CN104594207B - Bridge horizontal rotation support construction method adopting supporting device used for bridge horizontal rotation construction - Google Patents

Bridge horizontal rotation support construction method adopting supporting device used for bridge horizontal rotation construction Download PDF

Info

Publication number
CN104594207B
CN104594207B CN201510018808.7A CN201510018808A CN104594207B CN 104594207 B CN104594207 B CN 104594207B CN 201510018808 A CN201510018808 A CN 201510018808A CN 104594207 B CN104594207 B CN 104594207B
Authority
CN
China
Prior art keywords
emery disc
spike
bridge
sand
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510018808.7A
Other languages
Chinese (zh)
Other versions
CN104594207A (en
Inventor
王传霖
杨玉龙
宋满荣
张威
袁绪冲
王根杰
周奇
高媛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Construction Engineering Co Ltd of CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Construction Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group, Construction Engineering Co Ltd of CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN201510018808.7A priority Critical patent/CN104594207B/en
Publication of CN104594207A publication Critical patent/CN104594207A/en
Application granted granted Critical
Publication of CN104594207B publication Critical patent/CN104594207B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/08Methods or apparatus specially adapted for erecting or assembling bridges by rotational movement of the bridge or bridge sections

Abstract

The invention provides a bridge horizontal rotation support construction method adopting a supporting device used for bridge horizontal rotation construction, aiming at the defects existing in the existing bridge rotation body apparatus and technology. The supporting device comprises a sand tray, dry sand in the sand tray and a mortar plastering layer. The rotating supporting system comprises a rotating table and more than six rotation supporting modules; each rotation supporting module consists of a bottom supporting device, supporting lugs and a supporting lug steel walking board. The supporting device has the advantages that the structure is simple, the cost of the sand tray is low, the manufacturing technology is simple, and field processing and manufacturing can be realized. The construction method is simple, solid and steady in structure, detachment and cleaning are easy after use, and the labor and material costs are saved.

Description

Use the bridge horizontal Construction of Supporting of a kind of support means for bridge horizontal construction Method
Technical field
The invention belongs to the construction engineering technical field of bridge, particularly relate to a kind of in rotator construction to turn spike with The equipment that between slipping, space is filled with, is specifically related to use the bridge horizontal of a kind of support means for bridge horizontal construction Construction of Supporting method.
Background technology
At present in bridge horizontal rotator construction, when using centre bearing swing system, often support is set under top rotary table Foot, divides into steel limp at spike.When spike is bridge rotating, supporting construction swivel structure insures lower limb smoothly, is symmetrically distributed in vertical The both sides of axis.It is provided with slideway in the lower section of spike, insures spike when turning and can slide in slideway, to keep swivel structure to put down Surely.During Superstructure Construction, for keeping Stability Analysis of Structures, the space between spike and slideway need to be tamped, existing general doing Method is to fill steel, the tetrafluoro combined liner plate being made up of steel plate and tetrafluoro plate.Treat that Superstructure Construction is complete, take out before bridge rotating Aforesaid steel and the combined liner plate of tetrafluoro, and corrosion resistant plate of mating formation in chute surface.But, in practice of construction, due to bridge Superstructure load is very big, and the action time constructed is the longest, causes causing the combined liner plate of above-mentioned steel and tetrafluoro growing Occur to deform significantly under phase, big pressure environment, therefore and be difficult to pull out, affect follow-up operation of turning, from forming For affecting the bottleneck problem of rotator construction later stage progress, new constructing device and technique certainly will be taked difficult to solve this engineering Topic.
Summary of the invention
The present invention is to turn weak point existing on equipment and technology for making up above-mentioned existing highway bridge, it is provided that one adopt By a kind of bridge horizontal Construction of Supporting method of support means for bridge horizontal construction, reach to use simple, accelerate to construct into The purpose of degree.
Concrete inventive technique scheme is as follows:
Support means for bridge horizontal construction: include dry sand 5 in emery disc 3, emery disc, sand finish layer 6.Described emery disc 3 is Open-topped hollow, rectangular body.In the cavity of emery disc 3, it is filled with dry sand 5 in emery disc, constitutes sand bedding course.Described sand bedding course End face less than the end face of emery disc 3, and be provided with sand finish layer 6 at the top of sand bedding course.The end face of described sand finish 6 is not End face higher than emery disc 3.The sidewall of emery disc 3 has an emery disc side openings 4.Emery disc side openings 4 is furnished with Side openings plate 7.
Use the rotational support system of the support means for bridge horizontal construction of the present invention, including 1 turntable 12 He The rotational support assembly of more than 6.Described turntable 12 is in circular.The bottom of turntable 12 connects with the top of rotational support assembly It is connected together.Each rotational support assembly is by the support means for bridge horizontal construction of the present invention, spike 1, support Foot steel limp 2 is constituted.Wherein, the top in the support means constructed for bridge horizontal is provided with one piece of spike steel limp 2.? The top of spike steel limp 2 is provided with a spike 1.The end face of described spike 1 is connected with adjacent turntable 12 bottom surface.
Use the bridge horizontal Construction of Supporting method of a kind of base support means for bridge horizontal construction of the present invention, Carry out as follows:
Step 1: lay the steel plate slideway 8 of annular on the end face of concrete lower rotary table.The center of circle of described steel plate slideway and bridge pier yet to be built Center coincide.Steel plate slideway is installed emery disc 3.Each emery disc 3 center need to be mutually overlapping with the center of spike 1 to be positioned Close.
Step 2: have emery disc side openings 4 on the sidewall of each emery disc 3, and be furnished with side openings plate 7.
Step 3: will pour in emery disc 3 in dry sand in emery disc 5, with trowel dry sand in emery disc 5 is made real, floating, formed Sand bedding course.Guaranteeing that this sand bedding course is smooth and level, the end face of sand bedding course is less than emery disc 3 height.
Step 4: be provided with the spike 1 of spike steel limp 2 bottom the top of the sand bedding course described in step 3 disposes.Subsequently, In the one layer of cement mortar of surface brush of the sand bedding course not covered by spike steel limp 2, form sand finish layer 6.
Step 5: under the stable support of the spike 1 built in step 4, carry out cushion cap above concrete lower rotary table, bridge pier and The construction of bridge superstructure.
Step 6: after treating the construction construction of the cushion cap described in step 5, bridge pier and bridge superstructure, by side openings Plate 7 is removed at emery disc side openings 4, makes dry sand 5 in emery disc flow out from emery disc 3.Subsequently, remove emery disc 3, and clear up Steel plate slideway 8.
Step 7: load onto steel plate in the bottom surface of spike 1, the fit beneath polyfluortetraethylene plate of steel plate bottom spike 1, and Butter is spread in the bottom surface of polyfluortetraethylene plate.
Step 8: being driven turntable 12 to rotate by pulling equipment by hauling rope, spike 1 rotates along steel plate slideway 8, it is achieved The flat turn construction of bridge.After turntable 12 rotate in place, between spike 1 and slideway 8, use drift wedging and fix, clearly Reason construction area, assembling reinforcement, branching standing template, pour envelope hinge concrete, complete bridge horizontal construction.
Useful technique effect
The simple in construction of the present invention, emery disc are with low cost, and processing technology is simple, can on-the-spot processing and fabricating.Sand bedding course in the present invention is Being made up of dry sand 5 in the emery disc after screening, beating, in emery disc, dry sand 5 self compacting ability is preferable, and settling amount is minimum, thus The sand bedding course making the present invention has splendid bulk strength and the ability of the anti-deformation of resistance to compression.The present invention can meet Superstructure Construction Period spike is supported in the construction requirement on lower rotary table smoothly, thus ensures the needs that overall structure is stable.
Additionally, the present invention also has easy-to-dismount advantage: before turning after Superstructure Construction completes, the sand of the present invention In dish, dry sand 5 can unload easily, it is thus possible to emery disc 3 of dismantling easily, does not interferes with follow-up operation of turning, makes The most troubling bottleneck problem is readily solved, and substantially reduces the duration.
Accompanying drawing explanation
Fig. 1 is the schematic perspective view of the support means for bridge horizontal construction of the present invention.
Fig. 2 be use of the present invention for bridge horizontal construction support means rotational support system in single rotation prop up The schematic perspective view of support component.
Fig. 3 is the longitudinal sectional view of a-quadrant in Fig. 2.
Fig. 4 is the simple view of the rotational support system using the support means for bridge horizontal construction of the present invention.
Serial number in figure: dry sand in 1 spike, 2 spike steel limps, 3 emery discs, 4 emery disc side openings, 5 emery discs, 6 Cushion cap, 11 ball pivots, 12 turntables under cushion cap, 10 concrete on sand finish, 7 side openings plates, 8 slideways, 9 concrete.
Detailed description of the invention
Below in conjunction with the accompanying drawings and embodiment the present invention is described in more detail:
See Fig. 1, for the support means of bridge horizontal construction, including dry sand 5 in emery disc 3, emery disc, sand finish layer 6.Described Emery disc 3 is open-topped hollow, rectangular body.In the cavity of emery disc 3, it is filled with dry sand 5 in emery disc, constitutes sand bedding course.Institute State the end face end face less than emery disc 3 of sand bedding course, and be provided with sand finish layer 6 at the top of sand bedding course.Described sand finish 6 End face be not higher than the end face of emery disc 3, see Fig. 3.The sidewall of emery disc 3 has an emery disc side openings 4.At sand Side openings plate 7 it is furnished with in dish side openings 4.
Furtherly, the width of described emery disc 3 between 0.8m to 1.2m, length between 1.8 to 2.2m, highly Between 5cm to 8cm.The material of described emery disc 3 is Q235 steel plate.In described emery disc, dry sand 5 is that granularity is at 0.3mm Fluvial sand between 1mm.The material of described sand finish layer 6 is cement mortar.
Furtherly, the upper surface at sand finish layer 6 is provided with groove.
See Fig. 4, use the rotational support system of the support means for bridge horizontal construction of the present invention, see figure 4, including the individual rotational support assembly including 1 turntable 12 and more than 6.Described turntable 12 is in circular.Turntable 12 Bottom links together with the top of rotational support assembly.Preferably scheme is, is provided with 6 or 8 rotational support assemblies, and turns Dynamic support component is distributed on the bottom of turntable 12.See Fig. 2, each rotational support assembly by of the present invention for bridge Liangping turns the support means of construction, spike 1, spike steel limp 2 are constituted.Wherein, at the support dress constructed for bridge horizontal The top put is provided with one piece of spike steel limp 2.It is provided with a spike 1 at the top of spike steel limp 2, refers to Fig. 3.Described The end face of spike 1 is connected with adjacent turntable 12 bottom surface, refers to Fig. 4.
Furtherly, described spike 1 is the steel pipe in bicylinder shape, is perfused with concrete in the cavity of spike 1.Institute The concrete stated is the concrete of ungauged regions type.
Furtherly, use the bridge horizontal Construction of Supporting method of rotational support system of the present invention, enter as follows OK:
Step 1: lay the steel plate slideway 8 of annular on the end face of concrete lower rotary table.The center of circle of described steel plate slideway and bridge pier yet to be built Center coincide.Steel plate slideway is installed emery disc 3.Each emery disc 3 center need to be mutually overlapping with the center of spike 1 to be positioned Close.
Step 2: have emery disc side openings 4 on the sidewall of each emery disc 3, and be furnished with side openings plate 7.
Step 3: will pour in emery disc 3 in dry sand in emery disc 5, with trowel dry sand in emery disc 5 is made real, floating, formed Sand bedding course.Guaranteeing that this sand bedding course is smooth and level, the end face of sand bedding course is less than emery disc 3 height.
Step 4: be provided with the spike 1 of spike steel limp 2 bottom the top of the sand bedding course described in step 3 disposes.Subsequently, In the one layer of cement mortar of surface brush of the sand bedding course not covered by spike steel limp 2, form sand finish layer 6, see Fig. 3 and Fig. 4.
Step 5: under the stable support of the spike 1 built in step 4, carry out the cushion cap above concrete lower rotary table, bridge pier Construction with bridge superstructure.
Step 6: after treating the construction of the cushion cap described in step 5, bridge pier and bridge superstructure, by side openings plate 7 Remove at emery disc side openings 4, make dry sand 5 in emery disc flow out from emery disc 3.Subsequently, remove emery disc 3, and clear up steel plate Slideway 8.
Step 7: load onto steel plate in the bottom surface of spike 1, the fit beneath polyfluortetraethylene plate of steel plate bottom spike 1, and Butter is spread in the bottom surface of polyfluortetraethylene plate.
Step 8: being driven turntable 12 to rotate by pulling equipment by hauling rope, spike 1 rotates along steel plate slideway 8, it is achieved The flat turn construction of bridge.After turntable 12 rotate in place, between spike 1 and slideway 8, use drift wedging and fix, clearly Reason construction area, assembling reinforcement, branching standing template, pour envelope hinge concrete, complete bridge horizontal construction.
Furtherly, the center of emery disc 3 overlaps with the center of spike 1.The length of emery disc 3 and width are respectively greater than The length of spike steel limp 2 and width.
See Fig. 2, furtherly, when dry sand 5 can not unload naturally through emery disc side openings 4 in emery disc, the most first remove Emery disc 3 surrounding steel plate, then with high pressure air rifle, water pressure gun or scoop dry sand in emery disc 5 removed in emery disc 3 and dispose.

Claims (7)

1. using a kind of bridge horizontal Construction of Supporting method of base support means for bridge horizontal construction, described one is used for bridge Liangping turns the support means of construction and includes dry sand (5) in emery disc (3), emery disc, sand finish layer (6);Described emery disc (3) For open-topped hollow, rectangular body;In the cavity of emery disc (3), it is filled with dry sand in emery disc (5), constitutes sand bedding course;Institute State the end face end face less than emery disc (3) of sand bedding course, and be provided with sand finish layer (6) at the top of sand bedding course;Described mortar The end face of float coat (6) is not higher than the end face of emery disc (3);The sidewall of emery disc (3) has an emery disc side openings (4);Emery disc side openings (4) is furnished with side openings plate (7), it is characterised in that: carry out as follows:
Step 1: lay the steel plate slideway (8) of annular on the end face of concrete lower rotary table;The center of circle of described steel plate slideway with treat bridge construction The center of pier coincides;Steel plate slideway is installed emery disc (3);Each emery disc (3) center need to be with spike (1) to be positioned Center coincide;
Step 2: have emery disc side openings (4) on the sidewall of each emery disc (3), and be furnished with side openings plate (7);
Step 3: will pour in emery disc (3) in dry sand in emery disc (5), with trowel dry sand in emery disc (5) is made real, floating, Form sand bedding course;Guaranteeing that this sand bedding course is smooth and level, the end face of sand bedding course is less than emery disc (3) highly;
Step 4: be provided with the spike (1) of spike steel limp (2) bottom the top of the sand bedding course described in step 3 disposes;Subsequently, In the one layer of cement mortar of surface brush of the sand bedding course not covered by spike steel limp (2), form sand finish layer (6);
Step 5: under the stable support of the spike (1) built in step 4, carry out the cushion cap above concrete lower rotary table, bridge pier and The construction of bridge superstructure;
Step 6: after treating the construction of the cushion cap described in step 5, bridge pier and bridge superstructure, by side openings plate (7) certainly Emery disc side openings (4) place removes, and makes dry sand in emery disc (5) flow out from emery disc (3);Subsequently, remove emery disc (3), And clear up steel plate slideway (8);
Step 7: load onto steel plate in the bottom surface of spike (1), at the fit beneath polyfluortetraethylene plate of spike (1) bottom steel plate, and Butter is spread in the bottom surface of polyfluortetraethylene plate;
Step 8: being driven turntable (12) to rotate by pulling equipment by hauling rope, spike (1) rotates along steel plate slideway (8), real The flat turn construction of existing bridge;After turntable (12) rotate in place, between spike (1) and slideway (8), use drift wedging And fix, clear up construction area, assembling reinforcement, branching standing template, pour envelope hinge concrete, complete bridge horizontal construction.
2. the bridge horizontal Construction of Supporting side using a kind of base support means for bridge horizontal construction as claimed in claim 1 Method, it is characterised in that: the width of described emery disc (3) between 0.8m to 1.2m, length between 1.8 to 2.2m, high Degree is between 5cm to 8cm;The material of described emery disc (3) is Q235 steel plate;In described emery disc, dry sand (5) is granularity Fluvial sand between 0.3mm to 1mm;The material of described sand finish layer (6) is cement mortar.
3. the bridge horizontal Construction of Supporting side using a kind of base support means for bridge horizontal construction as claimed in claim 1 Method, it is characterised in that: the upper surface at sand finish layer (6) is provided with groove.
4. the bridge horizontal Construction of Supporting side using a kind of base support means for bridge horizontal construction as claimed in claim 1 Method, it is characterised in that: constituted rotational support system by the rotational support assembly of 1 turntable (12) and more than 6;Described turn Platform (12) is in circular;The bottom of turntable (12) links together with the top of rotational support assembly;Each rotational support group Part is constituted by the support means for bridge horizontal construction of the present invention, spike (1), spike steel limp (2);Its In, one piece of spike steel limp (2) it is provided with at the top of the support means constructed for bridge horizontal;At spike steel limp (2) Top be provided with a spike (1);The end face of described spike (1) is connected with adjacent turntable (12) bottom surface.
5. the bridge horizontal Construction of Supporting side using a kind of base support means for bridge horizontal construction as claimed in claim 4 Method, it is characterised in that: described spike (1) is the steel pipe in bicylinder shape, is perfused with coagulation in the cavity of spike (1) Soil.
A kind of bridge horizontal Construction of Supporting method of the base support means for bridge horizontal construction, its It is characterised by: the center of emery disc (3) overlaps with the center of spike (1);The length of emery disc (3) and width are the biggest Length and width in spike steel limp (2).
A kind of bridge horizontal Construction of Supporting method of the base support means for bridge horizontal construction, its It is characterised by: when dry sand (5) can not unload naturally through emery disc side openings (4) in emery disc, the most first remove emery disc (3) Surrounding steel plate, then will dry sand in emery disc (5) removing emery disc (3) be disposed with high pressure air rifle, water pressure gun or scoop.
CN201510018808.7A 2015-01-15 2015-01-15 Bridge horizontal rotation support construction method adopting supporting device used for bridge horizontal rotation construction Active CN104594207B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510018808.7A CN104594207B (en) 2015-01-15 2015-01-15 Bridge horizontal rotation support construction method adopting supporting device used for bridge horizontal rotation construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510018808.7A CN104594207B (en) 2015-01-15 2015-01-15 Bridge horizontal rotation support construction method adopting supporting device used for bridge horizontal rotation construction

Publications (2)

Publication Number Publication Date
CN104594207A CN104594207A (en) 2015-05-06
CN104594207B true CN104594207B (en) 2017-01-11

Family

ID=53120235

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510018808.7A Active CN104594207B (en) 2015-01-15 2015-01-15 Bridge horizontal rotation support construction method adopting supporting device used for bridge horizontal rotation construction

Country Status (1)

Country Link
CN (1) CN104594207B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105507163B (en) * 2015-11-26 2017-06-16 中铁四局集团建筑工程有限公司 Equipment and detection method for turning bridge experiment of weighing critical point differentiation
CN105735144B (en) * 2016-02-26 2017-05-10 江苏中铁山桥重工有限公司 Bridge arch segment right-angle turning method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2668664B2 (en) * 1995-06-27 1997-10-27 株式会社サンテック Ground improvement method and equipment
KR100682344B1 (en) * 2005-08-03 2007-02-15 명보산공 주식회사 Rotation Apparatus of constructing temporary bridge
CN101818482B (en) * 2010-03-22 2012-07-25 中铁十二局集团第二工程有限公司 Method for constructing road swivel bridge and railway swivel bridge by using turnplate spherical hinge
CN103147408B (en) * 2013-04-03 2015-04-08 中铁西南科学研究院有限公司 Bridge rotation constructing process and rotation system
CN203593977U (en) * 2013-10-29 2014-05-14 中国中铁航空港建设集团有限公司 Swivel bridge supporting leg

Also Published As

Publication number Publication date
CN104594207A (en) 2015-05-06

Similar Documents

Publication Publication Date Title
CN105133575B (en) Suspended formwork supporting device for casting lining on surface of underground continuous wall and construction method
CN104594207B (en) Bridge horizontal rotation support construction method adopting supporting device used for bridge horizontal rotation construction
CN107035147A (en) A kind of cone bucket concrete pouring construction method
CN205576955U (en) Raft foundation's reinforced structure is displaced into to strip footing
CN109306649A (en) A kind of prefabricated deployment equipment of Steel Bridge Deck
CN108505500A (en) It is a kind of to tilt seamless spliced prefab-form and its installation method
CN103122642A (en) Construction method of vertical post support change
CN106523028B (en) A kind of tunnel central drainage pipe and its laying method
CN204551284U (en) A kind of support workpiece for bridge and flat turn supporting component
CN204489562U (en) A kind of supporting construction depositing steel box-girder
CN105783869B (en) The live inclining experiment test device of rockfill
CN106049866B (en) A kind of method and product for blocking hollow cement brick making hole
CN106192656B (en) A kind of stagger arrangement link floor file block and its production method
CN108000688A (en) The prefab-form of trapezoidal hollow unit and vertical method for prefabricating
CN105507645B (en) Method for manufacturing reinforced concrete large thin shell spherical product by using hemispherical steel die
CN206448289U (en) It is provided with the large tank basis of connection raceway groove
CN208148158U (en) It is a kind of live with strength mortar preparation facilities
CN106368128B (en) For supporting the sandbox of disk on ton swivel arch bridge skewback to combine full sand bed die construction method
CN105784973B (en) A kind of live inclining experiment method of testing of rockfill
CN111535643B (en) Filling and maintaining device for leveling layer of bottom of cast-in-place concrete pool and construction method
CN205748360U (en) The on-the-spot inclining experiment test device of rockfill
CN104790416A (en) Sealing water stop structure and method for suspended steel cofferdam
CN108708296A (en) A kind of crab tongs-type deviation correcting device and construction technology being arranged in bridge pier bottom
CN110306598B (en) Construction method of inspection well
CN104562939B (en) Under bridge turntable of turning segment construction tire film frame and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Wang Chuanlin

Inventor after: Yang Yulong

Inventor after: Song Manrong

Inventor after: Zhang Wei

Inventor after: Yuan Xuchong

Inventor after: Wang Genjie

Inventor after: Zhou Qi

Inventor after: Gao Yuan

Inventor before: Yang Yulong

Inventor before: Song Manrong

Inventor before: Zhang Wei

Inventor before: Yuan Xuchong

Inventor before: Wang Genjie

Inventor before: Zhou Qi

Inventor before: Gao Yuan

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20161009

Address after: Wangjiang Road in Baohe District of Hefei city of Anhui Province, No. 96 230023

Applicant after: China Tiesiju Civil Engineering Group Co., Ltd.

Applicant after: CR4BG Construction Engineering Co., Ltd.

Address before: 230022, Hefei District, Anhui City, Shushan Province, the west side of the road

Applicant before: CR4BG Construction Engineering Co., Ltd.

GR01 Patent grant
GR01 Patent grant