CN204489562U - A kind of supporting construction depositing steel box-girder - Google Patents

A kind of supporting construction depositing steel box-girder Download PDF

Info

Publication number
CN204489562U
CN204489562U CN201520077399.3U CN201520077399U CN204489562U CN 204489562 U CN204489562 U CN 204489562U CN 201520077399 U CN201520077399 U CN 201520077399U CN 204489562 U CN204489562 U CN 204489562U
Authority
CN
China
Prior art keywords
girder
steel box
steel
buttress
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520077399.3U
Other languages
Chinese (zh)
Inventor
史鹏飞
赵涛
郑平
黄明
邓涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
First Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Original Assignee
First Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd filed Critical First Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Priority to CN201520077399.3U priority Critical patent/CN204489562U/en
Application granted granted Critical
Publication of CN204489562U publication Critical patent/CN204489562U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a kind of supporting construction depositing steel box-girder, comprise place, described place lower floor is graded broken stone layer, upper strata, described place is concrete layer, described place is provided with the concrete prefabricated pier of multiple well-distributed, described concrete prefabricated pier is all placed with the lower steel buttress for supporting lower floor's steel box-girder, described lower steel buttress is positioned over web and the dividing plate crossover location of lower floor's steel box-girder, concrete pavement layer on the upside of described lower floor steel box-girder is placed with the upper steel buttress for supporting upper strata steel box-girder, described upper steel buttress is positioned over web and the dividing plate crossover location of upper strata steel box-girder.The utility model takes bilayer to deposit beam section, and when depositing, interim point supporting is at the infall of vertical web and cross wall, and basis is firm, and not uneven sedimentation, makes supporting-point uniform force, ensure that beam body is indeformable.

Description

A kind of supporting construction depositing steel box-girder
Technical field
The utility model relates to a kind of supporting construction depositing steel box-girder.
Background technology
After the dismounting of urban viaduct steel box-girder, generally need to deposit on certain place, so that the later stage also builds.Because the steel box-girder after removing is heavier, and need to deposit the long period, and common place cannot meet storage condition, easily causes beam body deformability, therefore protection is deposited is very important work.
Utility model content
In view of the deficiencies in the prior art, the purpose of this utility model is to provide a kind of supporting construction depositing steel box-girder, to guarantee that beam body is indeformable in long storage time process.
To achieve these goals, the technical solution of the utility model is: a kind of supporting construction depositing steel box-girder, comprise place, described place lower floor is graded broken stone layer, upper strata, described place is concrete layer, described place is provided with the concrete prefabricated pier of multiple well-distributed, described concrete prefabricated pier is all placed with the lower steel buttress for supporting lower floor's steel box-girder, described lower steel buttress is positioned over web and the dividing plate crossover location of lower floor's steel box-girder, concrete pavement layer on the upside of described lower floor steel box-girder is placed with the upper steel buttress for supporting upper strata steel box-girder, described upper steel buttress is positioned over web and the dividing plate crossover location of upper strata steel box-girder.
Further, described upper steel buttress and lower steel buttress are all placed with the chock adjusting steel box-girder height.
Further, described graded broken stone layer is formed by the graded broken stone compacting of two-layer 300mm altogether, its degree of compaction >=95%.
Further, described concrete layer adopts C25 concreting to form, and its thickness is 150mm, and surface is super flat.
Further, described concrete surface is provided with the weathering of the gradient 0.5%, and described concrete layer is provided with weep drain in lower one end of weathering.
Further, described concrete prefabricated pier adopts the reinforced concrete knoll of C20 concreting.
Further, described upper steel buttress and lower steel buttress all adopt L100*7 angle steel to be welded.
Compared with prior art, the utility model has following beneficial effect: beam section takes bilayer to deposit, and when depositing, interim point supporting is at the infall of vertical web and cross wall, basis is firm, not uneven sedimentation, makes supporting-point uniform force, ensure that beam body is indeformable.
Accompanying drawing explanation
Fig. 1 is the structural representation in place.
Fig. 2 is the structural representation of the utility model embodiment.
Fig. 3 is the partial schematic diagram of the utility model embodiment.
Fig. 4 is the distribution schematic diagram of upper steel buttress.
Fig. 5 is the front view of concrete prefabricated pier.
Fig. 6 is the birds-eye view of concrete prefabricated pier.
Fig. 7 is the structural representation of upper steel buttress and lower steel buttress.
In figure: 1-place, 11-graded broken stone layer, 12-concrete layer, 13-weathering, 14-weep drain, the concrete prefabricated pier of 2-, 21-reinforced mesh, 22-hanger, steel buttress under 3-, 4-lower floor steel box-girder, 41-concrete pavement layer, the upper steel buttress of 5-, 6-upper strata steel box-girder, 7-chock.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in more detail.
As shown in Fig. 1 ~ 7, a kind of supporting construction depositing steel box-girder, comprise place 1, described place 1 lower floor is graded broken stone layer 11, upper strata, described place 1 is concrete layer 12, described place 1 is provided with four concrete prefabricated piers 2 of well-distributed, described concrete prefabricated pier 2 is all placed with the lower steel buttress 3 for supporting lower floor's steel box-girder 4, described lower steel buttress 3 is positioned over web and the dividing plate crossover location of lower floor's steel box-girder 4, concrete pavement layer 41 on the upside of described lower floor steel box-girder 4 is placed with the upper steel buttress 5 for supporting upper strata steel box-girder 6, described upper steel buttress 5 is positioned over web and the dividing plate crossover location of upper strata steel box-girder 6.
In the present embodiment, in order to make place 1 firm, described graded broken stone layer 11 is formed by the graded broken stone compacting of two-layer 300mm altogether, its degree of compaction >=95%; Described concrete layer 12 adopts C25 concreting to form, and compressive strength is 25MPa, and its thickness is 150mm, and surface is super flat.
In the present embodiment, in order to yard drain is unobstructed, described concrete layer 12 surface is provided with the weathering 13 of the gradient 0.5%, and described concrete layer 12 is provided with weep drain 14 in lower one end of weathering 13, to avoid steel box-girder storage space internal water accumulation, cause setting of ground.
In the present embodiment, in order to prevent steel buttress by ponding corrosion failure, described concrete prefabricated pier 2 adopts the reinforced concrete knoll of C20 concreting, include reinforced mesh 21 in described concrete prefabricated pier 2, described concrete prefabricated pier 2 both sides are prefabricated with two hangers 22 to facilitate layout inside.
In the present embodiment, steel box-girder is positioned over certain altitude by described upper steel buttress 5 and lower steel buttress 3, ensures that steel box-girder is not corroded depositing in process.In order to ensure that four fulcrums are steady, described upper steel buttress 5 and lower steel buttress 3 are all placed with the chock 7 adjusting steel box-girder height.Described upper steel buttress 5 and lower steel buttress 3 all adopt L100*7 angle steel to be welded.
The foregoing is only preferred embodiment of the present utility model, all equalizations done according to the utility model claim change and modify, and all should belong to covering scope of the present utility model.

Claims (7)

1. deposit the supporting construction of steel box-girder for one kind, comprise place, it is characterized in that: described place lower floor is graded broken stone layer, upper strata, described place is concrete layer, described place is provided with the concrete prefabricated pier of multiple well-distributed, described concrete prefabricated pier is all placed with the lower steel buttress for supporting lower floor's steel box-girder, described lower steel buttress is positioned over web and the dividing plate crossover location of lower floor's steel box-girder, concrete pavement layer on the upside of described lower floor steel box-girder is placed with the upper steel buttress for supporting upper strata steel box-girder, described upper steel buttress is positioned over web and the dividing plate crossover location of upper strata steel box-girder.
2. a kind of supporting construction depositing steel box-girder according to claim 1, is characterized in that: the chock described upper steel buttress and lower steel buttress being all placed with to adjust steel box-girder height.
3. a kind of supporting construction depositing steel box-girder according to claim 1, is characterized in that: described graded broken stone layer is formed by the graded broken stone compacting of two-layer 300mm altogether, its degree of compaction >=95%.
4. a kind of supporting construction depositing steel box-girder according to claim 1, is characterized in that: described concrete layer adopts C25 concreting to form, and its thickness is 150mm, and surface is super flat.
5. a kind of supporting construction depositing steel box-girder according to claim 1, is characterized in that: described concrete surface is provided with the weathering of the gradient 0.5%, and described concrete layer is provided with weep drain in lower one end of weathering.
6. a kind of supporting construction depositing steel box-girder according to claim 1, is characterized in that: described concrete prefabricated pier adopts the reinforced concrete knoll of C20 concreting.
7. a kind of supporting construction depositing steel box-girder according to claim 1, is characterized in that: described upper steel buttress and lower steel buttress all adopt L100*7 angle steel to be welded.
CN201520077399.3U 2015-02-04 2015-02-04 A kind of supporting construction depositing steel box-girder Active CN204489562U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520077399.3U CN204489562U (en) 2015-02-04 2015-02-04 A kind of supporting construction depositing steel box-girder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520077399.3U CN204489562U (en) 2015-02-04 2015-02-04 A kind of supporting construction depositing steel box-girder

Publications (1)

Publication Number Publication Date
CN204489562U true CN204489562U (en) 2015-07-22

Family

ID=53568836

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520077399.3U Active CN204489562U (en) 2015-02-04 2015-02-04 A kind of supporting construction depositing steel box-girder

Country Status (1)

Country Link
CN (1) CN204489562U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110847042A (en) * 2019-11-06 2020-02-28 武船重型工程股份有限公司 Double-layer steel box girder bridge installation method
CN111361856A (en) * 2020-03-23 2020-07-03 广西路桥工程集团有限公司 Storage method of large steel box girder
CN114541241A (en) * 2022-01-11 2022-05-27 广东省交通规划设计研究院集团股份有限公司 Anti-cracking structure for box girder in girder storage period

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110847042A (en) * 2019-11-06 2020-02-28 武船重型工程股份有限公司 Double-layer steel box girder bridge installation method
CN110847042B (en) * 2019-11-06 2021-10-26 武船重型工程股份有限公司 Double-layer steel box girder bridge installation method
CN111361856A (en) * 2020-03-23 2020-07-03 广西路桥工程集团有限公司 Storage method of large steel box girder
CN111361856B (en) * 2020-03-23 2022-02-01 广西路桥工程集团有限公司 Storage method of large steel box girder
CN114541241A (en) * 2022-01-11 2022-05-27 广东省交通规划设计研究院集团股份有限公司 Anti-cracking structure for box girder in girder storage period

Similar Documents

Publication Publication Date Title
CN203866663U (en) Porous pavement structure
CN204489562U (en) A kind of supporting construction depositing steel box-girder
CN206396615U (en) Suitable for the bridge structure of bridge pier differential settlement
CN208668596U (en) A kind of reinforced concrete girder slab system and prefabricated post assembly node
CN110409244A (en) A kind of prefabricated road deck of composite bearing and prefabricated pavement construction method
CN204825557U (en) Job site interim construction road combination ground structure
CN204875558U (en) Shaped steel runs through inside and outside compound support formula bracket system of encorbelmenting
CN208934013U (en) A kind of basement bottom board pouring after settlement structure
CN204875531U (en) Shaped steel runs through formula outer supporting bracket system of encorbelmenting
CN203765790U (en) Pedestal for prestress small box girder of highway in soft-foundation geological condition
CN202509449U (en) Pond, water channel or ditch slope protection
CN205662948U (en) Cold area road surface manhole cover
CN104594654A (en) Building reinforcement reconstruction scheme generation method
CN205329446U (en) Upper and lower staggered floor precast reinforced concrete basic unit of permeating water
CN107620317A (en) Piping lane construction foundation pit supporting supporting device
CN207176527U (en) Bridge Crack bracing means
CN206052565U (en) A kind of beam-column type bracket
CN106812065A (en) A kind of concrete freely-supported pre-stressed box girder construction process
CN204875418U (en) Water permeability road surface structure
CN206941328U (en) Prevent the bridge paving structure that pave-load layer ftractures at Steel Continuous Box beam bridge central bearing point
CN109763392B (en) Permeable pavement structure and construction method thereof
CN207672414U (en) A kind of bridge
CN205329566U (en) Subsiding crack infiltration restoration structure is contained to reinforced concrete apron
CN206457837U (en) A kind of assembled type base for power transmission line iron tower
CN105019656A (en) Construction method for floor system concrete post-cast strip suspended formwork

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20151223

Address after: Guanyun Zhuozhou Road, 072750 Hebei city of Baoding Province

Patentee after: THE 1ST ENGINEERING CO., LTD. OF CHINA RAILWAY 18TH BUREAU GROUP CO., LTD.

Patentee after: the Eighteenth Bureau of China's Railroad Group Co., Ltd.

Address before: Jimei District of Xiamen City, Fujian province 361000 Heng Road No. 543

Patentee before: THE 1ST ENGINEERING CO., LTD. OF CHINA RAILWAY 18TH BUREAU GROUP CO., LTD.