方法
CN103266568A (zh) 一种防撞墙施工的活动平台

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Patentee before: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd.

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Patentee after: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Patentee before: CMTCC Shanghai 13th Construction Co.,Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20190815

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee after: CHINA MCC20 GROUP Corp.,Ltd.

Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Patentee before: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

TR01 Transfer of patent right